Loading...
HomeMy WebLinkAboutSP-94-0000 - Decision - 1975 Dorset StreetFINDINGS OF FACT & DECISION 79 STATE OF VERMONT COUNTY OF CHITTENDEN S oo Od CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of MBL Associates to resubdivide 85 lots and relocate the overflow and RV parking areas within a planned residential development consisting of 161 single family lots and 60 multi -family units, Dorset Street. On the loth of May, 1994 the South Burlington Planning Commission approved the request of MBL Associates for revised final plat approval under Section 204 of the South Burlington Subdivision Regulations based on the following findings: 1. This project consists of the resubdivision of 85 lots and relocation of the overflow and RV parking areas within the previously approved 221 unit PRD. The sketch plan was reviewed on April 12, 1994. The purpose of the resubdivision is to comply with requirements of the State Water Quality Division to minimize impacts to the wetlands and buffer zones. 2. Access: No changes proposed. 3. Density: No change. The project will still consists of 161 lots and 60 multi -family units. 4. Lot size: The total number of lots remains unchanged. The smallest lot size previously approved was 7200 square feet (the minimum requirement is 12,000 square feet). This will continue to be the smallest lot size. The number of 7200 square foot lots will be reduced and the number of lots meeting the minimum will be increased by one (1). The lot size breakdown is as follows: LOT SIZE RANGE IN SQUARE FEET ORIGINAL # OF LOTS REVISED nF r.nTR (= 7200) (24) (20) 7200-8000 38 50 8001-9000 26 34 9001-10,000 35 35 10,001-11,000 21 8 11,001-12,000 17 9 12,000 + 24 25 1 5. Recreation path: The recreation path along the east side of lots #1-8 will be slightly relocated to the west to move the path out of the wetland buffer. Sheet 3 of the subdivision plat should be revised to show the recreation path easement in its revised location. 6. Parking lot: The multi -family overflow and RV parking areas are being relocated. These two (2) parking areas will be consolidated and moved to the easterly portion of the multi -family site. DECISION & CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the revised final plat application of MBL Associates to resubdivide 85 lots and relocate the overflow and RV parking areas within a planned residential development consisting of 161 single family lots and 60 multi -family units, Southeast Summit, Dorset Street as depicted on a 47 page set of plans, page two ( 2 ) entitled "Southeast Summit, Overall Site Plan", prepared by FitzPatrick-Llewellyn, Inc. and dated October 1992, last revised 4/14/94, and as depicted on a nine (9) page subdivision plat, page one (1) entitled "Southeast Summit, Plat of Subdivision of Lands of MBL Associates, Dorset Street, South Burlington, Vermont", prepared by FitzPatrick-Llewellyn, Inc. dated January 6, 1994, last revised 4/15/94, with the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. The final plat plans shall be revised prior to recording to show the changes listed below and shall require approval of the City Planner. Three (3) copies of the approved revised plans shall be submitted to the City Planner prior to recording. a) Sheet 3 of the subdivision plat shall be revised to show the recreation path easement located easterly of lots #1-8 in its revised location as shown on the engineering drawings. b) The engineering plans shall be revised to add a stub to M.H.9 for future extensions to the north. c) The engineering plans shall be revised to show an additional fire hydrant on Floral Drive (Street "D") at lot #124 in a location approved by the Fire Chief. 2 3. The final plat plans, including survey plats, shall be recorded in the South Burlington Land Records within 90 days or this approval is null and void. The plans shall be signed by the Planning Commission Chair or Clerk prior to recording. Chairm n or Clerk South Burlington Planning Commission 51-� 'r K. Date 3