Loading...
HomeMy WebLinkAboutBATCH - Supplemental - 1620 Dorset StreetCITY OF SOUTH BURLINGTON APPLICATION FOR A DEVELOPMENT OR SUBDIVISION PERMIT 1. Applicant's Name, Address, and Phone Number 2. Name, Address, and Phone Number of the Person Whom the Commission should contact regarding this Application 3. Nature of the Development or Subdivision e fir'=7 [?' ��,L ,^.✓f-a %c C: � fir/ �,^'� T `� ` - ; �'�' �� ° 1, q� r �d �� Jr � Gl � /I�` Gam-- �+. Location of Development or Subdivision 5. High--and.Low Elevations of the Tract of Land involved with the Development or Subdivision 6. Address of each of the Applicant's Offices in Vermont 7. Applicant's Legal Interest in the Property (Fee Simple, Option, Etc.) - 2 - 8. If the Applicant is not an individual, the Form, Date, and Place of Formation. of the Applicant FORM: DATE: PLACE: 9. Estimated Cost, Exclusive of Land Cost of the Development (Applicant -for a Subdivision Need Not Lswer) 10. Application for a Subdivision, the Number of Lots 11. What Restrictive Covenants are Planned for any Deed(s) to be issued? 12. Description of the Proposed Development of Subdivision A. Plans and Specifications: (1) Attach a detailed plat or plot plan of the proposed project drawn to scale, showing the location and dimensions of the entire tract. This plan should also show: all lots, streets, roads, water lines, sewage systems, drain systems, buildings, existing or intended. (2) In subdivisions where individual water and sewaFre facilities are intended, indicate the proposed location(s). (3) Show all easements, parks, playgrounds, parking areas, water courses, and other bodies of water, natural or artificial, existing or intended. (4) Include a contour mao of the land involved drawn on a scale of foot contour intervals. (5) Indicate on the plans the location and width of any easements for utilities, roads, etc., exist- ing or intended. Attach a.written explanation of any such easements. I —3- 13. What is the purpose of this Subdivision or Development and What is the intended use of the land after Subdivision or Development? 14. Describe the Site of the Proposed Development or Subdivis- ion including information, if available, on Soils, Streams or Other bodies of Water, Bedrocks, Etc., 15. Acreage: A. Number of acres owned, or in which you have a legal interest r B. Number of acres in this project C. Number of acres previously developed D. When do you anticipate beginning the project E. When will this development or subdivision be completed 16. Water System: A. What type of water system is to be provided, such as: Individual_ system on each lot,, community system, municipal system, etc. h B. Where is the nearest municipal water system and is it available and feasible to use it? 17. Sewage System: A. What type of sewage disposal system is to be provided or intended, such as: Individual system on each lot, community system, or municipal system? — 4 — B. Where is the nearest community sewage system and is it available and feasible to use it? C. If the sewage system is other than a community, municipal, or individual lot septic tank and leaching field, include competent professional engineering evidence that it will perform satisfactorily. 18. Adjacent Property: A. List below the names and addresses of adjacent property owners. B. What is the adjacent property used for at present? C. What is the future usage intended for the adjacent property? 19. Zoning: A. Which'District or Districts is the proposed site with- in according to the official zoning map of the City? DATE SIGNATURE ,k-T N Mu-L.. {{ v