Loading...
HomeMy WebLinkAboutSD-16-36 - Supplemental - 1200 Airport DriveCITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING & ZONING DEVELOPMENT REVIEW BOARD Report preparation date: January 13,2017 SD_16_36_1200AirportDrive_CityOfBurlington_Burlington Application received: December 23, 2016 Airports ketc h_fi I I_J a n_17_2017_mtg CITY OF BURLINGTON/BURLINGTON INTERNATIONAL AIRPORT-1200 AIRPORT DRIVE SKETCH PLAN APPLICATION #SD-16-36 Meeting date: January 17, 2017 Owner City of Burlington/Burlington International Airport 1200 Airport Drive, #1 South Burlington, VT 05403 Engineer Stantec Consulting Services, Inc. 55 Green Mountain Drive South Burlington, VT 05403 Location Map `rl �S 1 Applicant Burlington International Airport 1200 Airport Drive, #1 South Burlington, VT 05403 Propertv Information Tax Parcel 2000-000OC Airport Zoning District & Airport Industrial Zoning District L PROJECT DESCRIPTION Sketch plan application #SD-16-36 of City of Burlington/Burlington International Airport to place 228,000 cubic yards of fill in the former quarry on the airport property, 1200 Airport Drive. COMMENTS Development Review Planner Lindsey Britt and Administrative Officer Ray Belair, hereafter referred to as Staff, have reviewed the plans submitted by the applicant and have the following comments. Alteration of Existing Grade A permit is needed for the placing of fill on land when the amount is equal to or greater than 20 cubic yards except when incidental to or in connection with the construction of a structure on the same lot. When the grade is being altered site plans must show the area to be filled or removed and the existing grade and the proposed grade created by removal or addition of material. The applicant submitted the document "Proposed Grading Plan," which shows the grade of the land before and after the application of 228,000 cubic yards of fill. Staff considers this criterion to be met. Staff received the following comment from Public Works in an email dated January 3, 2017: As long as there are no easements or utility lines under this proposed area (perhaps the applicant could stipulate as much)1 am ok with these plans. Staff received confirmation from the applicant in an email dated January 3, 2017 that there are no known easements or utilities within the area where the fill is to be placed. Staff also received the following comment from the Champlain Water District in an email dated January 9, 2017: CWD's High Service 2 (HS2) transmission main runs along the east side of the quarry as shown on the attached plan. We contacted Jon Leinwohl of Stantec and confirmed that our transmission main is most likely outside the quarry fill work area. Given the proximity of the work to our main, we have the following comments: 1. CWD's HS2 transmission main should be shown on the quarry fill plans to document its location relative to the proposed work. 2. BTV should request CWD mark out the transmission main in the field prior the start of the filling operation. 3. BTV notify CWD when the filling operation begins and when it is completed. 1. Staff recommends the Board support the comments of the Champlain Water District by requesting the applicant include the HS2 transmission main on future plan submittals. Other Issues 2 The applicant is proposing to move 228,000 cubic yards of fill. Staff considers that it will take thousands of truck trips to move that amount of fill. It appears those trips will all be made on site; however, staff considers that this should be confirmed with the applicant, because if the trips will occur on and off site then this would represent a considerable impact on South Burlington roads. 2. Staff recommends the Board confirm with the applicant that the truck trips needed for placing the fill will occur on the applicant's site. RECOMMENDATION Staff recommends that the Board discuss the project with the applicant and close the hearing. Respe Ily submitted, K71x-!�-OvzQ Raymond J. Belair, Administrative Officer 3