HomeMy WebLinkAboutSP-95-0000 - Decision - 0364 Dorset StreetFINDINGS OF FACT & DECISION
STATE OF VERMONT
COUNTY OF CHITTENDEN
CITY OF SOUTH BURLINGTON
Re: Findings of Fact, application of Dorest Street Beverage to
expand an existing convenience store use and a pizza restaurant
(fast food) with take-out and delivery into 672 square feet of
vacant space. The convenience store would expand from 3,264 square
feet to 3,600 square feet and the restaurant from 864 square feet
to 1200 square feet and add 12 seats for a total of 22 seats, 364
Dorset Street.
On the 14th of March, 1995, the South Burlington Planning
Commission approved the request of Dorset Street Beverage for site
plan review under Section 26.10 of the South Burlington Zoning
Regulations based on the following findings:
1. This project consists of expanding a convenience store use and
a pizza restaurant (fast food) with take-out and delivery into 672
square feet of vacant space. The convenience store would expand
from 3,264 square feet to 3600 square feet and the restaurant from
864 square feet to 1200 square feet and add 12 seats for a total of
22 seats. This parcel also contains an additional building used
for a contracting business (Munson Earth Moving) and a real estate
business (South Burlington Realty). The last review of this site
by the Planning Commission was on 3/8/94 when the restaurant was
originally approved.
2. This property located at 364 Dorset Street lies within the CD2
District. It is bounded on the south and east by San Remo Drive,
on the west by Dorset Street and on the north by a mixed use
commercial building.
3. Access/circulation: Access to 364 Dorset Street is provided by
a 35 foot wide shared curb cut with the property to the north and
a 40 foot wide curb cut which serves 366 Dorset Street. No access
changes proposed. Access to San Remo Drive is provided via a
driveway on the adjacent property to the north.
4. The angled parking between 364 and 366 Dorset Street requires
cars to back out. This layout was previously approved on 4/23/91.
5. Coverage/setbacks: Building coverage is 12.1% (maximum allowed
is 40%). Overall coverage is 99% (maximum allowed is 90%). This
is an existing situation which will not be made worse by this
application.
6. Both buildings do not meet the setback requirements and are
therefore noncomplying structures subject to Section 26.002 of the
zoning regulations. In addition the parking spaces along Dorset
Street do not meet the setback requirements. Section 14.402 of the
zoning regulations prohibits parking spaces within 100 feet of the
Dorset Street r.o.w. unless hidden from view by a building. This
is an existing situation which is not being made worse by this
application.
7. Landscaping: The minimum landscaping requirement, based on
building costs, is $168 which is not being met. Since the lot is
99% covered, there is very little space available for additional
landscaping.
8. Parking: A total of 33 parking spaces are required and 31
spaces are being provided including two (2) handicapped spaces.
The applicant conducted a parking count survey which he presented
at the meeting to justify the two (2) space waiver.
9. The original 4/23/91 approval included a stipulation which
requires the gate on the south side of the building to remain open
between the hours of 7:00 A.M. and 6:00 P.M. in order to provide
access to the six (6) employee parking spaces. Staff has observed
that this gate is usually closed. This gate should remain open as
required and should be used by all employees. Parking can be tight
on the north side of the building during busy times.
10. A bike rack is required under Section 26.253(b) of the zoning
regulations and no bike rack was proposed.
11. Traffic: ITE estimates that the expansions will generate 20.1
additional vehicle trip ends (vte's) during the P.M. peak hour.
Based on trip count data provdied by the applicant at the meeting,
it is the Commission's opinion that the proposed uses on the
property will generate 81 vehicle trip ends during the P.M. peak
hour. This represents an increase of nine (9) vte's over existing
conditions.
12. Sewer: The additional sewer allocation needed for this
project is 360 gpd. The applicant will be required to pay the per
gallon fee prior to permit.
13. Lighting: Exterior lighting consists of interior lit awnings
along the west and north sides of the building and a fixture at
southwest corner of the building of unknown type and wattage. Any
new exterior lighting or change in existing lighting should
consists of downcasting shielded fixtures so as not cast light
beyond the property line. Any change in lighting should be
approved by the City Planner prior to installation.
14. Other: The dumpsters are located behind the building and are
screened by the building.
DECISION & CONDITIONS
Based on the above Findings of Fact, the South Burlington Planning
Commission approves the site plan application of Dorset Street
2
Beverage to expand an existing convenience store use and a pizza
restaurant (fast food) with take-out and delivery into 672 square
feet of vacant space. The convenience store would expand from
3,264 square feet to 3,600 square feet and the restaurant from 864
square feet to 1200 square feet and add 12 seats for a total of 22
seats, 364 Dorset Street, as depicted on a plan entitled "Dorset
Street Beverage, 364 Dorset Street", dated 3/3/95, with the
following stipulations:
1. All previous approvals and stipulations which are not
superseded by this approval shall remain in effect.
2. The Planning Commission grants an additional sewer allocation
of 360 gpd for this project. The sewer allocation fee shall be
paid prior to permit.
3. The site plan shall be revised prior to issuance of a zoning
permit to show the changes listed below and shall require approval
of the City Planner. Three (3) copies of the approved site plan
shall be submitted to the City Planner prior to permit issuance.
a) The site plan shall be revised to show a bike rack at a
location approved by the City Planner.
4. The Planning Commission grants a credit for the $168
landscaping requirement. The lot is 99% covered and there is very
little space available for additional landscaping.
5. The Planning Commission approves a total of 31 parking spaces
which represents a two (2) space or 3% waiver. It is the Planning
Commission's opinion, based on a parking count survey conducted by
the applicant, that 31 parking spaces will adequately serve the
convenience store and pizza restaurant.
6. For purposes of calculating required road impact fees under the
South Burlington Impact Fee Ordinance, the Planning Commission
estimates that all proposed uses on the property will generate 81
vehicle trip ends (vte's) during the P.M. Peak Hour. This
represents an increase of 9 vte's over existing conditions.
7. Any new exterior lighting or change in existing lighting shall
be downcasting and shielded so as not to cast light beyond the
property line. Any change in lighting must be approved by the City
Planner prior to installation.
8. The zoning permit shall be obtained within 6 months or this
approval is null and void.
9. The applicant shall obtain a Certificate of
Occupancy/Compliance from the Administrative Officer prior to
occupancy of the newly converted space.
3
10. Any change to the approved site plan shall require Planning
Commission approval.
A `YQ
A e i
hairman' 6 r
South Burlington Planning Commission
4