FINDINGS OF FACT AND DECISION
Sierra Pacific II, hereinafter referred to as the applicant, is seeking final plat approval to
amend a planned unit development consisting of 210 residential units, a 61 room hotel, a
20,000 sq. ft. movie theater building (1000 seats), a 22,500 sq. ft. restaurant/medical
office/day care building, a 3500 sq. ft. restaurant with drive -through service, and a bank
with drive -through service. The amendment consists of: 1) constructing an 8,000 sq. ft.
retail addition to the building at 7 Fayette Road, and 2) converting 10,700 sq. ft. of
restaurant and indoor recreation use to retail use, also at the 7 Fayette Road building.
The Development Review Board held a public hearing on Tuesday, May 20, 2008. Sean
Carroll and Jim Carroll represented the applicant.
Based on testimony provided at the above mentioned public hearing and the plans and
supporting materials contained in the document file for this application, the Development
Review Board finds, concludes, and decides the following:
FINDINGS OF FACT
The applicant is seeking final plat approval to amend a planned unit development
consisting of 210 residential units, a 61 room hotel, a 20,000 sq. ft. movie theater
building (1000 seats), a 22,500 sq. ft. restaurant/medical office/day care building,
a 3500 sq. ft. restaurant with drive -through service, and a bank with drive -through
service. The amendment consists of: 1) constructing an 8,000 sq. ft. retail
addition to the building at 7 Fayette Road, and 2) converting 10,700 sq. ft. of
restaurant and indoor recreation use to retail use, also at the 7 Fayette Road
building.
2. The preliminary plat approval for this project was granted by the Development
Review Board on May 6, 2008.
3. The owner of record of the subject property is J&J Properties, LLC.
4. The subject property is located in the Commercial 1 — Automobile Zoning District.
5. The plans submitted consist of a ten (10) page set of plans, page two (2) entitled,
"Sierra Pacific II 7 Fayette Road So. Burlington, VT. Existing Conditions",
prepared by Trudell Consulting Engineers, dated 5/12/08.
- 1 -
#S D-08-23
PLANNED UNIT DEVELOPMENT STANDARDS
Pursuant to Section 15.18 of the proposed Land Development Regulations. PUDs shall
comply with the following standards and conditions:
Sufficient water supply and wastewater disposal capacity is available to meet the
needs of the project.
The change in use will result in a reduction of wastewater disposal capacity.
Pursuant to Section 15.13(B)(1), municipal water service must be extended to serve the
proposed development. Prior to final plat approval, the applicant must obtain final water
allocation approval from the South Burlington Water Department.
The South Burlington Water Department has stated that there is no need for review of the
proposed project. As the applicant is proposing to change the use from restaurant to retail,
there is no need for additional water capacity.
Sufficient grading and erosion controls will be utilized during and after construction
to prevent soil erosion and runoff from creating unhealthy or dangerous conditions
on the subject property and adjacent properties.
The applicant was asked to submit an erosion control plan as part of the preliminary plat
application. These plans have been submitted.
The project incorporates access, circulation and traffic management strategies
sufficient to prevent unreasonable congestion of adjacent roads.
Access to the subject building currently exists from two curb cuts off of Fayette Road.
The eastern curb cut also provides access to the drive -through fast food restaurant and
a drive -through bank. The western cut cub provides access to below -grade parking and
a rear surface parking lot. It is proposed to be widened from 77 feet to 85 feet. Street
details shown in Figure 15.1C of the Land Development Regulations indicate that the
maximum curb cut width is 45 feet. The applicant is therefore requesting a waiver to
exceed this limit. This waiver was granted as part of the preliminary plat application.
The project's design respects and will provide suitable protection to wetlands,
streams, wildlife habitat as identified in the Open Space Strategy, and any unique
natural features on the site.
There do not appear to be any wetlands, wildlife habitat, or unique natural features on the
subject property. The plan depicts a 50 foot stream buffer. A minor impact is proposed. The
Board discussed this impact and determined that there was not significant enough to
warrant a review under Section 12.01(C)(4) of the Land Development Regulations.
The project is designed to be visually compatible with the planned development
patterns in the area, as specified in the Comprehensive Plan and the purpose of the
zoning district(s) in which it is located.
The proposed retail use is a compatible with the existing and the planned use of the area
-2-
#SD-08-23
Open space areas on the site have been located in such a way as to maximize
opportunities for creating contiguous open spaces between adjoining parcels and/or
stream buffer areas.
There is a wooded area to the northwest which serves as an open space area on the site.
A portion of this area is a stream buffer area.
The layout of a subdivision or PUD has been reviewed by the Fire Chief or (designee)
to ensure that adequate fire protection can be provided.
The Fire Chief has reviewed the plans and provided comments in a memo dated March 27,
2008.
Roads, recreation paths, stormwater facilities, sidewalks, landscaping, utility lines
and lighting have been designed in a manner that is compatible with the extension of
such services and infrastructure to adjacent landowners.
The existing site and proposed project do not provide for any adequate extension of
services or infrastructure to adjacent landowners.
Roads, utilities, sidewalks, recreation paths, and lighting are designed in a manner
that is consistent with City utility and roadway plans and maintenance standards.
Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines,
services, and service modifications shall be underground.
The project is consistent with the goals and objectives of the Comprehensive Plan
for the affected district(s).
The proposed change of use is in conformance with the Comprehensive Plan.
TRAFFIC
The Board invoked technical review for traffic at the April 1, 2008 meeting. The applicant
submitted a traffic study dated February 4, 2008, prepared by Clough Harbour &
Associates. This study was reviewed by the City's traffic consultant Georges Jacquemart.
He reviewed the applicant's study in a memo to Staff dated 5/6/08. There are no further
concerns.
SITE PLAN REVIEW STANDARDS
Pursuant to Section 14.03(A)(6) of the Land Development Regulations, any PUD shall
require site plan approval. Section 14.06 establishes the following general review standards
for all site plan applications:
Due attention by the applicant should be given to the goals and objectives and the
stated land use policies for the City of South Burlington as set forth in the
Comprehensive Plan.
The proposed project is in conformance with the Comprehensive Plan
-3-
#SD-08-23
The site shall be planned to accomplish a desirable transition from structure to site,
from structure to structure, and to provide for adequate planting, safe pedestrian
movement, and adequate parking areas.
Previous changes of use on the property have been supported by a shared parking
analysis indicating that the peak demand of the site would be met by the onsite parking. A
21 % parking waiver exists for the site.
The applicant has submitted a revised parking analysis. This analysis indicates that the
changes in use will result in a peak parking demand of 519 spaces which is 48 spaces
fewer than the 471 proposed. This results in a 9.2% parking waiver. This property, from day
one, has operated under a shared parking analysis which was updated for this project.
Parking shall be located to the rear or sides of buildings to the greatest extent
practicable.
No additional parking is proposed to the front of the building.
Without restricting the permissible limits of the applicable zoning district, the height
and scale of each building shall be compatible with its site and existing or adjoining
buildings.
The existing and proposed height of the building is within the limitations of the district.
Newly installed utility services and service modifications necessitated by exterior
alterations or building expansions shall, to the extent feasible, be underground.
It has already been noted that new utility lines must be underground.
The DRB shall encourage the use of a combination of common materials and
architectural characteristics, landscaping, buffers, screens and visual interruptions
to create attractive transitions between buildings of different architectural styles.
The applicant has stated that they will be changing the design of the exterior fagade of the
building. He has submitted renderings of these changes.
Proposed structures shall be related harmoniously to themselves, the terrain and to
existing buildings and roads in the vicinity that have a visual relationship to the
proposed structures.
The applicant has stated that they will be changing the design of the exterior fagade of the
building. He has submitted renderings of these changes.
In addition to the above general review standards, site plan applications shall meet the
following specific standards as set forth in Section 14.07 of the Land Development
Regulations:
The reservation of land may be required on any lot for provision of access to
abutting properties whenever such access is deemed necessary to reduce curb cuts
onto an arterial of collector street, to provide additional access for emergency or
other purposes, or to improve general access and circulation in the area.
-4-
#SD-08-23
No additional reservation of land is warranted as part of this application. The site is already
accessible from two points on Shelburne Road. Each of the sub -lots is accessible and
circulation is adequate.
Electric, telephone and other wire -served utility lines and service connections shall
be underground. Any utility installations remaining above ground shall be located so
as to have a harmonious relation to neighboring properties and to the site.
It has already been indicated that utility lines must be underground.
All dumpsters and other facilities to handle solid waste, including compliance with
any recycling or other requirements, shall be accessible, secure and properly
screened with opaque fencing to ensure that trash and debris do not escape the
enc/osure(s).
The plans depict the location for dumpsters. They are adequately screened.
Landscaping
Pursuant to Section 13.06(A) of the Land Development Regulations, landscaping and
screening shall be required for all uses subject to site plan and PUD review. Section
13.06(B) of the Land Development Regulations requires parking facilities to be curbed and
landscaped with appropriate trees, shrubs, and other plants including ground covers.
Landscaping budget requirements are to be determined pursuant to Section 13.06(G)(2) of
the South Burlington Land Development Regulations. The landscape plan and landscape
budget shall be prepared by a landscape architect or professional landscape designer.
Based on construction costs of $190,000, the applicant shall provide a minimum
landscaping budget of $5700. The applicant is proposing $5631 in landscaping and $3600
in a block/stone retaining wall, for a total of $9231 in landscaping. The Board finds the
block/stone retaining wall to be an acceptable addition to the landscaping budget.
The applicant has submitted a landscaping plan. However, the City Arborist has not yet
reviewed the plan. The City Arborist shall review the plans and provide comments.
Pursuant to Section 13.06(B)(4) of the Land Development Regulations, snow storage areas
must be shown on the plans. The plans show snow storage areas for the subject property.
Lighting
Pursuant to Appendix A.9 of the Land Development Regulations, luminaries shall not be
placed more than 30' above ground level and the maximum illumination at ground level
shall not exceed an average of three (3) foot candles. Pursuant to Appendix A.10(b) of
the Land Development Regulations, indirect glare produced by illumination at ground
level shall not exceed 0.3 foot candles maximum, and an average of 0.1 foot candles
average. All lighting shall be shielded and downcast. A point by point lighting plan has
been submitted in compliance with the South Burlington Land Development Regulations.
Waivers
-5-
#SD-08-23
The following is a list of waivers requested by the applicant:
1. Existing building encroaches into stream buffer at 7 Fayette Road by
approximately 1'-3".
2. Existing parking lot encroaches into stream buffer at 7 Fayette Road by
approximately 5'-6".
3. The proposed canopy encroaches into the front setback along Fayette Road by
approximately 15'-3".
4. The proposed addition encroaches into the front setback along Fayette Road by
approximately 4'.
5. A proposed MTC (utility) cabinet will be located within the 30' front setback along
Fayette Road, but will be at least 5' behind the right-of-way.
6. The western curb cut is proposed to be widened from 77 feet to 85 feet
(maximum allowed is 45 feet).
7. Allowing the retaining wall to be placed in the front yard and to encroach 25 feet
into the front setback.
The Board approved these waivers as part of the preliminary plat application.
DECISION
Motion b �C Q41 m b seconded b
y y
to approve Final Plat Application #SD-08-32 of Sierra Pacific II, subject to the following
conditions:
1. All previous approvals and stipulations shall remain in full effect, except as
amended herein.
2. This project shall be completed as shown on the plat submitted by the applicant,
and on file in the South Burlington Department of Planning and Zoning.
3. The plans shall be revised to show the changes below and shall require approval
of the Administrative Officer. Three (3) copies of the approved revised plans shall
be submitted to the Administrative Officer prior to recording.
a. The plans shall be revised to comply with the requests of the Fire Chief
as outlined in a memo dated March 27, 2008.
4. The applicant shall adhere to the comments of the South Burlington Fire Chief per
the memo dated March 27, 2008.
i�
#SD-08-23
5. The City Arborist shall review the plans and provide comments. If necessary, the
plans shall be revised to comply with the requests of the City Arborist.
6. The proposed project shall adhere to standards for erosion control as set forth in
Section 16.03 of the South Burlington Land Development Regulations. In addition,
the grading plan shall meet the standards set forth in Section 16.04 of the South
Burlington Land Development Regulations.
7. Pursuant to Section 15.13(E) of the Land Development Regulations, any new
utility lines, services, and service modifications shall be underground.
8. The applicant shall post a landscape bond in the amount of $5700. This bond shall
remain in full effect for three years to assure that the landscaping has taken root
and has a good chance of survival.
9. The Board approves a 48 space parking waiver or 9.2% for a total of 471 spaces
provided.
10. For the purpose of calculating road impact fees under the South Burlington
Impact Fee Ordinance, the Development Review Board estimates that this
project will generate zero (0) additional vehicle trip ends during the p.m. peak
hour.
11. The Board approves the following waivers:
a. Existing building to encroach into stream buffer at 7 Fayette Road by
approximately 1' — 3".
b. Existing parking lot to encroach into stream buffer at 7 Fayette Road by
approximately 5'— 6".
c. The proposed canopy to encroach into the front setback along Fayette
Road by approximately 15' — 3".
d. The proposed addition to encroach into the front setback along Fayette
Road by approximately 4'.
e. A proposed MTC (utility) cabinet to be located within the 30' front setback
along Fayette Road, but will be at least 5' behind the right-of-way.
f. Allowing the proposed MTC (utility) cabinet to be placed in the front yard.
g. The western curb cut to be widened from 77 feet to 85 feet (maximum
allowed is 45 feet).
h. Allowing the retaining wall to be placed in the front yard and to encroach 25
feet into the front setback.
-7-
#SD-08-23
12. Any new exterior lighting shall consists of downcasting fixtures. Any change to
approved lights shall require approval of the Administrative Officer prior to installation.
13. The mylar shall be recorded prior to permit issuance.
14. The applicant shall obtain a zoning permit within six (6) months pursuant to Section
17.04 of the Land Development Regulations or this approval is null and void.
15. The applicant shall obtain a Certificate of Occupancy/Compliance from the
Administrative Officer prior to occupancy.
16. Any changes to the final plat plan shall require the approval of the South Burlington
Development Review Board.
17. The final plat plan (Grading & Utilities Plan) shall be recorded in the land records
within 180 days or this approval is null and void. The final plat plan shall be signed by
the Board chair or Clerk prior to recording.
Mark Behr — yea/nay/abstai hot presen
Matthew Birmingham — yea/nay/aUs-tainr6of resen
John Dinklage — e /nay/abstain/not present
Roger Farley — e nay/abstain/not present
Eric Knudsen — e ay/abstain/not present
Peter Plumeau — nay/abstain/not present
Gayle Quimby — e ay/abstain/not present
Motion carried by a vote of
Signed this �� day of 2008, by
John Dinklage, Chair
Please note: You have the right to appeal this decision to the Vermont Environmental
Court, pursuant to 24 VSA 4471 and VRCP 76 in writing, within 30 days of the date this
decision is issued. The fee is $225.00. If you fail to appeal this decision, your right to
challenge this decision at some future time may be lost because you waited too long.
You will be bound by the decision, pursuant to 24 VSA 4472 (d) (exclusivity of remedy;
finality).