HomeMy WebLinkAboutSP-01-30 - Decision - 0090 Ethan Allen Drive#SP-01-30
FINDINGS OF FACT AND DECISION
STATE OF VERMONT '
COUNTY OF CHITTENDEN
CITY OF SOUTH BURLINGTON
Re: Findings of Fact, site plan #SP-01-30 of S & N Properties to construct a 9500 square foot light
manufacturing building, 90 Ethan Allen Drive.
On the 19th of June, 2001, the South Burlington Development Review Board approved the site plan
application of S & N Properties under Section 26.10 of the South Burlington Zoning Regulations
based on the following findings:
1. This project consists of a 9,500 square foot, 2 story light manufacturing building.
2. The owner of record of this particular property is S & N Properties, LLC.
3. This property located at 90 Ethan Allen Drive lies within the IC District. It is bounded on the
north by undeveloped land, on the east by a residence, on the west by an auto repair shop, and on the
south by Ethan Allen Drive,
4. Access/Circulation: Access is proposed to be via a 20 foot curb cut on Ethan Allen Drive.
Circulation on the site is adequate.
5. Coverage/setbacks: Building coverage is 11.5% (maximum allowed is 30%). Overall coverage is
36.9% (maximum allowed is 70%). Front yard coverage is 28.5% (maximum allowed is 30%).
Setback requirements are met.
6. Parking: A total of 7 spaces are required and 21 spaces including two (2) handicapped spaces and
a bike rack are being provided.
7. Landscaping The minimum landscaping requirement, based on buildings costs, is $11,400 which
is not being met. The plan should be revised to include $5584 of additional landscaping and
increase the size of the Red Maple trees to 2 '/2 inches.
8. Sewer: The sewer allocation required is 300 g.p.d. The applicant will be required to pay the per
gallon fee prior to permit insurance.
9. Lighting: Exterior lighting will consist of five (5) building mounted lights with incandescent lights
ranging in wattage from 65 to 120. These fixtures are downcasting and shielded.
10. D_psters: A screened dumpster storage area will be provided. The plan should be revised to
note that the dumpster will be screened from the road.
11. Traffic: This project is exempt from the road impact fees.
DECISION AND CONDITIONS
Based on the above Findings of Fact, the South Burlington Development Review Board approves site
plan #SP-01-30 of S & N Properties to construct a 9500 square foot light manufacturing building, 90
Ethan Allen Drive, as depicted on a five (5) page set of plans, page one (1) entitled, "Thomas
Mechanical South Burlington Vermont", prepared by W.E.F. Wall & Assoc., Inc., dated 4/11/01, with
the following stipulations:
All previous approvals and stipulations which are not superseded by this approval shall remain in
effect.
2. The site plan shall be revised to show the changes listed below and shall require approval of the
Director of Planning & Zoning (hereinafter Director). Three (3) copies of the approved revised site
plan shall be submitted to the Director prior to permit issuance.
a) The plan shall be revised to include $5584 of additional landscaping and increase the
size of the Red Maple trees to 2 1/2 inches.
b) The plan shall be revised to note that the dumpster will be screened from the road.
c) The plan shall be revised to relocate the Red Maple trees at least 6 feet from the edge of
the parking lot.
d) The applicant shall revise the plan to illustrate a more salt tolerant species than the
proposed White Pine trees in consultation with the City Arborist.
3. The applicant shall post a $11,400 landscape bond prior to issuance of a zoning permit. The bond
shall remain in effect for three (3) years to assure that the landscaping takes root and has a good
chance of surviving.
4. The building shall be sprinklered and include a fire alarm.
5. The Development Review Board approves an additional sewer allocation of 300 g.p.d. The
applicant will be required to pay the per gallon fee prior to permit issuance.
6. The applicant shall obtain a zoning permit within six (6) months pursuant to Section 27.302 of the
Zoning Regulations or this approval is null and void.
2
7. The applicant shall obtain a Certificate of Occupancy/Compliance from the Administrative Officer
prior to occupancy of the building.
8. Any change to the site plan shall require approval by the South Burlington Development Review
Board.
Chair or Clerk
South Burlington Development Review Board
Date
Please Note: You have the right to appeal this decision to the Vermont Environmental
Court, pursuant to 24 V.S.A. § 4471 and V.R.C.P. 76, in writing, within 30 days of the
date this decision is issued. The fee is $150.00. If you fail to appeal this decision, your
right to challenge this decision at some future time may be lost because you waited too
long. You will be bound by the decision, pursuant to 24 V.S.A. § 4472(d) (exclusivity of'
remedy; finality).
3