Loading...
HomeMy WebLinkAboutSD-92-0001 - Decision - 0421 0401 Dorset StreetFINDINGS OF FACT & DECISION STATE OF VERMONT 5'51- COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of Dorset Land Company for: 1) subdivision of 11.93 acres of land into two (2) parcels of 11.64 acres and 0.29 acres, and 3) construction of a planned commercial development on the 11.64 acre parcel consisting of 156,000 square feet in five (5) buildings for medical office, general office, cafe/deli, and retail (pharmacy) use, 421 Dorset Street. On the 28th of July, 1992 the South Burlington Planning Commission approved the request of Dorset Land Company for Preliminary Plat approval under Section 203 of the South Burlington Subdivision Regulations based on the following findings: 1. This project consists of the subdivision of 11.93 acres of land into two (2) parcels of 11.64 and 0.29 acres and the construction of a planned commercial development on the 11.64 acre parcel consisting of 156,000 square feet in five (5) buildings for medical office, general office, cafe/deli, and retail (pharmacy) use. 2. This project has again been reduced in size from 176,000 square feet presented at the April 14, 1992 meeting to the current proposal of 156,000 square feet. The net square footage is 125,520 square feet. The breakdown of the uses is as follows: Medical Office = 49,288 square feet General Office = 71,232 square feet Cafe/Deli = 2,000 square feet Pharmacy = 3,000 square feet 3. Access/circulation: Access is proposed via a new City street with a 60 foot r.o.w. and 30 foot road width connecting Sherry Road with Dorset Street. The other access will be via a 24 foot curb cut on Sherry Road providing access to a 28 space parking area. The new City street will have six (6) curb cuts providing access to parking areas and buildings C, D and E. The Sherry Road access to the subsurface parking under building "B" is only 30 feet from the Dorset Street/Sherry Road intersection. A curb cut this close to an intersection is undesirable. This situation could result in vehicles travelling west on Sherry Road wishing to turn left into the building "B" subsurface parking lot being prevented from doing so by a lane of cars stacked and waiting to turn right onto Dorset Street. Eliminating this curb cut and relocating it further to the west thereby creating a new curb cut to the surface parking and a new access to the subsurface parking, or making this access for egress only would improve this situation. Circulation of traffic on the site is acceptable. 4. Sherry Road: The portion of Sherry Road which allows this development should be upgraded by the applicant to current City standards as has been discussed at previous meetings and recommended by the Commission. Section 11.504(b) of the zoning regulations requires that entrances to PCD's be separated by a minimum distance of 400 feet either side of a public street. The Dorset Street entrance to this project is only 260 feet from Sherry Road. This standard may be modified as long as the general objectives of the PCD are met. 5. Parking: This project requires a total of 592 parking spaces and 12 handicapped spaces and the plans shows a total of 619 spaces including 11 handicapped spaces. 397 spaces are on the surface and 222 spaces are subsurface. All surface and subsurface parking stalls and aisle widths meet the minimum requirements. Portions of nine (9) spaces in the 28 space parking lot are within the proposed City street. 6. Coverage/setbacks: Building coverage in the CD3 area will be 19.40 (maximum allowed is 40%). Overall coverage in the CD3 area will be 60.8% (maximum allowed is 90%). Building coverage in the C2 area will be 9.5% (maximum allowed is 30%). Overall coverage in the C2 area will be 41% (maximum allowed is 70%). Setback requirements in both districts are being met. 7. Floor Area Ratio (F.A.R.): The F.A.R. in the CD3 area is proposed to be .58 (maximum allowed is .5). The Planning Commission can approve a F.A.R up to 1.2 if certain public space or amenities are provided. The new 60 foot public r.o.w. serves as a public amenity. 8. Landscaping: The minimum landscaping requirement for this project is $79,300. The applicant's landscaping plan has a value of $48,000 which is $31,300 short of the requirement. Many of the trees in the wetland areas will be saved. The applicant is requesting a credit in the amount of the shortfall for existing landscaping as provided for in Section 19.104(a) of the zoning regulations. Section 19.104(c) of the zoning regulations requires a 15 foot strip to be maintained as a buffer where this development is adjacent to a residential district and that it be suitably landscaped with dense evergreen or other suitable plantings as a screen. A 120 foot strip at the south-westerly portion of the project does not meet this requirement. A white pine hedge is proposed in this area but it is only 10 feet in width. E 9. Wetland: The project has been designed to minimize disturbance of the wetland. Only .99 acres of wetland will be impacted by this development. 10. Lighting: Exterior lighting will consist of 24-400 watt lamps and 11-250 watt lamps, all on 20 foot poles. Applicant should indicate the types of lights i.e. high pressure sodium, metal halide, etc. 11. Sewer: The sewer allocation for this project is 18,327 gpd. The applicant will be required to pay the required per gallon sewer allocation fee prior to permit. 12. Dumpsters: The plan does not show any dumpsters. If dumpsters are to be placed on the site they should be shown on the plan for final plat approval. 13. Traffic: A traffic study was conducted in March, 1988 with a supplemental study in May, 1988. The study analyzed all intersections along Dorset Street. The study indicated acceptable signalized intersection delays and LOS. The study incorporated the following assumptions: a. Assumed Dorset Street improved in all study years (1989, 1991, 1997). b. Assumed I-89 northbound on -ramp for the study years 1991 and 1997, not 1989. C. Assumed following build -out schedule: Phase 1: 1989: 30,000 square feet Phase 2: 1990: 40,000 square feet Phase 3: 1991: 40,000 square feet Phase 4: 1992: 40,000 square feet Phase 5: 1993: 25,000 square feet d. Assumed signal timing that provides optimal quality of flow. The results of the 1988 traffic analysis are consistent with the City Center Study conducted spring 1991. The City Center Study assumed a 205,000 square foot office development on the 421 Dorset Street property. In order to mitigate this development's impact on traffic, the applicant should participate in the following mitigation package: 15. Other: --- building elevations will have to be submitted prior to final plat approval. 3 --- building "A" and "B" should have pedestrian access from Dorset Street and building "B" should have a sidewalk between it and the proposed City street along the south side. 16. TWO (2) LOT SUBDIVISION This portion of the project consists of the subdivision of a 12,000 square foot lot off the rear of the main parcel. The current R7 zoning would apply to this lot. It is bounded on the north by the current PCD proposal, on the west by a 50 foot r.o.w., on the south by undeveloped land and on the east by the current PCD proposal and the Town Square residential development. 17. Lot size: This lot meets the minimum area and dimension requirements for both a single family and two-family dwelling in the R7 district. 18. Access: This parcel fronts on a 50 foot r.o.w. which was designed to be an extension of Oakwood Drive. This segment of Oakwood Drive along which this new lot will front is privately owned. Section 19.202(b) of the zoning regulations limits the number of lots served off a private r.o.w. to three (3). Since there are already three (3) lots served off this r.o.w., a condition should be attached which requires that prior to issuance of a zoning permit for development on this lot, that Oakwood Drive be upgraded to City standard and an irrevocable offer of dedication be recorded. 19. Water and Sewer: This lot is served by City water and sewer. The sewer allocation for this project is 450 gpd. The per gallon fee would have to be paid prior to permit. 20. Recreation to pay the per zoning/building Fee: The developer of this parcel unit recreation fee in effect permit is issued for construction DECISION & CONDITIONS will be required at the time a on this lot. Based on the above Findings of Fact, the Planning Commission approves the Preliminary Plat application of Dorset Land Company for 1) subdivision of 11.93 acres of land into two parcels of 11.64 acres and 0.29 acres, and 2) construction of a planned commercial development on the 11.64 acre parcel consisting of 156,000 square feet in five buildings for medical office, general office, cafe/deli, and retail (pharmacy) use as depicted on a four page set of plans, page one entitled "Plat of Survey of Dorset Land Company, Inc." prepared by Trudell Consulting Engineers, Inc. and dated 1/6/88, last revised 7/9/92, with the following stipulations: 1. As Sherry Road is proposed to provide access to this project, 4 the applicant shall be responsible for upgrading to city standard that portion of Sherry Road between Dorset Street and the westernmost project access. The final plat plans shall indicate the proposed improvements. The Sherry Road improvements shall be complete prior to the occupancy of the first building. 2. The final plat plan shall include details for the new public street connecting Sherry Road and Dorset Street. Appropriate legal documents for the public street r.o.w. (e.g. Irrevocable Offer of Dedication) shall be submitted to the City Attorney for approval and shall be recorded in the South Burlington land records prior to issuance of a zoning/building permit for the first building. 3. The Planning Commission waives the requirements of a minimum 400 foot distance between PCD entrances (Section 11.504(b), zoning regulations) . It is the Commission's opinion that the proposal for a second access located 260 feet from the main access will improve traffic safety and circulation in the area of the project. 4. The applicant shall post a $79,300, 3-year landscaping bond prior to issuance of a zoning/building permit. The request for a $31,000 credit on required landscaping is not approved at this time. Prior to final plat, applicant shall identify in the field those areas of existing landscaping which are to remain undisturbed. The Planning Commission shall determine at final plat whether the existing trees to remain equal at least the $31,000 credit requested. 5. In an effort to mitigate potential adverse traffic impacts, the following shall be required. a. applicant shall contribute an amount equal to 5% of the City's share of constructing a new northbound on -ramp at Exit 13, not to exceed $10,000. Contribution shall be made prior to issuance of a zoning/building permit and may be phased in accordance with phased development. Until such time as the city's share is finalized, applicant's contribution shall be based on the maximum $10,000 contribution. When the city's share is finalized and it is determined that the applicant has contributed more than 5% of the city's share, the city shall reimburse the applicant for the overpayment. b. Applicant shall contribute $24,660 to the Williston Road Area 1 improvement fund based on the P.M. peak hour trip ends estimated to be generated by the project. The contribution shall be made prior to issuance of a zoning/building permit and may be phased in accordance with phased development. C. The city shall use the contribution identified in a. and b. above for their intended purposes within 6 years of the date at which the contribution is made. If the contribution is not used within 6 years, it shall be returned to the applicant. 5 d. Applicant shall contribute toward the installation of a signal at the project intersection with Dorset Street when warranted. The amount of contribution shall be determined at final plat. e. Applicant shall coordinate proper signal optimization studies for all Dorset Street intersections. The details of the applicant's responsibility shall be determined at final plat. 6. The proposed cafe/deli and pharmacy uses are not allowed in the CD-3 zone. Therefore, these uses are allowed only in buildings C, D, or E which are located int he grandfathered C-2 zone. The final plat plans shall indicate the buildings(s) in which the cafe/deli and pharmacy uses will be located. 7. The Sherry Road access for the subsurface parking under building B shall be egress only. This shall be clearly indicated on the final plat plans. 8. The plans shall be revised prior to final plat to show the following: a. All parking spaces shall be located on private property outside of the proposed 60-foot public street r.o.w. b. Delineation of lanes for the main access at Dorset Street. The access shall include one ingress lane and two egress lanes. C. An additional hydrant as approved by the Fire Chief. d. Sidewalks on both sides of the main access with Dorset Street. 9. The Planning Commission approves a 0.58 F.A.R. for the area of the project zoned CD-3. The Planning Commission may approve an increase above the base F.A.R. of 0.5 if the applicant provides certain public amenities. It is the Commission's opinion that the provision of a public street connecting Sherry Road to Dorset Street will improve traffic circulation in the area and therefore qualifies as a public amenity. 10. All on -site lighting shall be down -casting, shielded luminaires and shall not cast light beyond the property line. Final approval of proposed street lighting within the 60-foot public r.o.w. shall be made at Final Plat. 11. A sewer allocation of 18,327 gpd is granted. Applicant shall pay the required per gallon sewer allocation fee prior to issuance of a zoning/building permit. 12. Building elevations for each building showing both pre - construction and post construction grade shall be submitted prior to final plat review. 0 13. The current R7 zoning shall apply to lot #2. 14. Section 19.202(b) of the zoning regulations limits the number of lots served by a private r.o.w. to three. Prior to issuance of a zoning/building permit for lot #2, the applicant or its successors and assigns shall upgrade to City standard that portion of Oakwood Drive from its current terminus as a public r.o.w. to the southern boundary of lot #2. In addition, prior to issuance of a zoning/building permit for lot #2, appropriate legal documents for conversion of this portion of Oakwood Drive to a public street (i.e., irrevocable offer of dedication) shall be submitted to the City Attorney for approval and recorded in the South Burlington land records. 15. Prior to issuance of a zoning/building permit for lot #2, the applicant shall pay the appropriate sewer and recreation fees. 16. Applicant shall obtain conditional use approval from the Zoning Board of Adjustment for the new office use in the CD-3 zoning district prior to final plat. 17. Prior to final plat, applicant shall obtain a letter from the adjoining property owner to the south (i.e., Veve ) agreeing to less than a 15-foot wide green space buffer. 18. The final plat application shall be submitted within 12 months or this approval is null and void. ��C�e, i ( 1"�- Chairman South Burlington Planning Commission Date FA