Loading...
HomeMy WebLinkAboutSD-99-66 - Decision - 0155 Dorset Street#SD-99-66 FINDINGS OF FACT AND DECISION STATE OF VERMONT COUNTY OF CH]TTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, final plat application of University Mall Realty Trust to amend an approval consisting of : 1)constructing a 111, 504 square foot GLA addition to the main University Mall building, 2) constructing a 983 space multi -level parking structure, and 3) constructing a 15, 510 square foot automotive repair structure, 155 Dorset Street. The amendment consists of minor site modifications to parking, access, and coverage. On the 2nd day of November, 1999, the South Burlington Development Review Board approved the final plat application of University Mall Realty Trust under Section 204 of the South Burlington Subdivision Regulations based on the following findings: 1. This project consists of amending an approval consisting of : 1)constructing a 111, 504 square foot GLA addition to the main University Mall building, 2) constructing a 983 space multi -level parking structure, and 3) constructing a 15, 510 square foot automotive repair structure, 155 Dorset Street. The amendment consists of minor site modifications to the parking layout and green space areas. 2. The record owner of this property is University Mall Realty Trust. 3. Pam: The applicant is proposing to remove seven (7) spaces along the east side of the main drive through the area west of Dorset Street, add three (3) spaces further south along the east side of the main drive through the area west of Dorset Street, and add two (2) spaces newt to a new piece of green space north of the northwest corner of the Sears store. This results in two (2) spaces fewer than previously approved. 4. Access/circulation: The applicant is proposing to close the existing entrance along the east side of the main drive through the area west of Dorset Street. The applicant is proposing to remove a curb further north along that drive to provide access. The applicant is proposing to add three 3' curb breaks along the east side of the main drive through the area west of Dorset Street. These breaks are being installed to facilitate drainage to the west side of this drive, where the closest catch basins are located. Access to the Paquette parcel from the Mall parking lot is not being affected. The elimination of a section of the proposed curbed "island" along the east side of the drive No Text parallel to Dorset Street will facilitate circulation between the Janes & Jacob property and the access points to Dorset Street. Proposed changes to the parking layout west of the Jacob parcel will improve circulation in this area. 5. Coverage: An area of green space near the northwest entrance has been eliminated. Drainage considerations prevent the construction of a raised curbed green space in this area. The applicant is proposing to convert an area of pavement northwest of the Sears store to green space to maintain the existing amount of green space in the CO District. DECISION AND CONDITIONS Based on the above Findings of Fact, the South Burlington Development Review Board approved the final plat application of University Mall Realty Trust to amend an approval consisting of the following: 1) construct a 983 space parking structure, 2) construct a 111,504 square foot GLA addition to the main building, and 3) construct a 15,510 square foot automotive center. The amendment consists of minor site modifications to the parking layout and green space areas, 155 Dorset Street, as depicted on a three (3) page set of plans, page one (1) entitled, "Overall Plan Sears Expansion University Mall 155 Dorset Street South Burlington," prepared by Pinkham Engineering Associates, Inc., dated 3/21/97, last revised on 9/1/99, with the following stipulations. 1) All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2) Any change to the final plat plans shall require approval of the South Burlington Development Review Board. 3) The Development Review Board, pursuant to Section 26.256(h) of the zoning regulations, approves a two parking space waiver and approves a total of 3125 parking spaces. 4) The final plat plans (sheets 2 of 20, 6 of 20 and 11 of 20) shall be recorded in the South Burlington land records within 90 days or this approval is null and void. The Development Review Board Chair or Clerk shall sign the plans prior to recording. r� Chair or Clerk Sou Burlington Develop ent Review Board l D to 2 No Text