FINDINGS OF FACT AND DECISION
STATE OF VERMONT
COUNTY OF CHITTENDEN
CITY OF SOUTH BURLINGTON
RE: Findings of Fact, site plan application #SP-02-26 of the City of South
Burlington to amend previously approved site plan #SP-01-21 for Dorset Park
Skating Rink Phase II, to relocate a sidewalk, add mechanical equipment, and
add exterior lighting over entry doors, at Dorset Park,1000 Dorset Street, South
Burlington, VT 05403.
On the 9t' day of April, the Director of Planning & Zoning approved the site plan
application of the City of South Burlington under Section 26.10(b) of the South
Burlington Zoning Regulations, based on the following findings:
1. This project consists of a site plan application to amend previously
approved site plan #SP-01-21 for Dorset Park Skating Rink Phase II, to
relocate a sidewalk and mechanical equipment at the new Dorset Park
Skating Rink, Dorset Park,1000 Dorset Street. The proposed changes
would (1) relocate a sidewalk currently approved to extend from the west
entrance of the building to the west parking area, and instead extend the
sidewalk the length of the west facade of the building to connect to the
north parking area; (2) add mechanical equipment on the southwest side
of the building; (3) create a fenced enclosure area housing mechanical
equipment at the northeast corner of the building; and (4) add exterior
lighting consisting of one light over each single door, and a triple light
over the double door on the west entrance to the rink.
2. The owner of record is the City of South Burlington.
3. The Site Plan permit to be amended in this decision amended earlier Site
Plan Permit #SP-00-24, which approved a new 140 by 290 foot ice skating
rink north of the Cairns Arena at Dorset Park. The first phase of Dorset
Park and the Cairns Arena were originally approved by the Planning
Commission on December 12,1994.
4. This property is located within the Park and Recreation District. It is
bounded to the north by Interstate 89, to the east by the Village at Dorset
Park residential development, to the south by City -owned park land, and
to the west by single family residences on Dorset Street.
5. Access or parking: No changes to access or parking will result.
#SP-02-26
6. Circulation: The proposed amendment will relocate a sidewalk that had
been approved to extend from the west entrance of the rink to the west
parking area. The proposal would instead provide a sidewalk extending
from the west entrance along the west fagade of the building and
connecting to the north parking area.
7. Coverage/setbacks: The proposed sidewalk and mechanical equipment
will add a combined total of 1,106 SF of impervious coverage to the site.
This results in a negligible increase in overall site coverage (from 8.0% to
8.03%). This is well below the 25% limit for the district. No change to
building coverage will result. All setbacks are met.
8. Lighting: The proposed amendment will add a single light fixture over
each single door entry, and a triple light fixture over the double door entry
on the west side of the building.
9. Landscaping: No changes affecting overall landscaping are proposed and
no additional bond is required.
DECISION AND CONDITIONS
Based on the above Findings of Fact, the South Burlington Director of Planning
and Zoning approves site plan application #SP-02-26 of the City of South
Burlington to amend previously approved site plan #SP-01-21 to relocate a
sidewalk and create a fenced enclosure housing mechanical equipment at Dorset
Park Skating Rink, Dorset Park,100 Dorset Street. The amendment is depicted
on a plan entitled "Proposed Layout Plan C.14," dated 3/15/02 and prepared by
Truex Cullins Associates, with the following stipulations:
1. All previous approvals and stipulations that are not superseded by this
approval shall remain in effect.
2. Prior to making any change to the lighting approved in this amendment,
cut sheets for all fixtures shall be submitted to and approved by the
Director of Planning & Zoning.
3. The applicant shall obtain a zoning permit within six (6) months of the
date of this decision, pursuant to Section 27.302 of the Zoning Regulations,
or this approval is null and void.
4. The applicant shall obtain a Certificate of Occupancy/Compliance from the
Administrative Officer.
#SP-02-26
5. Any change to the approved site plan shall require approval of the South
Burlington Development Review Board.
Beth Hoover Date
irector of Planning & Zoning
Please Note: You have the right to appeal this decision to the Vermont Environmental
Court, pursuant to 24 V S.A. § 4471 and V.R. CP. 76, in writing, within 30 days of the date
this decision is issued. The fee is $150.00. Ifyou fail to appeal this decision, your right to
challenge this decision at some future time maybe lost because you waited too long.
You will be bound by the decision, pursuant to 24 V.S.A. § 4472(d) (exclusivity of
remedy; finality).