CITY OF SOUTH BURLINGTON
DEPARTMENT OF PLANNING AND ZONING
DORSET STREET HOLDINGS, LLC - 75 SAN REMO DRIVE
SITE PLAN APPLICATION #SP-17-74
FINDINGS OF FACT AND DECISION
Dorset Street Holdings, LLC, hereinafter referred to as the applicant, is seeking approval
to amend a previously approved plan for a multi -use multi -building complex. The
amendment consists of adding the ground mounted HVAC unit, 75 San Remo Drive.
Based on the plans and materials contained in the document file for this application, the
Administrative Officer finds, concludes, and decides the following:
FINDINGS OF FACT
1. The applicant is seeking approval to amend a previously approved plan for a
previously approved plan for a multi -use multi -building complex. The amendment
consists of adding the ground mounted HVAC unit, 75 San Remo Drive.
2. The owner of record of the subject property is Dorset Street Holdings, LLC.
3. The subject property is located in the FBC T-4 Zoning District.
4. The application was received on October 26, 2017.
5. The plan submitted is entitled, "South Burlington Realty 360-368 Dorset Street South
Burlington, Vermont", prepared by Trudell Consulting Engineers, dated 10/20/17, and
last revised on 10/20/17.
DIMENSIONAL REQUIREMENTS
6. Coverages are not changing.
7. Setback requirements are being met.
SITE PLAN REVIEW STANDARDS
Only the standards below are affected by this application. All other standards will
continue to be met.
Bicycle Parking
8. The plan will be required to comply with Section 13.14 of the LDRs to include the
new type and location for bicycle racks, to accommodate four (4) bicycle parking
spaces.
Utility Cabinet
- 1 -
#SP-17-74
9. The proposed HVAC unit will meet the setback requirement and will be screened
with a fence to comply with Section 13.06 (C) (2) of the LDRs.
DECISION
Based on the above Findings of Fact, the Administrative Officer herby approves site plan
application #SP-17-74 of Dorset Street Holdings, LLC, subject to the following
conditions:
1. All previous approvals and stipulations which are not superseded by this approval
will remain in effect.
2. This project must be completed as shown on the plan and shall be on file in the
South Burlington Department of Planning and Zoning.
3. The plans must be revised to show the changes below and will require approval of
the Administrative Officer. Three (3) copies of the approved revised plans must be
submitted to the Administrative Officer prior to permit issuance.
a. The site plan must be revised to add four (4) bicycle parking spaces in
compliance with Section 13.14 of the LDRs.
4. The applicant must obtain a zoning permit from within six (6) months pursuant to
Section 17.04 of the Land Development Regulations or this approval is null and void.
5. All exterior lighting must be installed or shielded in such a manner as to conceal light
sources and reflector surfaces from view beyond the perimeter of the area to be
illuminated.
6. The applicant must obtain a Certificate of Occupancy from the Administrative Officer
prior to use of the HVAC unit.
7. Any change to the site plan will require approval by the South Burlington
Development Review Board or the Administrative Officer.
Signed on this day of v/�/l✓� 2017 by
2:2
L-IRaymond J. Belair, A inistrative Officer
PLEASE NOTE: Pursuant to 24 VSA §4465, an interested person may appeal this
decision by filing a Notice of Appeal with the secretary of the Development Review
Board. This Notice of Appeal must be accompanied with a $233 filing fee and be filed
within 15 days of the date of this decision.
-2-
#SP-17-74
The applicant or permittee retains the obligation to identify, apply for, and obtain relevant
state permits for this project. Call 802.477.2241 to speak with the regional Permit
Specialist.