HomeMy WebLinkAboutSP-98-0000 - Decision - 0087 Meadowland DriveFINDINGS OF FACT & DECISION STATE OF VERMONT S _ pOv COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of Lane Press to amend a previously approved plan for a 136,357 square foot manufacturing/printing building, 1000 Hinesburg Road. The amendment consists of: 1) constructing three (3) additions totaling 54,261 square feet, and 2) relocating the driveway. On the 13th day of January, 1998, the South Burlington Planning Commission approved the request of Lane Press for revised final plat approval under Section 204 of the South Burlington Subdivision Regulations based on the following findings: 1. This project consists of amending a previously approved plan for a 136,357 square foot manufacturing/printing building. The amendment consists of: 1) constructing three (3) additions totaling 54,261 square feet, and 2) relocating the driveway. The sketch plan was reviewed on 10/28/97 . 2. This property located at 1000 Hinesburg Road lies within the I- O District. It is bounded on the north by New England Telephone and I-89, on the east and south by Dynapower and on the west by several single family residences. 3. Access/circulation: Access is via a r.o.w. from Hinesburg Road which will be slightly revised to accommodate the revised driveway location on the property. The project must include a revised survey plat for the Dynapower property showing the revised r.o.w. location. This plat will require Planning Commission approval. Circulation on the site is adequate. 4. Coverage/setbacks: Building coverage is 14% (maximum allowed is 30%). Overall coverage is 28.6% (maximum allowed is 50%). Setback requirements will be met. 5. Parking: A total of 148 parking spaces are required and 301 spaces are available including seven (7) handicapped spaces. 6. Landscaping: The minimum landscaping requirement, based on building costs, is $29,850 which is not being met. This is $2350 more than at sketch plan due to the increased size of the building expansion since sketch plan review. At sketch plan the Commission indicated a willingness to approve a credit for the shortfall of $17,234, now $19,584, to cover the value of the relocated plantings. The Commission also indicated that the bond should be for the entire landscaping requirement of $29,850. 7. Traffic• 101.99 vehicle the addition increase. The zero (0). ITE estimates that the current facility generates trip ends ( vte' s ) during the P.M. peak hour and with to generate 142.68 vte's which is a 40.69 vte applicant was made aware that the road impact fee is 8. View Protection Zone: The lies within the Hinesburg Road portion of the addition or any will be within this zone. easterly portion of the property - North View Protection Zone. No of the new or relocated plantings 9. Sewer: No additional allocation needed. 10. Lighting: Existing exterior lighting consists of the following: --- 13 - 100 watt high pressure sodium lamps with downcasting shielded fixtures (bollards). --- two (2) twin 100 watt high pressure sodium lamps with downcasting shielded fixtures mounted on 24 foot poles. --- 18 - 400 watt single high pressure sodium lamps with downcasting shielded fixtures mounted on 24 foot poles. --- two (2) 400 watt twin high pressure sodium lamps with downcasting shielded fixtures mounted on 24 foot poles. --- eight (8) 100 watt building mounted lamps with downcasting shielded fixtures. 11. Proposed exterior lights consist of the following: --- four (4) 100 watt high pressure sodium lamps with downcasting shielded fixtures (bollards). --- eight (8) twin 250 watt high pressure sodium lamps with downcasting shielded fixtures mounted on 20 foot poles. --- 12 single 250 watt high pressure sodium lamps with downcasting shielded fixture mounted on 20 foot poles. 12. The Performance Standards in Appendix B of the zoning regulations limits the height of pole lights to 20 feet. Applicant will replace the existing 24 foot poles with 20 foot poles. 13. C.O. District: The plan shows the C.O. Districts corresponding with the drainageways westerly of the parking area. These C.O. Districts will not be impacted by the proposed expansion. 0a DECISION & CONDITIONS Based on the above Findings of Fact, South Burlington Planning Commission approves the final plat application of Lane Press to amend a previously approved plan for a 136,357 square foot manufacturing/printing building, 1000 Hinesburg Road. The amendment consists of: 1) constructing three (3) additions totaling 54,261 square feet, and 2) relocating the driveway, as depicted on a three ( 3 ) page set of plans, page one (1) entitled, "The Lane Press 1000 Hinesburg Road So. Burlington, Vermont 05403," prepared by Walt Adams, dated September 5, 1997, last revised 11/20/97, with the following stipulations: 1) All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2) Prior to issuance of a zoning permit, the applicant shall post a $29,850 landscape bond. The bond shall remain in effect for three (3) years to assure that the landscaping takes root and has a good chance of surviving. 3) Pursuant to Section 26.105(a) of the zoning regulations, the South Burlington Planning Commission grants the applicant a $19,584 credit for existing trees on the site. 4) All new exterior lighting shall consist of downcasting shielded fixtures so as not to cast light beyond the property line. Any change in lighting shall be approved by the City Planner prior to installation. The existing 24 foot light poles shall be reduced in height to 20 feet. 5) For the purpose of calculating road impact fees under the South Burlington Impact Fee Ordinance, the Planning Commission estimates that the expansion will generate 40.69 additional vehicle trip ends during the P.M. peak hour. 6) Prior to issuance of a zoning permit, the applicant shall record a revised plat of the Dynapower property showing the revised r.o.w. location which has been approved by the Planning Commission. 7) Culvert and drainage pipes shall be concrete or plastic not metal or aluminum. 8) Prior to permit issuance, the City Water Department shall review and approve the fire hydrant relocation. hairman or Clerk South Burlington Planning Commission � C 3