Loading...
HomeMy WebLinkAboutSP-01-92 - Decision - 0073 Ethan Allen Drive#SP-01-92 FINDINGS OF FACT AND DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON RE: Findings of Fact, Site Plan Application #SP-01-92 of Waste Systems International, Inc. seeking amendment of a previously approved site plan approval for an automobile repair and service use in conjunction with a truck terminal, 73 Ethan Allen Parkway. On the 31" day of December, 2001, the South Burlington Director of Planning & Zoning approved the request of Waste Systems International, Inc. for site plan review under Section 26.10 of the South Burlington Zoning Regulations based on the following findings: This project consists of an amendment to #SP-01-15 to replace the approved screened dumpster with two enclosed metal box receptacles for the storage of used tires at 73 Ethan Allen Parkway. 2. The owners of record of this property are Joseph Kelly and Sean Kelly. 3. Access, Circulation and Parkin: No changes to the approved access and circulation for this property are proposed. 4. Coverage and Setbacks: The installation of the proposed enclosed metal box receptacles will increase overall site coverage by 216 SF, or 0.52%, to 65.52%. This is within the 70% limit for the Mixed -Industrial Commercial district. All other coverages and all setback requirements are met. 5. Traffic: No changes to traffic generation will result from replacement of the dumpster with the metal box receptacles. 6. Sewer: No additional wastewater allocation is needed. 7. Landscaping: As the metal box receptacles will be located behind the building, no additional landscaping is recommended. 8. L ghiing: No changes to exterior lighting are proposed. #SP-01-92 DECISION AND CONDITIONS Based on the above Findings of Fact, the South Burlington Director of Planning and Zoning approves the site plan application of Waste Systems International, Inc. to amend previously approved site plan #SP-01-15 to replace a screened dumpster area with two enclosed metal box receptacles at 73 Ethan Allen Parkway, as depicted on a plan entitled "Site Plan of 73 Ethan Allen Parkway" prepared by Bradford L. Holden and dated October 19, 2001, with the following stipulations: All previous approvals and stipulations that are not superseded by this approval shall remain in effect. 2. The metal box enclosures shall be fully enclosed. Any change to the location or configuration of the approved enclosures shall require approval of the South Burlington Development Review Board. 3. Any changes to exterior lighting shall require approval of the Director of Planning & Zoning prior to installation. 4. The applicant shall obtain a zoning permit within six (6) months of the date of this approval, pursuant to Section 27.302 of the South Burlington Zoning Regulations, or this approval shall be null and void. 5. The applicant shall obtain a Certificate of Occupancy/Compliance from the Administrative Officer, 6. Any changes to the site plan shall require approval by the South Burlington Development Review Board. I - ( Beth Hoover Date Director of Planning & Zoning Please Note: You have the right to appeal this decision to the Vermont Environmental Court, pursuant to 24 V.S.A. § 4471 and V.R.C.P. 76, in writing, within 30 days of the date this decision is issued. The fee is $150.00. If you fail to appeal this decision, your right to challenge this decision at some future time may be lost because you waited too long. You will be bound by the decision, pursuant to 24 V.S.A. § 4472(d) (exclusivity of remedy; finality).