Loading...
HomeMy WebLinkAboutSD-24-08 - Supplemental - 0850 Hinesburg Road (29) SOUTH BURLINGTON WATER DEPARTMENT SBWD Technical Review Comments: SD-24-08 and MP-24-03, 850 Hinesburg Rd. Date: July 2, 2024 Submitted by Jay Nadeau, SBWD Superintendent The South Burlington Water Department has reviewed the Keene-Prel & Master Cover Letter 8-21-24 and plan sheet C2.2 referenced in the cover letter and have the following comments: 1. The plans show a 1-1/2” water tap on the Hiensburg Rd. water main but also show a fire hydrant and 8”tee and stub. Plans must be corrected to show an 8” water line from Hinesburg Rd. Main material must also be identified. 2. Since each new building will be outfitted with a Type 13D sprinkler system, are the proposed service line sizes large enough to support the sprinkler system? 3. The yard hydrant detail should be removed since yard hydrants are not permitted for this project. The South Burlington water department will have further comments as this project proceeds through the development review process.