Loading...
HomeMy WebLinkAboutSP-85-0000 - Decision - 0073 Ethan Allen DriveFINDINGS OF FACT STATE OF VERtv10NT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTOTJ Re: Findings of Fact, application of Allan and Risp B rard. lot 6 , Berard Industrial Park. khan Allen Drive On the 13th of Auuus� t19_a_j_, the South Burlington Planning Commission approved the request of —Allan and Ri, p Bcrard for site plan ab� oval under Section 19.lQ Of the South Burlington Zoning Regulations based on the following findings: 1, TRAFFIC :=.CCESS - Access is from a 24 foot wide driveway. 2. CIRCULATION AND PARKING - A gravel parking area will be provided. Seven spaces are required; four are provided in front, the rest in the rear. 3. LANDSCAPING & SCREENING - A $1500 landscaping bond shall be posted_prior to permit. Landscaping will be revised to show additional higher quality plantings in the front yard and will be approved by the Planner prior to permit. 4. OTHER - Storm water handling method shall be shown on the plan and will be approved by the City Engineer Prior to permit. On.site septic system shall be relocated for future street connection and to meet State requirements; it shall be approved prior to permit by the City Engineer. 5. Building permit shall be obtained within 6 months. South Burlington Planning Commission