HomeMy WebLinkAboutSP-89-0000 - Decision - 0350 Dorset StreetFINDINGS OF FACT
STATE OF VERMONT I� 0600
COUNTY OF CHITTENDEN
CITY OF SOUTH BURLINGTON
Re: Findings of Fact, application of SSL Corporation for conver-
sion of a vacant 7600 square foot building to retail and/or
office use, 350 Dorset Street.
On the 17th of October 1989, the South Burlington Planning Com-
mission approved the request of SSL Corporation for site plan
review under Section 19.10 of the South Burlington Zoning Regula-
tions based on the following findings:
1. TRAFFIC ACCESS: Dual access would be via two 241wide curb
cuts, on Dorset Street and San Remo Drive, respectively.
2. CIRCULATION AND PARKING: Circulation is provided along the
south and east sides of the building only. The project requires
42 parking spaces and 55 are proposed.
3. LANDSCAPING & SCREENING: Applicant shall post a $3500, 3-
year landscaping bond prior to permit.
4. OTHER: a) The Planning Commission approves a peak hour trip
generation of up to 70 trips (up from 59) because of ingress and
egress and curb design changes. b) No use or combination of
uses shall be allowed which exceeds the 70 peak hour trip end
maximum. Trip generation from the property shall be reviewed for
each proposed new retail use, or change in use, during adminis-
trative review by the Zoning Board or the Planning Commission.
c) A sewer allocation of 150 g.p.d. is granted. Applicant shall
pay $2.50 per gallon fee prior to zoning permit issuance. d)
The proposed curb cut shall be approved by the State prior to
permit. If not approved, applicant shall resubmit a revised plan
for Planning Commission approval. e) Zoning permits shall be
obtained within 6 months or this approval is null and void.
Cha' ma or Clerk,
South Burlington Planning Commission