HomeMy WebLinkAboutSP-06-04 - Decision - 0063 Ethan Allen DriveCITY OF SOUTH BURLINGTON
DEPARTMENT OF PLANNING AND ZONING
MICHAEL HOPWOOD - 63 ETHAN ALLEN DRIVE
SITE PLAN APPLICATION #SP-06-04
FINDINGS OF FACT AND DECISION
Michael Hopwood, hereinafter referred to as the applicant, is seeking to amend a
previously approved plan for a 6,000 sq. ft. auto sales and service repair building. The
amendment consists of: 1) constructing a 1200 sq. ft. (30' x 40) addition, 2) construct a roof
overhang (8' H x 6' W x 30' L) on east side building, 3) construct an 8' galvanized mesh
security fence, 4) add additional parking, and 5) other minor site modifications, 63 Ethan
Allen Drive.
Based on the plans and supporting materials contained in the document file for this
application, the Administrative Officer finds, concludes, and decides as follows:
FINDINGS OF FACT
This project consists of amending a previously approved plan for a 6,000 sq. ft. auto
sales and service repair building. The amendment consists of: 1) constructing a
1200 sq. ft. (30' x 40) addition, 2) construct a roof overhang (8' H x 6' W x 30' L) on
east side building, 3) construct an 8' galvanized mesh security fence, 4) add
additional parking, and 5) other minor site modifications, 63 Ethan Allen Drive.
2. The owner of record of the subject property is Michael Hopwood.
3. The subject property is located in the Mixed Industrial & Commercial (Mixed IC)
Zoning District.
4. The application was received on January 20, 2006.
5. The plan submitted is entitled, "Hopwood Property South Burlington Vermont Site
Plan", prepared by Llewellyn -Howley, Inc., dated 10/25/03, last revised on 1/18/06.
DIMENSIONAL REQUIREMENTS
6. The applicant is proposing a 1200 sq. ft. addition which would be constructed
over existing pavement, thus the building coverage will not be changing. Building
coverage is at 15.6 % (maximum is 30%). The overall coverage will be changing
slightly, due to the additional proposed parking. Current overall coverage is 45.8
%. Proposed is 50% (maximum is 70%). Front yard coverage along Ethan Allen
Drive is 30% and along Commerce Avenue is 28% (maximum allowed is 30%).
- 1 -
SITE PLAN REVIEW STANDARDS
Vehicular access
7. Access is provided via two (2) curb cuts, one being off Ethan Allen Drive, the
other off Commerce Avenue. No changes are proposed.
Circulation
8. Circulation on the site is adequate.
Parking
9. The current parking requirement is 13 parking spaces. The proposed addition
would require an additional two (2) spaces, for a total of 15. The plan indicates
18 parking spaces for customers and employees, including one (1) designated
as handicapped.
10. Pursuant to Section 13.01(G)(5) of the Land Development Regulations, bicycle
parking shall be provided on the subject property. A bicycle rack is depicted on
the plan.
11. Pursuant to Section 13.06(B) of the Land Development Regulations, internal
landscaping of the parking area does not apply.
Landscaping
12. Per Section 13.06(G)(3) of the Land Development Regulations, the applicant
must add $2,850 worth of new landscaping. This requirement is being met.
13. Pursuant to Section 13.06(B)(4) of the Land Development Regulations, snow
storage areas must be shown on the plan. Snow storage areas are depicted on
the plan.
Outdoor Lighting
14. The applicant is proposing a 175W lamp on a 14-foot poll southeast of the new
addition. Per Section 13.07 of the Land Development Regulations, all exterior
lighting shall be shielded and downcasting as to minimize lighting impacts on the
neighboring properties.
Pursuant to Section 14.06 and 14.07 of the Land Development Regulations, the
following review standards shall apply to site plan applications:
Traffic
15. The current use yields a total of 20.62 vehicle trip ends (vtes) during the P.M.
peak hour. With the additional space proposed, the number of vtes will
increase to 24.67 vtes, or a 4.05 increase. When the building was first
-2-
approved and built, the applicant paid all impact fees up front, so no additional impact
fees are required.
(a) The relationship of the proposed development to goals and objects set forth in
the City of South Burlington Comprehensive Plan.
16. The Comprehensive Plan states that the City should encourage development while
protecting natural resources and promoting a healthy and safe environment. The
proposed project is in keeping with the recommendations of the Comprehensive Plan.
(b) The site shall be planned to accomplish a desirable transition from structure to
site, from structure to structure, and to provide for adequate planting, safe
pedestrian movement, and adequate parking areas.
17. The proposal is in keeping with this requirement.
(c)Parking shall be located to the rear and sides of buildings to the greatest extent
practicable.
18. Parking is located on the front and side of the property.
19. Section 13.01 of the Land Development Regulations requires that bicycle parking or
storage facilities be provided for employees, residents, and visitors to the site. It has
already been noted that a bicycle rack is depicted on the plans.
(d) Without restricting the permissible limits of the applicable zoning district, the
height and scale of each building shall be compatible with its site and existing or
adjoining buildings.
20. The current building and proposed addition are in keeping with this requirement.
(e) Newly installed utility service modifications necessitated by exterior alterations
or building expansions shall, to the extent feasible, be underground.
21. Pursuant to Section 15.13(E) of the Land Development Reguations, any new utility
lines (telephone, cable, electric etc.) shall be located underground.
(0 The combination of common materials and architectural characteristics,
landscaping, buffers, screens, and visual interruptions to create attractive
transitions between buildings or different architectural styles shall be
encouraged.
22. The current building and proposed addition are in keeping with this requirement.
(g) Proposed structures shall be related harmoniously to themselves, the terrain
and to existing buildings and roads in the vicinity that have a visual relationship
to the proposed structures.
23. The current building and proposed addition are in keeping with this requirement.
-3-
In addition, to the above general review standards, site plan application shall meet the
following specific standards set forth in Section 14.07 of the Land Development
Regulations:
(a) The reservation of land may be required on any lot for provision of access to
abutting property whenever such access is deemed necessary to reduce curb
cuts onto an arterial or collector street, to provide additional access for
emergency or other purposes, or to improve general access and circulation in the
area.
24. The reservation of land is not necessary.
(b) Electric, telephone, and other wire -served utility lines and service connections
shall be underground. Any utility installations remaining above ground shall be
located so as to have a harmonious relation to neighboring properties and to the
site.
25. As stated above, any new utility lines shall be underground.
(c) All dumpsters and other facilities to handle solid waste, including compliance
with any recycling or other requirements, shall be accessible, secure, and
properly screened with opaque fencing to ensure that trash and other debris do
not escape the enclosure(s).
26. Two (2) screened dumpsters are noted on the plan.
Other
27. The applicant is proposing and eight (8) foot high galvanized mesh security fence
along the back and side of the property as a security measure. Prior to permit issuance,
the applicant shall submit a rendering of the fence to the Administrative Officer as to
ensure that the fence is meeting the requirements of Section 13.17(C) of the Land
Development Regulations.
DECISION
Based on the above Findings of Fact, the Administrative Officer hereby approves Site
Plan Application #SP-06-04 of Michael Hopwood to amend a previously approved plan for
a 6,000 sq. ft. auto sales and service repair building. The amendment consists of: 1)
constructing a 1200 sq. ft. (30' x 40') addition, 2) construct a roof overhang (8' H x 6' W x
30' L) on east side building, 3) construct an 8' galvanized mesh security fence, 4) add
additional parking, and 5) other minor site modifications, 63 Ethan Allen Drive, subject to
the following conditions:
1) All previous approvals and stipulations which are not superseded by this approval,
shall remain in effect.
2) Prior to permit issuance, the applicant shall submit a rendering of the 8' fence the
Administrative Officer to ensure that the fence meets the standards of Section
13.17(C) of the Land Development Regulations.
3) The applicant shall post a $2,850 landscape bond, prior to issuance of a zoning
permit. This bond shall remain in full effect for three (3) years to assure that the
landscaping has taken root and has a good chance of surviving.
4) This project shall be completed as shown on the plan submitted by the applicant
and on file in the South Burlington Department of Planning and Zoning.
5) The applicant shall obtain a zoning permit within six (6) months of this decision
pursuant to Section 17.04 of the Land Development Regulations, or this approval is
null and void.
6) The applicant shall obtain a Certificate of Occupancy from the Administrative Officer
prior to the use of the new addition.
7) Any change to the site plan shall require approval by the South Burlington
Administrative Officer.
Signed on this _U,� day of tJVW 2006 by
lair, Administrative Officer
Please note: Pursuant to 24 VSA § 4465, an interested person may appeal this decision
by filing a Notice of Appeal with the secretary of the Development Review Board. This
Notice of Appeal must be accompanied with a $110 filing fee and be filed within 15 days
of the date of this decision.
-5-