May 8, 2024
Ms. Marla Keene, PE
Development Review Planner
City of South Burlington Planning & Zoning
180 Market Street
South Burlington, VT, 05403
Re: WGM Associates
Proposed 7-Lot Subdivision
Preliminary Plan Application (PUD) and Master Plan Application
896-950 Hinesburg Road
Dear Ms. Keene:
Thank you for taking the time to review the status of the application package related the
next stage of Development Review Board review of the proposed 7-Lot subdivision. We
have attempted to summarize the features of this property and the components of the
Preliminary Plan and Master Plan applications.
Application Goals and Components:
1. To create individual lots for each of the thee (3) primary residential structures on
the 10.05-acre property.
a. The Lot configurations have been made less irregular in comparison to the
Sketch Plan review but still has exhibits some bump-outs to reflect the existing
conditions while providing equal acreage to the three family members.
2. To create a 1.0-acre common civic space (Community Garden along the most
easterly portions of the property.
3. To further subdivide (the most northerly) Lot 1 to create three additional
residential lots.
a. One of the three new residential lots (Lot 1B) will be co-located with the
existing commercial use.
i. This differs slightly from the Sketch Plan review which had collocated the
existing House (now shown on Lot 1A) with the commercial use.
Ms. Marla Keene, P.E.
Page 2 of 4
May 8, 2024
b. One of the three lots (Lot 1D) is being depicted with an Accessory Dwelling
Unit.
4. The proposed road will be private with the typology chosen to be the
“Neighborhood Street – Narrow”, to reflect the proposed reduction in impervious
area and limited traffic on this roadway.
a. Consistent with the Sketch Plan guidance the applicant is seeking
permission to construct the road in two-phases with the second phase
extending the road to the southerly property line.
5. The applicant is seeking a determination of Alternate Compliance for the
proposed typical section of this street which diverges from the standard typical
street section found in the newly published Department of Public Works
Standards and Specifications.
a. This is concurrently being forwarded to the City Department of Public Works
to address the durability and suitability of the proposed revisions.
b. Alternate approaches include:
i. Substitution of a crushed stone surface in lieu of a bituminous concrete
wearing surface.
ii. Substitution of a swale in lieu of curbing and enclosed drainage system.
iii. Consolidation of the sidewalk and roadway into one surface as part of a
shared use design for low volume roadways.
c. The proposed use of the Alternate Compliance route is one of the reasons
that a PUD approval is sought for this project.
6. The property lies in the Industrial-Open Space District but with the State’s
adoption of Act 47 in which residential density is increased to 5 units per acre,
the standards of the I-O District are not fitting.
a. The applicant proposes the adoption of generally the R4 Zoning district
standards for this PUD.
7. The recent amendments to the LDRs and recently published Public Works
Standards and Specifications omit the requirement to place street trees. In good
faith the applicant is proposing the inclusion of street trees with this application.
a. The applicant has also developed a tree retention plan in support of
maintaining the existing screening between Hinesburg Road and the existing
commercial use on the property.
Ms. Marla Keene, P.E.
Page 3 of 4
May 8, 2024
8. The Master Plan shows three phases of development with:
a. Phase I with 3 additional Single-Family Home units and one ADU (the current
Preliminary Plan application)
b. Phase II with 3 additional Single-Family home units
c. Phase III with 2 additional Single-Family Home units.
i. The buildable area calculation indicates a maximum density of 41 units.
ii. 11 Units are proposed.
9. Inclusionary Housing requirements outlined Article 18 are not triggered.
10. The property is located in a portion of the City where there are no overlay or
natural resource issues other than the wetland buffer that occupies the far east
side of the property in the north and south corners.
a. The approval calls for the elimination of the most southerly curb cut and the
paving of the apron at the commercial access.
12. The project is intended to be a balanced site except for the import of granular
materials for the construction of the roadway, driveways, walkways and
foundation. The estimated quantity is 420 cubic yards.
13. Water and sewer allocations have been obtained for the Phase I portion of the
project.
We have provided a summary of the submittal requirement required for both a
Preliminary and Master Plan application as outlined in Appendix E of the LDR’s to assist
in the review of the features required to be depicted.
This cover letter provides a brief summary of the documents that have been developed
in support of the demonstration of compliance including:
Article 15A(11) Compliance Narrative
Article 15B Master Plan Compliance Narrative
Master Plan Narrative
Article 15C PUD Compliance Narrative
Article 16 – EPSC Standards
Waiver Request Document
Trip Generation Summaries
Lot Coverage Summary
City Plan Mapping with the Property location shown
11. A permit from the Vermont Agency of Transportation has been acquired which
reflects the proposed project outlined in Preliminary Plan application.
Ms. Marla Keene, P.E.
Page 4 of 4
May 8, 2024
Zoning Mapping with the Property location shown
City Official Map with the Property location shown
This completes our general summary of the proposed project. If you should have
any questions, please feel free to contact me at 864-2323 x310.
Respectfully,
David S. Marshall, P.E.
Project Engineer
Attachments:
Preliminary and Master Plan Application Package
Preliminary Plan Application and Application Fee of $863 ($500 Base Fee +$13 + 7 Lots x $50/Lot)
Master Plan Application and Application Fee of $563 ($550 Base Fee +$13)
Adjoiner List
Appendix E Submittal Requirements Summary
Compliance Summaries for Articles 15A, 15B and 15C
Master Plan Narrative
Waiver Request Document
Trip Generation Summaries
Lot Coverage Summary
City Plan Mapping with the Property location shown
Zoning Mapping with the Property location shown
City Official Map with the Property location shown
Building Likeness Plans and Narrative
VTrans Section 1111 Permit
Stormwater Design
Plans and Mapping
P1 – Plat Plan Dated 02-27-2023 – No Revisions
C1.0 - Existing Conditions Plan Dated 03-01--2024 – No Revisions
C1.1 - Existing Conditions Plan Dated 03-01--2024 – No Revisions
C2.0 - Proposed Conditions Plan Dated 03-01--2024 – No Revisions
L1.0 – Landscaping Plan Dated 03-01--2024 – No Revisions
L1.1 – Landscaping Retention Plan Dated 03-01--2024 – No Revisions
MP1 – Master Plan - Phasing Dated 03-01--2024 – No Revisions
MP1.1 Master Plan - Area Plan Dated 03-01--2024 – No Revisions
C2.1 - Proposed Grading Plan Dated 03-01--2024 – No Revisions
C2.2 - Proposed Utility Plan Dated 03-01--2024 – No Revisions
C3.0 - EPSC Site Plan Dated 03-01--2024 – No Revisions
C3.1 – EPSC Notes and Details Dated 03-01--2024 – No Revisions
C3.2 – EPSC Details Dated 03-01--2024 – No Revisions
C4.0 – Road Profile and Details Dated 03-01--2024 – No Revisions
C4.1 – Sewer Details Dated 03-01--2024 – No Revisions
C4.2 – Water Details Dated 03-01--2024 – No Revisions
C4.3 – Storm Details Dated 03-01--2024 – No Revisions
C4.3 – Gravel Wetland Details Dated 03-01--2024 – No Revisions
SW1 – Stormwater Site Plan Dated 03-01--2024 – No Revisions
C5.0 – 5.5 Specifications Dated 03-01--2024 – No Revisions
cc: CEA File 24110.00
P:\AutoCADD Projects\2024\24110-WGM Associates\3-Permitting\1-Local Applications\2-Preliminary\Keene - Prel & Masterl Cover Letter.rtf