HomeMy WebLinkAboutSD-95-0000 - Decision - 0060 Farrell StreetFINDINGS OF FACT & DECISION
STATE OF VERMONT s - S _ t� 0 0 V
COUNTY OF CHITTENDEN
CITY OF SOUTH BURLINGTON
Re: Findings of Fact, application of National Gardening
Association for construction of a planned unit development
consisting of a 36,000 square foot general office/medical office
building and a 12,432 square foot general office building on a 4.77
acre parcel of land, 60 Farrell Street. The application also
includes a boundary line adjustment involving approximately 8,300
square feet of land.
On the 24th of January, 1995, the South Burlington Planning
Commission approved the request of National Gardening Association
for preliminary plat approval under Section 203 of the South
Burlington Subdivision Regulations based on the following findings:
1. This project consists of the following: 1) construction of a
2-story 12,432 square foot general office building and a 4-story
36,000 square foot office building which includes 21,000 square
feet of general office use and 15,000 square feet of medical office
use, and 2) a boundary line adjustment with 70 Farrell Street
(Olympiad) on a 4.6 acre lot. Sketch plan was reviewed on
11/29/94.
2. This property located at 60 Farrell Street lies within the C2
and C.O. Districts. It is bounded on the north by the Olympiad
fitness center, on the west by Farrell Street, on the south by I-
189 and on the east by WCAX-TV studios.
3. Access/circulation: Access will be provided by a 30 foot curb
cut on Farrell Street.
Circulation is adequate.
4. Coverage/setbacks: Building coverage is 10.4% (maximum allowed
is 30%). Overall coverage is 33% (maximum allowed is 70%). Front
yard coverage is 25% (maximum allowed is 30%).
5. Setback requirements are met. Additional setback requirements
are needed for the larger office building because it is 10 feet
higher than allowed (see discussion on building height). This
building meets the added setback requirements.
6. Landscaping: The minimum landscaping requirement, based on
building costs, is $29,188 which is not being met. Landscaping
proposed is $6,470 short of the requirement. Staff recommended
that additional landscaping be proposed which would include street
trees (40 feet on center) along the property frontage. The
landscape plan should also be revised to show the same site
improvements as is shown on the site plan.
7. Parking: This project requires a total of 209 parking spaces
and 195 spaces including six (6) handicapped spaces are being
provided. This is a 14 space or 6.7% shortfall. It is the
applicant's position that multiple story structures become
increasingly inefficient as height increases and footprint
decreases. This inefficiency is the result of space being consumed
by stairways, elevators and redundancy of service spaces such as
rest rooms and custodial closets. It was staff's opinion that 195
spaces are adequate.
8. Traffic: The applicant prepared a Traffic Impact Evaluation
for this project. It estimated that this project would generate 139
vte's during the P.M. peak hour. This is based on a 12,000 square
foot general office building but application is for a 12,432 square
foot building. Using the correct square footage would result in
one (1) additional vte for a total of 140 vte's.
9. This study found that: 1) the Farrell Street/project access
intersection will operate at LOS D through the year 2000, 2) the
Shelburne Road/Swift Street intersection will operate at LOS C in
the year 2000, and 3) the southbound Farrell Street movement at the
Swift Street/Farrell Street intersection will soon be experiencing
LOS F.
10. The applicant proposes to improve the LOS at the Farrell
Street/Swift Street intersection to LOS E in 1995 by adding an
exclusive right -turn lane on the Farrell Street approach. However,
this approach will still reach LOS F by the year 2000 with
background traffic alone. The applicant should conduct a signal
warrant analysis to determine whether or not a signal is warranted
now or in year 2000.
11. The impact of this project on the adjacent Eastwood
residential area was evaluated. The study indicates that 12
additional vte's will pass through the Eastwood area during both
the A.M. and P.M. peak hours. The study concludes that "additional
project - generated traffic passing through the Eastwood
residential neighborhood will be minimal and will not create an
unreasonable adverse traffic congestion or safety impact".
12. The Commission was made aware that traffic volumes through the
Eastwood neighborhood currently exceed recommended standards for
local residential streets by up to 58% (1500 maximum vehicles/day
recommended; 2,362 vehicles/day counted in 1993).
13. A copy of the traffic report was sent to Regional Planning for
their comment. The Commission should have their comments prior to
final plat.
14. The applicant was made aware that the road impact fee for this
project is approximately $28,000 .
2
15. Sewer: The sewer allocation being requested for this project
is 4,600 gpd. The applicant will be required to pay the per gallon
fee prior to permit issuance.
16. Boundary line adjustment: It was discovered that the Olympiad
building was partially constructed on this property. This
violation will be corrected by a land swap between the applicant
and the Olympiad. This land swap will result in the Olympiad
building meeting the side setback requirement and no change in lot
size for either property owners. This land swap is shown on the
site plan and survey plat. The round swimming pool which will end
up on the applicant's property will have to be removed prior to
recording of the final plat since it does not meet the side setback
requirement from the new property line.
17. Bicycle path: The bikeway which begins at UVM on Spear Street
and ends at Farrell Street crosses this property along the
southerly boundary. The plan shows this bikeway as planned.
18. Fire access lane: A 30 foot wide fire access lane located in
the C.O. zone is proposed. This lane will have a gravel base and
covered with topsoil so it can be covered with grass.
19. Building height: The smaller office building will have a 40
foot height which is the maximum allowed for a pitched roof
structure. The larger office building is proposed to be 45 feet in
height which is 10 feet more than is permitted for a flat roofed
structure. The applicant is requesting an increase in height to 45
feet under section 25.113(b) of the zoning regulations. The
Planning Commission may approve this increase in height if it
determines that a taller structure will comply with the criteria in
Section 25.113(b)(i)-(iii). The additional setbacks required under
Section 25.113(c) are being met.
20. Lighting: Exterior lighting will consist of 10 pole lights
with downcasting and shielded fixtures. Applicant should indicate
height of pole, type of light and wattage. If building mounted
lights are proposed, locations should be shown and details
submitted.
21. PUD criteria: The applicant has submitted a report addressing
the PUD criteria in Section 26.151 of the zoning regulations.
22. Other:
--- the location map should be shown on the site plan.
--- the correct street address is 60 Farrell Street.
--- buildings should be labeled A and B.
--- plan should indicate size and location of all HVAC equipment
structures, if located on the ground.
--- survey plat should be signed and stamped by the land surveyor.
3
DECISION AND CONDITIONS
Based on the above Findings of fact, the South Burlington Planning
Commission approves the preliminary plat application of National
Gardening Association for construction of a planned unit
development consisting of a 36,000 square foot general
office/medical office building and a 12,432 square foot general
office building on a 4.77 acre parcel of land, 60 Farrell Street.
The application also includes a boundary line adjustment involving
approximately 8,300 square feet of land, as depicted on a ten (10)
page set of plans, page one (1) entitled "National Gardening
Proposed New Office, Site Plan, South Burlington, Vermont" prepared
by Civil Engineering Associates, Inc., dated December 1994, with
the following stipulations:
1. All previous approvals and stipulations which are not
superseded by this approval shall remain in effect.
2. The applicant shall post a $29,188 landscape bond prior to
issuance of a zoning permit. The bond shall remain in effect for
three (3) years to assure that the landscaping takes root and has
a good chance of surviving.
3. The plans shall be revised prior to submittal of the final plat
application as follows:
a) The landscape plan shall be revised to: 1) show same site
improvements as is shown on the site plan and 2) show
additional landscaping which shall include street trees (40
feet on center) along the property frontage.
b) The site plan shall be revised to show the following:
1) location map, 2) the correct street address (60 Farrell
Street), 3) label buildings A and B, and 4) indicate size and
location of all HVAC equipment structures, if to be located on
the ground.
c) The survey plat shall be signed and stamped by the land
surveyor.
4. The Planning Commission approves 195 parking spaces which
represents a waiver of 14 spaces or 6.7% of the total required. It
is the Commission's opinion that 195 spaces will adequately serve
the project since a significant portion of the gross square footage
of the building will be devoted to stairway and elevator space and
therefore will not be devoted to uses which typically generate
parking demand.
5. For the purposes of calculating required road impact fees under
the South Burlington Impact Fee Ordinance, the Planning Commission
estimates that the proposed office complex will generate 140
vehicle trip ends during the P.M. peak hour.
4
6. A sewer allocation of 4,600 gpd is approved. The applicant
shall pay the per gallon fee prior to issuance of a zoning permit.
7. The applicant shall conduct a signal warrant analysis of the
Farrell Street/Swift Street intersection to determine whether or
not a signal is warranted in 1995 and/or in the year 2000.
8. Prior to final plat, the applicant shall re-evaluate the
projected LOS of the Farrell Street/Swift Street intersection
utilizing the new methodology for analyzing unsignalized
intersections as recommended by the VAOT.
9. The applicant shall be responsible for widening the northern
leg of the Farrell Street/Swift Street intersection to accommodate
northbound left -turn and right -turn lanes. Detailed plans of this
improvement shall be submitted with the final plat application.
10. The Planning Commission approves a building height of 45 feet
above average pre -construction grade for the large office building.
It is the Planning Commission's opinion that the requirements of
Sections 25.113(b) and (c) are adequately met.
11. All exterior lighting shall be downcasting and shielded and
shall not cast light beyond the property line. Any change in
lighting shall be approved by the City Planner prior to
installation. Applicant shall submit, prior to issuance of a
zoning permit, details and cut -sheets of all exterior building
mounted lights for approval by the City Planner.
12. The applicant must submit the revised final plat application
within 12 months or this approval is null and void.
Chairman or Clerk
South Burlington Planning Commission
*/V��
Date
0