Loading...
HomeMy WebLinkAboutSD-03-58 - Decision - 0466 Farrell StreetCITY of SOUTH BURLINGTON DEPARTMENT of PLANNING & ZONING F&M DEVELOPMENT COMPANY, LLC — PLANNED UNIT DEVELOPMENT FINAL PLAT APPLICATION #SD-03-58 FINDINGS of FACT AND DECISION The F&M Development Corporation, herein referred to as the applicant, is requesting final plat approval to amend a previously approved planned unit development consisting of. 1) a 95 room hotel, 2) 160 residential units in four (4) buildings, 3) a 130 unit congregate housing facility, 4) subdividing two (2) parcels of 24.458 acres into eight lots, 5) a 90,000 square foot building which will include 11,000 square feet of retail, a 150 seat, 7,500 square foot restaurant, 70,000 square feet of general office, 2,500 square foot drive -in -bank, and ten (10) residential units, 6) a 7,200 square foot addition to an indoor recreation facility, and 7) an existing 16,000 square foot television studio and office building. The amendment consists of replacing the proposed 95 room hotel with a four story, 60-unit multi -family dwelling, 409 Farrell Street. The South Burlington Development Review Board (DRB) held a public hearing on November 4, 2003. Eric Farrell represented the applicant. Based on testimony provided at the above mentioned public hearing and the plans and supporting materials contained in the document file for this application, the DRB finds, concludes, and decides the following: FINDINGS OF FACT 1. The applicant is requesting final plat approval to amend a previously approved planned unit development consisting of 1) a 95 room hotel, 2) 160 residential units in four (4) buildings, 3) a 130 unit congregate housing facility, 4) subdividing two (2) parcels of 24.458 acres into eight lots, 5) a 90,000 square foot building which will include 11,000 square feet of retail, a 150 seat, 7,500 square foot restaurant, 70,000 square feet of general office, 2,500 square foot drive -in -bank, and ten (10) residential units, 6) a 7,200 square foot addition to an indoor recreation facility, and 7) an existing 16,000 square foot television studio and office building. The amendment consists of replacing the proposed 95 room hotel with a four story, 60-unit multi -family dwelling, 409 Farrell Street. 2. The owners of record are EF Farrell, LLC and DB Morrissey, LLC. 3. The subject property contains 24.458 acres and is located in the Commercial l (Cl) District. 4. The plans consist of three (3) sheets entitled "O'Dell Parkway PUD — Building Five", prepared by T.J. Boyle and Associates, dated September 16, 2003, last revised on October 30, 2003; two (2) sheets entitled "O'Dell Parkway PUD — Farrell Street — South Burlington, VT", prepared by Civil Engineering Associates, dated October 28, 2003, and three (3) sheets entitled "O'Dell Parkway — Building 5", prepared by Rabideau Architects, Inc., dated October 8, 2003, last revised on October 29, 2003 5. This application was continued from the September 16, 2003 Development Review Board meeting. Setbacks: The proposed building meets all setback requirements for the subject PUD, as outlined in Table C-2 of the South Burlington Land Development Regulations, Density: The maximum density allowed on the subject PUD is 366 units (15 units/acre x 24.458 acres = 366.87 units). The current proposal will result in a total of 230 units. Coverage: The most recent approval for the subject PUD (SD-02-21) had a building coverage approved at 171/o (18% with Ben Franklin) and an overall coverage of approved at 53.3% (54.3% with Ben Franklin). The proposed amendments (SD-03-58 and SD-03-67) would create a minor change in overall coverage and building coverage on the subject property. The amendment on Lot #4 (SD-03-58) will decrease the building coverage by 1,752 square feet and decrease the overall coverage by 225 square feet. The amendment on Lot #2 (SD-03-67) will increase the building coverage by 704 square feet and increase the overall coverage by 10,707 square feet. Thus, the overall coverage will increase by 10,482 square feet, while the building coverage will decrease by 1,048 square feet, for the entire PUD. Accordingly, the building coverage will be reduced to 16.9% (17.9% with Ben Franklin) and the overall coverage will be increased to 54.3% (55.3% with Ben Franklin). PLANNED UNIT DEVELOPMENT STANDARDS Pursuant to Section 15.18 of the South Burlington Land Development Regulations, PUDs shall comply with the following standards and conditions: .Sufficient water supply and wastewater disposal capacity is available to meet the needs of the prq jecz According to Section 15.13(B)(1) of the South Burlington Land Development Regulations, the existing public utility system shall be extended to provide the necessary quantity of water, at an acceptable pressure, to the proposed dwelling units. 2 The Superintendent of the South Burlington Water Department, Jay Nadeau, reviewed and approved the plans of the proposed project. According to Jay Nadeau, the City currently has the available capacity to supply the amended PUD. The amended water allocation is valid for a five-year period from the date of Jay's letter on September 16, 2003. According to a letter from the City of Burlington Department of Public Works dated August 29, 2003, the City of Burlington's Water and Wastewater Treatment, Distribution, and Collection Facilities have sufficient unreserved capacity to handle the wastewater disposal of this project. Sufficient grading and erosion controls will be utilized during and after construction to prevent soil erosion and runofffrom creating unhealthy or dangerous conditions on the subject property and adjacent properties. The proposed project must adhere to standards for erosion control as set forth in Section 16.03 of the South Burlington Land Development Regulations. In addition, the grading plan shall meet the standards set forth in Section 16.04 of the South Burlington Land Development Regulations. The project incorporates access, circulation, and traffic management strategies sufficient to prevent unreasonable congestion of adjacent road& Access is provided to the proposed building by Farrell Street, a proposed public roadway connecting Shelburne Road and Joy Drive. According to the ITE, 6`, Edition, the change in use is estimated to decrease the P.M. vehicle trip ends from 38.0 to 23.4, for a total decrease of 14.6 P.M. peak -hour adjacent street traffic. Using the ITE, 6" Edition, staffs calculations indicate that the change in use from a 95 room extended stay hotel to 60 residential units and the change in use from a 130 unit housing facility to 63 residential units (SD-03-67) will result in a net decrease of 12.1 vehicle trip ends from the previous approval. The Development Review Board does not feel the proposed use will create any new circulation issues. The applicant has submitted an excerpt from the Traffic Impact Analysis, dated December 27, 1999, performed by Resources Systems Group, Inc. that was submitted with the original approval for the subject PUD. The project's design respects and will provide suitable protection to wetlands, streams, wildlife habitat as identified in the Open Space Strategy, and any unique natural features on the site The subject property does not contain any wetlands, streams, or unique natural features. M The proposed building footprint respects the boundaries of the Interstate Highway Overlay (IHO), which contains 150' of land from the State right-of-way along I-189. The project is designed to be visually compatible with the planned development patterns in the area, as specified in the Comprehensive Plan and the purpose of the zoning district(s) in which it is located According to the South Burlington Land Development Regulations, the Commercial 1 District is hereby formed in order to encourage the location of general retail and office uses in a manner that serves as or enhances a compact central business area. Other uses that would benefit from nearby access to a central business area, including clustered residential development and small industrial employers, may be permitted if they do not interfere with accessibility and continuity of the commercial district. Large -lot retail uses, warehouses, major industrial employers, and incompatible industrial uses shall not be permitted. Planned Unit Developments are encouraged in order to coordinate traffic movements, promote mixed -use developments, provide shared parking opportunities, and to provide a potential location for high - traffic generating commercial uses. The Development Review Board feels that the proposed PUD conforms to the purpose of the C1 District and that it is visually compatible with the area, which currently contains commercial uses and multi -family dwellings. The only issue the Development Review Board should consider is the visual impact from I-189, as the proposed structure will be 40' in height and highly visible from the Interstate. The Development Review Board notes that the applicant requested a height waiver of 5'. The applicant has also requested an additional height waiver of 3' to accommodate the elevator vent. This waiver is strictly for the elevator vent, which will extend 3' above the roof -line. Open space areas on the site have been located in such a way as to maximize opportunities for creating contiguous open spaces between adjoining parcels and/or stream buffer areas. The major open area on this PUD is the land adjacent to the Interstate which comprises the IHO. The Development Review Board feels the project maximizes the open space in this area. The Development Review Board also notes that the open space on this PUD will not vary from the previously approved plans. The layout of a subdivision or PUD has been reviewed by the Fire Chief or (designee) to ensure that adequate fire protection can be provided The South Burlington Fire Chief has reviewed and approved the plans. The applicant must comply with the Fire Chief's requests, as outlined in his letter dated October 31, 2003. Roads, recreation paths, stormwater facilities, sidewalks, landscaping, utility lines and lighting have been designed in a manner that is compatible with the extension of such services and infrastructure to adjacent landowners. 4 A proposed public road serves all lots in the PUD. A sidewalk exists on the northerly side of the roadway and a 10' wide bike path exists on the southerly side of the roadway. There is a future recreation path extending out of the northerly boundary of the PUD and a proposed bike path extending out of the easterly boundary of the PUD. The Development Review Board feels utilities and landscaping are compatible with adjacent properties. The Development Review Board notes that pursuant to Section 15.13(E) of the South Burlington Land Development Regulations, any new utility lines shall be underground. Roads, utilities, sidewalks, recreation paths, and lighting are designed in a manner that is consistent with City utility and roadway plans and maintenance standards. The applicant has submitted exterior lighting details (cut -sheets) for the street lights and pedestrian lights on the property. Both of the proposed lighting fixtures comply with Appendix A in the South Burlington Land Development Regulations. At this time, the applicant is not proposing building -mounted lights for the building. The City Engineer reviewed and approved the plans for the proposed project on October 9, 2003. The proiect is consistent with the goals and objectives of the Comprehensive Plan_ for the affected district(s)- The Development Review Board finds the proposed PUD to be consistent with the South Burlington Comprehensive Plan for the following reasons: a. The plan is consistent with the stated purpose of the C 1 District, as outlined in Section 5.01 of the South Burlington Land Development Regulations. b. The applicant is working with the City of South Burlington to develop affordable housing in this PUD. The development of affordable housing would support the recommended action in the Comprehensive Plan that states, "Encourage a variety of housing types that are affordable to very low, low, and moderate income persons, as defined by the State." c. The proposed PUD will produce high density, mixed -use development, which is the fits the character and the goals for the area. d. The proposed PUD will produce infill development, which is promoted through the Comprehensive Plan. 5 SITE PLANREVIEW STANDARDS Pursuant to Section 14.03(A)(6) of the South Burlington Land Development Regulations, any PUD shall require site plan approval. Section 14.06 of the South Burlington Land Development Regulations establishes the following general review standards for all site plan applications: The site shall be planned to accomplish a desirable transition from structure to site, from structure to structure, and to provide for adequate planting, safe pedestrian movement, and adequate parking area The Development Review Board feels the proposed project accomplishes a desirable transition from structure to site and from structure to structure. The Development Review Board also feels the site provides for adequate planting and safe pedestrian movement. Based on the Land Development Regulations, the most recent approval required 1,072 parking spaces, but received an approval of 961 total parking spaces. The plans depict a total of 1,000 parking spaces. The current proposal will alter the parking requirement, reflecting the change in use from a 95 room extended stay hotel to a 60 unit residential facility. The new requirement, based on the Land Development Regulations is 1,065 parking spaces (1,072 - 95 room extended stay hotel -130 unit congregate housing facility + 60 unit residential + 63 unit residential). The Development Review Board notes that this calculation includes the changes proposed through the applicant's other application, #SD- 03-67, currently in front of the Development Review Board for approval. So, the parking requirement has decreased from the previous approval. A waiver has been requested for 65 (1,065 — 1,000) parking spaces, or a 6.1%, shortfall, for a total of 1,000 parking spaces. The City hired Wilbur Smith Associates to conduct a parking study for the PUD, as amended by the proposed project. The study looked at existing conditions on the property and analyzed the demand of the proposed changes, including the applicant's other amendment in front of the Development Review Board (SD-03-67). The conclusion of the study was that the proposed parking on the property is sufficient to accommodate the proposed buildings. The applicant has submitted the details for the above -ground and underground parking spaces for the proposed project. The parking spaces meet the standards of Table 13-8 in the Land Development Regulations. According to Section 13.01(J) of the South Burlington Land Development Regulations, parking or storage facilities for recreational vehicles shall be provided in all multi -family residential developments of twenty-five (25) units or more. Recreational vehicles shall not be stored on any common open lands other than those specifically approved for such purpose by the Development Review Board through the review process. The Development Review Board may waive this provision only upon a showing by the applicant that the storage and parking of recreational vehicles shall be prohibited within all private and common areas of the development. �-9 Parking shall be located to the rear or sides of buildings to the greatest extent practicable - The proposed building contains one (1) parking lot that is located to the rear and the westerly side of the building and one (1) parking lot under the proposed building. Without restricting the permissible limits of the applicable zoning district, the height and scale of each building shall be compatible with its site and existing or adjoining buildings According to Section 3.07 (D) of the South Burlington Land Development Regulations, the maximum height of a pitched -roof structure shall be 40' above average pre -construction grade. The average pre -construction grade for the subject lot is 221 feet. The applicant has stated that the proposed building will be 54.2' above the average pre -construction grade and has requested a waiver for the additional 15' (rounded up from 14.2' for margin of error). According to Section 3.07(F) of the South Burlington Land Development Regulations, the Development Review Board may approve a waiver, but for each foot of additional height above 40', all front and rear yard setbacks shall be increased by one (1) foot and all side yard setback shall be increased by one-half (1/2) foot. Thus, the front and rear setbacks shall be increased by 15' and the side yard setback shall be increased by 7.5' in order for the Development Review Board to approve this waiver. The building, as proposed, does not meet the additional setback requirements for the height waiver. However, the Development Review Board finds the proposed project in compliance with Section 3.07(F)(2) of the South Burlington Land Development Regulations, and therefore grants the requested height waiver of 15', for a total building height of 55' above average pre -construction grade. Newly installed utility services and service modifications necessitated by exterior alterations or building expansions shah to the extentfeasible, be underground The Development Review Board has already stated that pursuant to Section 15.13(E) of the South Burlington Land Development Regulations, any new utility lines shall be underground. The DRB shall encourage the use of a combination of common materials and architectural characteristics, landscaping, buffers, screens and visual interruptions to create attractive transitions between buildings of different architectural styles The Development Review Board feels this criterion is being met. Proposed structures shall be related harmoniously to themselves, the terrain, and to existing buildings and roads in the vicinity that have a visual relationship to the proposed structures. The Development Review Board feels this criterion is being met. 7 r Site plan applications shall meet the following specific standards as set forth in Section 14.07 of the South Burlington Land Development Regulations: The reservation of land may be required on any lot for provision of access to abutting properties whenever such access is deemed necessary to reduce curb cuts onto an arterial of collector street, to provide additional access for emergency or other purposes, or to improve general access and circulation in the area. The Development Review Board does not feel the addition of the proposed building poses any opportunities to create access to abutting properties that will reduce curb cuts, improve general access, or improve circulation. Electric, telephone and other wire -served utility lines and service connections shall be underground Any utility installations remaining above ground shall be located so as to hime a harmonious relation to neighboring properties and to the site - The Development Review Board has already stated that pursuant to Section 15.13(E) of the South Burlington Land Development Regulations, any new utility lines shall be underground. All dumpsters and otherfacilities to handle solid waste, including compliance with any recycling or other requirements, shall be accessible, secure and properly screened with opaque fencing to ensure that trash and debris do not escape the enclosure(s). The plans show two (2) dumpsters in the northeast corner of the parking lot, which are both enclosed. Landscaping and Screening Requirements The previously approved PUD had a landscaping requirement of $132,875, based on building costs. This landscaping requirement is being met. The applicant has submitted a landscape budget for the proposed building, which contributes to the landscaping on the overall PUD. The landscape budget indicates that $44,928.60 of landscaping will be planted for the proposed building, which is in compliance with Table 13-9 of the Land Development Regulations. Pursuant to Section 13.06(B) of the Land Development Regulations, in all off-street parking area with twenty (20) of more parking spaces, at least ten percent (10%) of the interior of the parking area shall be landscaped with trees, shrubs, and other plants. At least one (1) major deciduous shade tree, whose caliper is equal to or greater than two and one-half (2.5) inches when measures six (6) inches above ground at the time of planting, shall be provided within each parking area for every three thousand (3,000) square feet of paved area or every ten (10) parking spaces, whichever is greater. 1:1 The applicant submitted an 8.5 x 11" depiction of the parking lot for the proposed building and the proposed landscaped areas, which meet the requirements set forth in Section 13.09 of the Land Development Regulations. Pursuant to Section 13.06(B) of the Land Development Regulations, snow storage area must be specified and located in an area that will minimize the potential for run-off. The applicant has submitted an 8.5 x I I" depiction of the parking lot for the proposed building and the proposed snow storage areas, which comply with Section 13.06(B) of the Land Development Regulations. The City Arborist reviewed the plans and provided comments. The applicant must comply with the requests of the City Arborist, as outlined in his letter dated October 31, 2003. DECISION Motion by Gayle Quimby, seconded by Mark Boucher, to approve Final Plat Application #SD-03-67, subject to the following conditions: 1. All previous approvals and stipulations shall remain in full effect, except as amended herein. 2. This project shall be completed as shown on the plans submitted by the applicant, as amended by this decision, and on file in the South Burlington Department of Planning & Zoning. 3. The proposed project shall adhere to standards for erosion control as set forth in Section 16.03 of the South Burlington Land Development Regulations. In addition, the grading plan shall meet the standards set forth in Section 16.04 of the South Burlington Land Development Regulations. 4. If and when the applicant updates the traffic study for the subject PUD, the new use shall be incorporated into that study and any traffic management strategies related to the proposed 63-unit multi -family dwelling units shall be implemented. 5. The applicant shall comply with the requests of the Fire Chief, as outlined in his letter dated October 31, 2003, prior to recording of the final plat plans. 6. Pursuant to Section 15.13(E) of the South Burlington Land Development Regulations, any new utility lines shall be underground. 7. If exterior lighting is to be installed on the building, the details of the lighting shall be submitted for approval prior to the issuance of the zoning permit. 0 8. The Development Review Board approves a parking waiver for the 65 parking spaces, or 6.1%0, shortfall requested by the applicant, for a total of 1,000 spaces. 9. All dumpsters and solid waste facilities shall be accessible, secure, and screened to the satisfaction of the Development Review Board. 10. Pursuant to Section 13.06(C)(1) of the South Burlington Land Development Regulations, any utility cabinets on the site shall be effectively screened to the approval of the Development Review Board. 11. The applicant shall comply with the requests of the City Arborist, as outlined in the comments dated October 31, 2003. 12. The applicant shall post a $44,928 landscape bond prior to the issuance of the zoning permit. This bond shall remain in effect for three (3) years to assure that the landscaping has taken root and has a good chance of surviving. 13. Pursuant to Section 15.08 (D) of the South Burlington Land Development Regulations, the applicant shall submit homeowner's association legal documents prior to the issuance of the first zoning permit. The documents shall include language that: a. prohibits the storage and parking of recreational vehicles within the development; 14. The Development Review Board approves a height waiver of 15', for a total building height of 55' above average pre -construction grade, pursuant to Section 3.07(F)(2) of the South Burlington Land Development Regulations. 15. Any changes to the final plat plans shall require approval of the South Burlington Development Review Board. 16. The final plat plans (sheets C-3 and N-3) shall be recorded in the land records within 90 days or this approval is null and void. The plans shall be signed by the Board Chair or Clerk prior to recording. W t c Chuck Bolton - yea/nay/abstain/not present Mark Boucher - ye4nay/abstain/not present John Dinklage - yea/nay/abstain/not present Roger Farley - yea/nay/abstain/not present Michele Kupersmith - yea/nay/abstain/not present Larry Kupferman - yea/nay/abstain/not present Gayle Quimby - ya/nay/abstain/not present Motion Carried by a vote of 7-0-0. Signed this w day of November, 2003, by R John Dinklage, Chair 11