HomeMy WebLinkAboutSP-10-76 - Decision - 0466 Farrell Street#S P-10-76
#CU-10-09
CITY OF SOUTH BURLINGTON
DEPARTMENT OF PLANNING AND ZONING
CLEARWIRE US, LLC. — 466 FARRELL STREET
SITE PLAN APPLICATION #SP-10-76
CONDITIONAL USE APPLICATION #CU-10-09
FINDINGS OF FACT AND DECISION
Clearwire US, LLC., hereafter referred to as the applicant, is seeking conditional use
approval to: 1) install three (3) panel antennas on an existing tower at the 110 foot level,
and 2) install a ground mounted equipment platform, 466 Farrell Street.
Clearwire US LLC is also seeking site plan approval to allow the installation of. 1) three
(3) panel antennas on an existing tower at the 110 foot level, and 2) a ground mounted
equipment platform, 466 Farrell Street.
The Development Review Board held public hearings on December 7, 2010, and January
18, 2011. Allen Hinkley represented the applicant.
Based on testimony provided at the above mentioned public hearing and the plans and
supporting materials contained in the document file for this application, the Development
Review Board finds, concludes, and decides the following:
Due to federal preemption issues, the board was unable to consider or weigh any of the
testimony regarding health and safety of the new antennas' emissions in its decision.
FINDINGS OF FACT
1. The applicant is seeking conditional use approval to: 1) install three (3) panel antennas
on an existing tower at the 110 foot level, and 2) install a ground mounted equipment
platform, 466 Farrell Street.
Clearwire US LLC is also seeking site plan approval to allow the installation of. 1) three
(3) panel antennas on an existing tower at the 110 foot level, and 2) a ground mounted
equipment platform, 466 Farrell Street.
2. The application was received on October 27, 2010.
3. The owner of record of the subject property is Farrell, LLC.
4. The subject property is located in the C1-R15 Zoning District.
5. The plans submitted consists of a 12 page set of plans, page two (2) entitled, "Site
Plan," prepared by Ericsson, Inc. et al., dated 10/6/2010.
1
FAUSERS\Planning & Zoning\Development Review Boa rd\Findings_Decisions\2010\Clearwire_SP-10_76_ffd.doc
r
#SP-10-76
#CU-10-09
CONDITIONAL USE CRITERIA
Pursuant to Section 14.10(E) of the Land Development Regulations, the proposed
conditional use shall meet the following standards:
1. The proposed use, in its location and operation, shall be consistent with the planned
character of the area as defined by the City of South Burlington Comprehensive Plan.
The proposal is to install telecommunications equipment on an existing
telecommunications tower, at a height of 110 feet. The applicant has submitted
elevations showing the existing and proposed tower, as well as a site plan depicting the
changes. The equipment appears to be relatively small in size, but will be visible from the
surrounding area.
2. The proposed use shall conform to the stated purpose of the district in which the
proposed use is located.
Pursuant to Section 5.01(A) of the Land Development Regulations, the Commercial 1
District is formed to encourage the location of general retail and office uses in a manner
that serves or enhances a compact central business area. Other uses that would benefit
from nearby access to a central business area may be permitted if they do not interfere
with accessibility and continuity of the commercial district.
The proposed placement of equipment on the existing tower is in compliance with the
stated purpose of the Cl District, as it is in an area that is densely developed with
commercial uses.
3. The Development Review Board finds that the proposed uses will not adversely affect
the. following:
(a) The capacity of existing or planned municipal or educational facilities.
The proposal will not adversely affect municipal services.
(b) The essential character of the neighborhood or district in which the property is
located, nor ability to develop adjacent property for appropriate uses
The proposed additional panel antennas in size and style are in keeping with the existing
panels, hence the visual impact will not adversely affect the essential character of the
neighborhood nor will the proposal affect the ability to develop adjacent properties.
(c) Traffic on roads and highways in the vicinity.
The proposal will not affect traffic in the vicinity.
2
FAUSERS\Planning & Zoning\Development Review Board\Findings_Decisions\2010\Clearwire_SP-10_76_ffd.doc
i
#SP-10-76
#CU-10-09
(d) Bylaws in effect.
The proposal would require a height waiver. The existing tower is 119 feet tall. While the
equipment would not be higher than the existing tower, a height waiver for the equipment
is still necessary.
Given that the current application only proposes a limited number of small additional
panels — three - there is little change to the existing tower and the three existing panels
and the adverse impact at this point on the bylaws governing height is minimal.
(e) Utilization of renewable energy resources.
The proposal will not adversely affect renewable energy resources.
SITE PLANREVIEW STANDARDS
Section 14.06 of the South Burlington Land Development Regulations establishes the
following general review standards for all site plan applications:
(a) The site shall be planned to accomplish a desirable transition fYom structure to
site, from structure to structure, and to provide for adequate planting, safe
pedestrian movement, and adequate parking areas
The proposed project will not have an impact on the transition from structure to site and
from structure to structure.
(b) Parking shall be located to the rear or sides of buildings to the greatest extent
practicable
Parking is not applicable to the proposed project.
(c) Without restricting the permissible limits of the applicable zoning district, the
height and scale of each building shall be compatible with its site and existing or
adjoining buildings
The existing tower is 119 feet in height. The proposed antennas will be mounted
approximately 110 feet high. Although the height of the tower already has a height waiver,
separate height waivers are required for any additional equipment or structures above 35
feet.
(d) Newly installed utility services and service modifications necessitated by exterior
alterations or building expansions shall, to the extent feasible, be underground.
3
FAUSERS\Planning & Zoning\Development Review Board\Findings_Decisions\2010\Clearwire_SP-10_76_ffd.doc
#SP-10-76
#CU-10-09
Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines,
services, and service modifications shall be underground.
(e) The DRB shall encourage the use of a combination of common materials and
architectural characteristics, landscaping, buffers, screens and visual
interruptions to create attractive transitions between buildings of different
architectural styles.
This is a very tall structure. Buffering and screening would be unlikely, if not impossible.
However, there is already a white vinyl stockade fence surrounding the tower, which
obstructs all of the ground -mounted equipment.
09 Proposed structures shall be related harmoniously to themselves, the terrain, and
to existing buildings and roads in the vicinity that have a visual relationship to the
proposed structures
The Board finds that this criterion is being met.
Site plan applications shall meet the following specific standards as set forth in Section
14.07 of the South Burlington Land Development Regulations:
(a) The reservation of land may be required on any lot for provision of access to
abutting properties whenever such access is deemed necessary to reduce curb cuts
onto an arterial of collector street, to provide additional access for emergency or
other purposes, or to improve general access and circulation in the area.
It is not necessary to require any additional access to abutting properties as part of this
application.
(b) Electric, telephone and other wire -served utility lines and service connections
shall be underground Any utility installations remaining above ground shall be
located so as to have a harmonious relation to neighboring properties and to the
site.
Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines,
services, and service modifications shall be underground.
(c) All dumpsters and other facilities to handle solid waste, including compliance with
any recycling or other requirements, shall be accessible, secure and properly
screened with opaque fencing to ensure that trash and debris do not escape the
enclosure(s).
There is no need to revise the site plan with respect to this criterion.
(d) Landscaping and Screening Requirements
4
FAUSERS\Planning & Zoning\Development Review Board\Findings_Decisions\2010\Clearwire_SP-10_76_ffd.doc
#SP-10-76
#CU-10-09
Because no buildings are proposed, there are no requirements for additional landscaping.
Access/Circulation
Access and circulation on the property will remain unchanged through the proposed
project.
Other
The plans should be revised to correct the notations that this property is located in
Burlington.
The plans should be revised to state that the ground mounted unit is enclosed by a vinyl
fence and not a chain link fence, as noted.
DECISION
Motion by YUIfl� � (Y/l �1�� , seconded by D-0 ���� G , to
approve Site Plan Application #SP-10-76 and Conditional Use Application #CU-10-09 of
Clearwire US, LLC. subject to the following conditions:
1. All previous approvals and stipulations which are not superseded by this approval
shall remain in effect.
2. This project shall be completed as shown on the plans submitted by the applicant and
on file in the South Burlington Department of Planning and Zoning.
The plans shall be revised to show the changes below and shall require approval of
the Administrative Officer. Three (3) copies of the approved revised plans shall be
submitted to the Administrative Officer prior to permit issuance.
a. The plans shall be revised to correct the notations that this property is
located in Burlington.
b. The plans shall be revised to state that the ground mounted unit is
enclosed by a vinyl fence and not a chain link fence, as noted.
4. The applicant shall obtain a zoning permit within six (6) months pursuant to Section
17.04 of the Land Development Regulations or this approval is null and void.
5. The applicant shall obtain a Certificate of Occupancy from the Administrative Officer
prior to use of the newly installed antennas.
5
FIUSERS\Planning & Zoning\Development Review Boa rd\Findings_Decisions\2010\Clearwire_SP-10_76_ffd.doc
#SP-10-76
#CU-10-09
6. Any change to the site plan shall require approval by the South Burlington
Development Review Board or the Administrative Officer.
7. The applicant's request for a height waiver of 75 feet, for a mounted height of 110
feet is hereby granted.
Mark Behr — e( Dhay/abst 'n/not present
Matthew Birmingham -4yay/abstain/not present
John Dinklage knayb'stain/not
/abstain/not present
Roger Farley ebstain/not present
Gayle Quimby — /abstain/not present
Michael Sirotkin y/abstain/not present
Bill Stuono — ye present
Motion carried by a vote of 0
-�,i'
Signed this day of March 2011, by
Mark Behr, Chairman
Please note: An appeal of this decision may be taken by filing, within 30 days of the
date of this decision, a notice of appeal and the required fee by certified mail to the
Superior Court, Environmental Division. See V.R.E.C.P. 5(b). A copy of the notice of
appeal must also be mailed to the City of South Burlington Planning and Zoning
Department at 575 Dorset Street, South Burlington, VT 05403. See V.R.E.C.P.
5(b)(4)(A). Please contact the Environmental Division at 802-828-1660 or
http://vermontjudicia[y.org/G'rC/environmental/default.aspx for more information on
filing requirements, deadlines, fees and mailing address.
The applicant or permittee retains the obligation to identify, apply for, and obtain
relevant state permits for this project. Call 802.879.5676 to speak with the regional
Permit Specialist.