Loading...
HomeMy WebLinkAboutSD-10-03 - Decision - 0899 Dorset Street#SD-10-03 CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING AND ZONING HOMESTEAD DESIGN, INC. - 899 DORSET STREET FINAL PLAT APPLICATION #SD-10-03 FINDINGS OF FACT AND DECISION Homestead Design Inc, hereafter referred to as the applicant, is seeking final plat approval for a planned unit development consisting of: 1) subdividing a 6.3 acre lot developed with a place of worship into two (2) lots of 4.27 acres (lot #1) and 2.03 acres (lot #2) and 2) developing the 2.03 acre lot with 18 dwelling units consisting of three (3) two-family dwelling and four (4) three -unit multi -family dwellings, 899 Dorset Street. The Development Review Board held a public hearing on March 16, 2010. Bill Nedde represented the applicant. Based on testimony provided at the above mentioned public hearing and the plans and supporting materials contained in the document file for this application, the Development Review Board finds, concludes, and decides the following: FINDINGS OF FACT 1. The applicant is seeking final plat approval for a planned unit development consisting of: 1) subdividing a 6.3 acre lot developed with a place of worship into two (2) lots of 4.27 acres (lot #1) and 2.03 acres (lot #2) and 2) developing the 2.03 acre lot with 18 dwelling units consisting of three (3) two-family dwelling and four (4) three -unit multi- family dwellings, 899 Dorset Street. 2. The owner of record of the subject property is Faith United Methodist Church. 3. The application was received on February 4, 2010. 4. The subject property is located in the Residential 2 Zoning Districts. 5. The plan submitted consists of an 18 page set of plans, page two (2) entitled, " Landscaping Plan Alder Hill Proposed Multi Family PUD Dorset Street South Burlington, Vermont", dated 2/3/2010, last revised on 3/12/2010. Zoning District & Dimensional Requirements Table 1. Dimensional Requirements R2 Zoning District Required Proposed Lot 1 Proposed Lot 2 Min. Lot Size n/a n/a n/a Max. Density 4 units/acre No residential 3.6 units/acre Max. Building Coverage 20% 7.9% 13.7% Max. Total Coverage 40% 34.8% 34.3% 4 Min. Front Setback 50 ft./30ft >50 ft 20 ft hDevelopment Review Boa rd\Findings_Decisions\2010\HomesteadDesign_SD1003_ffd.doc #SD-10-03 Min. Side Setback 5 ft. >5 ft >5 ft Min. Rear Setback 5 ft. >5 ft >5 ft Max. Building Height 35-40 ft.* <35 ft <35 ft 4 Zoning compliance + Non compliant. Waiver required. The applicant is proposing a front yard setback of only approximately twenty (20) feet, for a front setback waiver of ten (10) feet. The Board should discuss this request. This is consistent with the front yard setbacks of other homes in the Heatherfield development. The Board supports this request as it creates a larger rear yard. Each building is proposed to have a slightly different setback waiver. The applicant shall submit a list of the specific setback waiver requested for each building. Some of the islands for the parking spaces protrude into the new road right of way. Although the stipulation in the preliminary plat approval was to cut them back, the new Director of Public Works does not feel any changes are necessary. PLANNED UNIT DEVELOPMENT STANDARDS Pursuant to Section 15.18 of the South Burlington Land Development Regulations, PUDs shall comply with the following standards and conditions: Sufficient water supply and wastewater disposal capacity is available to meet the needs of the project. According to Section 15.13(B)(1) of the South Burlington Land Development Regulations, the existing public utility system shall be extended to provide the necessary quantity of water, at an acceptable pressure, to the proposed additional dwelling units. The South Burlington Water Department has reviewed the plans and made comments in a letter dated February 12, 2010. The plans need some minor revisions. According to Section 15.13 of the South Burlington Land Development Regulations, the subdivider or developer shall connect to the public sewer system or provide a community wastewater system approved by the City and the State in any subdivision where off -lot wastewater is proposed. Sufficient grading and erosion controls will be utilized during and after construction to prevent soil erosion and runoff from creating unhealthy or dangerous conditions on the subject property and adjacent properties. The proposed project shall adhere to standards for erosion control as set forth in Section 16.03 of the South Burlington Land Development Regulations. In addition, the grading plan shall meet the standards set forth in Section 16.04 of the South Burlington Land Development Regulations. The South Burlington Stormwater Superintendent has reviewed the plans and provided comments in an e-mail dated March 11, 2010. 2 I:\Development Review Boa rd\Findings_Decisions\2010\HomesteadDesign_SD1003_ffd.doc #SD-10-03 The project incorporates access, circulation, and traffic management strategies sufficient to prevent unreasonable congestion of adjacent roads. Access to the lot is proposed via a 24 foot wide proposed public road off of Songbird Road. The minimum width required is 28 feet. The applicant is requesting a four (4) foot reduction in the street width. The applicant is proposing to end the road with a hammer -head turnaround. The Director of Public Works has reviewed the plans and provided comments in a memo dated February 16, 2010. The proposed parking areas near the street provide just enough space for the required stall length without leaving any extra space beyond the street right of way. Additionally, the parking spaces in front of some of the units are not long enough to accommodate a vehicle outside of the road right of way. The Director of Public Works will permit this but has stated that the applicant should be aware that complications from snow -plowing or street maintenance will not be at the fault of the City for vehicles extending into the right of way. The project's design respects and will provide suitable protection to wetlands, streams, wildlife habitat as identified in the Open Space Strategy, and any unique natural features on the site. There do not appear to be any wetlands on the subject property. There is a minor tributary of the Potash Brook which is on site; appropriate buffers are being met. The applicant has submitted a survey plat with the final plat application, prepared by a licensed land surveyor and in compliance with Section 15.08 (A)(11) of the South Burlington Land Development Regulations. The project is designed to be visually compatible with the planned development patterns in the area, as specified in the Comprehensive Plan and the purpose of the zoning district(s) in which it is located. The purpose of the R2 District is to encourage moderate -density residential development, serving as a transition area between higher density residential districts and low -density districts. This project conforms to the planned development patterns in the area and the stated purpose of the R2 Zoning District. Open space areas on the site have been located in such a way as to maximize opportunities for creating contiguous open spaces between adjoining parcels and/or stream buffer areas. The Board notes that there are very little open spaces remaining on the site as the residential density has been allocated to only approximately 2 acres of the site; the remainder of the site is not open but rather 40% covered with a building (church) and parking areas. 3 I:\Development Review Board\Findings_Decisions\2010\HomesteadDesign_SD1003_ffd.doc #SD-10-03 The layout of a subdivision or PUD has been reviewed by the Fire Chief or (designee) to ensure that adequate fire protection can be provided. The plans have been reviewed by the South Burlington Fire Department, see comments dated March 12, 2010. Roads, recreation paths, stormwater facilities, sidewalks, landscaping, utility lines and lighting have been designed in a manner that is compatible with the extension of such services and infrastructure to adjacent landowners. The plans have been reviewed by the South Burlington City Engineer in a memo dated 2/25/2010. The applicant is proposing a recreation path to connect Songbird Road with Indian Creek Road. The Recreation Path Committee has reviewed this plan and are in favor of the recreation path as proposed. Roads, utilities, sidewalks, recreation paths, and lighting are designed in a manner that is consistent with City utility and roadway plans and maintenance standards. The project is consistent with the goals and objectives of the Comprehensive Plan for the affected district(s). The proposed project is consistent with the South Burlington Comprehensive Plan. SITE PLAN REVIEW STANDARDS Pursuant to Section 14.03(A)(6) of the South Burlington Land Development Regulations, any PUD shall require site plan approval. Section 14.06 of the South Burlington Land Development Regulations establishes the following general review standards for all site plan applications: The site shall be planned to accomplish a desirable transition from structure to site, from structure to structure, and to provide for adequate planting, safe pedestrian movement, and adequate parking areas. The proposed project accomplishes a desirable transition from structure to site and from structure to structure. The site provides for safe pedestrian movement. According to Table 13-1 of the South Burlington Land Development Regulations, the proposed project will require 41 parking spaces (2 parking spaces per dwelling unit plus 1 parking space for every 4 units). A total of 41 parking spaces are proposed for the development, with 18 garage spaces, 18 driveway spaces, and 5 off street parking spaces. Section 13.01(G)(5) requires that bicycle parking or storage facilities are provided for employees, residents, and visitors to the site. The plans depict a bicycle rack. 4 I:\Development Review Boa rd\Findings_Decisions\2010\HomesteadDesign_SD1003_ffd.doc #SD-10-03 Parking shall be located to the rear or sides of buildings to the greatest extent practicable. Parking to the front of this style of residential development is appropriate and has been favorably received by the DRB in the past. Without restricting the permissible limits of the applicable zoning district, the height and scale of each building shall be compatible with its site and existing or adjoining buildings. The applicant is proposing to stay within the height limitations of the district. Newly installed utility services and service modifications necessitated by exterior alterations or building expansions shall, to the extent feasible, be underground. Pursuant to Section 15.13(E) of the South Burlington Land Development Regulations, any new utility lines shall be underground. The DRB shall encourage the use of a combination of common materials and architectural characteristics, landscaping, buffers, screens and visual interruptions to create attractive transitions between buildings of different architectural styles. In addition, the proposed structures shall be related harmoniously to themselves, the terrain, and to existing buildings and roads in the vicinity that have a visual relationship to the proposed structures. The applicant has submitted four-sided building elevation plans of the proposed project. The Board finds that they are in conformance with this criterion. Site plan applications shall meet the following specific standards as set forth in Section 14.07 of the South Burlington Land Development Regulations: The reservation of land may be required on any lot for provision of access to abutting properties whenever such access is deemed necessary to reduce curb cuts onto an arterial of collector street, to provide additional access for emergency or other purposes, or to improve general access and circulation in the area. At this time, the Board does not feel it is necessary to reserve additional land for drives or parking. However, per the note of the Public Works Director, the recreation path crosses onto private property and so land is to be dedicated to the City. Electric, telephone and other wire -served utility lines and service connections shall be underground. Any utility installations remaining above ground shall be located so as to have a harmonious relation to neighboring properties and to the site. The Board has already noted that, pursuant to Section 15.13(E) of the South Burlington Land Development Regulations, any new utility lines shall be underground. All dumpsters and other facilities to handle solid waste, including compliance with any recycling or other requirements, shall be accessible, secure and properly 5 I:\Development Review Board\Findings_Decisions\2010\HomesteadDesign_SD1003_ffd.doc #SD-10-03 screened with opaque fencing to ensure that trash and debris do not escape the enclosure(s). All dumpsters and solid waste facilities shall be accessible, secure, and screened to the satisfaction of the Development Review Board. There do not appear to be any trash facilities proposed as part of this application; furthermore, similar residences in the development utilize individual trash containers. Landscaping and Screening Requirements Based on building costs of $2,064,000, the applicant shall provide a minimum of $30,000 in new trees and shrubs. The itemized landscaping budget prepared by the applicant far exceeds this amount at over $70,000. The City Arborist has reviewed the plans and provided comments in a memo dated March 12, 2010. The City will be responsible for maintenance of street trees required per the South Burlington Land Development Regulations. However, maintenance of all ground shrubs or perennials shall be the responsibility of the property owner or related homeowners association. The applicant is proposing to install landscaping, other than street trees, within the land to be dedicated to the City to connect this development with Songbird Road. This landscaping shall be removed from the planting schedule as this landscaping cannot be credited towards the applicant's landscaping requirement. Other DECISION Motion by seconded by to approve Final Plat Application #SD-10-03 of Homestead Design, Inc., subject to the following conditions: 1. All previous approvals and stipulations shall remain in full effect except as amended herein. 2. This project shall be completed as shown on the plat submitted by the applicant and on file in the South Burlington Department of Planning and Zoning. 3. The plans shall be revised to show the changes below and shall require approval of the Administrative Officer. Four (4) copies of the approved revised plans shall be submitted to the Administrative Officer prior to recording the mylar. a. The plans shall be revised to reflect the comments of the South Burlington Water Department per the letter dated February 12, 2010. b. The plans shall be revised to comply with the comments of the South Burlington Director of Public Works, Justin Rabidoux, per the memo dated February 16,-2010. M 11Development Review Board\Findings_Decisions\201MomesteadDesign_SD1003_ffd.doc #SD-10-03 c. The landscaping plan shall be revised to comply with the comments of the City Arborist, dated 3/12/2010. d. The plans shall be revised to include any utility cabinets, HVAC units, retaining walls, and similar items which might be proposed. e. The plans shall be revised to include the approved street name. f. The mailbox cluster shall be relocated outside of the street right-of-way, unless otherwise approved by the Director of Public Works/City Engineer. 4. The Board grants a front yard setback waiver of approximately10 feet for a front yard setback of approximately 20 feet. Prior to recording the final plat plans, the applicant shall submit a list of the specific front setback waivers requested for each building. 5. The applicant shall obtain final wastewater allocation prior to permit issuance for each building. 6. The applicant shall adhere to the comments of the City Arborist in a memo dated 3/12/2010. 7. The proposed project shall adhere to standards for erosion control as set forth in Section 16.03 of the South Burlington Land Development Regulations. In addition, the grading plan shall meet the standards set forth in Section 16.04 of the South Burlington Land Development Regulations. 8. The applicant shall provide the Stormwater Superintendent the stormwater system modeling prior to issuance of the first zoning permit. 9. The Board grants a reduction of four (4) feet in the required road width, for a total road width of twenty-four (24) feet. 10. The applicant shall adhere to the comments of the Fire Chief in a letter dated 3/12/2010. 11. The applicant shall adhere to the comments of the South Burlington Water Department per the letter dated 2/12/2010. 12. The applicant shall adhere to the comments of the South Burlington City Engineer, dated 2/25/2010 with the exception of item #2 in his memo. 13. All exterior lighting shall be downcast and shielded, and otherwise comply with Section 13.07 of the SBLDR. 14. Pursuant to Section 15.13(E) of the South Burlington Land Development Regulations, any new utility lines shall be underground. 15. The landscaping proposed within the city right of way shall be removed from the itemized planting budget. It shall not count towards the applicant's landscaping requirement. 7 I:\Development Review Boa rd\Findings_Decisions\2010\HomesteadDesign_SD1003_ffd.doc #SD-10-03 16. The applicant shall propose a new road name as the name proposed on the plans is not acceptable. The Planning Commission shall review the proposed street name; the final street name must be approved prior to recording the mylar. 17. No signs are approved as part of this application. The signs shown on the plans shall be removed. The applicant should apply for signs separately, under the South Burlington Sign Ordinance. 18. In accordance with Section 15.14 of the South Burlington Land Development Regulations, within 14 days of completion of required improvements (e.g. roads, water mains, sanitary sewers, storm drains, etc.) the developer shall submit to the City Engineer, "as built" construction drawings certified by a licensed engineer. 19. Street trees must be in place along the street prior to adding the final layer of the pavement. 20. The mylar shall be recorded prior to any zoning permit issuance. 21. The applicant shall post a $7,611 landscaping bond for the street trees prior to issuance of the zoning permit for road construction and a $30,000 landscaping bond for site landscaping prior to issuance of the first permit for the first building. These bonds shall remain in full effect for three (3) years from planting to assure that the landscaping has taken root and has a good chance of survival. 22. Pursuant to Section 15.17 of the Land Development Regulations, the applicant shall submit a Certificate of Title showing the ownership of all property and easements to be dedicated or acquired by the City to be approved by the City Attorney prior to recording the mylar. 23. Prior to issuance of a zoning permit for the first building or start of utility or road construction, all appropriate legal documents including easements (e.g. irrevocable offer of dedication and warranty deed for proposed public road, and utility, sewer, water, recreation path, etc.) shall be submitted to the City Attorney for approval and recorded in the South Burlington land records. 24. The applicant shall obtain a Certificate of Occupancy from the Administrative Officer prior to occupancy of the three (3) unit multi -family dwellings. 25. The applicant shall obtain a zoning permit for the first building within six (6) months of this approval. The Development Review Board grants a period of five (5) years for approval of the remainder of the buildings. At such time as the five years is reached and the applicant has not sought a zoning permit for the remainder of the buildings, they shall be eligible, per Section 17.04 of the South Burlington Land Development Regulations, for one (1) extension to an approval if the application takes place before the approval has expired and if the Development Review Board determines that conditions are essentially unchanged from the time of the original approval. In granting such an extension, the Development Review Board may specify a period of time up to one (1) year for the extension. 11Development Review Boa rd\Findings_Decisions\2010\HomesteadDesign_SD1003_ffd.doc #SD-10-03 26. Prior to start of construction of the improvements described in condition #23 above, the applicant shall post a bond which covers the cost of said improvements, the amount of which must be approved by the City Engineer. 27. Any changes to the final plat plan shall require approval of the South Burlington Development Review Board. 28. The final plat plan (sheet SP-2 and survey plat) shall be recorded in the land records within 180 days or this approval is null and void. The plan shall be signed by the Board Chair or Clerk prior to recording. Prior to recording the final plat plan, the applicant shall submit a copy of the survey plat in digital format. The format of the digital information shall require approval of the South Burlington GIS Coordinator. Mark Behr —��a nay/abs in/not present Matthew Bir Inn— er nay/abstain/not present John Dinklagnay/abstain/not present Roger Farleyay/abstain/not present Eric Knudseay/abstain/notpresent Gayle Quimbnay/abstain/ of presentBill Stuono —/abstain/not p se Motion carried by a vote of (D - 0- U Signed this ,�? day of 2010, by � � \ '12 / John Dinklage, Chairman Please note: You have the right to appeal this decision to the Vermont Environmental Court, pursuant to 24 VSA 4471 and VRECP 5 in writing, within 30 days of the date this decision is issued. The fee is $250.00. If you fail to appeal this decision, your right to challenge this decision at some future time may be lost because you waited too long. You will be bound by the decision, pursuant to 24 VSA 4472 (d) (exclusivity of remedy; finality). 9 I:\Development Review Boa rd\Findings_Decisions\2010\HomesteadDesign_SD1003_ffd.doc