HomeMy WebLinkAboutSP-94-0000 - Decision - 0358 Dorset Streetc I L DECISION & CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the site plan application of Stephen Whittlesey for: 1) adding a 22 seat tavern to an existing retail sales and billiard table rental use (5,100 square feet), 2) convert 2,900 square feet of vacant space to retail (Oakman Electrical Supply) and 3) convert 5,200 square feet of vacant space to retail (optional Extras) in a 16,800 square foot building containing an existing nonconforming storage use (3600 square feet), 358 Dorset Street/55 San Remo Drive, as depicted on a plan entitled "358 Dorset Street, South Burlington, VT", prepared by Somerset Associates, and dated 6/3/92, with a stamped "received" date of January 28, 1994, with the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. This site plan approval shall not be construed as approval to alter a noncomplying structure. The decision of whether or not to approve alteration to a noncomplying structure shall be made by the Administrative Officer in accordance with Section 19.002 of the zoning regulations. �. 3. This property lies within Traffic Overlay Zone 6 which allows this property to generate a maximum of 49 P.M. peak hour vehicle trip ends (vte's). I.T.E. estimates the existing approved uses to generate 47.4 vte's and the existing and proposed uses to generate 73.7 vte's or 24.7 vte's more than is allowed. Pursuant to Section 17.50 of the zoning regulations, the Planning Commission may approve peak hour traffic volumes above the normal standards if it determines that other site improvements will produce a net benefit for traffic flow in the vicinity. It is the Planning Commission's opinion that the recently completed Dorset Street improvement project will produce a net benefit in access safety to and from the property since turning movements on Dorset Street will be reduced due to the median. In addition, the removal of the gate will enhance circulation and access to the site. Therefore, it is the Commission's opinion that the provisions of Section 17.50 are adequately met. 4. The Planning Commission approves the reduction in the number of required parking spaces from 43 to 32 spaces. It is the Planning Commission's opinion that due to the off-peak nature of the billiard use that adequate parking will be available. 5. Any new exterior lighting or change in existing lighting shall consist of downcasting shielded fixtures so as not to cast light beyond the property line. Any change in lighting shall be approved by the City Planner prior to installation. 3 San Remo Drive do not meet the setback requirements. Section 1.6022 of the Central District Zoning Ordinance prohibits parking spaces within 100 feet of the Dorset Street r.o.w. and within 87 feet of the San Remo Drive r.o.w. 6. Floor Area Ratio: The Floor Area Ratio (F.A.R.) for this lot is 0.38 (maximum allowed is 0.5). This is based on 16,800 square feet of floor space on a 43,950 square foot lot. 7. Traffic: This property lies within Traffic Overlay Zone 6 which allows this property to generate a maximum of 49 P.M. peak hour vehicle trip ends (vte's). I.T.E. estimates the existing approved uses to generate 47.4 vte's and the existing and proposed uses to generate 73.7 vte's. Pursuant to Section 17.50 of the zoning regulations, the Planning Commission may approve peak hour traffic volumes above the normal standards if it determines that other site improvements will produce a net benefit for traffic flow in the vicinity. In the past the Planning Commission has granted credits for traffic due to the Dorset Street improvements for other properties along Dorset Street. 8. Landscaping: The minimum landscaping requirement, based on building costs, is $75 which is not being meta Additional landscaping was planted along Dorset Street as part of the billiard use and the area along San Remo Drive is adequately landscaped. Staff did not recommend additional landscaping. 9. Parking: The existing and proposed. uses require. .4.3:parking, spaces by standard and only. 32 spaces, including two (2) handicapped spaces, are being provided. This is an 11 space or 26% shortfall. The applicant has submitted parking count information for the billiard sales and rental use for the months of October through April. This information indicates that the peak parking demand for the use is after 7:00 P.M. on weekdays and after 2:00 P.M. on weekends. On weekdays, the retail and storage uses are closed by 5:00 P.M. and the only uses open Saturday afternoon is the billiard use and Optional Extras: Based on the information submitted adequate parking will be available given the off-peak nature of the billiard use. Sewer: No additional allocation needed. 11. Dumpster: All dumpsters will be stored on the north side of the building. This area will be screened from San Remo Drive and Dorset Street by a stockade fence. 12. Lighting: No additional lighting proposed. Current exterior lighting consists of three (3) 500 watt halogen lights on the side of the building near the billiard entrance and dual 200 watt flood lamps on the Dorset Street side of the building. .The applicant shall obtain a zoning/building permit within six r. .,months or this approval is null and void.,,. 'The applicant shall obtain a Certificate of `Occupancy from the inistrative Officer prior to use of the.new parking area. ..Any change to the site plan shall require. approval by the South lington Planning Commission. As expressly represented by the applicant, the existing gate on the property will be removed. The plan shall be revised prior to permit issuance to remove a note "yard light and pole". 1, As expressly' represented by the applicant, snow will be stored n'the north side of the building. The applicant shall keep king spaces free of snow. 4 Chairma or Clerk-.. South Burlington Planning. Commiasion bat k. Rh . 4