Loading...
HomeMy WebLinkAboutSD-00-41 SD-00-42 - Decision - 0060 Farrell Street#SD-00-41 & SD-00-42 FINDINGS OF FACT AND DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, preliminary plat application and final plat application of Wright and Morrissey Realty Corporation to amend a planned unit development consisting of: 1) an 11,400 square foot general office building, and 2) a 41,000 square foot building which includes 40,500 square feet of general office use and 500 square feet of bakery and delicatessen use. The amendment consists of 1) replacing the 11,400 square foot general office building with a 35 unit multi -family dwelling, 60 Farrell Street. On the 5th of September, 2000, the South Burlington Development Review Board approved the final plat application of Wright and Morrissey Realty Corporation under Section 203 and Section 204 of the South Burlington Subdivision Regulations based on the following findings: 1. This project is an amendment to a P.U.D. consisting of 1) an 11,400 square foot general office building, and 2) a 41,000 square foot building which includes 40,500 square feet of general office use and 500 square feet of bakery and delicatessen use. The amendment consists of 1) replacing the 11,400 square foot general office building with a 35 unit multi -family dwelling. 2. The property located at 60 Farrell Street lies within the C2 and C.O. Districts. It is bounded on the north by the Olympiad Fitness Center, on the west by Farrell Street, on the south by I-89, and on the east by WCAX studios. 3. Access/circulation: Access is provided by a 30 foot curb cut on Farrell Street and a 24 foot curb cut on Joy Drive. Access to Joy Drive is via a deeded right of way over the Olympiad property. Circulation on the site appears to be adequate. The applicant has depicted a pedestrian walkway linking the proposed parking area with the existing parking area on the landscaping plans. The proposed walkway encroaches into the C.O. District which is not allowed. The site plan should be revised to include a walkway. 4. Coverage/setbacks: The existing building coverage is 5% and will increase to 10% (20% max). The total coverage for the property is 27.6% and will increase to 44% (40% max). Coverage requirements are therefore not being met. It has been the Development Review Board's unwritten policy of using the residential coverage's for mixed use developments. The applicant requested that the policy be amended to allow the greater overall coverage. Staff supported this because it encourages mixed use development. The required setbacks according to Section 26.154(d) of the Zoning Ordinance is 30 feet for a planned unit development. This setback is not being met on the north boundary of the property. The Planning Commission may modify these setback requirements under Section 12.406 (b) of the zoning regulations. Additional setback requirements required for the height waivers are also not met (see discussion on building height). 5. Densi : The maximum density for this property, based on acreage, is 34.3 units of residential housing. The applicant is proposing 35 units of housing. This exceeds the maximum density by one unit. Staff recommended reducing the number of units by one to meet the density requirements. 6. Building Height: The applicant requested a seven foot height waiver for the proposed building which is proposed to rise to an overall height of 42 feet. This is a flat roof structure which under Section 25.113 (a) of the zoning regulations have a maximum height limit of 35 ft. Under Section 25.113 (b) of the Zoning regulations, the DRB may approve an increase in height for a residential structure up to 45 ft. if the Board determines that a taller structure: (i) Will utilize topography and will relate to other existing and proposed structures so as to be aesthetically compatible with the neighborhood; (ii) will not detract from scenic views of adjacent properties or public streets and walkways; and (iii) will allow retention of additional green space that will enhance the appearance of the developed property. Section 25.113 (d) of the zoning regulations requires additional setbacks for taller structures. The building must have a setback no less than 33.5 feet. A setback of 19 feet is proposed along the northern boundary and therefore does not meet this requirement. The Board may waive the requirements of this section as long as the general objectives of the PUD and applicable zoning district are met. Elevations should be revised to correctly label the east and west elevations and provide a door in the center of the west fagade to provide for pedestrian access of the western parking area. 7. Landscaping_ The minimum landscaping requirement, based on building costs, of $22,500 is being met. The proposed landscaping includes Dark American Arborvitae, Japanese Green Barberry, Aglo Rhododendron, Anthony Waterer Spirea, Cutleaf Stephanandra, and Red Oak. 8. Lighting: All lighting must be downcasting and shielded. The Director of Planning and Zoning has reviewed the proposed lights and recommends that the building mounted lights have wattage of 100 watts or less. 9. Parking: A total of 79 additional parking spaces are required for the proposed use for a total 2 of 230 necessary spaces. A total of 217 spaces will be available. Sixty-six additional parking spaces are proposed and the applicant has requested a parking waiver for the 13 space difference. A total of seven handicapped spaces are required and eight are provided. A bike rack is also being provided. The proposed location of the bike rack is within the Conservation/Open Space District. The applicant should revise the plans to relocate the bike rack outside the C. O. District. It should be clear that no additional parking is approved for the Olympiad at this time. 10. Traffic: ITE estimates that the approved uses for this property would generate 119 trip ends (vte's) during the P.M. peak hour. The proposed changes to property generate 118 vte's. The traffic impact fee will therefore be zero (0). 11. Sewer: The applicant sought an additional sewer allocation request for 5,970 g.p.d. The total proposed sewer allocation for this property will thereby increase to 9,820 g.p.d. The applicant will be required to pay the per gallon fee of $2.50 per gallon for the additional allocation prior to permit issuance. 12. Impact fees: The applicant was made aware that school, recreation, and road impact fees will apply to the new residential building. 13. C.O. District: The applicant proposed constructing a pedestrian path in the adjacent Conservation Open Space District. This is neither a permitted or conditional use in the C.O. District and should be removed from the plans. The applicant has also proposed filling, grading, and constructing drainage within the C.O. District. These are neither permitted or conditional uses in the C.O. District. The applicant should submit finish grade contours to ensure that no filling or regarding takes place in the C.O. District. The landscaping plans illustrate a patio area in the C.O. District. This should be removed from the plans as patios are neither permitted or conditional uses in the C.O. District. The applicant has proposed planting red oak trees in the C.O. District to create additional buffering along Interstate as required by Section. 26.105c of the Zoning Ordinance. 14. Other: The proposed dwelling units will not be less than 500 square feet per unit. DECISION AND CONDITIONS Based on the above Findings of Fact, the South Burlington Development Review Board approves preliminary plat application #SD-00-41 and final plat application #SD-00-42 of Wright and Morrissey Realty Corporation to amend a planned unit development consisting of: 1) an 11,400 square foot general office building, and 2) a 41,000 square foot building which includes 40,500 square feet of general office use and 500 square feet of bakery and delicatessen use. The amendment consists of. 1) replacing the 11,400 square foot general office building with a 35 unit 3 multi -family dwelling, 60 Farrell Street, as depicted on a nine page set of plans, page one entitled "Wright and Morrissey Realty Corp. Proposed Multi -Family Housing Overall Site Plan South Burlington Vermont," prepared by Civil Engineering Associates, dated May 2000, last revised on 7/20/00, with the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. The plat plans shall be revised to show the changes below and shall require approval of the Director of Planning & Zoning. Four copies of the approved revised plans shall be submitted to the Director of Planning & Zoning prior to recording: a. The plans shall be revised to remove all encroachments from the Conservation and Open Space District including the patio, the retaining wall, and all paths. b. The plans shall be revised to relocate the bike rack from the Conservation and Open Space District. c. The plans shall be revised to show plantings that will create a noise barrier. d. The plans shall be revised to reduce the number of units by one to 34 units. e. The plans shall be revised to illustrate the building mounted lights with wattage of 100 watts or less. f. The plans shall be revised to eliminate the future parking proposed for the Olympiad. g. The plans shall be revised to include finished contours to ensure that no filling or grading takes place in the Conservation and Open Space District. 3. Pursuant to Section 12.406(b) of the Zoning Regulations, the South Burlington Development Review Board modifies the setback requirements as shown on the approved plans. 4. Pursuant to Sections 25.113(b) and (c) of the zoning regulations, the South Burlington Development Review Board approves the taller structure within the development as follows: maximum height of 42 feet. It is the Board's opinion that the criteria under Sections 25.113(b) and (c) are being met for the taller structure. 5. Pursuant to Section 25.256(b) of the zoning regulations, the Development Review Board approves a 13 space or 6% waiver for a total of 217 spaces approved. The applicant is authorized to construct fewer parking spaces according to their need. 6. All exterior lighting shall consist of downcasting shielded fixtures. Any change to approved lights shall require approval of the Director of Planning & Zoning prior to installation. 7. The Development Review Board approves an additional sewer allocation of 5,970 gpd for a total allocation of 9,820 gpd. The applicant will be required to pay the per gallon 4 fee prior to permit issuance. 8. For the purpose of calculating road impact fees under the South Burlington Impact Fee Ordinance, the Development Review Board estimates that the proposed multi -family dwelling will generate zero (0) additional vehicle trip ends during the P.M. peak hour. 9. The proposed building shall be sprinklered and include a fire alarm. 10. The sanitary sewer line shall be bedded in 3/4 inch crushed stone. 11. The recycled crushed concrete or asphalt may be used for road and parking lots base instead of bank run gravel. 12. The units shall not be less than 500 square feet in size. 13. Prior to issuance of a zoning permit, the applicant shall post a $22,500 landscape bond. The bond shall remain in effect for three years to assure that the landscaping takes root and has a good chance of surviving. 14. The applicant shall obtain a zoning permit within six (6) months pursuant to Section 27.302 of the zoning regulations or this approval is null and void. 15. The applicant shall obtain a Certificate of Occupancy/Compliance from the Administrative Officer prior to occupancy of the building. 16. The final plat plans (sheet one and plat survey) shall be recorded in the South Burlington land records within 90 days or this approval is null and void. The plans shall be signed by the Development Review Board Chair or Clerk prior to recording. Prior to recording the final plat plans, the applicant shall submit a copy of the survey plat in digital format. The format of the digital information shall require approval of the Director. Chair or Clerk mouth Burlington Development Review Board Date 5