HomeMy WebLinkAboutSP-92-0000 - Decision - 0350 Dorset StreetFINDINGS OF FACT & DECISION
STATE OF VERMONT �' 2� 6)66
COUNTY OF CHITTENDEN
CITY OF SOUTH BURLINGTON
Re: Findings of Fact, application of Eric Fleggenheimer, d.b.a.
EMA, Inc. for conversion of a vacant 7,680 square foot building to
retail use, 350 Dorset Street.
On the 21st of May, 1992 the South Burlington Planning Commission
approved the request of Eric Fleggenheimer, d.b.a. EMA, Inc. for
site plan review under Section 19.10 of the South Burlington Zoning
Regulations based on the following findings:
1. Vermont Federal Bank is the record owner of the property which
is the subject of this application. This property is located at
350 Dorset Street.
2. This property is currently developed with a vacant 7,680 square
foot building. The previous use of this building was a truck
repair shop. This proposal would convert this building to retail
space for 2-4 retail units.
3. This property is located at 350 Dorset Street and is within the
Central District 2 zone. It is bounded on the north by a fabric
store and beauty salon (Dorset Street) and a radiator repair shop
(San Remo Drive), on the south by Champlain Oil's trucking
terminal, on the east by San Remo Drive and on the west by Dorset
Street.
4. Access/circulation: Access will be provided by a 30 foot curb
cut on Dorset Street, in conformance with the Dorset Street
reconstruction plans, and a 24 foot curb cut on San Remo Drive.
Traffic circulation on the site is acceptable.
5. Coverage: Building coverage will be 16.3% (maximum allowed is
40%). Overall coverage will be 83.1% (maximum allowed is 90%).
6. Setbacks: The existing building does not meet the front yard
setback requirements and the rear of the building extends beyond
the 80 foot building envelope. This building is therefore a
noncomplying structure. The proposed 71x100' canopy along the
south side of the building extends beyond the 80 foot building
envelope on both the east and west sides of the envelope. (The 80
foot building envelope requirement was adopted by the City Council
on May 4, 1992 and took affect on May 25, 1992).
7. Landscaping: The landscaping requirement for this project is
$6,000 which will be met. Plantings will include Birch, Ash, Red
Maple, Cedar, Lilac and Flowering Crab.
8. Parking: This project requires a total of 43 parking spaces
and 43 spaces are being proposed including two (2) handicapped
spaces. Parking stall dimensions and aisle widths meet minimum
requirements.
9. F.A.R. (Floor Area Ratio): The floor area ratio for this
project is .15 (maximum allowed is .5).
10. Alterations: This building is proposed to be altered by
adding a 7'x100' canopy along the south side of the building and
adding a 12'xl2' canopy on the north side of the building.
11. Traffic: This property is in Traffic Overlay Zone 6 which
allows this property to generate a maximum of 58.8 vehicle trip
ends (vte's) during the P.M. peak hour. Based upon a trip
generation analysis submitted by the applicant the property is
estimated to generate 51 to 67 vte's during the P.M. peak hour,
depending on whether furniture store or "specialty retail" retail
uses is assumed for the remaining 4,400 square feet not to be
occupied by Net Result. In 1989, the Planning Commission approved
a limit of 70 vte/hour for the property, 11 vte's above the 59 vte
limit set by zoning. The increase was allowed based on traffic
improvements to be realized by the completed Dorset Street project.
12. Lighting: Proposed exterior lighting consists of five (5) 250
watt lights on 20 foot poles with sharp cutoff luminaries. These
lights are located along the south boundary line.
13. Other: A new compressor pad is proposed to be located 43
feet from the Dorset Street r.o.w. line.
DECISION & CONDITIONS
Based on the above Findings of Fact, the South Burlington Planning
Commission approves the site plan application of Eric
Fleggenheimer, d.b.a. EMA, Inc. for conversion of a vacant 7,680
square foot building to retail use as depicted on a site plan
entitled, "Site Plan, 350 Dorset Street", prepared by Leonard Duffy
and Associates and dated 4/16/92, last revised 5/4/92, with the
following stipulations:
1) The applicant shall post a $6,000, 3-year landscaping bond
prior to issuance of a zoning/building permit. The plan shall be
revised prior to permit to show: a) the existing gravel areas,
which are not to be used for parking and circulation, converted to
lawn, and b) the plantings along San Remo Drive setback at least 32
feet from the San Remo Drive centerline.
2) A sewer allocation of 225 gpd is granted. The applicant shall
pay the $2.50 per gallon fee prior to issuance of a zoning/building
permit.
3) All lighting shall be downcasting, shielded luminaire and shall
not cast light beyond the property line.
4) The plan shall be revised prior to issuance of a
zoning/building permit to show the following:
a) The proposed compressor pad setback at least 50 feet from the
Dorset Street r.o.w.
b) Drainage system including underground pipe system, pipe size
and invert elevations. The drainage system shall be approved by
the City Engineer.
5) The applicant shall be made aware that approval of this site
plan does not constitute approval to alter the noncomplying
structure. Alterations to noncomplying structures are prohibited
in Section 1.80 of the Central District Ordinance. Compliance with
Section 1.80 shall be determined by the Zoning Administrator at
time of permit application.
6) This property is located within Traffic Overlay Zone 6 which
allows uses on this property to generate 59 vehicle trip ends
(vte's) during the peak hour. Based on ITE trip generation rates
for code #850 (supermarket) and code #814 (specialty retail), it is
estimated that the proposed use will generate 67 vte's during the
peak hour. Section 17.50 of the zoning regulations allows the
Planning Commission to approve peak hour volumes above the normal
standard if the Commission determines that other improvements will
produce a net benefit for traffic flow in the vicinity. It is the
Commission's determination that the Dorset Street project will
greatly improve traffic safety to and from this site and therefore
approves the additional peak hour vte's estimated to be generated
by this project.
Approval of this project is conditioned on use of the building for
43% supermarket (3,280 square feet) and 57% specialty retail (4,400
square feet), or 100% specialty retail. In addition, this property
is limited to a maximum peak hour trip generation of 67 vte's. In
order to assure compliance with these conditions, the City Planner
shall approve any new tenant prior to occupancy.
7. The zoning /building permit shall be obtained within 6 months
or this approval is null and void.
Chairman L__ "_"___-'__
South Burlington Planning Commission