HomeMy WebLinkAboutSD-19-07 - Supplemental - 1200 Airport Drive (8)SURFACE MOUNT BOLLARDS
16 1/8"
6"
MOUNT
SURFACE FLANGE
LAG BOLT*
PER MANUFACTURER'S RECOMMENDATIONS
* DIAMETER, LENGTH & MATERIAL
19 3/8" (+/-1/2")
(+/-1/2")
34"
18" (+/-1/2")
END VIEW
SURFACE FLANGE MOUNT DETAIL
RADIUS HOLE TYP.
2 EACH 9/16"
NOT TO SCALE
2'-6"2'-6"
BICYCLE RACK DETAIL
2'-6"
(MIN.)
2"
CAPACITY EACH)
(2 BIKE
BICYCLE RACK
PORTLAND CEMENT CONCRETE SIDEWALK, 8 INCH
MOUNT DETAIL BELOW
SEE SURFACE FLANGE
(MIN.)
2"WALLNVT STATE PLANE GRIDFalse Northing: 0.0000 False Easting: 1640416.6667 Origin Latitude: 42°30'00.0000"N Central Meridian: 72°30'00.0000"W US Survey Foot Transverse Mercator NAD83 Vermont State Planes VT83
Project No.Scale
Revision Drawing No.Sheet
Title
Client/Project
Client/Project Logo
Permit/Seal
Issued
Revision
Notes
Consultant
Copyright Reserved
By Appd YYYY.MM.DD
By Appd YYYY.MM.DD
Dsgn.Chkd.YYYY.MM.DDDwn.
use for any purpose other than that authorized by Stantec is forbidden.
The Copyrights to all designs and drawings are the property of Stantec. Reproduction or
- any errors or omissions shall be reported to Stantec without delay.
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing
of
ORIGINAL SHEET - ARCH D
Stantec
Street Address
City, Province/State, Postal/Zip Code
+1.555.555.1234
A
B
C
D
1 2 3 4 5
2019.03.15
CONSTRUCTION
NOT FOR
PRELIMINARY
BURLINGTON INTERNATIONAL AIRPORT
SOUTH BURLINGTON,VT
Tel:
www.stantec.com
BIKE PARKINGFile Name: ----v:\1953\active\195311193\transportation\drawing\bike parking195311193/195311636 1"=5'
BTV QTA RENTAL CAR FACILITY AND BTV HOTEL
PARKING GARAGE, GROUND LEVEL
BIKE PARKING PLAN INSIDE
SIDE VIEW
ELECTRICAL PANELS
AREA REQUIRED TO ACCESS
BIKE REPAIR STATION
SITE
WILL BE LOCATED AT THE HOTEL
THAT REQUIRED SHORT TERM SPOTS
HOTEL (6 BIKE CAPACITY) NOTE
PURPLE: THREE BIKE LOCKERS FOR
PARKING SPOTS
REMOVE 6 EXISTING
FOR QTA (4 BIKE CAPACITY)
GREEN: TWO BIKE RACKS
CAPACITY)
GREEN: ONE BIKE LOCKER FOR QTA(2 BIKE
MAIN ENTRANCE TO GARAGE
LONG TERM: 50% OF SHORT TERM SPOTS
SHORT TERM: 1 SPOT PER 5,000 SF (MIN. 4)
CITY OF SOUTH BURLINGTON BIKE PARKING REQUIREMENTS
BIKE CAPACITY)
TERMINAL AND FAA BUILDING (36
ORANGE: EIGHTEEN BIKE RACKS FOR
AREAS.
GUIDE USERS TO BIKE PARKING
BTV WILL INSTALL SIGNAGE TO 4.
BIKE REAPAIR STATION.
RACKS, BIKE LOCKERS AND THE
RECOMMENDATIONS FOR BIKE
THE MANUFACTURES
DEVELOPMENT REGULATIONS AND
CITY OF SOUTH BURLINGTON LAND
MAINTAIN ALL CLEARANCES PER 3.
INFORMATION.
LOCATION MAP FOR ADDITIONAL
SEE DESIGN CRITERIA AND 2.
REPAIR STATION.
BIKE LOCKER, BOLLARD AND BIKE
COLOR AND MODEL OF BIKE RACK,
WITH BTV TO DETERMINE STYLE,
CONTRACTOR SHALL COORDINATE 1.
BIKE PARKING LOCATION
N/A*417,000 SFEXISTING FAA BUILDING
N/A*32610,000 SFEXISTING TERMINAL
612**60,000 SFBTV HOTEL
248,000 SFQTA RENTAL CAR FACILITY
SPOTSSPOTSBUILDING AREA
LONG TERMSHORT TERMAPPROXIMATEBUILDING DESCRIPTION
**SHORT TERM SPOTS LOCATED AT THE HOTEL SITE
*LONG TERM PARKING SPOTS ARE NOT REQUIRED FOR EXISTING BUILDINGS