Loading...
HomeMy WebLinkAboutSP-93-0000 - Decision - 0108 Dorset StreetFINDINGS OF FACT & DECISION STATE OF VERMONT COUNTY OF CHITTENDEN J [ CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of J. Robert McCarroll for removal of an existing approximately 500 square foot structural canopy and construction of a 192 square foot porch, 72 square foot open portico and enclosure of 111 square feet of office area, Anchorage Inn, 108 Dorset Street. On the 14th of December, 1993 the South Burlington Planning Commission approved the request of J. Robert McCarroll for site plan review under Section 19.10 of the South Burlington Zoning Regulations based on the following findings: 1. This project consists of the following: 1) removal of a 485 square foot canopy, 2) add 192 square foot porch, 3) add a 72 square foot open portico and 4) enclose 111 square foot area for office use. 2. This property located at 108 Dorset Street lies within the CD 1 District. It is bounded on the north by the 100 Dorset Street commercial complex, on the east by a proposed retail building, on the south by Corporate Way and on the west by Dorset Street. 3. Access/circulation: Access is provided via a 30 foot curb cut on Dorset Street and a 24 foot curb cut on Corporate Way. No access changes proposed. Circulation is adequate. 4. Coverage/setbacks: Building coverage is 18.7% (maximum allowed is 40%). Overall coverage is 61.4% (maximum allowed is 90%). The building does not meet the setback requirements. The building is therefore a noncomplying structure subject to Section 19.002 of the zoning regulations. 5. Parking: This use requires a total of 91 spaces and 96 spaces are being provided including two (2) handicapped spaces. The registration parking spaces should be clearly marked for temporary parking only. Parallel parking spaces should be lengthened to 22 feet. 6. Landscaping: The minimum landscaping requirement, based on building costs, for this project is $690 which is not being met. The site is well landscaped so staff did not recommend any additional landscaping. 7. Traffic: No additional traffic is expected to be generated. 1 8. Sewer: No additional allocation needed. 9. Lighting: Exterior lighting will consist of the following: --- one (1) 16 foot pole with two (2) 500 watt high pressure sodium lamps. --- six (6) 500 watt high pressure sodium lamps attached to the building. --- four (4) 14 foot poles with 250 watt mercury vapor lamps. --- nine (9) 8 inch globes with 100 watt lamps by entry ways. --- nine (9) 13 watt florescent soffit lamps along front of building. --- six (6) twin 13 watt florescent lamps along front of building shining towards trees and building. --- one (1) 13 watt florescent lamp at peak of building illuminating front of center gable. 10. Dumpster: Dumpster should be screened. DECISION & CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the site plan application of J. Robert McCarroll for removal of an existing approximately 500 square foot structural canopy and construction of a 192 square foot porch, 72 square foot open portico and enclosure of 111 square feet of office area, Anchorage Inn, 108 Dorset Street as depicted on a plan entitled "Project Name: Anchorage Inn - 108 Dorset St.", prepared by J. Robert McCarroll, dated November 4, 1993, with the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. The plan shall be revised prior to issuance of a zoning/building permit to show the changes listed below and shall require approval of the City Planner. Three (3) copies of the approved revised plan shall be submitted to the City Planner prior to permit issuance. a) The parallel parking spaces along the front of the building shall be lengthened to 22 feet. b) The plan shall indicate screening around the dumpster area and shall indicate type of screening to be used. c) The landscaping shall accurately show existing landscaping and any new landscaping. 3. All new parking spaces shall be striped. The temporary registration parking shall be noted as such with either pavement markings or signs. 4. This site plan approval shall not be construed as approval to alter a noncomplying structure. The decision of whether or not to approve alteration to a noncomplying structure shall be made by the Administrative Officer in accordance with Section 19.002 of the zoning regulations. 5. The applicant shall obtain a zoning/building permit within six (6) months or this approval is null land void. 6. The applicant shall obtain a Certificate of Occupancy from the Administrative Officer prior to Occupancy of the newly constructed areas. 7. Any changes to the site plan shall require approval by the South Burlington Planning Commission. 8. Any changes to existing exterior lighting or any new lighting shall be downcasting and shielded so as not to cast light beyond the property line. Any change to exterior lighting shall be approved by the City Planner prior to installation. &Zz—ze, �A;," Chairman or Clerk South Burlington Planning Commission T �G Ijafte 3