Loading...
HomeMy WebLinkAboutSD-04-75 - Decision - 0360 Dorset StreetCITY of SOUTH BURLINGTON DEPARTMENT of PLANNING & ZONING SOUTH BURLINGTON REALTY- PLANNED UNIT DEVELOPMENT- 360 DORSET STREET FINAL PLAT APPLICATION #SD-04-75 South Burlington Realty, hereinafter referred to as the applicant, is seeking final plat approval to amend a planned unit development consisting of: 1) 34,506 sq ft of medical office use, 2) 1,803 sq ft of general office use, and 3) 2,400 sq ft of restaurant & retail use. The amendment consists of converting 2,400 sq ft of restaurant & retail use to retail food establishment use with less than 5,000 sq ft, 360 Dorset Street. The South Burlington Development Review Board held a public hearing on November 9, 2004. John Jaeger represented the applicant. Based on testimony provided at the above mentioned public hearing and the plans and supporting materials contained in the document file for this application, the Development Review Board finds, concludes, and decides the following: FINDINGS of FACT 1. The applicant is seeking final plat approval to amend a planned unit development consisting of: 1) 34,506 sq ft of medical office use, 2) 1,803 sq ft of general office use, and 3) 2,400 sq ft of restaurant & retail use. The amendment consists of converting 2,400 sq ft of restaurant & retail use to retail food establishment use with less than 5,000 sq ft, 360 Dorset Street. 2. The owner of record of the subject property is South Burlington Realty. 3. The subject property is located in the Central District 2 Zoning District. 4. The plans consist of a plan entitled "South Burlington Realty South Burlington Vermont", prepared by Llewellyn -Howley, Inc., dated 5/7/99, last revised on 10/7/04. PLANNED UNIT DEVELOPMENT STANDARDS Pursuant to Section 15.18 of the proposed Land Development Regulations, PUDs shall comply with the following standards and conditions: Sufficient water supply and wastewater disposal capacity is available to meet the needs of the project. If needed, the applicant shall obtain preliminary wastewater allocation approval from the Director of Planning and Zoning, Juli Beth Hinds, prior to final plat plan approval. If needed, the applicant shall obtain water allocation approval from the South Burlington Water Department, prior to final approval. - 1 - Sufficient grading and erosion controls will be utilized during and after construction to prevent soil erosion and runoff from creating unhealthy or dangerous conditions on the subject property and adjacent properties. This criterion is not applicable to the proposed project The project incorporates access, circulation and traffic management strategies sufficient to prevent unreasonable congestion of adjacent roads. Access and circulation on the subject property will remain unchanged through the proposed project. The project's design respects and will provide suitable protection to wetlands, streams, wildlife habitat as identified in the Open Space Strategy, and any unique natural features on the site. There are no wetlands, streams, wildlife habitat, or unique natural features on the subject property. The project is designed to be visually compatible with the planned development patterns in the area, as specified in the Comprehensive Plan and the purpose of the zoning district(s) in which it is located. The exterior of the building on the subject property will not be altered through the proposed project. Open space areas on the site have been located in such a way as to maximize opportunities for creating contiguous open spaces between adjoining parcels andlor stream buffer areas. Open space requirements are not applicable to the proposed project The layout of a subdivision or PUD has been reviewed by the Fire Chief or (designee) to ensure that adequate fire protection can be provided. The building configuration and site layout are not being altered through the proposed project, so review by the Fire Chief is not necessary. Roads, recreation paths, stormwater facilities, sidewalks, landscaping, utility lines and lighting have been designed in a manner that is compatible with the extension of such services and infrastructure to adjacent landowners. None of the above -mentioned utilities or infrastructure are being altered through the proposed project. Roads, utilities, sidewalks, recreation paths, and lighting are designed in a manner that is consistent with City utility and roadway plans and maintenance standards. None of the above -mentioned utilities or infrastructure are being altered through the proposed project. -2- The project is consistent with the goals and objectives of the Comprehensive Plan for the affected district(s). The proposed project is in conformance with the Comprehensive Plan. SITE PLAN REVIEW STANDARDS Pursuant to Section 14.03(A)(6) of the Land Development Regulations, any PUD shall require site plan approval. Section 14.06 establishes the following general review standards for all site plan applications: Due attention by the applicant should be given to the goals and objectives and the stated land use policies for the City of South Burlington as set forth in the Comprehensive Plan. The proposed project is in conformance with the Comprehensive Plan. The site shall be planned to accomplish a desirable transition from structure to site, from structure to structure, and to provide for adequate planting, safe pedestrian movement, and adequate parking areas. The proposed project will not have an impact on the relationship between structure and the site, the relationship between structure and structure, planting areas, or pedestrian movement. Pursuant to Section 13.01 of the Land Development Regulations, the existing use of the 2,400 square foot space requires 16 parking spaces, while the proposed use requires 16.08 parking spaces. The 0.08 space increase in the parking requirement is not significant enough to require an additional parking space at this time. Pursuant to Section 13.01(G)(5) of the Land Development Regulations, the plans depict a bicycle rack. Parking shall be located to the rear or sides of buildings to the greatest extent practicable. The parking spaces on the subject properties currently exist and will not be altered through this project. Without restricting the permissible limits of the applicable zoning district, the height and scale of each building shall be compatible with its site and existing or adjoining buildings. The building on the subject property is not being altered through the proposed project. Newly installed utility services and service modifications necessitated by exterior alterations or building expansions shall, to the extent feasible, be underground. -3- Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines, services, and service modifications shall be underground. The DRB shall encourage the use of a combination of common materials and architectural characteristics, landscaping, buffers, screens and visual interruptions to create attractive transitions between buildings of different architectural styles. The proposed project does not create any opportunities to create attractive transitions between buildings. Proposed structures shall be related harmoniously to themselves, the terrain and to existing buildings and roads in the vicinity that have a visual relationship to the proposed structures. The building on the subject property is not being altered through the proposed project. In addition to the above general review standards, site plan applications shall meet the following specific standards as set forth in Section 14.07 of the Land Development Regulations: The reservation of land may be required on any lot for provision of access to abutting properties whenever such access is deemed necessary to reduce curb cuts onto an arterial of collector street, to provide additional access for emergency or other purposes, or to improve general access and circulation in the area. There are not any opportunities to provide additional access to adjacent properties. Electric, telephone and other wire -served utility lines and service connections shall be underground. Any utility installations remaining above ground shall be located so as to have a harmonious relation to neighboring properties and to the site. It has already been indicated that utility lines must be underground. All dumpsters and other facilities to handle solid waste, including compliance with any recycling or other requirements, shall be accessible, secure and properly screened with opaque fencing to ensure that trash and debris do not escape the enclosure(s). The plans show an adequately screened dumpster on the subject property. Landscaping No construction or exterior alterations are proposed through this application. Thus, the standard landscaping requirement for planned unit developments are not applicable to the project. Pursuant to Section 13.06(B)(4) of the Land Development Regulations, snow storage areas must be shown on the plans. The plans do not show adequate snow storage areas. Traffic The existing use of subject 2,400 square foot space was estimated to generate 12 P.M. peak -hour vtes. According the ITE, 7th Edition, the proposed use (LU: 814) is estimated to generate 6.5 P.M. peak -hour vtes. Thus, there is no anticipated increase to P.M. peak -hour traffic flows. DECISION Motion by 41416Z, seconded by to approve F�Plat #SD-04-75 if South Burlington Realty, subject to the following conditions: 1) All previous approvals and stipulations shall remain in full effect, except as amended herein. 2) This project shall be completed as shown on the plat submitted by the applicant, and on file in the South Burlington Department of Planning & Zoning. 3) The plan shall be revised to show the changes below and shall require approval of the Administrative Officer. Three (3) copies of the approved revised plan shall be submitted to the Administrative Officer prior to recording. a) The plan shall be revised to depict adequate snow storage areas. 4) If needed, the applicant shall obtain preliminary wastewater allocation approval from the Director of Planning and Zoning, Juli Beth Hinds, prior to permit issuance. 5) if needed, the applicant shall obtain water allocation approval from the South Burlington Water Department, prior to permit issuance. 6) Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines, services, and service modifications shall be underground. 7) Any changes to the final plat plan shall require approval of the South Burlington Development Review Board. 8) The final plat plan (site plan) shall be recorded in the land records within 90 days or this approval is null and void. The plan shall be signed by the Board Chair or Clerk prior to recording. -5- Chuck Bolton §yn1 ay/abstain/not present Mark Boucher ay/abstain/not present John Dinklage nay/abstain/n ent Roger Farley —a /abstai not resent Michele Kupersmith ye nay/abstain/not resent Larry Kupferman — yea nay/abstain of presen Gayle Quimby — e nay/abstain/not presen Motion carried by a vote of 5-- 0 - D Signed this � day of November, 2004 by John Dinklage, Chair Please note: You have the right to appeal this decision to the Vermont Environmental Court, pursuant to 24 VSA 4471 and VRCP 76 in writing, within 30 days of the date this decision is issued. The fee is $225.00. If you fail to appeal this decision, your right to challenge this decision at some future time may be lost because you waited too long. You will be bound by the decision, pursuant to 24 VSA 4472 (d) (exclusivity of remedy; finality). Rev