HomeMy WebLinkAboutDR-07-12 - Decision - 0150 Dorset StreetCITY OF SOUTH BURLINGTON
DEPARTMENT OF PLANNING AND ZONING
STEVE GUILD DESIGN
150 DORSET STREET SUTIE 340
DESIGN REVIEW APPLICATION # DR-07-12
FINDINGS OF FACT AND DECISION
Steve Guild Design, hereafter referred to as the applicant, is requesting design review
approval for the exterior modifications to the property located at 150 Dorset Street. The
subject property falls within Design District 1 of the City Center Design Review Overlay
District. Pursuant to Section 11.01 of the South Burlington Land Development
Regulations, these changes shall be subject to design review by the Design Review
Committee (DRC) and the Development Review Board (DRB).
The Development Review Board held a public hearing on Tuesday, January 8, 2008.
The applicant was not present at the meeting.
Based on testimony provided at the above mentioned public hearing and the plans and
supporting materials contained in the document file for this application, the Development
Review Board finds, concludes, and decides the following:
FINDINGS OF FACT
The applicant is proposing to relocate an entrance door to a spot more easterly
on the south -facing wall. The original door will be reused. The applicant is also
proposing an interior remodel of the space. Finally, the applicant is proposing a
new refrigeration system to be located towards the back side of the property, on
the roof. The proposed refrigeration unit is similar in size and style to that which
already exists on the site.
2. The owner of record of the subject property is Dorset Square Associates.
3. The subject property is located in the Central District 1 Zoning District as well as
the Design District 1 of the City Center Design Review Overlay District.
4. The plans submitted consist of: a three (3) page set of plans, page one (1)
entitled, "Nothing But Noodles Blue Mall- exterior fit up, South Burlington, VT.
The South Burlington Design Review Committee discussed the proposal and has no
concerns regarding the proposal. The Design Review Committee unanimously voted to
recommend approval of the proposal by the Development Review Board.
DECISION /�
Motion by C A, J(-Eu 0 �, seconded by �G�,1 FAA 4 � j , to
approve Design Review Application #DR-07-12 of Steve Guild Design, subject to the
following conditions.
1. All previous approvals and stipulations shall remain in full effect except as
amended herein.
2. This project shall be completed as shown on the plans submitted by the applicant
and on file in the South Burlington Department of Planning and Zoning.
3. The applicant shall obtain a zoning permit within six (6) months pursuant to
Section 17.04 of the Land Development Regulations or this approval is null and
void.
4. The applicant shall obtain a Certificate of Occupancy/Compliance from the
Administrative Officer prior to use and occupancy of the new door.
5. Any change to the site plan shall require approval by the South Burlington
Development Review Board or the South Burlington Administrative Officer.
Mark Behr — yea/nay/abstain not presen
Matthew Birmingham — yea/nay/a not present
John Dinklage — . (nay/abstain/not present _..
Roger Farley — ge/nay/abstain/not
nay/abstain/not present
Eric Knudsen — resent
Peter Plumeau — ea/nay/abstain " of resen
Gayle Quimby—ie`a�nay/abstain/not present
Motion carried by a vote of rt =
Signed this day of.�2008, by
John Dinklage, Chair
Please note: You have the right to appeal this decision to the Vermont Environmental
Court, pursuant to 24 VSA 4471 and VRCP 76 in writing, within 30 days of the date this
decision is issued. The fee is $225.00. If you fail to appeal this decision, your right to
challenge this decision at some future time may be lost because you waited too long.
You will be bound by the decision, pursuant to 24 VSA 4472 (d) (exclusivity of remedy;
finality).