HomeMy WebLinkAboutSD-06-06 - Decision - 1530 Dorset StreetCITY OF SOUTH BURLINGTON
DEPARTMENT OF PLANNING AND ZONING
DORSET STREET ASSOCIATES, LLC - PLANNED UNIT
DEVELOPMENT
FINAL PLAT APPLICATION #SD-06-06
FINDINGS OF FACT AND DECISION
Dorset Street Associates LLC, hereafter referred to as the applicant, is requesting final
approval to amend a Planned Unit Development consisting of: 1) 59 single-family lots, 2)
90 multi -family units in 45 buildings, 3) 6 common lots, and 4) 1 reserved lot. The
amendment consists of: 1) relocating utility easement, 2) relocating street lights, 3)
revising duplex footprints, and 4) adding landscaping around utility cabinets, 1580
Dorset Street. The Development Review Board held a public hearing on February 21,
2006. Paul O'Leary represented the applicant.
Based on testimony provided at the above mentioned public hearing and the plans and
supporting materials contained in the document file for this application, the Development
Review Board finds, concludes, and decides the following:
FINDINGS OF FACT
1. The applicant is requesting final approval to amend a Planned Unit Development
consisting of: 1) 59 single-family lots, 2) 90 multi -family units in 45 buildings, 3) 6
common lots, and 4) 1 reserved lot. The amendment consists of: 1) relocating
utility easement, 2) relocating street lights, 3) revising duplex footprints, and 4)
adding landscaping around utility cabinets, 1580 Dorset Street.
2. The subject property is located in the Southeast Quadrant (SEQ) Zoning District.
3. The owner of record of the subject property is Dorset Street Associates, LLC.
4. The plans submitted with this application consist of an 18 page set of plans, page
one (1) entitled, "The Cider Mill South Burlington Vermont Site Plan `A"',
prepared by O'Leary -Burke Civil Associates, PLC, dated 7/5/05, last revised on
1 / 18/06.
ZONING DISTRICT & DIMENSIONAL REQUIREMENTS
There are no changes to the dimensional requirements as part of this application.
However, please note the comments included in the proposed amendments to
duplex building envelopes section below.
- 1 -
PROPOSED AMENDMENTS TO UTILITY EASEMENTS
The South Burlington Water Department reviewed the amended plans and has no
additional comments. The City Engineer is reviewing the p►ans and should have
comments prior to the hearing.
PROPOSED AMENDMENTS TO LIGHT FIXTURE TYPE AND LOCATIONS
These amendments are acceptable. The newly proposed light fixtures are shielded
and downcast in accordance with the South Burlington Land Development
Regulations.
PROPOSED AMENDMENTS TO DUPLEX BUILDING ENVELOPES
The applicant is proposing to adjust the condominium footprints to include porches
and decks. This is acceptable. The applicant has stated that the overall building
coverage for the site shall be approximately 8%. The amount of impervious surface
on the site, including driveways and roads, will be 7.4%, for total site coverage of
15.4%. This is well below the coverage limitation in the Southeast Quadrant of 30%.
Additionally, the Administrative Officer will further review the setback and coverage
statistics when the single family homes are presented for zoning permit application.
The duplex sites meet these requirements provided they stay within the approved
building envelopes.
PROPOSED ADDITION OF LANDSCAPING AROUND UTILITY CABINETS
SIGNS
In accordance with Section 13.18 of the South Burlington Land Development
Regulations, "there shall be suitable fencing to protect the public and sufficient
landscaping evergreens of sufficient height and density to screen effectively the
facility from surrounding property." The proposed landscaping around the utility
cabinets is not adequate. The applicant is proposing only four plants around the
cabinet. They are not entirely evergreen. The plans shall be revised to depict
greater screening of the utility cabinets and include a planting schedule and budget
for the utility cabinet screening. More trees or shrubs shall be used. These shall be
evergreens and shall be of a sufficient height to screen the cabinets.
Furthermore, the applicant shall submit a revised landscaping budget which depicts
the value of the revised site landscaping.
Signs shall be reviewed separate from this process by the Code Officer.
-2-
DECISION
Motion byy���-� Ou106V/ , seconded by WX 6#,IqA#4410
to approve Final Plat Application ##SD-06-06 of Dorset Street Associates, LLC., subject
to the following conditions:
1) All previous approvals and stipulations shall remain in full effect, except as amended
herein.
2) This project shall be completed as shown on the plat submitted by the applicant, and
on file in the South Burlington Department of Planning and Zoning.
3) The plans shall be revised to show the changes below and shall require approval of
the Administrative Officer. Four (4) copies of the approved revised plans must be
submitted to the Administrative Officer prior to recording:
a) The plans shall be revised to utilize more landscaping and thus greater screening of
the utility cabinets. These shall be evergreens and shall be of a sufficient height to
screen the cabinets
b) The plans shall be revised to remove any references to the signs as part of this
application.
4) The applicant shall submit a revised budget which depicts the value of site landscaping
to include the value of the utility cabinet screening.
5) Any changes to the final plat plan shall require approval of the South Burlington
Development Review Board.
6) The final plat plans (survey plats 1-4) shall be recorded in the land records within 180
days or this approval is null and void. The plans shall be signed by the Board Chair
or Clerk prior to recording.
Mark Behr—;,yea/nay/abstain/not present
Matthew Birmingham —lea/nay/abstain/not present
Chuck Bolton — ea nay/abstain/not resent
John Dinklage — yea/nay/abstainl _12 present
Roger Farley — ea ay/abstain/not present
Larry Kupferman — nay/abstain/not present
Gayle Quimby — e nay/abstain/not present
-3-
Motion carried by a vote of--�
Signed this da of2006, by
ark Behr, Vice Chairman
Please note: You have the right to appeal this decision to the Vermont Environmental
Court, pursuant to 24 VSA 4471 and VRCP 76 in writing, within 30 days of the date this
decision is issued. The fee is $225.00. If you fail to appeal this decision, your right to
challenge this decision at some future time may be lost because you waited too long.
You will be bound by the decision, pursuant to 24 VSA 4472 (d) (exclusivity of remedy;
finality).