Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Batch - Supplemental - 0086 Ethan Allen Drive
O'Leary -Burke civil Associates, PLC XV April 18, 2003 Mr. Ray Belair Zoning Administrator 575 Dorset Street South Burlington, VT 05403 RE: ACM Realty — 86 Ethan Allen Drive Site Plan Amendment Application Dear Ray: We are writing on behalf of ACM Realty as a follow up to your telephone conversation with Paul O'Leary Jr. last week. The City.of South Burlington granted Site Plan approval can November 10, 2002. As discussed, the parking lot configuration was modified slightly and the attached Record Drawing reflects the current conditions at 86 Ethan Allen Drive. Also, please note that the coverage calculations have been updated to reflect the as -built conditions. The application and plan reflect the actual conditions at 86 Ethan Allen Drive. Please find the following for your review: 1. Site Plan amendment application; 2. $35 application fee; 3. Five (5) copies of the Record Drawing; 4. One (1) reduced (11 "x 17") Record Drawing. Please give me a call if you have any questions. Sincerely, evin R. LaRose, L.S., E.I. Enclosures cc: Chris & Mike Senesac Z:A1999\99013\13elair-Site Flan Amendment.doc 5 ANDREW AVE. SUITE 5 ESSEX JCT., VT 05452 PHONE 802-878-9990 FAX 802-878-9989 OBCA@PSHIFT.COM 'CITY OF 90-91-11THBURLINGTON DEPARTMENT OF PLANNING & ZONING 575 DORSET STREET SOUTH BURLIN GTON, VER1V ONT 05403 (302) 346-4106 FAX (302) 346-4101 July 15, 2003 Paul O'Leary O'Leary -Burke Civil Associates, Inc. 5 Andrew Avenue, Suite 5 Essex Jct., Vermont 05452 Re: ACM Realty - Parking Modification - 86 Ethan Allen Drive Dear Mr. O'Leary: Enclosed, please find a copy of the Findings of Fact and Decision regarding the above referenced project issued on 7j14N3. Please note the conditions of approval. If you have any questions, please feel free to contact me. Sincerely,,,,' ff�v I Raimond J. Belair Administrative Officer AM AGENCY OF NATURAL RESOURCES DEPARTMENT OF ENVIRONMENTAL CONSERVATION WATER QUALITY DIVISION 103 SOUTH MAIN STREET WATERBURY, VERMONT 05671-0408 ;ORRECTED - PUBLIC NOTICE PUBLIC COMMENT PERIOD: March 19, 2010 -March 29, 2010 PERMITTEE INFORMATION PERMITTEE NAME: PERMITTEE ADDRESS: Ethan Allen Holdings, LLC 86 Ethan Allen Drive South Burlington, VT 05403 GENERAL PERMIT NUMBER: 3-9010 Amended (May 2007) PERMIT NUMBER: 3986-9010.R PREVIOUS PERMIT NUMBER: 3986-9010 DISCHARGE INFORMATION NATURE: Treated stormwater VOLUME: As necessary RECEIVING WATER: Groundwater in the Winooski River Watershed EXPIRATION DATE OF AUTHORIZATION TO DISCHARGE: Ten years from issuance date of final permit DESCRIPTION: This is a draft authorization to discharge proposed for issuance to Ethan Allen Holdings, LLC for the discharge of stormwater runoff from a commercial facility on Lot #11 of Ethan Allen Park located in South Burlington, Vermont to groundwater in the Winooski River Watershed. The means of treatment include overland flow, grass -lined swales, an infiltration basin, and a dry well. -2- FURTHER INFORMATION The complete application is on file and may be inspected at the VANR, Waterbury Office. Copies will be made at a cost based upon the current Secretary of State Official Fee Schedule for Copying Public Records and may be obtained by calling 802-241-3770 from 8:00 a.m. to 4:00 p.m., Monday through Friday. PUBLIC COMMENTS/PUBLIC HEARINGS Written public comments on the proposed authorization to discharge are invited and must be received on or before the close of business day (7:45 am - 4:30 pm) March 29, 2010, by the Agency of Natural Resources, Department of Environmental Conservation, Water Quality Division, Attention Vicki Hill, Building 10 North, 103 South Main Street, Waterbury, Vermont 05671 or send via email to Stormwater@state.vt.us. If sending by mail, the general permit number should appear next to the VANR address on the envelope and on the first page of any submitted comments. If sending by e-mail, the general permit number should appear on the subject line. All comments received by the above date will be considered by DEC prior to issuance of an authorization to discharge under the general permit. FINAL ACTION/APPEAL At the conclusion of the public notice period and after consideration of additional information received during the public notice period, the VANR will make a final determination to issue or to deny an authorization to discharge under the general permit. Pursuant to 10 V.S.A. Chapter 220, any appeal of this decision must be filed with the clerk of the Environmental Court within 30 days of the date of the decision. The appellant must attach to the Notice of Appeal the entry fee of $250.00, payable to the state of Vermont. The Notice of Appeal must specify the parties taking the appeal and the statutory provision under which each party claims party status; must designate the act or decision appealed from; must name the Environmental Court; and must be signed by the appellant or their attorney. In addition, the appeal must give the address or location and description of the property, project or facility with which the appeal is concerned and the name of the applicant or any permit involved in the appeal. The appellant must also serve a copy of the Notice of Appeal in accordance with Rule 5(b)(4)(B) of the Vermont Rules for Environmental Court Proceedings. For further information, see the Vermont Rules for Environmental Couri Proceedings, available on line at www.vennontiudiciary.org. The address for the Environmental Court is 2418 Airport Road, Suite 1, Barre, VT 05641 (Tel. 4 802-828-1660) Justin G. Johnson, Commissioner Department of Environmental Conservation AGENCY OF NATURAL RESOURCES DEPARTMENT OF ENVIRONMENTAL CONSERVATION WATER QUALITY DIVISION 103 SOUTH MAIN STREET WATERBURY, VERMONT 05671-0408 PUBLIC NOTICE PUBLIC COMMENT PERIOD: March 19, 2010 -March 29, 2010 PERMITTEE INFORMATION PERMITTEE NAME: PERMITTEE ADDRESS: Ethan Allen Holdings, LLC 86 Ethan Allen Drive South Burlington, VT 05403 GENERAL PERMIT NUMBER: 3-9010 Amended (May 2007) PERMIT NUMBER: 3986-9010.R PREVIOUS PERMIT NUMBER: 3986-9010 DISCHARGE INFORMATION NATURE: Treated stormwater VOLUME: As necessary RECEIVING WATER: Groundwater in the Winooski River Watershed EXPIRATION DATE OF AUTHORIZATION TO DISCHARGE: Ten years from issuance date of final permit DESCRIPTION: This is a draft authorization to discharge proposed for issuance to Ethan Allen Holdings, LLC for the discharge of stormwater runoff from a commercial facility on Lot #11 of Ethan Allen Park located in South Burlington, Vermont to groundwater in the Winooski River Watershed. The means of treatment include overland flow, grass -lined swales, an infiltration basin, and a dry well. I FURTHER INFORMATION -2- The complete application is on file and may be inspected at the VANR, Waterbury Office. Copies will be made at a cost based upon the current Secretary of State Official Fee Schedule for Copying Public Records and may be obtained by calling 802-241-3770 from 8:00 a.m. to 4:00 p.m., Monday through Friday. PUBLIC COMMENTS/PUBLIC HEARINGS Written public comments on the proposed authorization to discharge are invited and must be received on or before the close of business day (7:45 am - 4:30 pm) March 18, 2010, by the. Agency of Natural Resources, Department of Environmental Conservation, Water Quality Division, Attention Vicki Hill, Building 10 North, 103 South Main Street, Waterbury, Vermont 05671 or send via email to Stormwater@state.vt.us. If sending by mail, the general permit number should appear next to the VANR address on the envelope and on the first page of any submitted comments. If sending by e-mail, the general permit number should appear on the subject line. All comments received by the above date will be considered by DEC prior to issuance of an authorization to discharge under the general permit. FINAL ACTION/APPEAL At the conclusion of the public notice period and after consideration of additional information received during the public notice period, the VANR will make a finaldetermination to issue or to deny an authorization to discharge under the general permit. Pursuant to 10 V.S.A. Chapter 220, any appeal of this decision must be filed with the clerk of the Environmental Court within 30 days of the date of the decision. The appellant must attach to the Notice of Appeal the entry fee of $250.00, payable to the state of Vermont. The Notice of Appeal must specify the parties taking the appeal and the statutory provision under which each party claims party status; must designate the act or decision appealed from; must name the Environmental Court; and must be signed by the appellant or their attorney. In addition, the appeal must give the address or location and description of the property, project or facility with which the appeal is concerned and the name of the applicant or any permit involved in the appeal. The appellant must also serve a copy of the Notice of Appeal in accordance with Rule 5(b)(4)(B) of the Vermont Rules for Environmental Court Proceedings. For further information, see the Vermont Rules for Environmental Court Proceedings, available on line at www.vermontjud� iciar .org. The address for the Environmental Court is 2418 Airport Road, Suite 1, Barre, VT 05641 (Tel. # 802-828-1660) Justin G. Johnson, Commissioner Department of Environmental Conservation CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING & ZONING 575 DORSET S TREET SOUTH BURLINGTON, VERMOINT 05403 (802) 846-4106 FAX (802) 846-4101 Permit Number SP- ©3, 20 APPLICATION FOR SITE PLAN REVIEW All information requested on this application must be completed in full. Failure to provide the requested information either on this application form or on the site plan will result in your application being rejected and a delay in the review before the Development Review Board. 1) OWNER OF RECORD (Name as shown on deed, mailing address, phone and fax.#) Chris & Mike Senesac, ACM Realty, 63 Malletts Bay Avenue, Colchester, VT 05446 657-4188 2) LOCATION OF LAST RECORDED DEED (Book and page #) 3) APPLICANT (Name, mailing address, phone and fax #) Same as above 4) CONTACT PERSON (Name, mailing address, phone and fax #) Paul J. O'Leary, Jr., P.E., O'Lear),-Burke Civil Associates, PLC, 5 Andrew Ave., Suite 5, Essex Jct., VT 05452 Ph. 878-9990 Fax 878-9989 5) PROJECT STREET ADDRESS: Ethan Allen Drive (Lot 11) 6) TAX PARCEL ID # (can be obtained at Assessor's Office) 7) PROJECT DESCRIPTION a) Existing Uses on Property (including description and size of each separate use) 5,550 s.f. building for office and warehouse use b) Proposed Uses on property (include description and size of each new use and existing uses to remain) The purpose of this application is to amend a previously approved Site Plan application. A 5,550 s.f. building was recently constructed on the site and some minor changes were made to the parking area. Specifically, three parking spaces were added to the westerly side of the building. c) Total building square footage on property (proposed buildings and existing buildings to remain) 5,550 s.f d) Height of building & number of floors (proposed buildings and existing buildings to remain, specify if basement and mezzanine) 1 story - 18 feet e) Number of residential units (if applicable, new units and existing units to remain) none f') Number of employees & company vehicles (existing and proposed, note Office versus non -office employees) 15 employees, 2 company vehicles g) Other (list any other 'information pertinent to this application not specifically requested above, please note if Overlay Districts are applicable): 8) LOT COVERAGE a) Building: Existing 119 % Proposed `13.3 % b) Overall (building, parking, outside storage, etc) Existing 59.4 % Proposed 37:0 % c) Front yard (along each street) Existing 26 % Proposed 26 % 9) COST ESTEMATES a) Building (including interior renovations): $ N/A b) Landscaping: $ N/A c) Other site improvements (please list with cost): 10) ESTIMATED TRAFFIC a.) Average daily traffic for entire property (in and out): 32 (16 in/16 out) b) A.M. Peak hour for entire property (in and out): 4 (2 in/2 out) c) P.M. Peak hour for entire property (in and out): 4 (1 in/3 out) 11) PEAK HOURS OF OPERATION: 6AM - 4 PM 12) PEAK DAYS OF OPERATION: Monday - Friday 13) ESTIMATED PROJECT COMPLETION DATE: N/A 14) SITE PLAN AND FEE $35.00 -2- A site plan shall be submitted which shows the information listed on Exhibit A attached. Five (5) regular size copies and one reduced copy (11" x 17") of the site plan must be submitted. A site plan application fee shall be paid to the City at the time of submitting the site plan application (see Exhibit A). I hereby certify that all the information re and is acc ate to t e best of n 1 wled c'1 .A SIGNA' SIGNATURE O� > part of this application has been submitted 2� D�� '�' (� f we PLICANT ---- )PERTY OWNER Do not write below this line -------------------------------- DATE OF SUBMISSION: REVIEW AUTHORITY: Development Review Bo�o Director, Planning & Zoning I have reviewed this site plan application and find it to be: 54 Complete 13complete r03 irector ftnnin Zoning or Designee Date DEPARTMENT OF PLANNPJG & ZONING 575 DORSET STREET SOUTH BURLINGTON, VERMON7 05403 (802) 846-4106 FAX (802) 846-4101 November 20, 2002 Paul O'Leary (TI i-nrv-a-�- 1-;xAl Aeu cc-�afac J ---- — - - � — ------- 5 Andrew Avenue, Suite 5 Essex Junction, VT 05452 Re: Site plan application #SP-02-55 of ACM Realty, Chris and Mike Senesac Dear MT. O'Leary: Please find enclosed the Findings of Fact and Decision of the Director of Planning and Zoning's approval on November 20, 2002 in regards to the above referenced project. Please note the conditions of approval including the requirement to obtain a zoning permit within six (6) months, or this approval is null and void. If you have any questions, please give me a call. Sincerely, "116 111"w" (t Stephanie A. Smith Associate Planner CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING & ZONING 575 DORSET S TREET SOUTH BURLINGTON, VERMOINT 05403 (802)846-4106 FAX (802) 846-4101 Permit Number SP- j? UZ-- APPLICATION FOR SITE PLAN REVIEW All information requested on this application must be completed in full. Failure to provide the requested information either on this application form or on the site plan will result in your application being rejected and a delay in the review before the Development Review Board. 1) OWNER OF RECORD (Name as shown on deed, mailing address, phone and fax #) Chris & Mike Senesac, ACM Realty, 63 Malletts Bay Avenue, Colchester, VT 05446 657-4188 2) LOCATION OF LAST RECORDED DEED (Book and page #) 3) APPLICANT (Name, mailing address, phone and fax #) Same as above 4) CONTACT PERSON (Name, mailing address, phone and fax #) Paul J. O'Leary, Jr., P.E., O'Leary -Burke Civil Associates, PLC, 5 Andrew Ave., Suite 5, Essex Jct., VT 05452 Ph. 878-9990 Fax 878-9989 5) PROJECT STREET ADDRESS: Ethan Allen Drive (Lot 11) 6) TAX PARCEL ID # (can be obtained at Assessor's Office) 7) PROJECT DESCRIPTION a) Existing Uses on Property (including description and size of each separate use) 5,500 s.f. building for office and warehouse use b) Proposed Uses on property (include description and size of each new use and existing uses to remain) The purpose of this application is to amend a previously approved Site Plan application. A 5,500 s.f building was recently constructed on the site and some minor changes were made to the building and landscaping. c) Total building square footage on property (proposed buildings and existing buildings to remain) -1- 5,550 s. f. d) Height of building & number of floors (proposed buildings and existing buildings to remain, specify if basement and mezzanine) I story - 18 feet e) Number of residential units (if applicable, new units and existing units to remain) none f') Number of employees & company vehicles (existing and proposed, note office versus non -office employees) 15 employees, 2 company vehicles g) Other (list any other information pertinent to this application not specifically requested above, please note if Overlay Districts are applicable): 8) LOT COVERAGE a) Building: Existing 19 % Proposed 19 b) Overall (building, parking, outside storage, etc) Existing 59.4 % Proposed 59.4 c) Front yard (along each street) Existing 26 % Proposed 26 9) COST ESTEMATES a) Building (including interior renovations): $ N/A b) Landscaping: $ N/A c) Other site improvements (please list with cost): 10) ESTIMATED TRAFFIC a.) Average daily traffic for entire property (in and out): 32 (16 in/16 out) b) A.M. Peak hour for entire property (in and out): 4 (2 in/2 out) c) P.M. Peak hour for entire property (in and out): 4 (1 in/3 out) 11) PEAK HOURS OF OPERATION: 6AM - 4 PM 12) PEAK DAYS OF OPERATION: Monday - Friday 13) ESTIMATED PROJECT COMPLETION DATE: N/A 14) SITE PLAN AND FEE $35.00 -2- I hereby certify that all the information requested as and is accurate to the best of my knowledge. , SIGNA'I'M O of this application has been submitted CANT TY OWNER Do not write below this line ------------------------------------------------------------------------------------------------- DATE OF SUBMISSION: REVIEW AUTHORITY: ❑ Development Review Bo r Director, Planning & Zoning I have reviewed this site plan application and find it to be: 9 Complete complete `�' ______________ _ ___ __ __________________________ Directo of Planning & Zoning or Designee l (i uz-, Date -3- TYPE LINDEN BUKNIN& f' U51-1 -.EA5TF-KN WHiTE (,E[)AK AKTIC; t5LUE WILLOW DWAKF ALDEKTA 5FI2(.)C,E bOLf-,) LEAF" f5AKDERKY &OLD FLOWEK '5FiKFA CKIM'ON FI&MEY DARDERKY K05E C;,LOW f5AKDEKRY 6OLD MOUND '5rIKEA VELVET GREEN BOXWOOD EMEKAID GREEN ARE50K V11 -AE 00" NUMBER SQUANT ITY1 51ZE 3 3.5" - 4" 2 4 3'- 4' 14 4 1 3 C:,-? AL 115 3 7 C-,, A I- b 4 3 6A L 7 23 C AL el- 4 4 ',:)AL 9 i2 6 AL 10 4 3 C�AL 1 i 1 3 C-7 A L 12 2 t. 6AL 6 `60, k vo�j A A�mm_ NUMDER2 'QUANT ITYI SIZETYPE LINDEN 1 3 35 4" [�UKNINO DU5H 2 4 3'- 4' -.EASTERN WHITE CEDAR 3 14 AC-1 --1- 11 D-LUC WILLOW 4 1 -,AL .DWARF ALI3EKTA 5FRUGE OOLD I EAF DAKDEMY GOLD FLOWEK 5PIKEA CRIMSON FI&MEY DAKf3F-KKY K05E C7LOW t5AKDEKRY COOL MOUND WiREA VELVET GREEN DOXWOOD EMERAI -D GpKEEN AKDOK V I I-AE 7 to P.41 3 4 2 4 i.2 4 -7 (--.j AL 3 COAL 3 Cl; AL 4 (-.7AL 6 CAL 3 (7AL -3 ;JAL b 6AL July 11, 2001 City of South Burlington 575 Dorset Street South Burlington, VT 05403 Re: Irrevocable Standby Letter of Credit #10058 Ethan Allen Holdings LLC 63 Malletts Bay Ave. Colchester, VT 05446-1425 Dear Beneficiary: 110 /A. / / / We hereby establish our Irrevocable Standby Letter of Credit #10058 in favor of City of South Burlington for the account of Ethan Allen Holdings LLC up to an aggregate amount of $5,828.00 available by your draft or drafts on us at sight accompanied by: 1.) the original Letter of Credit and all amendments, if any, 2.) a written statement signed by an authorized officer of City of South Burlington that these funds are due you under the terms of your agreement with Ethan Allen Holdings LLC, accompanied by 3.) a current secretary certificate or resolution from City of South Burlington that the officer is authorized to sign on behalf of City of South Burlington. If your demand represents a partial drawing hereunder, we will endorse the original credit and return same to you for possible future claims. If, however, your demand represents a full drawing, or if such drawing is presented on the day of the relevant expiration date hereof, we will hold the original for our files and remove same from circulation. All drafts must be marked under Letter of Credit #10058. We engage with you that all drafts drawn under and in compliance with the terms and conditions of this credit will be duly honored on delivery of documents as specified if presented at this office on or before July 11, 2004. Two Burlington Square. P.O. Box 820• Burlington, Vermont. 05402-0820. 802-658-4000 Except so far as otherwise expressly stated, this credit is subject to the "Uniform Customs and Practice for Documentary Credits (1993 Revision), International Chamber of Commerce Publication #500." Very truly yours, Debra E. Cross Vice President Two Burlington Square. P.O. Box 820• Burlington, Vermont• 05402-0820. 802-658-4000 " J/ BENEFICIARY ACCEPTANCE Chittenden Bank has this 11th day of July, 2001 caused to be Hand Delivered Letter of Credit #10058 to the Beneficiary, City of South Burlington. This Letter of Credit is Issued on behalf of Ethan Allen Holdings LLC. R By r ly Authorized Agent Date l 161 1r Two Burlington Square. P.O. Box 820• Burlington, Vermont* 05402-0820® 802-658-4000 S I T E P LAN L E TT E R ® F C R E D I T AGREEMENT THIS AGREEMENT, exe�u �i i triplicate between , of / 6IIV I;t l L , herein fter referred to as "DEVELOPER",of hereinafter referred to as ""Bank", and hereinafter referred to as 'MUNICIP ITY". W I T N E S S E T H: WHEREAS, Developer has received site plan approval from the MUNICIPALITY'S PlAnning Commiission for th de elopment of property Iocat.ed a4 , i , "rt �� i 6 . , as depecited on a s to A plan entitled �- dt �/ ", ,d ted 0 , and prepared by rr4 7XC WHEREAS, DEVELOPER is required by said approval, at its own expense, to complete the construction of the development site in accordance with the plan approved by the Planning Commission; and WHEREAS, the parties to this Agreement wish to establish a mechanism to secure the obligations of the DEVELOPER for the work as set forth above; and WHEREAS, the BANK executes this Agreement solely in the capacity of issuer of a Letter of Credit hereinafter specified; NOW, THEREFORE, the parties hereby covenant and agree as follows: 1. DEVELOPER will, at its own expense, complete the following construction as depicted and in accordance with the specifications set forth in said site plan and,related documents: //, 2. The Developer shall complete the improvements set forth in Paragraph 1 no later than >� 3. DEVELOPER shall replace or repair any defective or improper work or materials which may be recognized within one year after completion of the improvements set forth in Paragraph I. For the purpose of this Agreement "completion" shall be deemed to have occurred when the MUNICIPALITY has inspected and approved the construction of all the improvements required by this Agreement and issued written notice to the DEVELOPER that the construction is complete. 4. For the guarantee of DEVELOPER's performance of all requirements hereunder set forth, DEVELOPER has caused the BANK to issue its Irrevocable Letter of Credit in favor of the MUNICIPALITY, the original of which is attached to the MUNICIPALITY's copy of this Agreement, and a copy of which is attached to the DEVELOPER's copy of this Agreement. During the term of this Agreement, DEVELOPER shall cause the attached Letter of Credit to be renewed at least thirty (30) days before the maturity date thereof. Failure of DEVELOPER to deliver evidence of such renewal to MUNICIPALITY thirty (30) days prior to the date of expiration of said Letter of Credit shall constitute a default of the terms of this Agreement. 5. Said Irrevocable Letter of Credit provides that the drafts drawn under said credit, must be accompanied by a written statement signed by a duly authorized agent of the MUNICIPALITY, that in the judgement of the MUNICIPALITY, the DEVELOPER is in default under the terms of this Agreement, and that the funds to be drawn by the draft are in payment for, or in anticipation of payment for materials, labor and services required for completion of the improvements identified in Paragraph 1. Payment of each draft will be made at sight when presented to the BANK by the MUNICIPALITY, the payment limited only by the aggregate amounts presented in relationship to the maximum amount of the Letter of Credit. If DEVELOPER shall be in default of the Agreement for seven (7) days because of its failure to provide evidence of renewal of the Letter of Credit, required in paragraph 4 above, the MUNICIPALITY shall notify DEVELOPER by certified mail of said default. DEVELOPER shall then within three (3) business days provide MUNICIPALITY with evidence of said renewal of Letter of Credit or MUNICIPALITY may notify BANK of such default and request payment under said Letter of Credit. r � �ll"I i 6.The EVELO,PEr N,CIPALITY hereby agree that the sum of. +r'L f Y`7 z/L�` ( S �, `` ) shall be sufficient tsecure DEVELOPER's obligations u der this Agreement but shall not relieve DEVELOPER from the obligation to pay any additional costs, if actual costs exceed the above -stated cost. 7. The MUNICIPALITY will promptly submit to the DEVELOPER a copy of any draft it submits to the BANK. The consent of the DEVELOPER to payment of said draft by BANK to the MUNICIPALITY under said Letter of Credit shall not be required, . 2: 8. The MUNICIPALITY shall not file with the BANK a Statement of Default until ten (10) days after notice has been sent to the DEVELOPER, by certified mail, setting forth its intention to do so. 9. All funds drawn on the BANK by the MUNICIPALITY pursuant to the Letter of Credit shall be used solely by the MUNICIPALITY for the purpose of completing construction of the improvements Identified in Paragraph 1. Any work contracted for by the MUNICIPALITY pursuant hereto shall be let on a contractual basis, or on a time and material basis, or shall be performed by the MUNICIPALITY's own work force and equipment, or shall be accomplished in such other manner as in the judgement of the MUNICIPALITY shall accomplish the work more expeditiously and economically. 10. If payments are drawn on the BANK by the MUNICIPALITY pursuant to said Letter of Credit, and it shall later develop that a portion of the monies drawn are in excess of the MUNICIPALITY'S needs, any such excess amount shall be refunded by the MUNICIPALITY to the BANK, to be credited by said BANK to the DEVELOPER. 11. This Agreement and said Letter of Credit shall terminate and shall be of no force and effect upon completion of the one year warranty period as described in the above Paragraph 3. If the MUNICIPALITY has not delivered any written notice to the DEVELOPER of any defective or improper work or materials in the construction of the improvements within the twelve (12) month period, or if notice has been given and the defective work or materials have been corrected by the DEVELOPER, the MUNICIPALITY shall forthwith notify the BANK in writing that the Letter of Credit may be canceled, and shall return the original Letter of Credit to the BANK, and both the DEVELOPER and the BANK shall be released from all obligations hereunder and under said Letter of Credit. 12. The BANK may not modify the Letter of Credit without first receiving written consent of the MUNICIPALITY. 13. DEVELOPER hereby agrees to indemnify and hold BANK harmless from all claims, causes of action or liability of any kind arising out of this Agreement or the issuance by BANK of this Letter of Credit, including attorney's fees, as long as BANK follows the terms and conditions outlined in said Letter of Credit. 14 This Agreement shall be binding on all parties hereto and their respective heirs, executors, administrators, successors and assigns. 0 .s Dated at IN THE PRESENCE OF: t e d atrZ,�, IN PRESENCE OF: Dated tLk I ' r' Vermont, this day of%� By• ,r • 4 } Duly Authoriltnel Agent (DEVELOPER) Vermont, this day of cI ( HANK ) Vermont, this day •f IN SENCE �Ow All- 2 By: C. Dul uthorized Agent (MUNICIPALITY) 4 111111 , IF DEPARTMENT OF PLANNING & ZONING 575 DORSET STREET SOUTH BURLINGTON, VERMONT 05403 (802) 546-4106 FAX (802) 546-4101 July 11, 2001 T...._1 ✓hT -- -. raul V ] GCaiy O'Leary -Burke, PLC 5 Andre Avenue, Suite 5 Essex Jct., VT 05452 Re: Site Plan Application, 86 Ethan Allen Drive Dear Mr. O'Leary: Enclosed please find a copy of the minutes and Finding of Facts of the Development Review Board meeting on June 19, 2001 (effective date June 10, 2001). Please note the conditions of approval, including that a Zoning Permit be obtained within six (6) months or this approval will be null and void. If you have any questions, please give me a call. Sincerel Sarah MacCallum Associate Planner Enclosure FEATURES HOUSING — Rear housing is rugged, corrosion -resistant, die-cast aluminum. Corrosion -resistant external hardware includes slotted hex -head and tamper -proof fasteners. Finish is dark bronze thermoset polyester powder electrostatically applied, BALLAST — 100W high reactance, high power factor. Encased -and -potted solid-state ignitors. 175W constant -wattage autotransformer. Ballast is cop- per wound and 100% factory tested. Meets ANSI standards and is UL 1029 listed. Electrical components are mounted on back housing. (For 50 hertz availability, consult factory). OPTICS — Reflector is finished in white thermoset polyester powder electro- statically applied. Front housing and refractor are one-piece, injection - molded, UV -stabilized polycarbonate. Standard finish on opaque portion of front cover and back housing is dark bronze polyester enamel. Refractor is sealed and gasketed to inhibit the entrance of outside contaminants. INSTALLATION —Top 3/4'threaded wiring access. Back access through re- movable 3/4' knockout. Feed-thru wiring can be achieved by using a condulet tee. Mount on any flat vertical surface. SOCKET— Porcelain, horizontally-oriented,100W medium -base socket, 175W- mogul-base socket with copper alloy, nickel -plated screw shell and center contact. UL listed medium base ssoW Fnnv mnn 11CMtAr rn,,,, n_.1 _ _., wuv. ouui dre - y ,50 4KV pulse rated. - LISTING — UL 1572 listed suitable for wet locations. CSA certified (see options). NOM labeled (see options). Type...................................... Catalognumber............................................................. ................ Wall-Paks TWP Metal Halide 100,175W 8' to 15' mounting Height: 15-7/16' (39.2cm) Width: 16-1/8" (41 cm) Depth: 7-3/4' 09.7cm) Weight: 16 lbs. (7 kg) ORDERING INFORMATION Example: TWP 175M 120 Choose the boldface catalog nomenclature that best suits your needs and write it on the appropriate line. Order accessories as separate catalog numbers (shipped separately), TWP Series Wattage Voltage .�P /lamp 120 L) P tion s 100M' 082 2 Shipped installed in f Mure SF Single fuse (120, 277, 347V)° LPI Lamp (shipped in carton with fixture) 175M 2402 OF Double fuse (208, 480V)° LS Lamp support (mogul socket only) IS Intea i fitter 277 540, EC Emergency circuit S Full shiel 347 4802 QRS Quartz restrike system" MG yyireguard9 TBa CR Corrosion -resistant finish (housing only) DBL Optional architectural color — black CRT Corrosion -resistant finish (Teflon)' DMB Optional architectural color — medium bronze -70F Reduced ambient operation DWH Optional architectural color — white PE Photoelectric cell — button type' CSA Labeled for US shipment to Canada PER NEMA twist -lock receptacle8 NOM Labeled for shipment to Mexico Accessories Order as separate catalog number. PEK Photocell kit 020V only) PE3 NEMA twist -lock photocontrol (347V) PE4 NEMA twist -lock photocontrol (48OV) NOTES: 1 Not available 480V. 6 Quartz lamp wattage not to exceed 2 Not available in Canada. ballastwattage rating. 3 Optional multi -tap ballast (120, 208, 277V). 020, 277, 347V in Canada). 240, 7 Black finish on housing only. 4 Not available with multi -tap ballast. 8 Photocell not included. 9 Requires factory modification. 5 Lamp not included. /A L/THON/A LAGHT/NG HI-TEK INDUSTRIAL & OUTDOOR LIGHTING TWP M1 (CITY OF SOUTH BUPMINGTON DEPARTMENT OF PLANNITq G & TONE"4G 575 DORSET STREET SOUTH BUR,LINGTO 1, vERMONT 05403 (502) 546-4106 Pe A 7' (QA9n QAG A 101 Permit Number ASP- C- APPLICATION FOR SITE PL VIEW All information requested on this application must be completed in full. Failure to provide the requested information either on this application form or on the site plan will result in your application being rejected and a delay in the review before the Development Review Board. as shown on deed, 2) LOCATION OF LAST RECORDED DEED (Book and page # 3) APPLICANT (Name, mailing address, phone and fax #) CONTACT PERSON (Name, mailing address, phone and fax #jal�#t .. i1�� 1r� / 5'✓r',, �����. � .�-�;•� 1�; L- t:-s,��` /fir _ �s�f' 7 _� �� 0 5) PROTECT STREET ADDRESS:14&rll--JZi�!(_ n) TAX PARCEL 1D # (can be obtained at Assessor's Office 7) PROJECT DESCRIPTION a) Existing Uses on Property (including b) Proposed Uses on property (include c) Total building square footage on p and size of each separate use} iption and size o/� each new use and a sting uses to remain} (proposed buildings and existing buildings to remain) d) Height of buildings�i umber of floors (proposed buildings and existing buildings to remain, specify if basement i�; , �� (p p g g g P fy and mezzanine) /�� � rxL e) Number of residential units (if applicable, new unityand existing units to remain) f'1 Number of employees & company vehicles (existing and proposed, note office versus non -office employees) Other (list any other information pertinent to this application not specifcally requested above, -olease note if Overlay Districts are applicable): 8) LOT COVERAGE a) 3, ' ding: Existing ull % Proposed % b) Overall (building, paxidng, outside storage, etc) `� Existing---!L-0/0 Proposed -�- -,9' % c) Front yard (along each street) Existing 2_1/o Proposed 9) COST ESTRAATES a) Building (including interior renovations): 01 b) Landscaping: $ r-7 1111 f< Z/ - 6C c) Other site improvements (please list with cost): 10) ESTIMATED TRAFFIC a) A-verage daily traffic for entire property (in and out): b) A.M. Peak hour for entire property (in and out): c) P.M. Peak -hour for entire property (In and out): 12) PEAK DAYS OF OPERATION: /W/"`�----S� — 13) ESTIMATED PROJECT COMPLETION DATE: 25�ez Ahr 14) SITE PLAN AND FEE A site plan shall be submitted which shows the information listed on Exhibit A attached- Five (5) regular size copies and one reduced copy (I I " x 17") of the site plan must be submitted- A site plan application fee shall be paid to the City at the time of submitting the site plan application (see Exhibit A). I hereby certify that all the information requested as part of this application has been submitted and is accurate to the best of my knowledge. SIGNATURE OF PROPERTY OWNER Do not write below this line BATE OF SUBMISSION: REVIEW AUTHORITY: ❑ Development Review Board ❑ Director, Planning & Zoning I have reviewed this site plan application and find it to be: ❑ Complete ❑ Incomplete Director of Planning & Zoning or Designee Date of 5 SITE PLANT The following information must be shown on the site plan. Please submit five (5) copies and one reduced copi(I I " x 17") of the site plan. Failure to provide the following information will result in your application being rejected and a delayin the review before the Development Review Board. • Lot drawn to scale (20 feet scale if possible) • Survey data (distance and acreage) • Contours (existing and finished) • Proposed landscaping schedule (number, variety and size) as required in Section 26.105 of the zoning regulations • Location of streets, abutting properties, fire hydrants, existing buildings, existing landscaping • Existing and proposed curb cuts, pavement, waWvays • Zoning boundaries • Number and location of parking spaces (as required under Section 26.25 of the zoning regulations) • Number and location of handicapped spaces (as required under Section 26.253(a) of the zoning regulations) • Location of septic tanks (if applicable) • Location of any easements • Lot coverage information: Building footprint, total lot, and front yard o North arrow • Name of person or firm preparing site plan and date • Exterior lighting details (cut sheets). All lights should be down casting and shielded. • Dumpster locations (dumpsters must be screened) • Bicycle rack as required under Section 26.253(b) of the zoning regulations • If Restaurant is proposed, provide number seats and square footage of floor area provided for patron use but not containing fixed seats APPLICATION --FEE 2-N-ew Application 60.00* I '2Amendment 35.00* * Includes $ 10. 00 recording fee O'Leary -Burke c � Associates, PLC June 20, 2001 Ms. Sarah MacCallum Associate Planner City of South Burlington 575 Dorset Street South Burlington, VT 05403 RE: Lot #11, 86 Ethan Allen Drive Belter Park, South Burlington, VT Dear Sarah: n, IVED AM 2 1 20 CitY of SO. Burlington As a follow up to the June 19, 2001 approval of the above referenced project, please find the following: • Lighting cut sheets for the RUUD MAC41O-D wall -mounted 100-watt metal halide lights as specified on sheet D1; • A copy of the plans and letter sent to Jay Nadeau, South Burlington Water Department addressing his comments regarding the water supply to the project. If you have any questions, please feel free to give us a call. Sincerely, Kevin R. LaRose, E.I. Z:\ 1999\99013\maccallum.doc 5 ANDREW AVE. SUITE 5 ESSEX JCT., VT 05452 PHONE 802-878-9990 FAX 802-878-9989 CIVIL@TOGETHER.NET MACW SERIES WALL MOUNT 1 _�'° (305 BULLETIN MACW-12" mm) AREA )UTOFF FLOOD RUUD LIGHTING point Four, 1/2" (13 mm) conduit entries, mm) 1 4„ (102 mm) 1 4" (102 mm) 6" (152 mm) GENERAL DESCRIPTION: SPEC. # WATTAGE CATALOG # (a) VOLTAGE (b) OPTIONS (Factory Installed) 50W MH 70W MH MACW407 100W MH MACW410-D �bl 175W MH MACW417- _L _ 35W HPS MACW503-1 (b) 50W HPS MACW505-0 (b) 70W HPS MACW507-!a) _ 100W HPS MACW510- (a) 150W HPS MACW515- (a) Specify (a) Voltage, and (b) Options. M=120/208/240/277V (N/A on 50-t00W MH & 35, 50W HPS) T=120/277/347V (N/A on 50-100W MH & 35, 50W HPS) (b) 1=120V (Reactor Ballast) (For 50-15OW HPS) 5=480V (N/A on 50-100W MH & 35, Ib) 50W HPS) = 50D=220/240V 50 Hz (N/A on 50, (b) 70W MH & 35W HPS) (b)I8=220V 60 Hz (N/A on 50W MH & 35, 50W HPS) F=Fusing Q=Quartz Standby (Includes 10OW quartz lamp) (non delay -relay type) -(a)P=Button Photocell -SP=External Photocell (torMOV) Ballast Housing. Reflector. Seamless, Prefinished semi specular die cast aluminum. diffuse & diffuse aluminum Capacitor Finish color; bronze. wrapper, and semi specular aluminum sides. 1.25" (32 mm)--{ I----- ❑ 12" (305 mm) —I ignitor I _ (Where required) Lamp 1/2" Conduit (Included). Entry 5" (127 mm) ---- - Lampholder — T Adjustable Backlight Shield. 0° to 30°. Wall Mount Box. — — Ballast For surface wiring Compartment �— Lens Frame. or entry. Cover Die cast aluminum Finish color; black. door frame secures - - Patented lens; sealed with Hinge silicone gasket. Assembly Finish color; black. 60' forward throw sharp cutoff luminaire with adjustable backlight control for H.I.D. lamp, totally enclosed. Backlight shield provides precise cutoff adjustability from 0° (nadir) to 301 (house -side). Housing is seamless, die cast aluminum. Lens assembly consists of rigid aluminum frame, high - impact, clear tempered glass, and backlight shield. Fixture mounts to wall with a 4" (102 mm) x 6" (152 mm) x 1.25" (32 mm) cast aluminum mounting box and gasket. Two 5/16" (8 mm) dia. threaded mounting rods are supplied with nuts and sealing washers to attach fixture to mounting box. Also provided are four threaded and closed 1/2" (13) conduit entries. ELECTRICAL: Fixture includes clear, medium base lamp. Porcelain enclosed, 4kv rated screw shell type lamp holder. All ballast assemblies are high power factor and consist of the following: 50-100W MH & 50W HPS: Dual -tap (in U.S.: 120/277V; in Canada: 50W MH & 50W HPS= 120/277V, 70 & 100W MH=120/347V) High Reactance ballast. 175W MH: Constant Wattage Autotransformer, see voltage options. 35W HPS: 120V Reactor ballast. 70-15OW HPS: High Reactance ballast, see voltage options. FINISH: Exclusive DeltaGuardTM finish features an E-coat epoxy primer with medium bronze acrylic powder topcoat, providing excellent resistance to corrosion, ultraviolet degradation and abrasion. The finish is covered by our 7 year limited warranty. LABELS: ANSI lamp wattage label supplied, visible during relamping. UL Listed for wet locations and enclosure classified IP54 per IEC 529; in Canada, CSA Certified or Canadian UL Listed for wet locations. ACCESSORIES: FWG-12 = Wire Guard 12" (305 mm) AREA CUTOFF FLOODLIGHT APPLICATION DATA Candlepower Distribution Curve of 150W HPS 12" (305 mm) Area Cutoff Floodlight, with backlight shield located for backlight cutoff. 60' 40' 20' 0' 20' 40' 60' 80' 60 40' 20 3 5 0' 20 40' Isofootcandle plot of 15OW HPS Area Cutoff Floodlight at 15' (4.6 m) mounting height, 0° vertical tilt, with backlight shield located for backlight cutoff. 80' 60, 40' 20' 01 20' 40' P, AN 11% 01111011110 MEEMEN Isofootcandle plot of 175W MH Area Cutoff Floodlight at 15' (4.6 m) mounting height, 0° vertical tilt, with backlight shield located for backlight cutoff. 0 4141 E A 1019 0 14 1460 1111 rn-11311 Im , N - ME I iJ%MEN Isofootcandle plot of 15OW HPS Area Cutoff Floodlight at 20' (6.1 m) mounting height, 0° vertical tilt, with backlight shield located for backlight cutoff. I' 104 goo, NEENNE Isofootcandle plot of 175W MH Area Cutoff Floodlight at 20' (6.1 m) mounting height, 0° vertical tilt, with backlight shield located for backlight cutoff. 80' 60' 40' 20' o' 20' 40' 60' 80' 80' 60 40 1 20 � 5 0' 20 40 60' 80 Isofootcandle plot of two 150W HPS Area Cutoff Floodlights at 20' (6.1 m) mounting height, 180' configuration, 0° vertical tilt, with backlight shield located for backlight cutoff. RUUD LIGHTING, INC. U.S. 9201 Washington Avenue Racine, Wisconsin 53406-3772 CANADA 5700 Timberlea Blvd., Unit 3 Mississauga, Ontario L4W 5B9 PHONE (800)236-7000 PHONE (800)473-1234 © 1994, RUUD LIGHTING, INC. Printed in U.S.A. FAX (800)236-7500 FAX (800)236-7500 O'Leary -Burke U I Associates, PLC a June 20, 2001 Mr. Jay Nadeau Water Department City of South Burlington 403 Queen City Park Road South Burlington, VT 05403 RE: Lot #11, 86 Ethan Allen Drive Belter Park, South Burlington, VT Dear Jay: Attached is a revised set of plans per your comments in a letter dated May 23, 2001. Please find the following changes to the attached set of plans for your review: 1.. A note has been added to plan sheets 1 and D1 stating that, "All work to be performed in accordance with the Specifications and Details for the Installation of Water lines and appurtenances for all Water Systems Owned by the Champlain Water District, the City of South Burlington, and the Village of Jericho"; 2. A note has been added to plan sheets 1 and DI stating that, "The contractor shall notify the South Burlington Water Department prior to backfilling joints, thrust blocks, fittings, main line taps, appurtenances, and water crossings"; 3. A note has been added to plan sheets 1 and D1 stating that, "The South Burlington Water Department shall be notified in advance to locate and mark all water mains that may be involved in this project"; 4. Water lines shall be buried to a depth of 6' to the top of the pipe. Insulation meeting the above specifications shall be installed where necessary. 5. The water department will be notified of any changes to this project with hard copies; 6. A note has been added to plan sheets land DI stating that, "As-builts in the form of one electronic copy in Auto-CAD.DWG version 14 and hard 5 ANDREW AVE. SUITE 5 ESSEX JCT., VT 05452 PHONE 802-878-9990 FAX 802-878-9989 CI VIL(a TOGETHER.NET Mr. Jay Nadeau June 20, 2001 Page 2 copy will be supplied to the water department upon completion of the project"; 7. It is understood that the Champlain Water District will perform an inspection of the water system one year from the date the system is placed into service. Following the applicants correction of punch list items, if any and receipt of all record drawings, CWD will accept the water system. If you have any questions, feel free to call. Sincerely, Fevin R. LaRose, E.I. Z:\1999\99013\nadeau.doc O'Leary -Burke ch l Associates Pic `V May 14, 2001 Mr. Ray Belair, Zoning Administrator 575 Dorset Street So. Burlington, VT 05403 RE: ACM Realty — 86 Ethan Allen Drive Dear Ray: V, MAY 1 5 20 city of So. Burlington We are writing on behalf of ACM Realty as a follow up to our telephone conversation on May 14, 2001. The City granted approval on December 21, 1999. Condition #7 stated that the applicant shall obtain a zoning permit within six months (June 21, 1999). As discussed this was not possible, as the Act 250 permit was not granted until September 8, 2000. The only plan changes were minor, as required per the City approval and/or State approval. Please find the following for re -approval: 1. Site Plan application; 2. $60 application fee; 3. Five (5) copies of project plans (sheets 1 and 2). We understand that this matter will be scheduled for June 19, 2001 as a consent agenda item. If you have any questions, please call. Sincerely, David W. Burke Enc. cc: Chris Senesac DA 1999\99013\Belairrenew.doc 5 ANDREW AVE. SUITE 5 ESSEX JCT., VT 05452 PHONE 802-878-9990 FAX 802-878-9989 CIVIL@TOGETHER.NET Land Use: 150 Warehousing Description Warehouses are primarily devoted to the storage of materials; they may also include office and maintenance areas. High -cube warehouse (land use 152) is a related use. Additional Data No vehicle occupancy data is available specifically for warehousing, but the average was approximately 1.3 persons per automobile for all industrial uses. The peak hour of the generator typically coincides with the peak hour of the adjacent street traffic. Farilitiac with amnlnvooc nn . _ + .a, un •win May pear, clt Utl WI f wurs. The sites were surveyed from the late 1960s to the mid-1990s throughout the United States and Canada. Source Numbers 6, 7, 12, 13, 15, 17, 74, 184, 192, 390, 406, 411, 436, 443 i� � 4 '. V C MAY 1 5 2001 U'v 'It SO, Borlmgton Trip Generation, 6th Edition 188 Institute of Transportation Engineers Warehousing (150) Average Vehicle Trip Ends vs: 1000 Sq. Feet Gross Floor Area On a: Weekday, CJity nt �n . Burlingtarj Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Number of Studies: 22 Average 1000 Sq. Feet GFA: 406 Directional Distribution: 24% entering, 76% exiting Trip Generation per 1000 Sq. Feet Gross Floor Area Average Rate Range of Rates Standard Deviation L-- 0.51 0.17 - 1.66 n_AS Data Plot and Equation i 1,50 1,40 1,301 1,204 1,101 1,00( 90C 80C 700 600 Soo 400 300 200 100 0 ....................... ..130.. ......... :X.................. ..................................... ,<..........•......... ..... ............... .........X .... x .i�.. ...................... X.......... . ........................ ....................... Xkx '............X........................................................ X 0 1000 2000 3000 X = 1000 Sq. Feet Gross Floor Area X Actual Data Points Fitted Curve ------ Average Rate Fitted Curve Equation: Ln(T) = 0.754 Ln(X) + 0.826 R2 = 0.69 Trip Generation, 6th Edition 200 Institute of Transportation Engineers Warehousing (150) Average Vehicle Trip Ends vs: 1000 Sq. Feet Gross Floor Area On a: Weekday MAY 1 5 200f Number of Studies: 16 City 0t Sa, BLirlington Average 1000 Sq. Feet GFA: 273 Directional Distribution: 50% entering, 50% exiting Trip Generation per 1000 Sq. Feet Gross Floor Area Average Rate Range of Rates Standard Deviation 4.96 1.51 - 17.00 4.05 Data Plot and Equation 12.00 11,00, 10,001 9.001 N 8,00( to a f— 7,OOC a> . U L 6,000 d Cn d 6,000 Q II 4,000 I— 3,000 2,000 1,000 0 ............................................... ....................... ....................... X .................... ..<......... .. ....................... X ..............,..............................;.......................... .: ....................... X..�.............:................ ..........:.......................... X X......................... X 0 1000 2000 3000 X = 1000 Sq. Feet Gross Floor Area X Actual Data Points Fitted Curve ------ Average Rate Fitted Curve Equation: T = 3.676(X) + 350.266 R2 = 0.82 Trip Generation, 6th Edition 198 Institute of Transportation Engineers enousing (150) Average Vehicle Trip Ends vs: 1000 Sq. Feet Gross Floor", On a: Weekday, A.M. Peak Hour of Generator 1 5 20M Number of Studies: 19 Lity of So. Burlington Average 1000 Sq. Feet GFA: 340 Directional Distribution: 59% entering, 41 % exiting f�--r,&rotinn nPr 1000 Sa. Feet Gross Floor Area 10 Average Rate Range of Rates 0.57 0.28 - 1.93 Standard Ueviauull Ita plot and Equation 1,300 .......... ......... .. ......... 1,200 ....... ................... .......... 1,100 411S 11 1 1 .......... 1.000 X ..................... .................. F ................. ............ 900 .......... .. .... ...................... 800- ......... ................................. .. 700 .......... .................. > ...................... ............. 600- ............ ....................... .............. Soo X........................II .. X.... ... .................... — 400 ............. ..................... 300 ........ ................... ........ ......... 200 X........ ............ 100 X X 0 - 0 10 ; 00 20 00 3000 X = 1000 Sq. Feet Gross Floor Area ------ Average Rate X Actual Data Points — Fitted Curve Fitted Curve Equation: T = 0.388(X) + 63-121 R 2 = 0.86 Trip Generation, 6th Edition 201 Institute of Transportation Engineers 99013 - ACM/BELTER PARK LOT #11 LANDSCAPING ESTIMATE By: KRL 6/3/99 NO. DESCRIPTION UNIT QTY UNIT COST TOTAL COST 1 CRIMSON KING MAPLE EA 1 $250.00 $250.00 2 WHITE PINES EA 6 $200.00 $1,200.00 3 AMERICAN ARBORVITAE EA 6 $150.00 $900.00 4 RED MAPLES EA 3 $250.00 $750.00 5 ROSE GLOW BARBERRY EA 11 $50.00 $550.00 I 3,650.00 " r! 4. tJ„�� k 4 #A Y f �rN of fii'%jogton DEVELOPMENT REVIEW BOARD MEMO JUNE 19, 2001 MEETING MEMORANDUM To: South Burlington De to ent Review Board From: Raymond J. Bela nistrative Officer Re: June 19, 2001 agenda items Date: June 15, 2001 2) CONSENT AGENDA A) SITE PLAN APPLICATION — 6,475 SQ FT WAREHOUSE BLDG - ETHAN ALLEN HOLDINGS 90 ETHAN ALLEN DRIVE This project consists of constructing a 6,475 square foot warehouse building. The Planning Commission approved this site plan on November 2, 1999 (minutes enclosed). The approval has since expired. The property is located within the IC District. Access/Circulation: Access is proposed to be via a 30 foot curb cut on Ethan Allen Drive. Circulation on the site is adequate. Coverage/setbacks: Building coverage is 15.62% (maximum allowed is 30%). Overall coverage is 39.44% (maximum allowed is 70%). Front yard coverage is 26.9% (maximum allowed is 30%). Setback requirements have been met. Parking: A total of 16 parking spaces are required and 17 spaces, including one handicapped space and a bike rack are being provided. The plan should be revised to note the correct parking requirement for office space which is 1 space/250 square feet. Landscaping_ The minimum landscaping required, based on building costs, is $5,828 which is being met. Plantings will include Red Maple, Rose Glow Barberry, and White Pine. The plan should be revised to provide a 15 foot green strip along the property's frontage as required under Section 25.107 of the zoning regulations. Coverages should be adjusted accordingly. Li htin : Exterior lighting consists of three 12" wall mounted fixtures with 100 watt metal halide lamps. Prior to issuance of a zoning permit, the applicant should submit details of proposed building mounted lights to the Director of Planning & Zoning for approval. DEVELOPMENT REVIEW BOARD MEMO JUNE 19, 2001 MEETING Dumpster: The dumpster will be screened by a 6 ft. high stockade fence. Traffic: This project is exempt from the road impact fees. Recommended Conditions: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. All exterior lighting shall consist of downcasting shielded fixtures. Any changes to approved lights shall require approval of the Director of Planning & Zoning prior to installation. Prior to permit issuance, the applicant shall submit details of the proposed building mounted lights to the Director of Planning & Zoning for approval. 3. Prior to the issuance of a zoning permit, the applicant shall post a $5,828 landscape bond. The bond shall remain in- effect for three (3) years to assure that the landscaping takes root and as a good chance of surviving. 4. The building shall be sprinklered. 5. The Development Review Board approves a sewer allocation of 225 g.p.d. The applicant will be required to pay the per gallon fee prior to permit issuance. 6. The applicant shall comply with the requirements of the South Burlington Water Department as outlined in a letter dated 5/23/01 from Jay Nadeau to O'Leary -Burke Civil Associates PLC. 7. The applicant shall obtain a zoning permit within six (6) months pursuant to Section 27.302 of the zoning regulations or this approval is null and void. 8. The applicant shall obtain a Certificate of Occupancy/Compliance from the Administrative Officer prior to use of the building. 9. Any change to the site plan shall require approval by South Burlington Development Review Board. 3) SOUTH BURLINGTON REALTY COMPANY —PRELIMINARY & FINAL PLAT & DESIGN REVIEW APPLICATIONS — ADD 8 UNITS TO 92 UNIT PRD, 201 PATCHEN ROAD This project consists of amending a planned residential development consisting of 92 multi -family units in 23 buildings on 27.76 acres of land. The amendment consists of adding four (4) multi -family units in one (1) building resulting in 96 multi -family units. The sketch plan was reviewed on 3/20/01 (minutes enclosed). Since sketch plan review, the applicant has eliminated one (1) building (4 units). This property is located on Juniper Drive and lies within the Residential Four District and C.O. District. It is bounded on the south by a single family residence and the Summer Woods residential development, on the north by the Patchen Place residential development and a cemetery, on the west by undeveloped property, and on the east by single family residences and Patchen Road. 2 .jJUTH BURLINGTON WATER DEPARTMENT 403 Queen City Park Road South Burlington, VT 05403 Phone: (802) 864-4361 Fax: (802) 864-0435 May 23, 2001 O'Leary -Burke Civil Associates,PLC 5 Andrew Ave., Suite 5 Essex Junction, VT RE: Lot 11, Better Park South Burlington We have reviewed the above referenced project and offer the following comments: 1. All construction drawings and plans shall have a note stating," All work to be performed in accordance with the Specifications and Details for the Installation of Water lines and Appurtenances for All Water Systems Owned by the CWD, the City of South Burlington, and the Village of Jericho." 2. All materials for this project shall be in accordance with the above referenced specifications. 3. The SBWD shall be notified in advance to locate and mark all water mains that may be involved in this project. 4. Water lines shall be buried to a depth of 6' to the top of the pipe. Insulation meeting the above specifications shall be installed where necessary. 5. The SBWD staff shall be notified in advance to inspect all fittings, thrust blocks and crossings prior to backfilling. 6. All Details should be modified to those shown in the Specifications and Details for the Installation of Water Lines and Appurtenances for all Water Systems Owned by the Champlain Water District, the City of South Burlington, and the Village of Jericho. 7. Upon completion of the water system construction project, "As-Builts" shall be supplied to the CWD Retail Department in the form of one hard copy and one electronic copy in Auto-CAD.DWG Version 14 Format or newer. 8. This department shall be notified of any changes to this project with revised hard copy plans. 9. After the above items are corrected and if there are no other changes to this plan the South Burlington Water Department approves this project relative to all water related activity. If you have any questions or concerns, please call me. Sincerely, South Burlington Water Depart t AJayydeau Superintendent Cc: Sara MacCullum DEVELOPMENT REVIEW BOARD NOVEMBER 2, 1999 Mr. O'Neill noted that in Burlington, applicants talk with the Fire Department in the conceptual stage. That doesn't happen in South Burlington. Mr. Dinklage noted that the Board and the Planning Commission rely heavily on staff comments. He said it would be good if they could be in a position where staff comments were always supported by the DRB. He encouraged the Chief to talk with Mr. Belair and with the applicants. Mr. Roth asked if there is a national code. Chief O'Neill said there is, and this code has been adopted by the State. But in certain situation, the Department has to sign off that they can provide protection. He agreed it would be good to talk with applicants early in the process. Mr. Belair said staff could notify the applicant when the Chief makes a recommendation and suggest the applicant get together with the Chief. Mr. Dinklage stressed that if the DRB makes a decision that the Chief strongly disagrees with, he should let the Planning staff know. 4. Continued Site Plan Application of ACM Realty to construct a 6475 sq. ft. warehouse building, 86 Ethan Allen Drive: Mr. O'Rourke stepped down during the application due to a conflict of interest. Mr. O'Leary identified the property as Lot I I of the Better Industrial Park. He noted that the application had been tabled to allow further discussion on the sprinkler issue. Mr. O'Leary said the applicant met with the Chief and understand his concern with the distance from the Fire Station and the potential response time. He noted there would be considerable savings in fire insurance if they sprinkler the building and have agreed to do so. Ms. Quimby moved the Development Review Board approve the site plan application of ACM Realty to construct a 6475 sq. ft. warehouse building, 86 Ethan Allen Drive, as depicted on a two page set of plans, page one entitled "Better Park Lot 11 Ethan Allen Drive South Burlington, Vermont," prepared by O'Leary -Burke Civil Associates, PLC, dated 5/20/99, last revised on 8/27/99, with the following stipulations: 1. All previous approvals and stipulations, which are not superseded by this approval, shall remain in effect. 2. The plat plan shall be revised to show the changes below and shall require approval of the Director of Planning & Zoning. Three copies of the approved revised plans shall be submitted to the Director of Planning & Zoning prior to permit issuance: OA DEVELOPMENT REVIEW BOARD NOVEMBER 2, 1999 a. The plan shall be revised to note the correct parking requirements for office space is one space/250 square feet. b. The plan shall be revised to provide a 15 foot green strip along the property's frontage as required under Section 25.107 of the zoning regulations. Coverage shall be adjusted accordingly. 3. All exterior lighting shall consist of downcasting shielded fixtures. Any changes to approved lights shall require approval of the Director of Planning & Zoning prior to installation. Prior to permit issuance, the applicant shall submit details of the proposed building mounted lights to the Director of Planning & Zoning for approval. 4. Prior to issuance of a zoning permit, the applicant shall post a $5828 landscape bond. The bond shall remain in effect for three years to assure that the landscaping takes root and has a good chance of surviving. 5. The Development Review Board approves a sewer allocation of 225 gpd. The applicant shall be required to pay the per gallon fee prior to permit issuance. 6. The building shall be sprinklered. 7. The applicant shall obtain a zoning permit within six months pursuant to Section 27.302 of the zoning regulations or this approval is null and void. 8. The applicant shall obtain a Certificate of Occupancy/Compliance from the Administrative Officer prior to use of the building. 9. Any change to the site plan shall require approval by the South Burlington Development Review Board. Mr. Farley seconded the motion, which was then passed unanimously. Mr. O'Rourke rejoined the Board. 5. Public hearing: Final Plat application of University Mall Realty Trust to amend an approval consisting of the following: 1) construction of a 983 space parking structure, 2) construction of a 111,504 sq. ft. GLA addition to the main building, and 3) construction of a 15,510 sq. ft. automotive center. The amendment consists of minor site modifications to the parking layout and green space areas, 155 Dorset Street: State of Vermont LAND USE PERMIT AMENDMENT CASE # 4C0643-19 LAWS/RF.GULATIONS INVOLVED APPLICANT Ethan Allen Holdings, LLC 10 V.S.A. §§ 6001-6092 (Act 250) ADDRESS 63 Mallets Bay Avenue Colchester, VT 05446 District #4 Environmental Commission hereby issues Land Use Permit Amendment 4C0643-19, pursuant to the authority vested in it by 10 V.S.A. §§ 6001-6092. This permit amendment applies to the lands identified in Book 148, Pages 225, of the land records of the City of South Burlington, Vermont, as the subject of a deed to Ethan Allen Holdings, LLC, the Permittee as Grantee. This permit specifically authorizes the Permittee to construct a 6475 square foot commercial office and warehouse/storage building to be served by municipal water and sewer facilities. The project also includes 16 parking spaces and two stormwater infiltration basins. The proposed project is part of a previously approved commercial subdivision under Land Use Permit #4C0643 and is located on Ethan Allen Drive in the City of South Burlington. The project is subject to Act 250 jurisdiction because the project involves the construction of improvements for a commercial purpose on more than ten acres and thus constitutes "development" pursuant to 10 V.S.A. § 6001(3) and Environmental Board Rule ("EBR") 2(A)(2), and the project is a material or substantial change to a development over which the Commission has jurisdiction and thus constitutes "development" pursuant to EBR 2(A)(5). Accordingly, a land use permit amendment is required pursuant to EBR 34. The Permittee, and its assigns and successors in interest, are obligated by this permit to complete, operate and maintain the project as approved by the District Commission in accordance with the following conditions`. All conditions of Land Use Permit 4C0643 and amendments are in full force and effect except as amended herein. By acceptance of this permit, the Permittee agrees to allow representatives of the State of Vermont access to the property covered by the permit, at reasonable times, for the purpose of ascertaining compliance with Vermont environmental and health statutes and regulations and with this permit. The project shall be completed, operated and maintained in accordance with: (a) Findings of Fact and Conclusions of Law #4C0643, (b) the plans and exhibits on file with the District Environmental Commission, and (c) the conditions of this permit. No substantial or material changes shall be made in the project without the prior issuance of a permit amendment. Land Use Permit #4C0643-19 Page 2 of 5 4. The approved plans are: Sheet 1 - "Site Plan - Belter Park Lot 1 l," dated 5/20/99, last revision 12/1/99; Sheet D1 - "Typicals, Details & Specifications," dated 5/20/99, last revision 6/5/00; Sheet - "Ethan Allen Holdings, LLC - Front Elevation," dated 7/20/99; and Sheet - "Ethan Allen Holdings, LLC - Rear & Side Elevation," dated 7/25/99. 5. A copy of this permit and approved plans shall be on the site at all times throughout the construction process. 6. The Permittee shall notify the District Commission in writing at least five (5) days prior to the commencement of construction that construction will be commenced. The District Coordinator may conduct a site visit to inspect the installation of erosion control measures. 7. No changes shall be made in the design or use of this project without the written approval of the District Coordinator or the Commission, whichever is appropriate under the Environmental Board Rules. 8. The District Environmental Commission maintains continuing jurisdiction during the lifetime of the permit and may periodically require that the permit holder file an affidavit certifying that the project is being completed, operated and maintained in accordance with the terms of the permit, as provided by 10 V.S.A. Ch. 151 and Environmental Board Rule 32(A). 9. By acceptance of the conditions of this permit without appeal, the Permittee confirms and agrees that the conditions of this permit shall run with the land and the land uses herein permitted, and will be binding upon and enforceable against the Permittee and all assigns and successors in interest. 10. The project is approved for the following maximum impacts: 16 - vehicle parking spaces (90 remaining for the commercial subdivision); 225 - gallons per day of water and wastewater; 32 - vehicle trips per day (463 remaining for the commercial subdivision); and 4 - peak hour vehicle trips (96 remaining for the commercial subdivision). 11. This permit hereby incorporates all of the conditions of the following Agency of Natural Resources Permits: • Water Supply and Wastewater Disposal Permit WW-4-1382 issued on April 5, 2000 by the Wastewater Management Division; and • Final Discharge Permit #1-1413 issued on July 26, 2000 by the Wastewater Management Division. Any subsequent nonmaterial changes to these permits shall be automatically incorporated herein upon issuance by the Agency of Natural Resources. Subsequent amendments involving material changes to the Act 250 permit shall not be constructed prior to review and approval of the District Coordinator or the District Commission under applicable Environmental Board Rules. Land Use Permit #4C0643-19 Page 3 of 5 12. The Permittee and all subsequent owners or lessees shall install and maintain only low -flow plumbing fixtures in any buildings. Any failed water conservation measures shall be promptly replaced with products of equal or better performance. 13. The limit of disturbance shall not exceed the area as shown on Sheet 1 (Exhibit #27) and noted as "silt fence." 14. The Permittee shall comply with the erosion control measures described in the application (Exhibit #5) and as shown on Sheets 1 and D1. The Permittee shall prevent the transport of any sediment beyond that area necessary for construction approved herein. All erosion control devices shall be inspected after each rainfall event, periodically cleaned as necessary, repaired promptly, and maintained until vegetation is permanently established on all slopes and disturbed areas. Sediment deposits shall be removed when they reach approximately one-half the height of the hay bale or silt fence barrier. Removed sediments shall be disposed in a stable upland area within the sediment barrier perimeter. The Commission reserves the right to schedule hearings and site inspections to review erosion control and to evaluate and impose additional conditions with respect to erosion control as it deems necessary. 15. The Permittee shall comply with the "Erosion Control Specifications" detailed on Sheet D1. All disturbed areas of the site shall be stabilized, seeded and mulched immediately upon completion of final grading. Between the periods of October 1 to April 15, all earth disturbing work shall conform with the "Winter Construction" standards and specifications of the Vermont Handbook for Soil Erosion and Sediment Control on Construction Sites (1987). 16. In addition to conformance with all erosion control conditions, the Permittee shall not cause, permit or allow the discharge of waste material into any surface waters. Compliance with the requirements of this condition does not absolve the Permittee from compliance with 10 V.S.A. Chapter 47, Vennont's Water Pollution Control Law. 17. The Permittee and all assigns and successors in interest shall install and continually maintain the landscaping as shown on Sheet 1 (Exhibit #27) by replacing any dead or diseased plantings within the season or as soon as possible after the ground thaws, whichever is sooner. 18. Immediately upon completion of the project, the Permittee shall submit a certification from a nurseryman or landscape architect stating specifically that"the landscape plantings have been installed in accordance with the approved landscape plans and applicable conditions of this permit." 19. The installation of exterior light fixtures is limited to those shown on Sheets 1 and Dl, and Exhibit #21, and shall be mounted no higher than (15) feet above grade level. All exterior lighting shall be installed or shielded in such a manner as to conceal light sources and reflector surfaces from view beyond the perimeter of the area to be illuminated. Additionally, all exterior lighting shall conform with the Outdoor Lighting Manual for Vermont Municipalities published by the Chittenden County Regional Planning Commission (1996). E Land Use Permit #4C0643-19 Page 4 of 5 20. All exterior signage shall comply with the details described in the application (Exhibit #5) 21. The installation and/or use of electric resistance space heat is specifically prohibited without the prior written approval of the District Environmental Commission. 22. The project shall conform with the Vermont Consolidated Act 250 Energy Guidelines for Typical Commercial and Industrial Buildings promulgated by the Vermont Department of Public Service. In addition to meeting the above referenced guidelines, the Permittee shall incorporate any additional energy efficiency measures that are determined by custom analysis to be cost effective for the project. 23. At the completion of the project, and prior to the occupancy of the building, the Permittee shall certify by affidavit that the site improvements have been constructed in accordance with this permit pursuant to Environmental Board Rule 32(A). 24. No further subdivision, alteration, and/or development of any parcel of land approved herein shall be permitted without the written approval of the District Commission. 25. The Permittee shall reference the requirements and conditions imposed by Land Use Permit #4C0643-19 in all deeds and leases. 26. Pursuant to 10 V.S.A. § 6090(b), this permit amendment is hereby issued for an indefinite term, as long as there is compliance with the conditions herein. Notwithstanding any other provision herein, this permit shall expire three (3) years from the date of issuance if the Permittee has/have not commenced construction and made substantial progress toward completion within the three year period in accordance with 10 V.S.A. § 6091(b). 27. All site work, construction and landscape installation shall be completed in accordance with the approved plans within three (3) years from the date of this permit, unless an extension of this date is approved in writing by the Commission. Such requests to extend must be filed prior to the deadline and shall be reviewed in accordance with Environmental Board Rule 32(B). 28. Failure to comply with all of the above conditions may be grounds for permit revocation pursuant to 10 V.S.A. § 6090(c). I Land Use Permit #4C0643-19 Page 5 of 5 Dated at Essex Junction, Vermont, this day of September 2000. By Rayb rn Lavigne, Acti Chair in this matter District #4 Environmen Commission Commission members participating in this decision: Myron Wheeler Ralph Montefusco The applicant or a party may file a motion to alter within 30 days from the date of this decision, pursuant to Environmental Board Rule 31. Any appeal of this decision must comply with all provisions of 10 V.S.A. § 6089 and Environmental Board Rule 40 including a $100.00 filing fee and the submission of the original and ten copies of the following: notice of appeal, a statement of why the appellant believes the commission was in error, a statement of the issues to be addressed in the appeal, a summary of the evidence that will be presented, a preliminary list of witnesses and this decision. Decisions on minor applications may be appealed if a hearing was held by the district commission or timely requested by the appellant. W:\ACT250\DIST4\4C643-19.PMT EXHIBIT LIST FOR APPLICATION #4C0643-19 Page 1 E D R [El A=APPLICANT X A H T E IN I C IT I T=TOWN TPC=TOWN PLANNING COMMISSION I E E JE J RPC=REGIONAL PLANNING COMMISSION B I IR I ANR=AGENCY OF NATURAL RESOURCES I V JE J AOT=AGENCY OF TRANSPORTATION T E ID I DPS=DEPARTMENT OF PUBLIC SERVICE D VDH=VERMONT DEPT. OF HEALTH [B] DHP=DIVISION FOR HISTORIC PRESERVATION N ]y] WMD=WASTEWATER MANAGEMENT DIVISION 0.1 NATURE OF EXHIBIT DATE ENTERED 1 3/20/2000 A Letter of Transmittal from O'Leary -Burke Associates to Jim Boyd (3/17/2000) 2 " A Chart of utility & traffic impacts/lots 9-21 3 A Land Use Permit Application (2/3/2000) 4 " A Schedule A fee information 5 " A Schedule B Act 250 Narrative 6 " A Schedule E adjoiner information 7 " A Schedule F certificate of service g A Project location map 9 " A Deed information 10 A LUP & Findings of Fact #4C0643 11 A Application for Water & Wastewater Disposal Permit (2/29/2000) 12 A Letter by Planning & Zoning, City of South Burlington re: sewer allocation (1/12/2000) 13 A Letter by South Burlington Water Department re: ability to serve (2/9/2000) 14 A Letter by O'Leary -Burke Associates to Joe Weith, Planner, City of South Burlington re: proposed office/warehouse (12/21/1999) 15 A Letter by O'Leary -Burke Associates to Water Dept. City of South Burlington (2/2/2000) Exhibit List for Application #4C0643-19 Page 2 16 3/20/2000 A Letter by Supt., South Burlington Water Department to O'Leary -Burke Associates (2/9/2000) 17 A Letter by O'Leary -Burke Associates to Champlain Water District (12/21/1999) 18 A Letter by Champlain Water District to O'Leary -Burke Associates (12/27/1999) 19 A Erosion Evaluation on Problem Sites 20 A Stormwater Discharge Permit Application (3/16/2000) 21 A Site Lighting Cut Sheets 22 A Soils Map 23 A Letter by O'Leary -Burke to Green Mountain Power Corp. (12/28/1999) & Letter by GMP to O'Leary -Burke re: GMP Guidelines (1/4/2000) 24 A Letter by GMP re: ability to serve (1/4/2000) 25 A Letter by O'Leary -Burke to VT Gas (12/28/1999) & Letter by VT Gas to O'Leary -Burke (1/3/2000) 26 A Letter by O'Leary -Burke to Joe Weith, City Planner (2/11/2000) Municipal Impact Questionnaire by J. Weith (2/25/2000) 27 A Plan: site plan, sheet 1 (revised 12/1/99) 28 A Plan: typicals, details & specifications, sheet D1 (revised 12/l/99) 29 4/6/00 A Water Supply & Wastewater Disposal Permit 30 8/9/00 A ANR Entry Of Appearance 31 9/6/00 A Final Stormwater Discharge Permit 4C064319.ex/eb OF SERVICE I hereby certify thw_ I this day of September, 2000 )opy of the foregoing Land Use Permit #4CO643-19 as sent, first class mail, postage prepaid, to: PARTIES: Ethan Allen Holdings, LLC 63 Malletts Bay Avenue Colchester, VT 05446 Paul O'Leary O'Leary -Burke Civil Associates 5 Andrew Avenue, Suite 5 Essex Junction, VT 05452 Margaret Picard, City Clerk Chair, City Council Chair, Planning Commission City of South Burlington 575 Dorset Street South Burlington, VT 05403 Michael Crane, Executive Director Chittenden County Regional Planning Commission PO Box 108 Essex Junction, VT 05453 Elizabeth Lord/Steve Sease Agency of Natural Resources 103 South Main St. - Center Bldg., 3rd Floor Waterbury, Vermont 05671-0301 FOR YOUR INFORMATION: District #4 Environmental Commission Ray Lavigne, Chair/Myron Wheeler/Ralph Montefusco 1 11 West Street Essex Junction, Vermont 05452 Ernie Christianson, Regional Engineer ANR/111 West Street Essex Junction, VT 05452 Dated at Essex Junction, Verm t, this day e tember, 2000. Edie Bowen, Admim tive Secretary wAC064319.cs/eb 879-5660 STATE OF VERMONT AGENCY OF NATURAL RESOURCES INTERAGENCY ACT 250 REVIEW COMMITTEE RE: Ethan Allen Holdings, LLC ) DISTRICT ENVIRONMENTAL COMMISSION #4 APPLICATION #4C0643-19 August 4, 2000 ENTRY OF APPEARANCE Please enter the appearance of the Agency of Natural Resources ("Agency"), State of Vermont, by and through its legal staff, Brett Rosenthal, in the above -captioned matter. Criterion 4 - SOIL EROSION Kim Greenwood, Water Quality Engineer with the Department of Environmental Conservation, Water Quality Division, has received revised plans for winter erosion control that adequately address these concerns. The permit should reference "Ethan Allen Shopping Center Storm and Erosion Control Details and Specifications Plan Sheet 9 dated 9/8/99 revision date 7/12/00 by O'Leary -Burke Civil Associates." Criterion 9(F) - ENERGY CONSERVATION The Department of Public Service (DPS) participates in the interagency review of Act 250 applications with regard to Criterion 9(F). This criterion requires that "... the planning and design of the subdivision or development reflect the principles of energy conservation and incorporate the best available technology for efficient use or recovery of energy." Christopher Owen of the Departent of Public Service has reviewed the proposed office warehouse building and has spoken with Paul O'Leary representing the applicant. The Department recommends that any final land use permit retain the energy conditions in the proposed permit, that, is compliance with Vermont Consolidated Act 250 Energy Guidelines for Typical C&I Buildings, and installation of any custom energy measures deemed cost effective on a life -cycle cost basis. The applicant has contacted the energy efficiency utility, Efficiency Vermont, to ascertain compliance with the Act 250 Energy Guidelines and to identify any custom energy measures that may apply, consistent with the permit condition. The applicant may also find it helpful to contact Vermont Gas Systems to assure that the heating system and thermal envelope are reasonably efficient. The contact at Vermont Gas Systems, Inc. is Sandra Laflamm, 863-4511, ext. 389. Dated July 20, 2000, at Waterbury, Vermont. Respectfully submitted, State of Vermont Agency of Natural Resources By - i 0 � Brett Rosenthal ) CERTIFICATE OF SERVICE I hereby certify that I, Tina Morgan, Secretary for the Agency of Natural Resources, sent a copy of the foregoing Entry of Appearance & Comments dated August 4, 2000, regarding File #4C0643-19 (Ethan Allen Holdings, LLC), by U.S. mail, postage prepaid, to the following: Ethan Allen Holdings, LLC 63 Malletts Bay Avenue Colchester, VT 05446 Paul O'Leary O'Leary -Burke Civil Associates 5 Andrew Avenue, Suite 5 Essex Junction, VT 05452 Margaret Picard, City Clerk Chair, City Council Chair, Planning Commission City of South Burlington 575 Dorset Street South Burlington, VT 05403 Michael Crane, Executive Director Chittenden County Regional Planning Commission P.O. Box 108 Essex Junction, VT 05453 Dated August 8, 2000 @ Waterbury, VT ti�a_ Morgan State of Vermont Department of Fish and Wildlife Department of Forests, Parks and Recreation Department of Environmental Conservation State Geologist RELAY SERVICE FOR THE HEARING IMPAIRED 1-800-253-0191 TDD>Voice 1-800-253-0195 Voice>TDD June 23, 2000 Ms Margaret A Picard, City Clerk City of South Burlington 575 Dorset Street South Burlington, VT 05403 Dear Ms Picard: E AGENCY OF NATURAL RESOURCES Department of Environmental Conservation Wastewater Management Division 103 South Main Street - Sewing Bldg. Waterbury, Vermont 05671-0405 Telephone: (802) 241-3822 Fax: (802) 241-2596 Enclosed are copies of a public notice regarding the public comment period for the issuance of a draft discharge permit to Ethan Allen Holdings, LLC authorizing the discharge of treated stormwater from Lot 11, Belter Park in South Burlington to groundwater. One of these notices is information for the local officials. Please post the other in a public place for disseminating this information to the local residents. We are also sending copies of this notice to other local officials and interested persons who have asked to be included on our mailing list. We will be glad to send you additional copies if you desire, or add names of interested persons to our mailing list. Sincerely, LBrian. Kooiker, Chief Discharge Permits Section Enclosures 100% Processed Chlorine Free Regional Offices - Barre/Essex Jct./Pittsford/Rutland/Springfield/St. Johnsbury AGENCY OF NATURAL RESOURCES DEPARTMENT OF ENVIRONMENTAL CONSERVATION WASTEWATER MANAGEMENT DIVISION 103 SOUTH MAIN STREET WATERBURY, VERMONT 05671-0405 NOTICE: DRAFT DISCHARGE PERMIT PUBLIC NOTICE NUMBER: 1-1413 PUBLIC COMMENT PERIOD: June 26 - July 25, 2000 PERMITTEE INFORMATION PERMITTEE NAME: Ethan Allen Holdings, LLC PERMITTEE ADDRESS: 63 Mallets Bay Ave Colchester, VT 05446 PERMIT NUMBER: 1-1413 FILE NUMBER: 04-14 DISCHARGE INFORMATION NATURE: Treated stormwater runoff VOLUME: As necessary RECEIVING WATER: Groundwater EXPIRATION DATE: June 30, 2005 DESCRIPTION: This is a draft discharge permit proposed for issuance for a commercial building on Lot 11, Belter Park, Ethan Allen Drive, South Burlington, Vermont. The means of treatment includes overland flow and grass -lined swales prior to discharge to groundwater via an infiltration basin and drywell. TENTATIVE DETERMINATIONS Tentative determinations regarding effluent limitations and other conditions to be imposed on the pending Vermont permit have been made by the State of Vermont Agency of Natural Resources (VANR). The limitations imposed will assure that the Vermont Water Quality Standards and applicable provisions of the Federal Clean Water Act, PL 92-500, as amended, will be met. -2- FURTHER INFORMATION The complete application, proposed permit, and other information are on file and may be inspected at the VANR, Waterbury Office. Copies, obtained by calling (802) 241-3822, will be made at a cost based upon the current Secretary of State Official Fee Schedule for Copying Public Records from 8:00 a.m. to 4:00 p.m., Monday through Friday. PUBLIC COMMENTS/PUBLIC HEARINGS Written public comments on the proposed permit are invited and must be received on or before the close of business day (7:45 am - 4:30 pm) July 25, 2000 to the Agency of Natural Resources, Department of Environmental Conservation, Wastewater Management Division, Sewing Building, 103 South Main Street, Waterbury, Vermont 05671-0405. Comments may also be faxed to 802-241-2596. The permit number should appear next to the VANR address on the envelope and on the first page of any submitted comments. All comments received by the above date will be considered in formulation of the final determinations. During the notice period, any person may submit a written request to this office for a public hearing to consider the proposed permit. The request must state the interest of the party filing such request and the reasons why a hearing is warranted. A hearing will be held if there is a significant public interest (including the filing of requests or petitions for such hearing) in holding such a hearing. FINAL ACTION/APPEAL At the conclusion of the public notice period and after consideration of additional information received during the public notice period, the VANR will make a final determination to issue or to deny the permit. Any person may, within thirty (30) days after permit issuance or denial, appeal. the VANR determination to the Vermont Water Resources Board pursuant to Title 10 V.S.A., Chapter 47, subchapter 1269. Canute E. Dalmasse, Commissioner Department of Environmental Conservation AGENCY OF NATURAL RESOURCES DEPARTMENT OF ENVIRONMENTAL CONSERVATION WASTEWATER MANAGEMENT DIVISION 103 SOUTH MAIN STREET WATERBURY, VERMONT 05671-0405 NOTICE: DRAFT DISCHARGE PERMIT PUBLIC NOTICE NUMBER: 1-1413 PUBLIC COMMENT PERIOD: June 26 - July 25, 2000 PERMITTEE INFORMATION PERMITTEE NAME: Ethan Allen Holdings, LLC PERMITTEE ADDRESS: 63 Mallets Bay Ave Colchester, VT 05446 PERMIT NUMBER: 1-1413 FILE NUMBER: 04-14 DISCHARGE INFORMATION NATURE: Treated stormwater runoff VOLUME: As necessary RECEIVING WATER: Groundwater EXPIRATION DATE: June 30, 2005 DESCRIPTION: This is a draft discharge permit proposed for issuance for a commercial building on Lot 11, Belter Park, Ethan Allen Drive, South. Burlington, Vermont. The means of treatment includes overland flow and grass -lined swales prior to discharge to groundwater via an infiltration basin and drywell. TENTATIVE DETERMINATIONS Tentative determinations regarding effluent limitations and other conditions to be imposed on the pending Vermont permit have been made by the State of Vermont Agency of Natural Resources (VANR). The limitations imposed will assure that the Vermont Water Quality Standards and applicable provisions of the Federal Clean Water Act, PL 92-500, as amended, will be meta FURTHER INFORMATION The complete application, proposed permit, and other information are on file and may be inspected at the VANR, Waterbury Office. Copies, obtained by calling (802) 241-3822, will be made at a cost based upon the current Secretary of State Official Fee Schedule for Copying Public Records from 8:00 a.m. to 4:00 p.m., Monday through Friday. PUBLIC COMMENTS/PUBLIC HEARINGS Written public comments on the proposed permit are invited and must be received on or before the close of business day (7:45 am - 4:30 pm) July 25, 2000 to the Agency of Natural Resources, Department of Environmental Conservation, Wastewater Management Division, Sewing Building, 103 South Main Street, Waterbury, Vermont 05671-0405. Comments may also be faxed to 802-241-2596. The permit number should appear next to the V,ANR address on the envelope and on the first page of any submitted comments. All comments received by the above date will be considered in formulation of the final determinations. During the notice period, any person may submit a written request to this office for a public hearing to consider the proposed permit. The request must state the interest of the party filing such request and the reasons why a hearing is warranted. A hearing will be held if there is a significant public interest (including the filing of requests or petitions for such hearing) in holding such a hearing. FINAL ACTION/APPEAL At the conclusion of the public notice period and after consideration of additional information received during the public notice period, the VANR will make a final determination to issue or to deny the permit. Any person may, within thirty (30) days after permit issuance or denial, appeal the VANR determination to the Vermont Water Resources Board pursuant to Title 10 V.S.A., Chapter 47, subchapter 1269. Canute E. Dalmasse, Commissioner Department of Environmental Conservation �. ai'_0: Dv,,s arj-:�ea;reaucin viron Ten tat ConseNaticn March 6, 2000 Ethan Allen Holdings, LLC 63 Malletts Bay Avenue Colchester VT 05446 AGENCY OF NATURAL RESOURCES Department of Environmental Conservation Wastewater Management Division Essex Junction Regional Office 111 West Street Essex Junction, VT 05452 (802)879-5656 Subject: WW-4-1382 -- Lot 11, proposed 6,475sf commercial lot with office space/warehouse 15 employees mun w/s 225 gpd located on Ethan Allen Drive in South Burlington, Vermont Dear Applicant: We have received your application and fee paid by check #1018 on March 1, 2000, which begins the 30 day in-house performance standards for our review. If we require further information from you to make a decision, the time until we receive it is not included in the in-house performance standards. If you have any questions about the review process, or if you have not received a decision on your application within the 30 in-house days, please contact this office at (802) 879-5656. We have forwarded your application to the Information Specialist, who will send you a Project Review Sheet indicating other state departments you should contact about additional permits you may need. If you have not already done so, you should also check with town officials about any necessary town permits. Sincerely, s IrFite%I . Roberge DEC Regional Office Coord. City of South Burlington Planning Commission Paul J. O'Leary TDD: 1-500-253-0191 100% Processed Chlorine Free �n J . ..,,,stordR�tl�r� S �ringfie�di.S`t. Johnsbury CHAMPLAIN WATER DISTRICT Dedicated to Quality Water & Service December 27, 1999 Mr. Kevin LaRose, E.I. O'Leary -Burke Civil Associates, PLC 5 Andrew Ave. Suite 5 Essex Junction, VT 05452 403 Queen City Park Road South Burlington, VT 05403 Phone: (802) 864-7454 Fax: (802)864-0435 RE: Act 250 Review: Lot # 11, 86 Ethan Allen Drive, Belter Park, South Burlington, Vermont Dear Mr. LaRose: In response to your request for information regarding the Champlain Water District's capability to supply water to the referenced proposed project, we submit the following: 1. Water is supplied to the referenced area via a 24" transmission main. 2. Adequate water storage is located south of Dorsei Street and Swift Street intersection, as provided by a 1,500,000 gallon water storage tank. 3. Your estimated demand of 225 gallons per day, for this proposed project could be furnished by the Champlain Water District without restricting or encumbering its present users on the CWD supply system. 4. Capability of the local water distribution system must be verified by the local water system official. If you have any questions, please do not hesitate to call. Sincerely, C1 AMPLAIN WATER DISTRICT Richard A. Pratt Chief Engineer / Assistant General Manager cc: J. Fay B. Desranleau P. Jacob C. Hafter r DEPARTMENT OF PLANNING & ZONING 575 DORSET STREET SOUTH BURLINGTON, VERMONT 05403 (802) 846-4106 FAX (802) 846-4101 January 12, 2000 Irene Roberge Agency of Natural Resources 111 West Street Essex Junction, Vermont 05452 Re: Sewer Allocation, 86 Ethan Allen Drive Dear Ms. Roberge: Please be advised that the South Burlington Development Review Board on 11/2/99 approved a sewer allocation of 225 gpd for a 6475 square foot warehouse at 86 Ethan Allen Drive owned by ACM Realty. This property is served by the Airport Parkway Wastewater Treatment Facility which has sufficient capacity to handle this additional demand. If you have any questions, please give me a call eith, Director ng and Zoning JW/mcp cc: Kevin Larose DEPARTMENT OF PLANNING & ZONING 575 DORSET STREET SOUTH BURLINGTON, VERMONT 05403 (802) 846-4106 FAX (802) 846-4101 December 28, 1999 Irene Roberge Agency of Natural Resources III West Street Essex Junction, VT. 05452 RE: Sewer Allocation, 86 Ethan Allen Drive Dear Ms. Roberge: Please be advised that the South Burlington Development Review Board on November 2, 1999 approved a sewer allocation of 225 gpd for a proposed 6475 sq. ft. warehouse building at 86 Ethan Allen Drive owned by ACM Realty. This property is served by the Airport Parkway Wastewater Treatment Facility which has sufficient capacity to handle this additional demand. If you have any questions, please give me a call. fincerely, Joe ith Director PlanAg and Zoning DEPARTMENT OF PLANNING & ZONING 575 DORSET STREET SOUTH BURLINGTON, VERMONT 05403 (802) 846-4106 FAX (802) 846-4101 December 28, 1999 Mr. Paul O'Leary Jr. O'Leary -Burke Civil Associates, PLC 5 Andrew Ave., Suite 5 Essex Junction, VT 05452 Re: Site Plan, 86 Ethan Allen Drive Dear Mr. O'Leary: Enclosed is a copy of the Findings of Fact and Decision on the above referenced project granted by the Development Review Board on November 2, 1999. Please note the conditions of approval. If you have any questions, please give me a call. Sincerely, Lisa J Mahoney ' Planning & Zoning Assistant"' LJM/mcp Ends City of So. B FAX NO. ; 1 802 658 4748 Dec. 01 1998 02:04PM P1 w APPLICATION FOR SITE PLAN REVIEW All infinrmsition reauested on this aoolicabon must be completed in full. Failure to provide the _ - - -- - application being rejected and a deflay'in'the review before the F�fanriing �:orrllrtlSSlQ�I. 1) OWNER OF RECORD (Name as shown on deed, mailing address, phone and fax #) QU 2) APPLICANT (Name, mailing address, phone and fax #) 3) CONTACT PERSON (Name, mailing address, phone and fax #) 4) PROJECT STREET ADDRESS: 5) TAX MAP NUMBER (can be obtained at Assessor's Office) 6) PROJECT DESCRIPTION a) Existing Uses on Property (including description and size of each separate use) b) Proposed Uses (include description and size of each new use and existing uses to remain) , y 1 , i-. cJ�;z a s r- r « j VyAqZ0 C) Total building square footage (proposed buildings and existing buildings to remain) (v 4� 9 S F — d) Height of building S number of floors (proposed buildings and existing buildings to remain, specify if basement and mezzanine) ,`l- i=L.� Z- e) Number of residential units (if applicable, new units and existing units to remain) f) Number of employees (existing and proposed): CQ rite, of Soy B I FRX NO. : 1 8012 658 4-748 1 Dec. 01 1998 02: 0SPM P2 g,i Other (list any other information pertinent to this application not specifically requested 7) LOT COVERAGE a) Building: Existing _ % Proposed % b) Overall (building, parking, outside storage, etc) Existing % Proposed % c) Front yard (along each street) Existing C> % Proposed I.L % 8) COST ESTIMATES a) Building: $ _3� x ' 0 S f =- l9`if Z�-b b) Landscaping: $ _ 2 / S7 -- c) Other site improvements (please list with cost): 9) ESTIMATED TRAFFIC a) Average daily traffic (in and out)' b) A.M. Peak hour (in and out) c) P.M. Peak hour (In and out) - A o 10) PEAK FLOURS OF OPERATION: 11) PEAK GAYS OF OPERATION: - G 12) ESTIMATED PROJECT COMPLETION DATE: 5 a) n!1 u ✓ 13) SITE PLAN AND FEE A site plan shall be submitted which shows the information listed on Exhibit A attached. Five (5) regular size copies and one reduced copy (11" x 17") of the site plan must be submitted. A site plan application fee shall be paid to the City at the time of submitting the site plan application (see Exhibit A). ill . City of So. B FAX NO. : 1 802 658 4748 Dec. 01 1998 02:05PIN P3 I hereby certify that all the information requested as part of this application has been submitted and is accurate to the best of my knowledge. r �`I SIGNATURE APPLICANT SIGNATURE OF CO -APPLICANT Do not write below this line DATE OF SUBMISSION: REVIEW AUTHORITY- 0-11,-Manning Commission ob I have reviewed this site plan application and find it to be: (Apfrmsp) DDirector, Planning & Zoning Complete Incomplete Director of Planning & Zoning or Designee Land Use: 150 Warehousing Description Warehouses are primarily devoted to the storage of materials; they may also include office and maintenance areas. High -cube warehouse (land use 152) is a related use. Additional Data No vehicle occupancy data is available specifically for warehousing, but the average was approximately 1.3 persons per automobile for all industrial uses. The peak hour of the generator typically coincides with the peak hour of the adjacent street traffic. Facilities with employees on shift work may peak at other hours. The sites were surveyed from the late 1960s to the mid-1990s throughout the United States and Canada. Source Numbers 6, 7, 12, 13, 15, 17, 74, 184, 192, 390, 406, 411, 436, 443 Trip Generation, 6th Edition 188 Institute of Transportation Engineers 8 Warehousing (150) Average Vehicle Trip Ends vs: 1000 Sq. Feet Gross Floor Area On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Number of Studies: 22 Average 1000 Sq. Feet GFA: 406 Directional Distribution: 24% entering, 76% exiting Trip Generation per 1000 Sq. Feet Gross Floor Area Average Rate Range of Rates Standard Deviation 0.51 0.17 - 1.66 0.83 uata riot ana tauation a 1,500 1,400 1,300 1,200 1,100 1,000 900 800 700 600 500 400 300 200 100 0 0 ----------------------- -------- ........................ 'X ......... .............. ...................... ..................... --------------- ,... .'- ----------------------------------- - —------- ----------- ---------------- ... -'..... ..... ...... ... i............... ....................... ...................... ........ . ........ -. - -.X .... X .................... .... .................. .................--..... - --X----------- - •----- •------- X4---------------- ------------------------- - XX X Actual Data Points 1000 2000 X = 1000 Sq. Feet Gross Floor Area Fitted Curve Fitted Curve Equation: Ln(T) = 0.754 Ln(X) + 0.826 ------ Average Rate R2 = 0.69 3000 Trip Generation, 6th Edition 200 Institute of Transportation Engineers Warehousing (150) Average Vehicle Trip Ends vs: 1000 Sq. Feet Gross Floor Area On a: Weekday Number of Studies: 16 Average 1000 Sq. Feet GFA: 273 Directional Distribution: 50% entering, 50% exiting Trip Generation per 1000 Sq. Feet Gross Floor Area Average Rate Range of Rates Standard Deviation 4.96 1.51 - 17.00 4.05 Data Plot and Equation 12,000 11,000 10,000 9,000 Cn c 8,000 - W a F- 7,000 - d U L 6,000 - d - rn cc 5,000 - Q 4,000 H 3,000 2,000 1,000 0 0 X --------------------------------•-----•-;< •--•- ...................... -------------- ----------.=----- ----- ...... ---------------- ----------- X .' '........................ ------------ - ---- ------ ----------•--•--------- ' X----------------- X X Actual Data Points 1000 2000 X = 1000 Sq. Feet Gross Floor Area Fitted Curve Fitted Curve Equation: T = 3.676(X) + 350.266 3000 ------ Average Rate R2 = 0.82 Trip Generation, 6th Edition 198 Institute of Transportation Engineers `� � �renousrng ` (150) Average Vehicle Trip Ends vs: 1000 Sq. Feet Gross Floor Area On a: Weekday, A.M. Peak Hour of Generator Number of Studies: 19 Average 1000 Sq. Feet GFA: 340 Directional Distribution: 59% entering, 41 % exiting Trip Generation per 1000 Sq. Feet Gross Floor Area Average Rate Range of Rates Standard Deviation 0.57 0.28 - 1.93 0.84 Data Plot and Equation 1,300 1,200 - 1,100 1,000 rn 900 v C W a 600 F- a� 0 700 L d N 600 rn c0 > 500 Q II F' 400 300 ............... ---------- I ---------- ..................... x ' -------------------- -- ------ x --------------------------- x x , ----------------- --=------- ; . ....... 200 '- "--'- ----------- ' 100 0 ------------ ,'k---- --- -- -- - - - -- ; x x 0 1000 2000 X = 1000 Sq. Feet Gross Floor Area X Actual Data Points Fitted Curve Fitted Curve Equation: T = 0.388(X) + 63.121 ------ Average Rate R2 = 0.86 3000 Trip Generation, 6th Edition 201 Institute of Transportation Engineers 99013 - ACM/BELTER PARK LOT #11 LANDSCAPING ESTIMATE By: KRL 6/3/99 NO. DESCRIPTION UNIT QTY UNIT COST TOTAL COST 1 CRIMSON KING MAPLE EA 1 $250.00 $250.00 2 WHITE PINES EA 6 $200.00 $1,200.00 3 AMERICAN ARBORVITAE EA 6 $150.00 $900.00 4 RED MAPLES EA 3 $250.00 $750.00 5 ROSE GLOW BARBERRY EA 11 $50.00 $550.00 $3,650.00 O'Leary -Burke CiA Associates, PLC August 3, 1999 Mr. Ray Belair, Zoning Administrator City of South Burlington 575 Dorset Street South Burlington., VT 05403 RE: Proposed Office/Warehouse Lot #11, Ethan Allen Drive, So. Burlington, VT. Dear Ray: We are writing on behalf of Michael & Chris Senesac to request staff review and planning commission scheduling for the proposed Commercial use on Lot #11, Ethan Allen Drive. This proposal is for a 6,475 S.F. commercial building. The front 1,400 S.F. of the building is proposed for office use and the back 5,075 S.F. of the building is proposed for warehouse/storage use. Michael & Chris Senesac intend to relocate their business, ACM Realty, to this location and lease the remaining space. The building will connect to the municipal waterline on Ethan Allen Drive at the projects frontage (see attached permit EC-4-0772, conditions #2 and #3). The building will connect to the municipal sewage system. The anticipated maximum number of employees is fifteen, which will require 225 gpd of sanitary sewage capacity. Based on the 61h Edition of the ITE Trip Generation Manual, category 150 Warehousing, the expected PM peak trip generation will be approximately 4 vehicles. We are attaching the following for your review: 1) Site Plan Application; 2) $60 application fee; 3) Five (5) copies of Site Plan (Sheet 1) and Details & Typicals (Sheet 2); 4) One (1) reduced 11"x17" copy of plan sheets 1 and 2; 5) ITE Trip Generation Information; 6) Landscaping Cost Estimate If you have any questions, please call. Paul Leary Jr., P.E. enc. cc: Chris & Michael Senesac 1999/99013/weith 5 ANDREW AVE. SUITE 5 ESSEX JCT., VT 05452 PHONE 802-878-9990 FAX 802-878-9989 CIVIL@TOGETHER.NET O'Leary -Burke Liv� Associates, PLC December 21, 1999 Mr. Joe Weith, Planner City of South Burlington 575 Dorset Street South Burlington, VT 05403 RE: Proposed Office/Warehouse Lot #11 , Ethan Allen Drive, South Burlington, VT Dear Joe: We are writing on behalf of Michael & Chris Senesac in regard to the proposed commercial use on Lot #11, 86 Ethan Allen Drive, South Burlington, VT. The proposal is for a 6,475 SF office/warehouse building. A new 6" PVC sewer line will connect to an existing sewer line at the frontage of the project. We are beginning the Land Use (Act 250) permitting process and are requesting your review and a letter stating the ability of the City of South Burlington to provide 225 gallons per day (15 employees each x 15 gallons per day) of sewer treatment to serve this proposed development. An early spring 1999 construction start is anticipated. If you have any questions, please contact this office. Sincerely, P L/C' - Kevin LaRose, E.I. Enclosure cc: Michael & Chris Senesac F A 1999\99 013\we i t h s ewe r. d o c 5 ANDREW AVE. SUITE 5 ESSEX JCT., VT 05452 PHONE 802-878-9990 FAX 802-878-9989 CIVIL@TOGETHER.NFT CITY OF SOUTH BURLING` ON DEPARTMENT OF PLANNING eft ZONING 575 DORSET STREET SOUTH BURLINGTON, VERiV ONT 05403 (802) 846-4106 FAX (802) 846-4101 November 30, 1999 Paul O'Leary O'Leary -Burke Civil Associates, PLC 5 Andrews Avenue, Suite 5 Essex Junction, VT 05452 Re: Site Plan/86 Ethan Allen Drive Dear Mr. O'Leary: Enclosed is a copy of the October 19, 1999 Development Review Board minutes on the above referenced project. If you have any questions, please give me a call Sincerely, _r,Lisa Mahoney, Planning & Zoning A istant LM/mcp 1 Encl MEMORANDUM To: South Burling t D velopment Review Board From: Raymond J. Be dministrative Officer Re: November 2, 1999 agenda items Date: October 29, 1999 4) ACM REALTY - CONSTRUCT 0FFICE/WAREHOUSE BUILDING - SITE PLAN This application was continued from the October 19, 1999 meeting (minutes not available) to provide the Board an opportunity to meet with the Fire Chief to discuss the need for fire sprinkler systems. This project consists of constructing a 6475 square foot warehouse building. This property located at 86 Ethan Allen Drive lies within the IC District. Access/Circulation: Access is proposed to be via a 30 foot curb cut on Ethan Allen Drive. Circulation on the site is adequate. Coverage/setbacks: Building coverage is 15.62% (maximum allowed is 30%). Overall coverage is 39.44% (maximum allowed is 70%). Front yard coverage is 26.9% (maximum allowed is 30%). Setback requirements have been met. Parking: A total of 16 parking spaces are required and 17 spaces, including one handicapped space and a bike rack are being provided. The plan should be revised to note the correct parking requirement for office space which is 1 space/250 square feet. Landscaping: The minimum landscaping required, based on building costs, is $5,828 which is being met. Plantings will include Red Maple, Rose Glow Barberry, and White Pine. The plan should be revised to provide a 15 foot green strip along the property's frontage as required under Section 25.107 of the zoning regulations. Coverages should be adjusted accordingly. Lighting: Exterior lighting consists of three 12" wall mounted fixtures with 100 watt metal Memorandum - Development Review Board November 2, 1999 October 29, 1999 halide lamps. Prior to issuance of a zoning permit, the applicant should submit details of proposed building mounted lights to the Director of Planning & Zoning for approval. Dumpster: The dumpster will be screened by a 6 ft. high stockade fence. Traffic: This project is exempt from the road impact fees. 5) UNIVERSITY MALL REALTY TRUST - SITE MODIFICATIONS - FINAL PLAT This project consists of amending a previous approval consisting of: 1)constructing a 111, 504 square foot GLA addition to the main University Mall building, 2) constructing a 983 space multi -level parking structure, and 3) constructing a 15, 510 square foot automotive repair structure. The amendment consists of minor modifications to parking, access, and coverage. Parking: The applicant is proposing to remove seven (7) spaces along the east side of the main drive through the area west of Dorset Street, add three (3) spaces further south along the east side of the main drive through the area west of Dorset Street, add two (2) spaces north of the Paquette parcel, and add two (2) spaces next to a new piece of green space north of the northwest corner of the Sears store. The net change in available parking spaces is zero (0). Access/circulation: The applicant is proposing to close the existing entrance along the east side of the main drive through the area west of Dorset Street. The applicant is proposing to remove a curb further north along that drive to provide access. The applicant is proposing to add three T curb breaks along the east side of the main drive through the area west of Dorset Street. These breaks are being installed to facilitate drainage to the west side of this drive, where the closest catch basins are located. Access to the Paquette parcel from the Mall parking lot has been removed by the addition of two parking spaces north of the Paquette parcel. The Dorset Street access to the Paquette parcel is sufficient. The property does not require access via the Mall parking lot. The elimination of a section of the proposed curbed "island" along the east side of the drive 2 CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING & ZONING 575 DORSET STREET SOUTH BURLINGTON, VERMONT 05403 (802) 846-4106 FAX (802) 846-4101 October 29, 1999 Paul O'Leary O'Leary - Burke Civil Associates, PLC 5 Andrews Avenue, Suite 5 Essex Junction, VT 05452 ' Re: Warehouse, 86 Ethan Allen Drive Dear Mr. O'Leary: Enclosed is the agenda for next Tuesday's Development Review Board meeting and my comments to the Board. Please be sure someone is present on Tuesday, November 2, 1999 at 7:30 P.M. to represent your request. If you have any questions, please give me a call. Sincerel�r, Raymond J. Belair, Administrative Officer RJB/mcp Encls DEVELOPMENT REVIEW BOARD 19 OCTOBER 1999 9. All exterior lighting shall consist of downcasting shielded fixtures. Any change to approved lights shall require approval of the Director prior to installation. All flood lights shall be removed. Prior to permit issuance, the applicant shall submit details of the exterior lights for approval by the Duirector. 10. All areas of the site which are not shown as paved on the plan shall be lawn with the exception of the fenced storage area. 11. Prior to issuance of a zoning permit, the applicant shall submit the plans to the City Center Design Review Committee for a final review. The applicant shall revise the plans to show any changes recommended by the Design Review Committee provided such changes are determined by the Director of Planning & Zoning to be minor and consistent with the Development Review Board's approval. 12. The applicant shall obtain a zoning permit within six months pursuant to Section 27.302 of the zoning regulations or this approval is null and void. 13. The applicant shall obtain a Certificate of Occupancy/Compliance from the Administrative Officer prior to the use of the newly converted space. 14. Any change to the site plan shall require approval by the South Burlington Development Review Board. Mr. Roth seconded. The motion passed unanimously. 10. Site plan application of ACM Realty to construct a 6475 sq. ft. warehouse building, 86 Ethan Allen Drive: Mr. O'Leary identified the property as Lot 1 I of the Belter Industrial Park. ACM Realty would have the office in the front of the building. The back 2400 sq. ft. would be for storage of supplies. They would also look for a tenant for the smaller part of the building. 16 parking spaces are required. 17 are provided. Staff has asked for a 15 ft. buffer which would require elimination of one parking space. The plan would result in 15.6% building coverage and 37.8% total lot coverage. 14 DEVELOPMENT REVIEW BOARD 19 OCTOBER 1999 The three building mounted lights will be downshielded. The applicant estimated 4-9 vehicle trip ends in the p.m. peak hour. Mr. O'Leary reviewed the landscaping which will include red maple street trees. Mr. Senesac noted that Labor and Industry does not require sprinklering of the building. He questioned the need to do this as the Fire Chief recommends. Mr. O'Leary said there is a hydrant in front of the building. Mr. Belair suggested a meeting with the Fire Chief on this issue. Members agreed to delay action for two weeks to allow the applicant to meet with the Fire Chief. Ms. Barone moved to continue the application until 2 November. Mr Roth seconded. Motion passed unanimously. As there was no further business to come dorOhe Board, the meeting was adjourned at 9:55 p.m. J 15 G 11/2/99 MOTION OF APPROVAL ACM REALTY I move the South Burlington Development Review Board approve the site plan application of ACM Realty to construct a 6,475 square foot warehouse building, 86 Ethan Allen Drive, as depicted on a two (2) page set of plans, page one (1) entitled, "Belter Park Lot 11 Ethan Allen Drive South Burlington, Vermont," prepared by O'Leary - Burke Civil Associates, PLC, dated 5/20/99, last revised on 8/27/99, with the following stipulations: 1) All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2) The plat plan shall be revised to show the changes below and shall require approval of the Director of Planning & Zoning Three (3) copies of the approved revised plans shall be submitted to the Director of Planning & Zoning prior to issuance: a) The plan shall be revised to note the correct parking requirements for office space is one (1) space/250 square feet. b) The plan shall be revised to provide a 15 foot green strip along the property's frontage as required under Section 25.107 of the zoning regulations. Coverage shall be adjusted accordingly. 3) All exterior lighting shall consists of downcasting shielded fixtures. Any change to approved lights shall require approval of the Director of Planning & Zoning prior to installation. Prior to permit issuance, the applicant shall submit details of the proposed building mounted lights to the Director of Planning & Zoning for approval. 4) Prior to issuance of a zoning permit, the applicant shall post a $5828 landscape bond. The bond shall remain in effect for three (3) years to assure that the landscaping takes root and has a good :7af rviving. 5) The emission approves a sewer allocation of 225 gpd. The applicant shall be required to pay the per gallon fee prior to permit issuance. 6) The building shall be sprinklered. 7) The applicant shall obtain a zoning permit within six (6) months pursuant to Section 27.302 of the zoning regulations or this approval is null and void. 8) The applicant shall obtain a Certificate of Occupancy/Compliance from the Administrative Officer prior to the use of the building. 9) Any change to the site plan shall require approval by the South Burlington Development Review ����^ Streetscape Improvements: The zoning requires applicants to implement streetscape improvements (i.e., sidewalks, street lighting, street trees, etc.) within the portion of the public ROW directly fronting the parcel of land for which development is proposed. The Dorset Street improvements have already been implemented. The applicant is not proposing any streetscape improvements along San Remo Drive as the City has not yet agreed on appropriate streetscape design for this road. 10) ACM REALTY - CONSTRUCT OFFICE/WAREHOUSE BUILDING - SITE PLAN This project consists of constructing a 6475 square foot warehouse building. This property located at 86 Ethan Allen Drive lies within the IC District. Access/Circulation: Access is proposed to be via a 30 foot curb cut on Ethan Allen Drive. Circulation on the site is adequate. Coverage/setbacks: Building coverage is 15.62% (maximum allowed is 30%). Overall coverage is 39.44% (maximum allowed is 70%). Front yard coverage is 26.9% (maximum allowed is 30%). Setback requirements have been met. Parking: A total of 16 parking spaces are required and 17 spaces, including one handicapped space and a bike rack are being provided. The plan should be revised to note the correct parking requirement for office space which is 1 space/250 square feet. Landscaping: The minimum landscaping required, based on building costs, is $5,828 which is being met. Plantings will include Red Maple, Rose Glow Barberry, and White Pine. The plan should be revised to provide a 15 foot green strip along the property's frontage as required under Section 25.107 of the zoning regulations. Coverages should be adjusted accordingly. Lighting_ Exterior lighting consists of three 12" wall mounted fixtures with 100 watt metal halide lamps. Prior to issuance of a zoning permit, the applicant should submit details of proposed building mounted lights to the Director of Planning & Zoning for approval. Dumpster: The dumpster will be screened by a 6 ft. high stockade fence. Traffic: This project is exempt from the road impact fees. 14 CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING & ZONING 575 DORSET STREET SO UTH BURLINGTON, VERMONT 05403 (802) 846-4106 FAX (802) 846-4101 October 15, 1999 Paul O'Leary O'Leary -Burke Civil Associates, PLC 5 Andrews Avenue, Suite 5 Essex Junction, VT 05452 Re: Warehouse, 86 Ethan Allen Drive Dear Mr. O'Leary: Enclosed is the agenda for next Tuesday's Development Review Board meeting and comments from City Engineer Bill Szymanski, the Fire Department and myself. Please be sure someone is present on Tuesday, October 19, 1999 at 7:30 P.M. to represent your request. If you have any questions, please give me a call. Since r, y, -- � iy .,; E Raymond J. Belair, Administrative Officer RJBJmcp Encls MEMORANDUM To: South Burlington Development Review Board From: South Burlington Fire Department Re: October 19, 1999 agenda items Date: October 15, 1999 1) ACM Realty Dated 8/31/99 86 Ethan Allen Drive The building should be sprinklered 2) Malcolm Willard Dated 10/6/99 1100 Hinesburg Road The building should be sprinklered and include an alarm system 3) Burlington International Airport 3064 Williston Road Acceptable 4) Dorset Land Company 415 Dorset Street Acceptable 5) Highlands Development Company, LLC Golf Course Road Acceptable 6) Dorset Square Associates 150 Dorset Street The building should be sprinklered Dated 8/13/99 Dated 8/29/99 Dated 8/30/99 Dated 10/13/999 MEMORANDUM To: South Burlington Development Review Board From: William J. Szymanski, South Burlington City Engineer Re: October 19, 1999 Agenda Items Date: October 4, 1999 BURLINGTON AIRPORT - LEDGE REMOVAL - WILLISTON ROAD 1) This is a full-scale quarry and crushing operation and a completion date should be set. 2) A scale and weighing house is being installed (not shown on plans) so an extended operation is expected. 3) Traffic control on Williston Road must be maintained. 4) No work on Sundays and blasting are limited to 8:00 A.M. to 5:00 P.M. ECONOMOU FARMS GOLF COURSE - PHASE 1B - LOT LINE ADJUSTMENT Lot line adjustment survey plan prepared by Civil Engineering Associates dated May 1996 with latest revision dated 8/30/99 is acceptable. BELTER PARK - LOT NO. 11 - ETHAN ALLEN DRIVE Site plan prepared by O'Leary - Burke Engineers dated 5/20/99 is acceptable. DORSET SQUARE - (BLUE MALL) - DORSET STREET - MARKET STREET Site plan prepared by O'Leary - Burke Engineers dated 7/23/98 with latest revision dated 7/28/99 is acceptable. DORSET LAND COMPANY - DORSET STREET Disturbed sidewalk shall be removed and new poured in place not reset as plan shows. O'Leary -Burke & Associates, PLC October 7, 1999 Mr. Ray Belair, Zoning Administrator City of South Burlington 575 Dorset Street South Burlington., VT 05403 RE: Proposed Office/Warehouse Lot #11, Ethan Allen Drive, So. Burlington, VT. Dear Ray: We are writing on behalf of Michael & Chris Senesac in response to the staff comments, dated September 30, 1999, for the proposed Commercial use on Lot #11, Ethan Allen Drive. This proposal is for a 6,475 S.F. commercial building. The front 1,400 S.F. of the building is proposed for office use and the back 5,075 S.F. of the building is proposed for warehouse/storage use. Michael & Chris Senesac intend to relocate their business, ACM Realty, to this location and lease the remaining space. As requested, the plan was revised to reflect the modification of the parking space requirements from 15 spaces/200 sq.ft. to 1 space/250 sq.ft. We have included a cut sheet on the proposed exterior lighting. As for the number of company vehicles operating from the proposed building, zero vehicles will operate from the building. The computed number of vehicle trip ends of 4, based on the 6`h edition of the ITE Trip Generation Manual, category 150 Warehousing, was computed using the average rate of 0.51 vte/1000 sq.ft. gross floor area. The ITE estimate of 9.34 vte as sent to us in Staff Comments, dated September 30, 1999, is computed using the formula provided in the ITE manual. We typically use the average rate on smaller buildings because the formula will produce a skewed result. For example, the formula will yield 2.28 vte for a building with 0 sq.ft. We are attaching the following for your review: 1) Five (5) copies of Site Plan (Sheet 1) and Details & Typicals (Sheet 2); 2) One (1) reduced 11 "x 17" copy of plan sheets 1 and 2. If you have any questions, please call. Sincerely, Kevin R. LaRose, E.I. enc. cc: Chris & Michael Senesac 1999/99013/weith2 Ary uxr,w AVE. SUITE 5 ESSEX JCT., VT 05452 PHONE 802-878-9990 FAX 802-878-9989 CIVIL@TOGETHER.NET E�st-i (Y-) cr+o-j Ca [CulQ-i-(CX> bra (i-.$) Cf 5c,' - - Cos A9H)0S0 < 3 ",-. - � � 5, � 9 7, 5 -0 r4 Pco p ooe(� 25 D k re-e-n -Fk Dar ni or V, Slz7eCcc)� L cii-a ( : -+ � D 0/& " -I- ;�-Ci -- ra - -,(c Ca �, (a,-) 1 a+ ( , an (, --fli 11 �' c Ptt I eC:v V-» X ::-, I 00c) S� C �</Z:- (�. 4 7 5- t 0 -7 00 Ln C-� C, -� C L� �.C. �75 R= 3� ACM REALTY - CONSTRUCT OFFICE/WAREHOUSE BUILDING - SITE PLAN -The parking table on the plan should be corrected to accurately reflect the minimum parking space requirements as 1 space/250 sq. ft. rather than 15 spaces/200 sq.ft. -The applicant should provide information on the number of company vehicles operating from the premises, if any, for parking calculation purposes. -The ITE estimate for P.M. peak hour is 9.34 vte's. -The applicant should submit more detailed cut sheets. BURLINGTON INTERNATIONAL AIRPORT - EARTH REMOVAL - MISCELLANEOUS -The applicant should include submission of a plan for rehabilitation of the site at the conclusion of operations including grading, seeding and planting, fencing, drainage, and other appropriate measures in accordance with Section 26.352(b) of the zoning regulations. -The applicant may be required to post a bond or other security adequate to assure compliance with the zoning regulations. -The applicant should include information related to anticipated noise levels and anticipated vibration measurements in accordance with Appendix B of the zoning regulations. -The applicant should indicate whether this project will impact any wetlands or streams. -This project is subject to the following stipulations from the October 19, 1998 Zoning Board of Adjustment approval: a) Maximum trip ends limited to 16/hour with a flag -person present at all times. Applicant shall use reasonable discretion at all times to allow reasonable flow of public traffic. b)Blasting and crushing will be limited to the hours of 7:00 a.m. to 7:00 p.m. c)The hauling road shall be temporary and only used during construction. d)Truckers shall inspect their trucks before hauling to limit spillage and tracking of debris. Trucks will be covered at all times. e)Intersection of haul road and Williston Road will be cleansed periodically as necessary. LOT INFORMATION - I. ZONING, MIXED INDU5TRIAL ♦ COMI.ERCIAL Ilcl 2 PARCEL SIZE, 41432 5F. 1016 Act 3. LOT KEQUIKEIPNT5, MIN LOT SIZE, 40p00 S.F. MIN SETOACKS- FRONT YARD 40 FT. 510E YARD• b FT. REAR YARD 30 FT. TYPE lAlMDFR QUANTITY SIZE LINDEN 1 3e-4• EeNTPRN WHITE CEOAK ASS 3 14 ARTIC DLUE WILL 4 1 3 GAL DWARF ALDERTA SPRUCE GOLD LEAF DARDEKKY 5 6 3 4 7 GAL 3 GAL GOLD FLOWER 5PIKEA 7 2 3 GAL CRM.DON PKaAEY DAKV*"Y ROSE GLOW DARDERRY 8 9 4 12 4 GAL 6 GAL GOLD A/OUND SPIREA VELVET GREEN DOXWOOD U II 4 I 3 GAL 3 GAL EMERALD GREEN AKI5M VITAE 12 2 6 GAL � I --- -------- r-------------- ,- - - - - - - - '-- --- ;-1----`-------------- — — — — — — — J _-------74-------�/ _-75 — T--------------------- ------------------ -- ------,9`- --�------------ 60-------- ---6 L_—----------- \ -- _ __ _ _�_-- _—_—_-6� »>-- —_62--_---_—_--- _ —_-------_—_—_—_—_-- -------------- 7--—I------- —_%�-_—_----_-----4 --- I I 1 I 0 oTe o 0 0 o I I— L ------� I I I I I I I I 1 I / $TTALLS "W�16 ! " 99 I eItAV0- PARKNI6 AREA 'X10' OIAP54Bt PAO Wes/ 6�NI6N STOLKA06� r ILL. BELTER N/F I / I / L I I I EXISTING aA' PA� NACE5 GRAVEL OKIVE r FIRE DEPARTLENf FIKE CTION - ELECTS K. 1 METERS ( I � � I LIGFIT I I g I I I I I I I I \ropes (AyA;'Rt N EXISTING 6" PVC\ SEWER i GRAPHIC SCALE — — R � a ( IN Fm) I i-b - 20 IL HAM ING STALLTALL 5 WIDE WALK LL�T1 "IB' FARKING ®�T - A 1 ^II �/' / iTALtS (TYP3 DIKE RACK / r \ I a 63_ 88_ THE CONTRACTOR SHALL NOTIFY -=SAFE' AT 1-888-OMr-SA- PRIOR TO ANY EXCAVATION. ^I 1 I SWEDISH PIT N/F 12 I I I I I DTNI6 6RA / / 1 ►Srr sw�N R f � 86.p2 66.3Q DO.N x. rRay �'°0j"Alw wl Rxz a SITE 1 p �xa rwb LOCATION PLAN tas LEGEND f � 86.p2 66.3Q DO.N x. rRay �'°0j"Alw wl Rxz a SITE 1 p �xa rwb LOCATION PLAN tas LEGEND PROPERTY LINE - - ADUTTING FROFERTY LINE DUR.DING SETDACK LINE O IRON PIN FOLWD CONCRETE MONUMENT FOl*4C) /• /•� 1 SURVEY CONTROL POINT EX15TRNK> FLANTINGS /90� N/. NOW OR FOKWItLY - u ^ STOCKADE FENCE -o o WIRE FENCE EXISTING TKEELRIE N WATER VALVE -__--_-499__-._.. EXISTING GRADE CONTOUt O NEW CURD 5TOF CqL EXISTING UTILITY POLE NEW PLANTINGS �s City of So. Burlington PAKKNUF TAKE SF OFFICE SPACE • 1 5PACE/250 5F 5 15 MON-OFFICE E1PLOYFP_5 V 2 SFACE5/3 EMPLOYEES ID TOTAL 1 16 LAND USE TAOM LAND USE AREA Z OF TOTAL MAX Z ALLOWED OVILDROS5 5550 5F, U.3Z 30% 1, PAVEMENT, GRAVEL ♦ STORAGE b.344 SF. 37.02 lox OFEN SPACE 20.I06 5F. 63.02 302 MIN. FRONT YAKO COVERAGE (3Ox MAX. ALLOWED), L373 5F/4,509 S.F.- 26.55Z APPLICANT MICHAEJ_ ♦ CHRIS SEWSAC ETHAN ALLEN H�, LLC 63 MALLETT5 DAY AVENU:. COLCHESTER, VT 05446 .L'JYO3 AOO REGdtO LMAWNG NORYATIdI FIR EfdA'J� A00 RGptD ptAWINb RIGRYATICN FRL N9AJ1 APO MICE A! fOt JAY Il•L)fMl. 4CUM OLN.NIB'TON WA1Ot ORARTWRT LIY. 1I / ,,5�17t II�4j, REWIm pMMYK E3 nM1RNlrry 12D' .`V, \ F O +.ae O .v¢rw/— #_ O'LEAItY-BURKE S47 _ HA IL CIVIL ASSOCIATES, PLC 5 ANDREW AVENUE SATE 5 � Vr iill%V1-�Zp• FMMJE- 87r- RIY• R7A_OOA9 BELTER PARK 5 20 99 -W LOT 11 99013 Aol. xt.. • 99M 3-61 s,fxT r RECORD DRAWING 1 8 r-� JJIMa s a e s � a lit gill log P rho o bu Hv 3 i M p U) �- J0. �✓ 8p CD Jill p5 a� Mill lb o� F� YYY �a 'M'O"/ r0 iil'pplG F �O n� Y N� llblliq It 7 +p a lit hill,t it -a yya�y�a��9{{ i s _ � p Jill , "ae a b�low A till, oil 4: Its I'll; Ell Hbi lit 10 lot �b IP Mg, I'T I;, il R F a H ♦ 1 d n a r d r d d i d 0 d Y 9 m CJ 4- CO U CD UT Q ,-1 -r-I U CD L m I T L to CD J CD rn rn cy) V V O Q N N-- iT cn I C� CD CD cn (T M / m 3 a co U IV LOT RFORIIATION• �V / 1 ZONING• MIXED INDUSTRIAL ♦ GOMMERGIAL IIGI \ \ 2 PARCEL 5I7E• 4L452 5F. 10.15 AG 3. LOT REq/1REM9NTS• JIT 7MIR LOT SIZE• 40AM SF. MIR 5ETDAGKS- FRONT YARD, 40 FT. I 50' SIDE YARD• D FT. REAR YARD 30 FT. 15' / _ _ d". ------ -----------r----- it ________ I ---_.----.-_75_----__./'// -10 ,10,0.1Ai / / -- a1 --Tq-1= -- -- ao-------- - --------------- \\-----------Aa--a----------------------------- - ------- I ________ _ ___--- -----------__— I i rKESMVE EXISTING, ---7 I / / 6RA� DRNE / / I NS�TALLS t YPJ RIK�-----_- MISC. TREES I I "I / REMOVED O DE i3 OLW5TEK FAD \ (_ K 011latHEAD DOORS W/ 6 HIGH STOLKAOE1 I o // X !•Y BELTER o I I � SWEDISH PIT 1`:':=::'': END PAN/F VtAVEL .:'' {: ':'.. I f OV�tFY1NG �1'FYPJ N/F DW GRAVELEGI 1� SPACE WAREJiOWE SAGE 2400 S.F. 2676 SF. I I NOTE_ CONTRACTOR SHALL T.V. EXISTING,SEWER LIE TO DETERMINE LOCATION OF THE _ I I I I SEWER SERVICE TO LOT Oil I ``\\\ `PLANT 6 NMI: PINES. I I MIR 6' HIGH 15 FT. O I FEE• 9173' rLANT 6 DARK GREEN AMEKIGAN ARDOKVITAE II MIR 6' H16H • 6 FT. O OFFICE SFAGE 400 Sr. I I OFFICE S.F. I ....... .. I FJOTR/ViGE is ... FRENCH DRAIN AROUND FRONT INVERT • 10S' ..: :.:'. II ROSE DARDERRY AT ::_" ....::..:..::. O O O/C (fig PARKING, STALL WITH 3' WIDE-.-- t ULOADINIG AREA/' ..: %! '. .:. 1 V7 0 I O CRIMSON KIN,'MAKE ... �J RyE2D MAPLES \ 8• ry4 ` \ TDY- TOP R _ EXISTING a- PVC\ SEWER 4 - \ 40' O�AL�rEX \ � ��T�V4 SPIKE• ®•PVs REMOVE ARRp�, 3(1 FT. OF ( NVERT IN 90.66' / RAISED !SAW GUT / WATERLNE WITH/A•NEW EXI571N6� / T OUT 10.44' 'AVFJETJT� OUT. REPLACE 7 ISTIN6 SMi WITH SSEO GAD + / GCMPORATIOR PAVE PAT WITH LOT \ I NVERT INµ rnvlNG. , GRAPHIC SCALE b 0 10 b b b I T— THE CONTRACTOR SHALL NOTIFY 'DIGSAFE" AT IN FEET) 1-888-DICrSAFE PRIOR TO ANY EXCAVATION. I i-h - E0 tt LEGEND PROPERTY LINE - - ADUTTwb PROPERTY LRE - DOILDIN6 SET15ACK LINE 0 IRON PIN FOUND CONCRETE MONUMENT FOUND /■\ /•\ SURVEY CONTROL POINT EXISTING rLANTINE/ N/F Now OR FORMERLY 0 0--- STOCKADE FENCE -o o WIK£ FENCE i v'l'Y'WYv v YVYYYYI�� EXISTING TREELI E N WATER VALVE EXISTING, GRADE CONTOIA FINISH GRADE CONTOUR O NEW CURD STOP ap, EXISTING UTILITY rOLE ® 4� NEW rLANTING5 rARKWG TADLE MOD SF OFFICE 5rAGE • D 5FAGE5/200 5F 7 D NON -OFFICE EM LOYEES • 2 SPACES/3 E rL.OYEES n TOTAL h LAND USE TAME LAND USE I AREA L Z OF TOT MAX. Z ALLOWED DUILDIN05 6A73 SF. Db2Z 301 DLOG', PAVEIEMf. GRAVEL +STORAGE ID330 SF. 3144Z 70Z OrEN Sr AGE 25,n2 sf. 6036Z 3OZ MIR -FRONT YAKD GOVEKA6E LIM MAX. N1-OWEDI• 536 S013.100 SF.• 26.M APPLICANTMICK AGM GRIS 5ENE5 '= GM REALTY * I GEL -SEA rLAGE WILLISTON. VT 0545 AUG 3 ' 1999 City of So. Burlington WR O�A>0 AEYW/ YmFY O°lNE f°OTAOE 6 01111.. NLL lE lots,,, //� wA o ■ �,.,� . FA,>l.NIlT BELTER PARK 5 20 9 . °•Lt4�i' 0 NRK 9E1O1/llDlltlf LOT 11 99m3 OTLEARY-BURKE ,r,I.. AD= 111of 9e■ra Bdftdftft•• 9em3 Si -� 54n " c CIVIL ASSOCIATES, PLC 19EErA fj• 'blllg� \!` '�i1/N L EEO• //lllll\� PJO 1•:2C 5 ANDREW AMENUE SUITE 3 ESSEX XT., yr PHONE, 878-9990 FAX 878-99M SITE PLAN 1