FINDINGS OF FACT & DECISION
STATE OF VERMONT
COUNTY OF CHITTENDEN
CITY OF SOUTH BURLINGTON
Re: Findings of Fact, final plat application #SD-oi-5o and design review application
#DR-oi-iz of Edgar Welch to amend a planned unit development consisting of. I) a
iz,000 sq. ft. retail building which includes one (i) dwelling unit, z) a 1800 sq. ft. retail
building, and 3) a 1800 sq. ft. accessory building. The amendment consists of. i)
converting 2594 sq. ft. of retail space to general office space in main building, z)
adding 590 sq. ft. of mezzanine retail space to main building, 3) facade alterations to
all buildings, 4) signage alteration, 5) site modifications to parking, landscaping, and
lighting, 6) using the accessory building for seasonal barbeques, and 7) converting 96o
sq. ft. of retail space to indoor recreational use in the main building, 34o Dorset Street.
On the 16`h day of October zoos, the South Burlington Development Review Board
approved the request of Edgar Welch for design review approval and final plat
approval under Section 24.30 of the zoning regulations and Section zoo of the
subdivision regulations, respectfully, based on the following findings:
i. The owner of record of this property is Edgar Welch.
z. This project consists of amending a planned unit development consisting of. i)
a I2,900 sq. ft. retail building which includes one (i) dwelling unit, z) a 1800 sq.
ft. retail building, and 3) a 1800 sq. ft. accessory building. The amendment
consists of: i) converting 2594 sq. ft. of retail space to general office space in
main building, z) adding 590 sq. ft. of mezzanine retail space to main building,
3) fagade alterations to all buildings, 4) signage alterations, 5) site
modifications to parking, landscaping, and lighting, 6) using the accessory
building for seasonal barbeques, and 7) converting 96o sq. ft. of retail space to
indoor recreation use in the main building.
3. This very same application, with some other modifications, was approved by
the Board on i/i6/oi. This approval contained a condition that the Design
Review Committee (DRC) approves all exterior and landscaping changes or
this approval would be null and void. The applicant failed to apply and
absinthe required approval from the DRC, despite repeated proddings from
staff.
4. The amendment results in an increase in impact due to adding more gross
square footage in the building in the form of a mezzanine and additional
overall coverage. The Board reviewed the three (3) kinds of changes that
justify an amendment to a permit.
Page #z
5. The Board determined that there have been changes in the operation of the
permittee's project that was not feasible at the time the permit was issued.
6. This property at 34o Dorset Street is located within Central District Two and
Design Review District Two. It is bounded on the west by Dorset Street, on
the north by a mixed use office, retail, and residential building, on the east by
San Remo Drive, and on the south by an office building.
7. Access/Circulation: Access is provided via a 30 foot curb cut on Dorset Street,
two (z) 24 foot curb cuts on San Remo Drive, and access to the DeSarno
property to the south. Access is also available across the adjoining 23 San
Remo Drive property to San Remo Drive. The applicant proposed modifying
the circulation to provide for one-way traffic around the rear of 34o Dorset
Street. Staff supported this proposal, as it would improve circulation on the
site.
8. Coverage/Setbacks: Building coverage is 21% (maximum allowed is 400/0).
Overall coverage is 71.4% (maximum allowed is 90%) as listed on the plan.
This is the same coverage at noted on the last approved plan. The proposed
plan shows converting lawn area to a dumpster storage area which increases
overall coverage. The plan should be revised to note the correct overall
coverage information.
9. All the existing buildings project either wholly or partially outside of the
allowable building envelope and are there non -complying structures subject to
Section 26.002 of the zoning regulations.
io. Parking is not allowed in the building envelopes and front yard setback areas
along San Remo Drive and Dorset Street unless hidden by a building. Parking
and pavement exist within these envelopes and this proposal will not increase
the degree of noncompliance.
II. Floor Area Ratio (F.A.R.): The base maximum density of development can
not exceed on F.A.R. of o.5. This project has an F.A.R. of 0.22.
12. Parking: A total of 69 spaces are required for this project and 65 spaces are
being provided including three (3) handicapped spaces and one (i) bike rack.
This is a four (4) space or 5.8% shortfall. Staff supported a parking waiver of
four (4) spaces or 5.8% as there is an opportunity for on -street parking with
the implementation of the San Remo Drive Streetscape Plan. The note on the
site plan regarding parking should be revised to accurately describe the
existing and proposed uses.
13. Sewer: No additional sewer allocation requested.
14. Landscaping,_ The minimum landscaping requirement, based on building
costs, is $3120 which is being met. The Design Review Committee at their
9/24/01 meeting required the applicant to revise the landscape plan for the
Development Review Board.
i5. Traffic: The property is currently approved for 104.8 P.M. peak vehicle trip
ends (vte's). The Development Review Board estimates, as part of the last
approval, that the proposed uses will generate 118.36 peak hour vte's for an
overall increase of 13.56 vte's.
Page #3
16. LightinQ: The applicant was previously approved for the following exterior
lights:
a. One (I) 250 watt metal halide lamp with a downcasting shielded fixture
mounted on Iz foot pole.
b. Nine (9) ioo watt metal halide lamps mounted in the new soffit with
downcasting shielded fixtures.
c. Three (3) ioo watt metal halide building mounted lamps mounted on
the building above three (3) doors with downcasting shielded fixtures.
17. The applicant has proposed several changes to the lighting. The Design
Review Committee approved the proposed lighting changes.
18. Dumpster: The dumpster will be stored within a vinyl fenced enclosure to the
rear of the accessory building.
i9. DESIGN REVIEW
The City Center Design Review Committee reviewed this proposal at their
9/24/01 meeting.
DECISION & CONDITIONS
Based on the above Findings of Fact, the South Burlington Development Review
Board approves final plat application #SD-oi-5o and Design Review application #DR-
oI-Iz of Edgar Welch to amend a planned unit development consisting of. I) a I2,900
sq. ft. retail building which includes one (i) dwelling unit, z) a 1800 sq. ft. retail
building, and 3) a 1800 sq. ft. accessory building. The amendment consist of. i)
converting 2594 sq. ft. of retail space to general office space in main building, z)
adding 590 sq. ft. of mezzanine retail space to main building, 3) facade alterations to
all building, 4) signage alterations, 5) site modifications to parking, landscaping, and
lighting, and 6) converting 96o sq. ft. of retail space to indoor recreational use in the
main building, 34o Dorset Street, as depicted on a two (z) page set of plans, page one
(I) entitled, "34o Dorset Street South Burlington, Vermont" prepared by Michael
Dugan, dated 1/28/99, last revised on io/oi/oi, with the following stipulations:
i. All previous approvals and stipulations which are not superseded by this
approval shall remain in effect.
z. The Board has chosen to review the amendment applications on the basis that
there have been changes in the operation of the applicant's project, not
reasonably foreseeable at the time the original approval was granted.
3. The plat plans shall be revised to show the changes below and shall require
approval of the Director of Planning & Zoning (hereinafter Director). Four
(4) copies of the approved revised plans shall be submitted to the Director
prior to recording:
Page #4
a. The plan shall be revised to note the current overall coverage
information.
b. The plan shall be revised to note the proposed and existing uses and the
parking requirements.
4. Pursuant to Section 25.256 (b) of the zoning regulations, the Development
Review Board approves a 4 space or 5.8% waiver for a total of 5 spaces
approved.
5. For the purpose of calculating road impact fees under the South Burlington
Impact Fee Ordinance, the Development Review Board estimates that the
proposed change in use and expansion will generate 13.56 additional vehicle
trip ends during the P.M. peak hour.
6. Any new exterior lighting shall consist of downcasting shielded fixtures. Any
change to approval lights shall require approval of the Director prior to
installation.
7. The final plat plan (sheet si) shall be recorded in the South Burlington Land
Records within go days or this approval is null and void. The plan shall be
signed by the Development Review Board Chair or Clerk prior to recording.
Chairman/C f r r
South Burlin&t�Z—
Development Review Board
Date / C) � 0
Please note: You have the right to appeal this decision to the Vermont Environmental
Court, pursuant to 24 V.S.A. 4471 and V.R.C.P. 76, in writing, within 3o days of the
date this decision is issued. The fee is $i5o.00. If you fail to appeal this decision, your
right to challenge this decision at some future time may be lost because you waited
too long. You will be bound by the decision, pursuant to 24 V.S.A. 4472 (d)
(exclusivity of remedy finality).