Loading...
HomeMy WebLinkAboutMP-24-03 - Supplemental - 0850 Hinesburg Road (16) CIVIL ENGINEERING ASSOCIATES, INC. 10 Mansfield View Lane Phone: 802-864-2323 South Burlington, VT 05403 Fax: 802-864-2271 E-Mail: dmarshall@cea-vt.com May 8, 2024 Ms. Marla Keene, PE Development Review Planner City of South Burlington Planning & Zoning 180 Market Street South Burlington, VT, 05403 Re: WGM Associates Proposed 7-Lot Subdivision Preliminary Plan Application (PUD) and Master Plan Application 896-950 Hinesburg Road Dear Ms. Keene: Thank you for taking the time to review the status of the application package related the next stage of Development Review Board review of the proposed 7-Lot subdivision. We have attempted to summarize the features of this property and the components of the Preliminary Plan and Master Plan applications. Application Goals and Components: 1. To create individual lots for each of the thee (3) primary residential structures on the 10.05-acre property. a. The Lot configurations have been made less irregular in comparison to the Sketch Plan review but still has exhibits some bump-outs to reflect the existing conditions while providing equal acreage to the three family members. 2. To create a 1.0-acre common civic space (Community Garden along the most easterly portions of the property. 3. To further subdivide (the most northerly) Lot 1 to create three additional residential lots. a. One of the three new residential lots (Lot 1B) will be co-located with the existing commercial use. i. This differs slightly from the Sketch Plan review which had collocated the existing House (now shown on Lot 1A) with the commercial use. Ms. Marla Keene, P.E. Page 2 of 4 May 8, 2024 b. One of the three lots (Lot 1D) is being depicted with an Accessory Dwelling Unit. 4. The proposed road will be private with the typology chosen to be the “Neighborhood Street – Narrow”, to reflect the proposed reduction in impervious area and limited traffic on this roadway. a. Consistent with the Sketch Plan guidance the applicant is seeking permission to construct the road in two-phases with the second phase extending the road to the southerly property line. 5. The applicant is seeking a determination of Alternate Compliance for the proposed typical section of this street which diverges from the standard typical street section found in the newly published Department of Public Works Standards and Specifications. a. This is concurrently being forwarded to the City Department of Public Works to address the durability and suitability of the proposed revisions. b. Alternate approaches include: i. Substitution of a crushed stone surface in lieu of a bituminous concrete wearing surface. ii. Substitution of a swale in lieu of curbing and enclosed drainage system. iii. Consolidation of the sidewalk and roadway into one surface as part of a shared use design for low volume roadways. c. The proposed use of the Alternate Compliance route is one of the reasons that a PUD approval is sought for this project. 6. The property lies in the Industrial-Open Space District but with the State’s adoption of Act 47 in which residential density is increased to 5 units per acre, the standards of the I-O District are not fitting. a. The applicant proposes the adoption of generally the R4 Zoning district standards for this PUD. 7. The recent amendments to the LDRs and recently published Public Works Standards and Specifications omit the requirement to place street trees. In good faith the applicant is proposing the inclusion of street trees with this application. a. The applicant has also developed a tree retention plan in support of maintaining the existing screening between Hinesburg Road and the existing commercial use on the property. Ms. Marla Keene, P.E. Page 3 of 4 May 8, 2024 8. The Master Plan shows three phases of development with: a. Phase I with 3 additional Single-Family Home units and one ADU (the current Preliminary Plan application) b. Phase II with 3 additional Single-Family home units c. Phase III with 2 additional Single-Family Home units. i. The buildable area calculation indicates a maximum density of 41 units. ii. 11 Units are proposed. 9. Inclusionary Housing requirements outlined Article 18 are not triggered. 10. The property is located in a portion of the City where there are no overlay or natural resource issues other than the wetland buffer that occupies the far east side of the property in the north and south corners. a. The approval calls for the elimination of the most southerly curb cut and the paving of the apron at the commercial access. 12. The project is intended to be a balanced site except for the import of granular materials for the construction of the roadway, driveways, walkways and foundation. The estimated quantity is 420 cubic yards. 13. Water and sewer allocations have been obtained for the Phase I portion of the project. We have provided a summary of the submittal requirement required for both a Preliminary and Master Plan application as outlined in Appendix E of the LDR’s to assist in the review of the features required to be depicted. This cover letter provides a brief summary of the documents that have been developed in support of the demonstration of compliance including:  Article 15A(11) Compliance Narrative  Article 15B Master Plan Compliance Narrative  Master Plan Narrative  Article 15C PUD Compliance Narrative  Article 16 – EPSC Standards  Waiver Request Document  Trip Generation Summaries  Lot Coverage Summary  City Plan Mapping with the Property location shown 11. A permit from the Vermont Agency of Transportation has been acquired which reflects the proposed project outlined in Preliminary Plan application. Ms. Marla Keene, P.E. Page 4 of 4 May 8, 2024  Zoning Mapping with the Property location shown  City Official Map with the Property location shown This completes our general summary of the proposed project. If you should have any questions, please feel free to contact me at 864-2323 x310. Respectfully, David S. Marshall, P.E. Project Engineer Attachments: Preliminary and Master Plan Application Package Preliminary Plan Application and Application Fee of $863 ($500 Base Fee +$13 + 7 Lots x $50/Lot) Master Plan Application and Application Fee of $563 ($550 Base Fee +$13) Adjoiner List Appendix E Submittal Requirements Summary Compliance Summaries for Articles 15A, 15B and 15C Master Plan Narrative Waiver Request Document Trip Generation Summaries Lot Coverage Summary City Plan Mapping with the Property location shown Zoning Mapping with the Property location shown City Official Map with the Property location shown Building Likeness Plans and Narrative VTrans Section 1111 Permit Stormwater Design Plans and Mapping P1 – Plat Plan Dated 02-27-2023 – No Revisions C1.0 - Existing Conditions Plan Dated 03-01--2024 – No Revisions C1.1 - Existing Conditions Plan Dated 03-01--2024 – No Revisions C2.0 - Proposed Conditions Plan Dated 03-01--2024 – No Revisions L1.0 – Landscaping Plan Dated 03-01--2024 – No Revisions L1.1 – Landscaping Retention Plan Dated 03-01--2024 – No Revisions MP1 – Master Plan - Phasing Dated 03-01--2024 – No Revisions MP1.1 Master Plan - Area Plan Dated 03-01--2024 – No Revisions C2.1 - Proposed Grading Plan Dated 03-01--2024 – No Revisions C2.2 - Proposed Utility Plan Dated 03-01--2024 – No Revisions C3.0 - EPSC Site Plan Dated 03-01--2024 – No Revisions C3.1 – EPSC Notes and Details Dated 03-01--2024 – No Revisions C3.2 – EPSC Details Dated 03-01--2024 – No Revisions C4.0 – Road Profile and Details Dated 03-01--2024 – No Revisions C4.1 – Sewer Details Dated 03-01--2024 – No Revisions C4.2 – Water Details Dated 03-01--2024 – No Revisions C4.3 – Storm Details Dated 03-01--2024 – No Revisions C4.3 – Gravel Wetland Details Dated 03-01--2024 – No Revisions SW1 – Stormwater Site Plan Dated 03-01--2024 – No Revisions C5.0 – 5.5 Specifications Dated 03-01--2024 – No Revisions cc: CEA File 24110.00 P:\AutoCADD Projects\2024\24110-WGM Associates\3-Permitting\1-Local Applications\2-Preliminary\Keene - Prel & Masterl Cover Letter.rtf 575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburl.com Permit Number MP-______-__________ (office use only) APPLICATION FOR MASTER PLAN REVIEW All information requested on this application must be completed in full. Failure to provide the requested information either on this application form or on the plans will result in your application being deemed incomplete, and a delay in scheduling for the Development Review Board. 1) OWNER OF RECORD (Name as shown on deed, mailing address, and phone) 2) LOCATION OF LAST RECORDED DEED (Book and page #) 3) APPLICANT (Name, mailing address, phone, and e-mail) 4) APPLICANT’S LEGAL INTEREST IN PROPERTY (i.e. fee simple, option, etc.) 5) CONTACT PERSON (Name, mailing address, phone, and e-mail 5a) CONTACT EMAIL ADDRESS: 6) PROJECT STREET ADDRESS: 7) TAX PARCEL ID # (may be obtained online or at the Assessor’s Office): 8) PROJECT DESCRIPTION: a) General project description (explain what you want approval for): b) Existing uses on property (please describe sizes of each separate use, if applicable) 2 Master Plan Application Form. Rev. 01-2020 c) Proposed uses on property (please describe the size or number of units and nature of proposed uses) d) Maximum total number of residential units and/or square footage of uses to be developed, including any existing units and/or uses to remain: e) Maximum proposed building height (if applicable) f) Proposed phasing (please describe the number of total phases and, if applicable at this time, the number of units or square feet of uses to be proposed in the first phase): 9) MASTER PLAN UMBRELLA CRITERIA a) Total acreage of involved property(ies) b) Total acreage of first phase for development (if known at this time) c) Total number of residential units and/or sq ft of all uses requested d) Existing impervious coverage, entire site (sq ft and %): e) Maximum proposed impervious coverage, entire site (sq ft and %): f) Maximum existing building coverage, entire site (sq ft and %) : g) Maximum proposed building coverage, entire site (sq ft and %): h) Estimated number of existing PM peak hour vehicle trip ends: i) Maximum proposed number of PM peak house vehicle trip ends: j) Existing or proposed encumbrances on property (easements, covenants, leases, rights of way, etc.) 3 Master Plan Application Form. Rev. 01-2020 k) Proposed extension, relocation or modification of municipal facilities (sanitary, sewer, water supply, streets, stormwater, etc.) – please describe briefly 10) ESTIMATED FINAL PROJECT COMPLETION YEAR 11) PLANS AND FEE Plans shall be submitted which show the information required by the City’s Land Development Regulations. One digital (PDF format) copy of all application materials listed in LDR Appendix E, with plans provided as individual sheets and named to include sheet number and latest revision date, must be submitted. An application fee shall be paid to the City at the time of submitting the application in accordance with the City’s fee schedule. NOTE: NOTIFICATION of ADJOINING PROPERTY OWNERS: Notification of adjoining property owners, in accordance with 24 V.S.A. §4464(a) and Section 17.06(B) of the South Burlington Land Development Regulations, is the responsibility of the applicant. After deeming an application complete, the Administrative Officer will provide the applicant with a draft meeting agendas or public hearing notice and sample certificate of service. The sworn certificate of service shall be returned to the City prior to the start of any public hearing. I hereby certify that all the information request as part of this application has been submitted and is accurate to the best of my knowledge. _________________________________ ______________________________ Signature of Applicant Signature of Property Owner ____________________________________________________________________________________ Please do not write below this line DATE OF SUBMISSION _________________________________ I have reviewed this application and find it to be: COMPLETE INCOMPLETE ______________________________________________ _________________ Administrative Officer Date The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state permits for this project. Call (802) 879-5676 to speak with the regional Permit Specialist. WGM Associates Adjoiner List 900 Hinesburg Rd – Parcel ID: 0860-00896 February 2024 1/2 Parcel ID # 0860-00800 Owner of Record Waterloo Real Estate Group, LLC Property Location: 800 Hinesburg Rd. 2096 Callaway Dr. The Villages, FL 32162 Parcel ID # 0860-01000 Owner of Record Landrum Property Location: 87 Meadowland Dr. PO Box 130 Burlington, VT 05407 Parcel ID # 0860-01020 Owner of Record Burlington Properties, Ltd. Property Location: 85 Meadowland Dr. 85 Meadowland Dr. So Burlington, VT 05403 Parcel ID # 0860-00835 Owner of Record 835 Hinesburg Rd., LLC Property Location: 835 Hinesburg Rd. 2 Church St. Burlington, VT 05401 Parcel ID # 0860-01037 Owner of Record Calek Properties, LLC Property Location: 1037 Hinesburg Rd. 1 Naylor Rd Essex Jct., VT 05452 Parcel ID # 0860-01045 Owner of Record 4 On the Floor, LLC Property Location: 1045 Hinesburg Rd. 1045 Hinesburg Rd So Burlington, VT 05403 WGM Associates Adjoiner List 900 Hinesburg Rd – Parcel ID: 0860-00896 February 2024 2/2 Parcel ID # 0860-01061 Owner of Record Allen Brook Development, Inc. Property Location: 1061 Hinesburg Rd. 31 Commerce Ave So Burlington, VT 05403 Page 1 of 11 WGM Associates 15.B MASTER PLAN REVIEW 15.B.01 Purpose 15.B.02 Applicability 15.B.03 Master Plan Review Process 15.B.04 Master Plan Components 15.B.05 Review Standards 15.B.06 Master Plan Approval, Effect, Duration, Amendment 15.B.01 Purpose For purposes of these Regulations a master development plan, or “Master Plan,” is a plan for the integrated, long-term development of a tract or parcel of land which prescribes the overall pattern, type, density, form, and timing of development, consistent with applicable regulations, the City’s adopted Capital Improvement Program, and Official Map. Master plan review and approval by the Development Review Board (DRB) is intended to: • Establish the framework for the orderly, well-planned, and integrated development of large tracts of land consisting of one or more contiguous parcels, and for phased development projects that occur over an extended period of time; The Anticipated time period runs from 2025 to 2035. • Identify and address the cumulative and overall impacts of more complex or phased development on the planned pattern and density of development in the vicinity, on resources identified for protection under Article 12, and on existing and planned municipal infrastructure, facilities, and services; The project will create 9 additional residential units. • Ensure that the location, timing, and rate of proposed development does not exceed the ability or capacity of the City to provide municipal infrastructure, facilities, and services in an efficient and cost- effective manner; Absorption is expected to average one residential unit per year. • Serve as the basis for development phasing, by specifying the timing and sequence of development in relation to existing and planned infrastructure capacity, required improvements, and the provision of open space, including civic spaces and other public amenities; The phasing will primarily dictate the extent of the supporting road construction • Define and clarify respective interests, roles, responsibilities, and management structures for project development under the Master Plan, and for long-term management and maintenance; These will all be privately owned and maintained facilities managed by the Homeowners Association. • Provide assurances to the City, affected neighbors, and other interested parties that subsequent development will be consistent with an approved Master Plan; and • Provide assurances to the applicant, investors, and developers that, for the duration of the approved Master Plan, development consistent with the plan may proceed under regulations in effect at the time of master plan approval. WGM Associates Master Plan Compliance Summary April 25, 2024 15.B.02 Applicability A. Required Approval Master plan review and approval by the DRB is required prior to preliminary subdivision review under Article 15.A, or site plan review under Article 14, as applicable, for: (1) Any Major Subdivision involving four (4) or more acres, except for any portion of Transect Zone Subdivision within the City Center Form Based Code District. This property includes 10.05 acres and is therefore subject to Master Plan review. (2) Any land subdivision or site development proposed to occur over two (2) or more phases, or three (3) or more years. This proposed project has three phases that are anticipated to occur over 10 years and therefore is subject to Master plan Review. (3) A Planned Unit Development under Article 15.C unless, at applicant request, Master Plan review is waived by the DRB for a PUD on less than four (4) acres under 15.C.03. Not applicable. (4) The DRB may also require the submission of a Master Plan for any tract or parcel of land where there exists clear potential for future growth and development beyond that presented in an application, as necessary to establish physical and functional connections between areas of proposed and potential future development. Acknowledged. B. Elective Review An applicant may request Master Plan review for any project that involves two (2) or more acres in any zoning district, except within the City Center FBC District. Not applicable 15.B.03 Master Plan Review Process The following procedures apply to any subdivision or development project for which master plan review is requested or required: A. Pre-Application Sketch Plan Review An applicant must submit a Sketch Plan for review and follow the procedures and submittal requirements of Section 15.A.05. If master plan review is requested or required, the applicant must then file an application for master plan approval within six (6) months of the final DRB sketch plan review meeting. The Master Plan must generally conform to the layout shown on the Sketch Plan, and incorporate recommendations made by the DRB. The project did not appear to include a Master Plan Sketch Plan review in addition to the Subdivision Sketch Plan review. With the modest size of the initial proposed subdivision which consumed the entire property, it could be surmised that there was a defacto (informal) Master Plan review completed at that time. B. Master Plan Application The applicant must submit a Master Plan that includes the components described under (D) below; and specific submission requirements as listed in Appendix E, Submission Requirements. The applicant must WGM Associates Master Plan Compliance Summary April 25, 2024 meet with Planning and Zoning Department Staff to review application requirements, relevant codes and standards, and proposed phasing schedules, prior to submitting a formal application. This review occurred on April 29th. C. Combined Review. Master plan review is required prior to or in association with preliminary subdivision review under Section 15.A.06, or site plan review under Article 14 if no subdivision of land is proposed. This Master Plan application is proposed to be undertaken as the same time as the subdivision preliminary plan submission. (1) At applicant request, master plan review, as applicable to the entire tract or parcel to be subdivided or developed, may be combined with preliminary subdivision or site plan review for either the entire subdivision or development, or for a discrete portion or phase of the proposed development. Yes, the applicant is seeking combined review with the Phase I subdivision preliminary plan application. (2) The DRB may simultaneously review the Master Plan with any area proposed for preliminary subdivision or site plan review, but must issue separate findings of fact, and any conditions of approval, specific to each type of review. Acknowledged. Findings of fact pertaining to the Master Plan shall be binding on the City, the DRB, and the applicant for all subsequent preliminary and final subdivision or site plan applications made pursuant to master plan approval. (3) Any land proposed for subdivision or development for which master plan review is secured without preliminary subdivision or site plan review shall require preliminary subdivision or site plan review and approval prior to final review and approval unless the DRB has waived the preliminary subdivision stage of review under the approved Master Plan. Acknowledged. D. Neighborhood Meeting. The applicant for master plan review must conduct at least one (1) neighborhood meeting in the neighborhood in which the project is located, the costs of which are to be borne by the applicant. The purpose of this meeting is to present the pending proposal, provide an opportunity for public questions and comments, and to allow the applicant to identify and address potential neighborhood concerns in advance of the formal hearing process. There are seven (7) property owners within 500 feet of the property boundaries who will be invited to this meeting. (1) The neighborhood meeting must be held within thirty (30) calendar days of filing a complete application, and no less than seven (7) calendar days prior to the first public hearing. This meeting is tentatively scheduled for Wednesday May 15th. (2) The meeting should be held on a weekday evening or Saturday, in an ADA-accessible building open to the public in the City of South Burlington. The meeting will be held at the offices of Civil Engineering Associates located 0.3 miles to the south of the property. WGM Associates Master Plan Compliance Summary April 25, 2024 (3) The meeting should not be held on the same day as a regularly scheduled Development Review Board or City Council meeting. This is being held on a Wednesday. (4) A meeting invitation that includes a brief project description, and the date, time, and location of the neighborhood meeting must be posted on the development site and sent, by regular mail, to all property owners located within 500 feet of the property line, at least seven (7) calendar days prior to the meeting date. A digital copy of the meeting notice must also be provided to the Administrative Officer in advance for posting and forwarding to the City’s notice list. Acknowledged. (5) The meeting must include an overview of the project by the applicant, an opportunity for all members of the public in attendance to offer oral input, and acceptance of any written input. Acknowledged. (6) Following the meeting, the applicant must submit the meeting attendance list and meeting minutes to the Administrative Officer for inclusion in the public hearing record. Acknowledged. E. Public Hearing Following the submission of a complete application, the Administrative Officer must schedule and the DRB must hold a warned public hearing on the master plan application, as required under 24 V.S.A. §§ 4463 and 4464 and Section 17.08(F) of these Regulations. 15.B.04 Master Plan Components A. Submission Requirements. In addition to submission requirements under Appendix E, a Master Plan submitted for review under this Article must include each of the following listed components and information, to be presented in narrative, graphic, and tabular form, unless waived by the DRB as not applicable to a particular subdivision or development. B. Project Description A map, narrative, and accompanying table(s) that describe: Sheet MP-1 with the summary table depicts the graphic features of the Master Plan and a supporting narrative is attached with this application. • The overall vision for and scope of the proposed development; • The land area and properties to be included under each phase of development; • Current property ownership and contact information; • Current zoning district designations; • Proposed Planned Unit Development (PUD) type(s) under Article 15.C, as applicable; • Project consistency with applicable zoning and subdivision regulations; and • Any requested modifications or waivers, as allowed under the Regulations. C. Context Report A map and accompanying narrative that describe the area proposed for subdivision, development, or WGM Associates Master Plan Compliance Summary April 25, 2024 redevelopment, in relation to the existing and planned pattern and type of development in surrounding neighborhood, and to existing and planned City facilities, services, and infrastructure in the vicinity of the project, to include: Sheet MP-1 depicts the graphic features of the Master Plan surrounding area and a supporting Master Plan Narrative covering the context is attached with this application. • Existing parcels, and existing and planned streets and blocks, recreation paths, transit routes, buildings, land uses, parks, civic spaces, and other open spaces and community facilities located within ¼ -mile of project boundaries; • Proposed street, recreation path, transit, infrastructure, and open space connections between existing, planned, and proposed development; • A more detailed Development Context Analysis as required for an Infill or Redevelopment (IRD) PUD under Article 15.C, as applicable; and • A description of how concerns raised in the Neighborhood Meeting will be addressed. D. Existing Conditions Report A Site Conditions Map for the entire tract and accompanying narrative, that depict and describe existing: Sheet C1.0 depicts the graphic features of the Master Plan surrounding area and a supporting Master Plan Narrative covering the existing conditions is attached with this application. • Topographic conditions, including elevation contours, surface waters, wetlands, and other natural features; • Natural Resources under Article 12, or as otherwise regulated by the City; • Existing streets, blocks, and utility corridors, including existing rights-of-way; and • Existing land uses and structures, including any historic sites or structures listed or eligible for listing on the Vermont State Register of Historic Places. Note! The greater the level of detail provided in the Master Plan, the less need for extensive review of subsequent phases of development. Conversely, the more general the details provided, the greater the level of information and review that may be required by the DRB for subsequent phases of development. E. Development Plan One or more maps and an accompanying narrative that depict and describe the overall pattern, type, and density of development proposed for the entire project, and for each phase of development, to include: Sheet MP-1 with the summary table depicts the graphic features of the Master Plan and a supporting Master Plan Narrative is attached with this application. • Natural resource areas identified for protection, consistent with adopted Environmental Protection Standards under Article 12; • Any designated Conservation Area or other open space areas, • Any land area to be set aside for renewable energy production; • The proposed street and block grid within and connecting each phase of development, including the location of major streets by Street Type, and any existing rights-of-way, easements or intersections identified for relocation; • Proposed recreation paths, transit routes, infrastructure, and utility corridors between and serving each phase of development; WGM Associates Master Plan Compliance Summary April 25, 2024 • One or more designated Development Areas, to include land use allocation areas by proposed use type(s), at minimum to include any designated residential areas, nonresidential areas, mixed use areas, civic space areas, and the location of principal or shared parking areas serving the development. • Any proposed transition areas along the project perimeter, in which proposed development will either be integrated with or buffered from adjoining properties and development; • Existing buildings to be incorporated in proposed development or redevelopment; and • Public and private transportation, infrastructure, and utility improvements necessary to accommodate each phase of development, and the entire project at buildout, to include any land, facilities, or improvements proposed for public dedication, consistent with the City’s adopted Official Map. F. Summary Statistics The following project statistics or metrics, presented in an easy to reference tabular format, must be provided for the entire tract or project area, and for each phase of development, unless waived by the DRB as not relevant or applicable to a particular project: Sheet MP-1 includes the summary statistics for this project. • Total tract or parcel area, and the area associated with each phase of development, in acres and square feet; for protection under Article 12, and by resource type (Hazard, Level I, Level II); and the area, in acres, of any designated Conservation Area(s) or lots, as shown on the Master Plan; • Total area, in acres, included in existing and planned street rights-of-way; the number and length in feet of proposed streets by Street Type, and the number of street intersections, as shown on the Master Plan. • Total number of existing and planned blocks; and the block perimeter and average block length for each block, in feet, as shown on the Master Plan. • Total Buildable Area, in acres and square feet, as allocated by land use or building type, within each designated Development Area and block shown on the Master Plan, to exclude existing and planned street rights-of-way, but to include existing and proposed civic space lots and parking lots. • Number of proposed dwelling units by housing or building type within each designated Development Area and block shown on the Master Plan; • Total gross floor area by use or building type for nonresidential and mixed use development within each designated Development Area and block shown on the Master Plan; and • Other statistics or data required by the DRB as necessary to determine conformance with relevant standards under these Regulations. G. Buildout Analysis and Budget Based on the statistics provided under (F) above, the applicant must also provide an analysis for each of the following based on total forecasted demand at buildout, and as allocated for each phase of development, for use in determining the project’s total “Buildout Budget”: Sheet MP-1 includes the build-out budget for this project. • Minimum and maximum acreage allocations by land use or building type, as percentages of the Buildable Area within designated Development Areas; • Gross and net (or effective) development densities by land use or building type; WGM Associates Master Plan Compliance Summary April 25, 2024 • Minimum number or percentage of affordable housing units required within residential and mixed- use development areas, as applicable pursuant to Article 18; • Minimum percentage, and area in square feet, of required civic space(s) within designated Development Areas; • Maximum peak hour trip generation rates, by use type; • Maximum water supply and wastewater system demand, by use type; • Maximum total impervious surface (percentage, total square footage), and volume of stormwater runoff per designated Development Area; and • Other measures or parameters required by the DRB as necessary to identify and limit the forecasted impacts of development on municipal facilities, infrastructure and services, and properties and uses within the vicinity of the project. H. Design Standards The application must include proposed standards, specifications, illustrations, best management practices, or other forms of guidance for the following, consistent with City regulations in effect at the time of Master Plan approval, as applicable to all subsequent development under the Master Plan: • Protections for natural resources defined and regulated under Article 12, consistent with the standards and accepted mitigation measures of Article 12. The only natural resources on the property are the 100-foot wetland buffers that extend into the site from the adjacent property to the east. This buffer will be protected with a split rail fence within the proposed residential lots. • The mix or allocation of land uses, as specified for each phase of development; As outlined in the narrative, the project will include a mix of single family homes, a minimum of one ADU and one commercial use co-existing with a residential home/lot. • Typical street cross-sections by Street Type, as referenced under Article 11.A; This is depicted on Sheet C4.0. • Typical Civic Space and other proposed open space types, as referenced under Article 11.B; The proposed civic space will be a community garden. • Typical block and building lot dimensions and configurations, consistent with applicable subdivision and zoning district regulations, or PUD type, and for designated transition areas as necessary to complement or match the adjoining pattern of development; These dimensions are shown on Sheet MP-1. • Typical building types, as applicable and referenced under Article 11.C, including proposed housing types, and building elevations; Building likeness for the single family homes has been included in the phase I subdivision application and is included here for general sense of the homes for the remaining phases of the project. • Building height and setback standards as applicable by zoning district, PUD or building type; and for WGM Associates Master Plan Compliance Summary April 25, 2024 designated transition areas, as necessary to complement or match the adjoining pattern and form of development; The project proposes to generally adopt the R4 dimensional and height standards (see the Article 15.A compliance Review). • Parking standards and specifications for off-site, on-street, and on-site parking, including any charging stations needed to serve proposed development, consistent with City parking standards under Section 13.01, Article 14, and by Street Type; There will not be any on-street parking and that all of the parking needs will be addressed within each residential parcel. • Setbacks, buffering, screening, or other mitigation measures necessary to separate incompatible land uses, particularly within designated transition areas; The north and south sides of the property are currently outfitted with hedgerow screening. No other buffering is proposed beyond that required with the proposed setbacks. • Overall lighting plan, including typical fixtures, consistent with relevant lighting requirements under Section 13.07 and Appendix D; No street lighting is proposed. • Landscaping and screening specifications, consistent with relevant landscaping standards under Section 13.04; A vegetation retention plan (L1.1) has been prepared which depicts the existing plant materials and those to be retained in support of maintaining the screening of the property. • Specifications for the siting and design of new buildings, and the retrofit of existing buildings, as necessary to meet applicable energy standards under Section 3.18, and to incorporate renewable energy installations; and The energy code requirements have been added to the site plans. The siting of the proposed buildings is limited to those area located within the setbacks. • Any additional architectural or design guidance for each type or phase of development, and for proposed transition areas, that is intended to integrate existing and new forms of development, and to ensure coordinated and cohesive phased development. No additional guidance is proposed. I. Phasing Plan. The application must include a narrative or table and map that clearly identify, describe and depict each phase of development, including properties included, designated development areas by use type, major streets, supporting infrastructure and facility improvements, civic spaces, and other public amenities to be provided prior to or in association with each phase; and a schedule for the timing and sequence of development over the period covered by the Master Plan, consistent with the City’s adopted Capital Improvement Program We could not find any conflicts with the proposed improvements outlined in the CIP and Official Map There are no proposed facilities located near this property.. (1) An applicant for a Conservation PUD (Not applicable) (2) Each proposed phase of development should account for at least 20 percent of the total project area or expected buildout in units/square feet; incorporate one or more distinct areas identified for WGM Associates Master Plan Compliance Summary April 25, 2024 coordinated development and management; and the infrastructure and facilities necessary to support that phase of development. The first phase (which includes the civic space) includes about 4 acres while each of the remaining phases has about 3 acres each or 30% each of the total. (a) In the instance of a Conservation Planned Unit Development Not applicable (3) Any temporary or interim structures or uses (e.g., buildings, parking, construction, or staging areas) intended for conversion or redevelopment in a subsequent phase should also be identified in the phasing plan None are proposed. J. Management Plan A narrative description of the proposed management structure responsible for project development, to include all principals or entities with direct control over and responsibility for the financing, permitting, construction, and completion of development under the Master Plan; The project is proposed by: WGM Associates who is the owner of the property. P O BOX 2352 South Burlington, VT 05403 Managing Partners include: Keith & Nicole Wright Nancy McGovern Sharron Greer and, following project completion, for long-term ownership, management, operation, and maintenance of capital and community assets. The management of the common infrastructure will be outlined in a Homeowners Association Declaration and Covenants The management plan must also clearly identify any streets, infrastructure, facilities, civic or other open spaces proposed for public dedication under each phase of development None are proposed, consistent with the City’s adopted Official Map and Capital Improvement Plan, for consideration under subsequent DRB reviews and conditions of approval or under development agreements to be approved by the City Council. 15.B.05 Review Standards A. Findings For Master Plan approval, the DRB must find that: (1) The Master Plan includes all the components required under 15.B.04 above, in sufficient detail to provide the framework and standards for future development under the plan, unless specifically waived by the DRB as not applicable to the proposed subdivision or development; Acknowledged. (2) The overall type, pattern, and density of development, and allocation of land uses, are consistent with these Regulations and other City regulations in effect at the time of application, including WGM Associates Master Plan Compliance Summary April 25, 2024 relevant subdivision, zoning district or planned unit development standards; The proposed project and build-out scenario proposes a balance between the maximum development density and the character of the surrounding I-O District developed properties. (3) The proposed Development Plan demonstrates the efficient, coordinated, and integrated development and use of land which: (a) Considers existing topography and physical site constraints; The project seeks to balance the agricultural uses on the east side of the site while creating a gridded street layout which enables improved solar access per the LDRs guidelines. (b) Avoids or minimizes and mitigates the impacts of future development on environmental resources identified for protection, as enumerated in Article 12, and as incorporated into the overall design; The only resources are located on the east side of the site which is being protected from residential development by including that in the open/civic space which is to be dedicated as a community garden area. (c) Defines an overall pattern of development, including proposed streets and blocks, that is consistent with the zoning district or proposed type of planned unit development; With the property being located in the I-O District, the guidance on residential property development is tepid at best in light of the new statutory requirements regarding residential density. This master plan seeks to strike a balance between a modest residential density designed to accommodate the Owner’s modest goals and the reality of being surrounded by I-O District commercial land uses. (d) Maintains street, pedestrian, and transit connectivity, and contiguous or accessible open space with the adjoining neighborhood, and within and between each phase of development; The Master plan provides guidance on the phased development of the property in a manner which enables the maximum connectivity possible in the existing development configuration surrounding the property. The modest proposed density provides opportunities for the consolidation of vehicular, pedestrian and bicycle circulation in this area. (e) Avoids, or minimizes and mitigates the adverse impacts of development on adjacent properties and uses, through the designation of transition areas or buffer areas along the project perimeter; and The property is currently isolation from the existing commercial uses (and undeveloped I-O District parcel to the south) through a perimeter hedgerow. Buffering is further promoted in the easterly direction with the inclusion the civic open space Lot. Density along the south side is limited to only one new abutting residential lot. (f) Includes adequate standards specific to each type and phase of development, to include guidance for the functional and aesthetic integration of development with the surrounding neighborhood, and provisions for buffering or screening incompatible land uses. The surrounding neighborhood is comprised of large commercial light industrial buildings and an undeveloped I-O District zoned property to the south. The proposed layout and modest density seeks to recognize those characteristics and avoids a high density clustering surrounded by commercial uses. (4) The Buildout Budget sets reasonable development parameters for the entire project, and as allocated for each phase of development, for reference in subsequent regulatory reviews, as WGM Associates Master Plan Compliance Summary April 25, 2024 necessary to identify and limit the cumulative and overall impacts of project development on City infrastructure, facilities and services. The Master Plan proposes the creation of 8 new residential lots (9 identified units) in addition to the three existing homes. The maximum allowed density is 41 units. (5) Proposed design standards and related guidance are sufficiently detailed to prescribe and direct coordinated development, consistent with the Master Plan and regulations in effect at the time of master plan approval, for the duration of the plan. A modest narrative accompanies the Master Plan sheet which describes the components of each phase. (6) The Phasing Plan and Schedule: (a) are consistent with the City’s adopted Capital Improvement Program; We could not identify any potential projects that would be conflicted with the proposed build-out of the Master Plan. (b) ensure that all phases of development will occur in an orderly fashion; The three (3) proposed phases are modest in nature. and that (c) infrastructure and facility improvements necessary to support each phase of development will be provided concurrently with such development, as may be further ensured through subsequent or separate regulatory review processes and development agreements. The infrastructure requirements are either readily available or will primarily be accommodated in the first phase of the project. (7) The Management Plan: (a) defines a management structure for the duration of the Master Plan that supports long-term project viability through project buildout; The WGM Associates is comprised of the family members who occupy the property and it will be supported with a Homeowners Associates Declaration and Covenants. (b) identifies those principals or entities responsible for securing necessary municipal permits and approvals for development under the Master Plan This information is identified in the Master Plan Narrative document; and (c) clearly identifies proposed ownership and responsibilities for the long-term management, maintenance and operation of capital and community assets, including any proposed dedications of land, facilities and infrastructure to the City There are no proposed dedications to the City and the long term management will be addressed through formalized HOA docs proposed to be submitted with the Final Plan application package. Page 1 of 5 WGM Associates Master Plan Narrative Project Description • The overall vision for and scope of the proposed development; The overall goal is to construct the phase I infrastructure which will enable the future connection of the three (3) Phase II homes into that infrastructure. The building-out of the roadway will be required during this phase which will enable the future phase III residential units. • The land area and properties to be included under each phase of development; 1. Phase I will include Lots 1A-1D, the Lot 4 civic space (Community garden) and the northern 30- foot wide strip of Lot 2 for the road (Maxine’s Way) construction. This totals 4.2 acres. 2. Phase II will include all of Lot 2 which is 3.00 acres (a portion of Lot 2 is double counted with Phase II). 3. Phase III will include all of the lands of Lot 3 (3.02 acres) • Current property ownership and contact information; WGM Associates Keith & Nicole Wright – Managing Partners 896 Hinesburg Road P O BOX 2352 South Burlington, VT 05043 802-922-0748 Keith@kwrightinc.com • Current zoning district designations; Industrial-Open Space District. • Proposed Planned Unit Development (PUD) type(s) under Article 15.C, as applicable; General PUD • Project consistency with applicable zoning and subdivision regulations; The applicant has prepared and attached a conformance Summary for Article 15A. • Any requested modifications or waivers, as allowed under the Regulations. Context Report Narrative that describes the area proposed for subdivision in relation to the existing and planned pattern and type of development in surrounding neighborhood, and to existing and planned City facilities, services, and infrastructure in the vicinity of the project, to include: • Existing Parcels – this 10-acre parcel is surrounded by: on the north by the 17.32 Ac. manufacturing facility on the East by the 31.26 Ac. Lane Press Building on the south by an undeveloped 6.7-acre parcel. And across VT Route 116 to the west by an undeveloped 113 Ac. parcel WGM Associates Master Plan Narrative April 29, 2024 Page 2 of 5 Located to the SW within ¼ mile of the site is an office building and a Dog Daycare. Existing and Planned Streets and Blocks – The west side of the parcel fronts VT Route 116. There are no other existing or planned streets abut just off the SE corner is the shared driveway for Lane Press and Dynapower. Recreation Paths – There are no existing recreation paths in the immediate vicinity except at Meadowland Drive which is 850 feet south of Maxine’s Way and 500 feet south of the south end of the parcel. The Official Map does not show any facilities in this area. The Comprehensive Plan does show a recreation path on the west side of the VT Route 116. Transit Routes – The property is located along the Middlebury Commuter route which has a pick-up drop-off site on Meadowland Drive for those AM commuter heading south. No northbound service in the AM. Northbound from Middlebury drops off at Meadowland Drive and continues into Burlington. Buildings – There are three (3) single family homes located on this parcel and seven (7) accessory structures. Land Uses - Properties to the north and east are developed with large manufacturing buildings. Lands to the south and west are undeveloped. Located to the SW within ¼ mile of the site there are multiple office buildings, medical practices, Dog Daycare and residential homes located within the Rye Meadows project. Parks – The nearest neighborhood park located 2,300 feet from the first new house to the facility within the Rye Meadows subdivision (This neighborhood when permitted was designed to accommodate users located within 1,300 feet of the park). Civic spaces – There are no civic spaces in the vicinity. Other open spaces and community facilities located within ¼ -mile of project boundaries; There are no dedicated open spaces within ¼ mile other than the open space near the Neighborhood park associated with the Rye Meadows project. • Proposed street, recreation path, transit, infrastructure, and open space connections between existing, planned, and proposed development; There are no published plans for proposed development in the area other than this project. The other limited planned infrastructure was previously identified. • A more detailed Development Context Analysis as required for an Infill or Redevelopment (IRD) PUD under Article 15.C, as applicable; Not applicable as this type of PUD is not proposed. WGM Associates Master Plan Narrative April 29, 2024 Page 3 of 5 • A description of how concerns raised in the Neighborhood Meeting will be addressed. There are seven property owners located within 500 feet of the subject property. The applicant will record and summarize any concerns and will provide written responses to how they will be addressed. This will be submitted to the DRB as part of an update to the application package. Existing Conditions Report. Narrative that describes the existing: • Topographic conditions, including elevation contours, surface waters, wetlands, and other natural features; The 10-acre property slopes from west to east with an average grade of 10%. There are no surface waters or wetlands on the property. Wetland buffers extend upgradient from the Lane Press property on the east side of the parcel. • Natural Resources under Article 12, or as otherwise regulated by the City; There are no natural resource areas on the property except for the 100’ wetland buffer extending from wetlands located on the Lane Press property to the east. • Existing streets, blocks, and utility corridors, including existing rights-of-way; The subject parcel fronts VT Route 116 (Hinesburg Road) to the west. The shared drive for Lane Press and Dynapower lies off of the southeast corner of the property. Utility corridors located just off of the property include a water main and gas main on the south side, a water main on the north side, overhead power along the west side, sewer main on the east side and an underground power/communications corridor serving Lane Press and Dynapower located off of the southeast corner of the property. • Existing land uses and structures, including any historic sites or structures listed or eligible for listing on the Vermont State Register of Historic Places. The property has three existing single family homes, all of which are greater than 50 years old. None of them were identified in prior reviews as being eligible for the Vermont Register. There are no facilities that are listed on the Vermont Register of Historic Places in the vicinity except for the Tilley House on the north side of I-89. Development Plan Narrative that describes the overall pattern, type, and density of development proposed for the entire project, and for each phase of development, to include: • Natural resource areas identified for protection – The property does not have any natural resource area other than the wetland buffer that overlaps the parcel from the abutting property to the east. • Any designated Conservation Area or other open space areas – The project proposes a 1-acre civil/open space area on the east side of the parcel which will envelope the majority of the wetland buffer and the water supply for the community garden. WGM Associates Master Plan Narrative April 29, 2024 Page 4 of 5 • Any land area to be set aside for renewable energy production; The northeast corner of the property is currently dedicated for PV Panel solar generation. • The proposed street and block grid – The proposed streets will be “Neighborhood Street – Narrow” in recognition of the low volume and traffic calming benefits while also reducing the amount of impervious area that otherwise would need to be mitigated. The proposed street layout runs in both an east-west orientation at the north end of the property and then in the north-south direction along the east side of the property in support of the creation of a future block with the property to the south. The are no proposed relocations of any existing rights-of-way, easements or intersections. • Proposed recreation paths, transit routes, infrastructure, and utility corridors between and serving each phase of development; The proposed infrastructure to serve Phase I and Phase II is primarily located along the proposed road alignment. Future utility extensions to serve the modest Phase III component will be placed in the Maxine’s Way future Right-of-way or in the case of sewer will cross Lot 4 to gain access to the proposed and existing sewer main that runs along the east side of the property. • Designated Development Areas and Timing – The proposed project includes three phases of development: Phase I – Creates four (4) new residential units on 3 lots with one of the lots including the existing commercial use. This phase creates the civic spaces located on Lot 4 at the east side of the property. Timing – The infrastructure will be completed by 2025. Construction of the homes is anticipated by 2028 Phase II – Utilizes the infrastructure constructed with Phase I to create three (3) new residential lots. This will likely require the extension of Maxine’s Way to the south property line. Timing- The three residential homes would be permitted and constructed between 2027 and 2030. Phase III – Utilizes the extended Maxine’s Way to serve as access for two additional residential lots. Timing – The two (2) additional lots would be permitted and constructed between 2030 and 2035. • Any proposed transition areas - No proposed transition areas are planned as the existing hedge rows provide buffering from the commercial land use to the north and future land use to the south. • Existing buildings to be incorporated in proposed development or redevelopment; The three (3) existing residential homes and the 7 accessory buildings will all be retained. The proposed lot lines have been configured to site those features on their own lots. • Public and private transportation, infrastructure, and utility improvements necessary to accommodate each phase of development, and the entire project at buildout, to include any land, facilities, or improvements proposed for public dedication, consistent with the City’s adopted Official Map. There are no features located on the official Map in this vicinity. All of the roads and utility infrastructure are proposed to be privately owned and maintained with no offer of dedication to the City. In support of allowing the connectivity requirements of the LDRs to be implemented into the WGM Associates Master Plan Narrative April 29, 2024 Page 5 of 5 future completion of the block around this property, a means of enabling third parties to move through the property will be developed. This may simply take the form of a condition of approval or a third- party access easement. Unit Total Unit Total Unit Total Qty Description LUC AM Peak AM Peak PM Peak PM Peak AADT AADT 11 Single Family Homes 210 0.7 7.7 0.94 10.3 9.43 103.7 1 Accessory Dwelling Unit 215 0.48 0.48 0.57 0.6 7.2 7.2 5 Wright Transpor. Trucks Empirical 0 0 0 0.0 2 10.0 5 Wright Trans. Employees Empirical 0 0 0 0.0 2 10.0 8.2 10.9 130.9 WGM Associates PUD Trip Generation Summary 1-May-24 Master Plan Note: Wright Transportation Truck Employees arrive between 6 AM and 7 AM and the Transport trucks leave the site within 15 minutes of each employee arriving. The Transport trucks arrive back at the property betwene 7 and 8 PM and the employees tyoically leave within 15 minutes. Unit Total Unit Total Unit Total Qty Description LUC AM Peak AM Peak PM Peak PM Peak AADT AADT 6 Single Family Homes 210 0.7 4.2 0.94 5.6 9.43 56.6 1 Accessory Dwelling Unit 215 0.48 0.48 0.57 0.6 7.2 7.2 5 Wright Transpor. Trucks Empirical 1 5 1 5.0 2 10.0 5 Wright Trans. Employees Empirical 1 5 1 5.0 2 10.0 14.7 16.2 83.8 WGM Associates PUD Phase I Trip Generation Summary 1-May-24 Note: Wright Transportation Truck Employees arrive between 6 AM and 7 AM and the Transport trucks leave the site within 15 minutes of each employee arriving. The Transport trucks arrive back at the property betwene 7 and 8 PM and the employees tyoically leave within 15 minutes. Unit Total Unit Total Unit Total Qty Description LUC AM Peak AM Peak PM Peak PM Peak AADT AADT 4 Single Family Homes 210 0.7 2.8 0.94 3.8 9.43 37.7 0.5 Lot 2 Split between N & S 210 0.7 0.35 0.94 0.5 9.43 4.7 1 Accessory Dwelling Unit 215 0.48 0.48 0.57 0.6 7.2 7.2 5 Wright Transpor. Trucks Empirical 0 0 0 0.0 2 10.0 5 Wright Trans. Employees Empirical 0 0 0 0.0 2 10.0 3.6 4.8 69.6 WGM Associates PUD Maxine's Way Trip Generation Summary 1-May-24 Note: Wright Transportation Truck Employees arrive between 6 AM and 7 AM and the Transport trucks leave the site within 15 minutes of each employee arriving. The Transport trucks arrive back at the property betwene 7 and 8 PM and the employees tyoically leave within 15 minutes. Unit Total Unit Total Unit Total Qty Description LUC AM Peak AM Peak PM Peak PM Peak AADT AADT 3 Single Family Homes 210 0.7 2.1 0.94 2.8 9.43 28.3 1 Accessory Dwelling Unit 215 0.48 0.48 0.57 0.6 7.2 7.2 2.6 3.4 35.5 WGM Associates PUD Maxine's Way East of Wright Transportation Trip Generation Summary 1-May-24 Note: Wright Transportation Truck Employees arrive between 6 AM and 7 AM and the Transport trucks leave the site within 15 minutes of each employee arriving. The Transport trucks arrive back at the property betwene 7 and 8 PM and the employees tyoically leave within 15 minutes. Unit Total Unit Total Unit Total Qty Description LUC AM Peak AM Peak PM Peak PM Peak AADT AADT 6 Single Family Homes 210 0.7 4.2 0.94 5.6 9.43 56.6 1 Accessory Dwelling Unit 215 0.48 0.48 0.57 0.6 7.2 7.2 4.7 6.2 63.8 WGM Associates PUD Phase 1&2 - Maxine's Way East of Wright Transportation Trip Generation Summary 1-May-24 Note: Wright Transportation Truck Employees arrive between 6 AM and 7 AM and the Transport trucks leave the site within 15 minutes of each employee arriving. The Transport trucks arrive back at the property betwene 7 and 8 PM and the employees tyoically leave within 15 minutes. §¨¦89 §¨¦89 §¨¦189 ¬«116 £¤2 £¤7 Jaycee Park City Center Park Veterans Memorial ParkRed Rocks Park Farrell Park Wheeler Nature Park Szymanski Park Muddy Brook Wetland Reserve Block StandardApplicability Non-Exempt #2 #5 #1 #3 #4 #6 #7 #8 #9 Vermont National Country Club UVM East Woods Natural Area Muddy Brook Park UVM Centennial Woods Natural Area UVM Wheelock Barn UVM Hort. Farm LIME KILN RD SWIFT ST WHITE S T WILLISTON RD AIRPO R T P K W Y CENTRAL AVE P A T C H E N RD SPEAR ST DO R S E T S T K I M B ALL AVEKENNEDYDR A I R P O R T D R C HEE S E F A C T O R Y R D OLD FARM RD Legend Commuter Rail Station Planned Street Right of Way Proposed Road New/Changed Road Network Common Open Land Golf Course Institutional & Agricultural Lands Proposed Park & Open Space Existing Park and Open Space Tax Parcel Boundary-2021 Form Based Code Area (346 acres) Municipal Boundary Recreation Paths Easement Existing Trail Existing Recreation Path Planned Rec Path or Trail The following notations are hereby incorporated into the Official Map: 1. Blue circle #1 refers to the proposed realignment and reconstructionof Airport Parkway to facilitate circulation between Lime Kiln Road and the Airport. 2. Blue circle #2 refers to provision of a northbound on-ramp at Exit 13. 3. Blue circle #3 refers to creation of an appropriate internal roadwaynetwork for development of the O’Brien farm property and provision of between five and ten acres of public parkland within the property or an immediately adjacent area. 4. Blue circle #4 refers to development of Exit 12B at Hinesburg Road anda dead-end at Old Farm Road. 5. Blue circle #5, along with blue circle #4, refers to the development of an appropriate roadway network to service Exit 12B and facilitate connections to Williston Road, Kennedy Drive and Kimball Avenue. 6. Blue circle #6 refers to development of an internal roadway networklinking Queen City Park Road with Fayette Drive through the Martin’sFoods and Southland properties. 7. Blue circle #7 refers to development of an appropriate roadway system between Hinesburg Road and Dorset Street through the Marceau andChittenden properties. 8. Blue circle #8 refers to acquisition of right-of-way and completion of areconfigured intersection at Spear Street and Swift Street. 9. Blue circle #9 refers to proposed recreation paths within 20’ planned City rights of way. 0 0.5 10.25 Miles City of South Burlington Official Map (Citywide) Map Prepared by: M.Needle, CCRPC, using ArcGIS Pro Adopted October 4, 2021 State of Vermont Agency of Transportation Policy, Planning & Intermodal Development Division Policy, Planning and Research Bureau Development Review & Permitting Services Section Barre City Place, 219 North Main Street [phone] 802-636-0037 Barre, VT 05641 [ttd] 800-253-0191 vtrans.vermont.gov April 25, 2024 WGM Associates Nicole Wright via email: Keith@wrightinc.com 850 Hinesburg Road South Burlington, VT 05403 Subject: So. Burlington, VT116, L.S. 0123+55 ~ 0129+36 RT PERMIT #46439, ACCESS FOR SEVEN-LOT SUBDIVISION Dear Nicole, Your application for a permit to work within the State Highway right-of-way to close an existing access, pave an existing access 40' wide per standard B-71B, and install a 1.5” water service connection to serve a seven-lot subdivision on 10.05 acres, at the location indicated, has been processed by this office and is enclosed. Future development of these lots beyond what is shown on the plan requires VTrans approval. Pursuant to Title 19 VSA § 1111(b), authorization for this access is strictly contingent upon its compliance with all local ordinances and regulations relating to highways and land use. Furthermore, under Title 19 VSA § 1111(g), the agency or a municipal designee may suspend this authorization if the access fails to comply with such ordinances and regulations. To enforce a suspension, the agency may also, at its discretion, physically close the access. This permit addresses only access to, work within, and drainage affecting the State highway. It does not address other possible transportation issues, such as access to town highways, use of private roads, and use of railroad crossings. If relevant to the proposed development, such issues must be addressed separately. Please note the following required actions on your part, as detailed in the attached Special Conditions: • Before beginning construction, you are required to contact District Transportation Office #5 at (802) 655-1580 for a preconstruction meeting. • You are required to record the enclosed Notice of Permit Action in the town land records and submit a recorded copy to us by 5/25/2024. • After construction is complete, you are required to contact District 5 again for an inspection / acceptance. Sincerely, Ed Pierce Permit Coordinator (802) 498-8946 Enclosures cc: District Transportation Office #5 Civil Engineering Associates, Inc. DocuSign Envelope ID: C7627C2A-DB8E-40FE-80F6-1F47BCFF446E (802) 655-1580 DECEMBER 1, 2025 CLOSE AN EXISTING ACCESS AND PAVE AN EXISTING ACCESS 40' WIDE PER STANDARD B-71B TO SERVE A SEVEN-LOT SUBDIVISION ON 10.05 ACRES South Burlington VT 116 2.34 ~ 2.45 123+55 RT ~ 129+36 RT 46439 DocuSign Envelope ID: C7627C2A-DB8E-40FE-80F6-1F47BCFF446E 4/25/2024 DocuSign Envelope ID: C7627C2A-DB8E-40FE-80F6-1F47BCFF446E WGM Associates So. Burlington, VT116, L.S. 0123+55 ~ 0129+36 RT April 25, 2024 Page 1 of 5 SPECIAL CONDITIONS This permit is granted subject to the restrictions and conditions on the back of the permit, with particular attention given to the Special Conditions listed below. This permit pertains only to the authority exercised by the Vermont Agency of Transportation (Agency) under Vermont Statutes Annotated, Title 19, Section 1111, and does not relieve the Permit Holder from the requirements of otherwise applicable statutes, rules, regulations or ordinances (e.g., Act 250, zoning, etc.). The Permit Holder shall observe and comply with all Federal and State laws and local bylaws, ordinances, and regulations in any manner affecting the conduct of the work and the action or operation of those engaged in the work, including all orders or decrees as exist at present and those which may be enacted later by bodies or tribunals having jurisdiction or authority over the work, and the Permit Holder shall defend, indemnify, and save harmless the State and all its officers, agents, and employees against any claim or liability arising from or based on the violation of any such law, bylaws, ordinances, regulations, order, or decree, whether by the Permit Holder in person, by an employee of the Permit Holder, by a person or entity hired by the Permit Holder, or by a Subcontractor or supplier. The Permit Holder shall accomplish all work under this permit in accordance with the attached: a. detail D and the profile and notes of standard drawing B-71B. b. “WGM Associates – 7-Lot Subdivision – Proposed Improvements Plan” and “Proposed Utility Plan” by Civil Engineering Associates, Inc., dated March 2024, last revised 4/24/24. Future development of these lots beyond what is shown on the plans requires VTrans approval. A preconstruction meeting to discuss work to be completed must be held prior to the Permit Holder's employees or contractor beginning work. The Permit Holder is required to notify the District Transportation Administrator five (5) working days in advance of such meeting. Please note that the Vermont Agency of Transportation is not a member of Dig Safe. The Permit Holder shall also contact Dan Ertel, State Signal Supervisor, at (802) 343-2188. Mr. Ertel will need to locate and mark all existing buried utility facilities owned by the Agency near the location of the proposed work. Roadway shoulder areas must be maintained free of unnecessary obstructions, including parked vehicles, at all times while work is being performed under this permit. Two-way traffic shall be maintained at all times unless permission is granted from the District Transportation Administrator. Whenever two-way, one-lane controlled traffic is authorized to be maintained by the Applicant’s Contractor, the traveling public shall not be delayed more than 10 minutes. All grading within the State Highway right-of-way associated with the proposed construction shall be subject to inspection and approval by the District Transportation Administrator or his or her staff. The Permit Holder shall be responsible for ensuring that all grading work in or on the State Highway right-of-way complies with applicable statutes, rules, regulations or ordinances. DocuSign Envelope ID: C7627C2A-DB8E-40FE-80F6-1F47BCFF446E WGM Associates So. Burlington, VT116, L.S. 0123+55 ~ 0129+36 RT April 25, 2024 Page 2 of 5 In areas to be grass covered, the Permit Holder shall restore turf by preparing the area and applying the necessary topsoil, limestone, fertilizer, seed, and mulch, all to the satisfaction of the District Transportation Administrator. The Permit Holder shall be responsible for ensuring that all turf restoration work in or on the State Highway right-of-way is in compliance with applicable statutes, rules, regulations or ordinances. The placement, size, shape, and color of all pavement markings must be in accordance with the most recent editions of the MUTCD (Manual on Uniform Traffic Control Devices) and Vermont standards. All existing pavement markings that become disturbed or overlaid with pavement shall be replaced by the Permit Holder with “in kind” (durable or paint) markings to the satisfaction of the District Transportation Administrator. The Permit Holder shall bear all costs associated with this work. In the event that area lighting proves to be a hazard to the traveling public, the Permit Holder will be ordered to remove or modify it at his or her expense to the satisfaction of the District Transportation Administrator. Upon completion of the work, the Permit Holder shall be responsible to schedule and hold a final inspection. The Permit Holder is required to notify the District Transportation Administrator five (5) working days in advance of such inspection. This permit does not become effective until the Permit Holder records, in the office of the appropriate municipal clerk, the attached “Notice of Permit Action”. The Permit Holder, and their assigns and successors in interest, are obligated by this permit to complete, operate and maintain the access(es) in accordance with the Special Conditions. The Permit Holder shall file a municipal clerk certified copy of the recorded “Notice of Permit Action” within one (1) month of the permit issuance date in the Office of the Development Review and Permitting Services Section. The conditions of this permit and the land uses permitted herein in using the State highway access shall run with the land and are binding upon and enforceable against the Applicant and their successors and assigns. No change shall be made to the design, operation or use of the approved access(es) without a permit amendment issued by the Agency of Transportation or a jurisdictional opinion from the Development Review and Permitting Services Section that a permit amendment is not required. The access must be constructed in such a manner as to prevent water from flowing onto the State Highway. If the access is not constructed satisfactorily, the District Transportation Administrator can order reconstruction of the access at the Permit Holder’s expense. This access will serve as the only access to this property and to any future subdivisions of this property unless approved otherwise by the Agency. The Permit Holder is required to allow a connection and to grant an associated right to pass between the access and adjoining properties (in the future) that will result in a combination of accesses to serve more than one property or lot. By issuance of this permit, the Agency revokes all previous permits for access to this property. DocuSign Envelope ID: C7627C2A-DB8E-40FE-80F6-1F47BCFF446E WGM Associates So. Burlington, VT116, L.S. 0123+55 ~ 0129+36 RT April 25, 2024 Page 3 of 5 In the event traffic from this project increases to the point where traffic signals, additional lanes for turning or any other modifications are necessary, the Permit Holder shall bear the expense of such improvements or facilities. The Agency may require the Permit Holder to update or provide a traffic study to determine if additional modifications are necessary. The Permit Holder is responsible for access maintenance (beyond the edge of paved shoulder). “Access maintenance” will include, but not be limited to, the surface of the access, the replacement and maintenance of the culvert, as necessary, the trimming of vegetation, and the removal of snow banks to provide corner sight distance. In conformance with Vermont Statutes Annotated, Title 19, Section 1111(f), the Agency may eliminate this access in the future where development has burdened the highway system to such an extent that a frontage road or other access improvements (which may serve more than one property or lot) must be constructed to alleviate this burden. The Permit Holder shall bear the expense of the frontage road or other access improvements. The Agency shall determine the need of a frontage road or other improvements based upon and justified by standard Agency procedures. The Permit Holder shall pave the access as shown on the plan. In the event of the Permit Holder’s failure to complete all the work, approved under this permit, by the “work completion date,” the Agency, in addition to any other enforcement powers that may be provided for by law, may suspend this permit until compliance is obtained. If there is continued use or activity after suspension, the Agency may physically close the driveway or access point if, in the Agency’s opinion, safety of highways users is or may be affected. The Permit Holder shall verify the appropriate safety measures needed, prior to construction, so proper devices and/or personnel are available when and as needed. Traffic control devices, shall be in conformance with the MUTCD (Manual on Uniform Traffic Control Devices), Agency standards and any additional traffic control deemed necessary by the District Transportation Administrator. The Permit Holder’s failure to utilize proper measures shall be considered sufficient grounds for the District Transportation Administrator to order cessation of the work immediately. The Permit Holder will perform construction in such a way as to minimize conflicts with normal highway traffic. When two-way traffic cannot be maintained, the Permit Holder shall provide a sign package that conforms to the MUTCD (Manual on Uniform Traffic Control Devices) or Agency standards, as well as trained Flaggers. The District Transportation Administrator may require a similar sign package with trained Flaggers whenever it is deemed necessary for the protection of the traveling public. In addition, the District Transportation Administrator may require the presence of Uniform Traffic Officers (UTOs); moreover, the presence of UTOs shall not excuse the Permit Holder from its obligation to provide the sign package and Flaggers. When traffic control becomes so complex that the traffic control cannot be accomplished using Agency standards, the Permit Holder must submit a traffic control plan to the Agency's Permitting Services office for Agency approval prior to beginning work. The Permit Holder shall ensure that all workers exposed to the risks of moving highway traffic and/or construction equipment wear high-visibility safety apparel meeting the requirements of ISEA DocuSign Envelope ID: C7627C2A-DB8E-40FE-80F6-1F47BCFF446E WGM Associates So. Burlington, VT116, L.S. 0123+55 ~ 0129+36 RT April 25, 2024 Page 4 of 5 (International Safety Equipment Association) “American National Standards for High-Visibility Safety Apparel,” and labeled as ANSI (American National Standards Institute) 107-2004, or latest revisions, for Performance Class 2 or 3 requirements. A competent person - one designated by the Permit Holder’s Contractor to be responsible for worker safety within the activity area of the State highway right-of-way -shall select the appropriate class of garment. The Engineer may suspend this permit until compliance is obtained. Independence; Liability: The Permit Holder will act in an independent capacity and not as officers or employees of the State. The Permit Holder shall defend the State and its officers and employees against all claims or suits arising in whole or in part from any act or omission of the Permit Holder or of any agent of the Permit Holder. The State shall notify the Permit Holder in the event of any such claim or suit, and the Permit Holder shall immediately retain counsel and otherwise provide a complete defense against the entire claim or suit. After a final judgment or settlement, the Permit Holder may request recoupment of specific defense costs and may file suit in the Washington Superior Court requesting recoupment. The Permit Holder shall be entitled to recoup costs only upon a showing that such costs were entirely unrelated to the defense of any claim arising from an act or omission of the Permit Holder. The Permit Holder shall indemnify the State and its officers and employees in the event that the State, its officers or employees become legally obligated to pay any damages or losses arising from any act or omission of the Permit Holder. Insurance: Before beginning any work under this Permit the Permit Holder must provide certificates of insurance to show that the following minimum coverages are in effect. It is the responsibility of the Permit Holder to maintain current certificates of insurance on file with the State for the duration of work under the Permit. No warranty is made that the coverages and limits listed herein are adequate to cover and protect the interests of the Permit Holder for the Permit Holder’s operations. These are solely minimums that have been established to protect the interests of the State. Workers’ Compensation: With respect to all operations performed under the Permit, the Permit Holder shall carry workers’ compensation insurance in accordance with the laws of the State of Vermont. General Liability and Property Damage: With respect to all operations performed under the Permit, the Permit Holder shall carry general liability insurance having all major divisions of coverage including, but not limited to: Premises - Operations Products and Completed Operations Personal Injury Liability Contractual Liability The policy shall be on an occurrence form and limits shall not be less than: $2,000,000 Per Occurrence DocuSign Envelope ID: C7627C2A-DB8E-40FE-80F6-1F47BCFF446E WGM Associates So. Burlington, VT116, L.S. 0123+55 ~ 0129+36 RT April 25, 2024 Page 5 of 5 $2,000,000 General Aggregate $2,000,000 Products/Completed Operations Aggregate $ 50,000 Fire/Legal Liability Permit Holder shall name the State of Vermont and its officers and employees as additional insureds for liability arising out of this Permit. Automotive Liability: The Permit Holder shall carry automotive liability insurance covering all motor vehicles, including hired and non-owned coverage, used in connection with the Permit. Limits of coverage shall not be less than: $1,000,000 combined single limit. Permit Holder shall name the State of Vermont and its officers and employees as additional insureds for liability arising out of this Permit. DocuSign Envelope ID: C7627C2A-DB8E-40FE-80F6-1F47BCFF446E VERMONT AGENCY OF TRANSPORTATION NOTICE OF PERMIT ACTION Grantor (Owner/Applicant): WGM ASSOCIATES Address: Street: 850 Hinesburg Road City/State/ZIP: SOUTH BURLINGTON,VT 05403 Location of Work: Location Start Town: So. Burlington Route: VT116 Log Station/MM: 0123+55 ~ 0129+36 / 2.34 + 2.45 Location End Town: Route: Log Station/MM: Property Deed Reference: Book: 675 Page: 550 Additional Book: Additional Page: Permit ID #: 46439 Description of Work: CLOSE AN EXISTING ACCESS, PAVE AN EXISTING ACCESS 40' WIDE PER STANDARD B-71B AND INSTALL A 1.5” WATER SERVICE CONNECTION TO SERVE A SEVEN-LOT SUBDIVISION ON 10.05 ACRES [X] Issued Permit [ ] Notice of Violation [ ] Suspension of Permit [ ] Withdrawn Action Date: April 25, 2024 Signature:___________________ Authorized Representative for the Secretary of Transportation Location of Record: Vermont Agency of Transportation Development Review & Permitting Services Section Barre City Place, 219 North Main Street Barre, Vermont 05641 Town/City of Clerk's Office Received at a.m./p.m. and recorded in Book on Page ______ of land records. ______________________________ Attest: _____________________________________ Assistant Town/City Clerk DocuSign Envelope ID: C7627C2A-DB8E-40FE-80F6-1F47BCFF446E SHED POOL HOUSE (#950) GARAGE HEDGE ROW A/C A/C GARAGE SHED HOUSE (#900) HOUSE (#850) SHED SILO HEDGE ROW EXIST. SOLAR PA N E L S HE D G E R O W 725.79' N 83°09'1 5 " E 59 8 . 9 4 ' S 0 4 ° 5 0 ' 1 1 " E S 83°07'45" W 727.48' N 0 5 ° 5 3 ' 2 1 " W 4 2 0 . 7 2 ' 17 8 . 9 1 ' N 0 1 ° 4 9 ' 1 2 " W SHED A/C W ? DE C K PRESUMED WETLAND (AS SHOWN ON PREVIOUS LANE PRESS PLANS) HI N E S B U R G R O A D S S 100 ' WET L A N D BUF F E R 100' WETLAND BUFFER S MAXINE'S WAY CLOSE-OFF EXIST. CURB CUT WITH THE REMOVAL OF THE DRIVEWAY GRAVEL AND REPLACEMENT WITH LAWN AREA. SAWCUT AND REMOVE EXISTING PAVED APRON. CONVERT OVER-WIDE AREA BY REMOVING DRIVEWAY GRAVEL AND REPLACEMENT WITH LAWN AREA 40 ' M A X . MINIMUM APRON PAVING LIMITS PROPOSED OPEN SPACE / AMENITY AREA PROPOSED STORMWATER MANAGEMENT FACILITY STONE LINED SWALE (TYP.) PROPOSED 20' WIDE NEIGHBORHOOD STREET - NARROW (PRIVATE STREET) (SEE DETAIL ON SHT. C4.0) FUTURE CONNECTOR ROAD TO BE CONSTRUCTED UPON FUTURE DEVELOPMENT OF LOTS 2 AND 3. EASEMENT LIMITS ARE SHOWN ON SURVEY PLAT SHT. P1 LOT 1B ACCESSORY STRUCTURE BUILDING ENVELOPE PROPOSED BUILDING ENVELOPE (TYP.) CONCEPTUAL SINGLE FAMILY HOME LOCATION (TYP.) S WETLAND BUFFER IN OPEN SPACE (14,839 S.F.) WETLAND BUFFER IN OPEN SPACE (8,660 S.F.) R1 5 4 . 0 ' R1 5 4 . 0 ' LOT 1A 0.26 ACRES LOT 1B 1.52 ACRES LOT 1C 0.52 ACRES LOT 1D 0.73 ACRES LOT 4 1.00 ACRES LOT 2 3.00 ACRES LOT 3 3.02 ACRES CONCEPTUAL SINGLE 2-BR ACCESSORY DWELLING UNIT (ADU) LEGEND W 4/24/24 DSM REVISED PER VTRANS REVIEW FM G ST S T W E PROPOSED CONTOUR100 PROPOSED CURB PROPOSED FENCE PROPOSED GRAVEL PROPOSED PAVEMENT PROPOSED GUARD RAIL PROPOSED SWALE PROPOSED ELECTRIC PROPOSED FORCEMAIN PROPOSED GAS PROPOSED STORM PROPOSED GRAVITY SEWER PROPOSED TELEPHONE PROPOSED WATER PROPOSED WELL S PROPOSED SEWER MANHOLE D PROPOSED STORM MANHOLE PROPOSED CATCH BASIN REBAR SET CONCRETE MONUMENT SET PROPOSED HYDRANT PROPOSED SHUT OFF PROPOSED UTILITY POLE PROPOSED LIGHT POLE PROPOSED EDGE OF BRUSH/WOODS PROPOSED SETBACK LINE PROPOSED PROPERTY LINE 1. UTILITIES SHOWN DO NOT PURPORT TO CONSTITUTE OR REPRESENT ALL UTILITIES LOCATED UPON OR ADJACENT TO THE SURVEYED PREMISES. EXISTING UTILITY LOCATIONS ARE APPROXIMATE ONLY. THE CONTRACTOR SHALL FIELD VERIFY ALL UTILITY CONFLICTS. ALL DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER. THE CONTRACTOR SHALL CONTACT DIG SAFE (888-344-7233) PRIOR TO ANY CONSTRUCTION. IN ADDITION, THE CONTRACTOR SHALL HIRE A PRIVATE UTILITY LOCATING FIRM TO LOCATE OWNER OWNED UNDERGROUND UTILITIES PRIOR TO START OF ANY EXCAVATION. 2. ALL EXISTING UTILITIES NOT INCORPORATED INTO THE FINAL DESIGN SHALL BE REMOVED OR ABANDONED AS INDICATED ON THE PLANS OR DIRECTED BY THE ENGINEER. 3. THE CONTRACTOR SHALL MAINTAIN AS-BUILT PLANS (WITH TIES) FOR ALL UNDERGROUND UTILITIES. THOSE PLANS SHALL BE SUBMITTED TO THE OWNER AT THE COMPLETION OF THE PROJECT. 4. THE CONTRACTOR SHALL REPAIR/RESTORE ALL DISTURBED AREAS (ON OR OFF THE SITE) AS A DIRECT OR INDIRECT RESULT OF THE CONSTRUCTION. 5. ALL GRASSED AREAS SHALL BE MAINTAINED UNTIL FULL VEGETATION IS ESTABLISHED. 6. MAINTAIN ALL TREES OUTSIDE OF CONSTRUCTION LIMITS. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK NECESSARY FOR COMPLETE AND OPERABLE FACILITIES AND UTILITIES. 8. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ALL ITEMS AND MATERIALS INCORPORATED INTO THE SITE WORK. WORK SHALL NOT BEGIN ON ANY ITEM UNTIL SHOP DRAWING APPROVAL IS GRANTED. 9. IN ADDITION TO THE REQUIREMENTS SET IN THESE PLANS AND SPECIFICATIONS, THE CONTRACTOR SHALL COMPLETE THE WORK IN ACCORDANCE WITH ALL PERMIT CONDITIONS AND ANY LOCAL PUBLIC WORKS STANDARDS. 10. THE TOLERANCE FOR FINISH GRADES FOR ALL PAVEMENT, WALKWAYS AND LAWN AREAS SHALL BE 0.1 FEET. UNLESS NOTED OTHERWISE, ALL EXISTING MANHOLE COVERS, VALVES, CURB STOPS AND OTHER ITEMS TO REMAIN SHALL BE ADJUSTED TO THE NEW FINISH GRADE. 11. ANY DEWATERING NECESSARY FOR THE COMPLETION OF THE SITEWORK SHALL BE CONSIDERED AS PART OF THE CONTRACT AND SHALL BE THE CONTRACTOR'S RESPONSIBILITY. 12. THE CONTRACTOR SHALL COORDINATE ALL WORK WITHIN STATE HIGHWAY VT116 R.O.W. WITH VTRANS AUTHORITIES. 13. THE CONTRACTOR SHALL INSTALL THE ELECTRICAL, CABLE AND TELEPHONE SERVICES IN ACCORDANCE WITH THE UTILITY COMPANIES REQUIREMENTS. 14. EXISTING PAVEMENT AND TREE STUMPS TO BE REMOVED SHALL BE DISPOSED OF AT AN APPROVED OFF-SITE LOCATION. ALL PAVEMENT CUTS SHALL BE MADE WITH A PAVEMENT SAW. 15. IF THERE ARE ANY CONFLICTS OR INCONSISTENCIES WITH THE PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALL CONTACT THE ENGINEER FOR VERIFICATION BEFORE WORK CONTINUES ON THE ITEM IN QUESTION. 16. PROPERTY LINE INFORMATION IS APPROXIMATE AND BASED ON EXISTING TAX MAP INFORMATION. THIS PLAN IS NOT A BOUNDARY SURVEY AND IS NOT INTENDED TO BE USED AS ONE. 17. IF THE BUILDING IS TO BE SPRINKLERED, BACKFLOW PREVENTION SHALL BE PROVIDED IN ACCORDANCE WITH AWWA M14. THE SITE CONTRACTOR SHALL CONSTRUCT THE WATER LINE TO TWO FEET ABOVE THE FINISHED FLOOR. SEE MECHANICAL PLANS FOR RISER DETAIL. 18. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING TESTING AND INSPECTION SERVICES INDICATED IN THE CONTRACT DOCUMENTS, TYPICAL FOR CONCRETE AND SOIL TESTING. 19. THE CONTRACTOR IS RESPONSIBLE FOR ALL LAYOUT AND FIELD ENGINEERING REQUIRED FOR COMPLETION OF THE PROJECT. CIVIL ENGINEERING ASSOCIATES WILL PROVIDE AN AUTOCAD FILE WHERE APPLICABLE. 20. THE OWNER SHALL BE RESPONSIBLE FOR THE INSTALLATION OF ANY AND ALL SAFETY FENCES OR RAILS ABOVE EXISTING AND PROPOSED WALLS. THE OWNER SHALL VERIFY LOCAL, STATE AND INSURANCE REQUIREMENT GUIDELINES FOR THE INSTALLATION AND VERIFY ANY AND ALL PERMITTING REQUIREMENTS. GENERAL NOTES PROPOSED GUY WIRE/POLE PROPOSED SIGN PROPOSED YARD DRAIN OE PROPOSED OVERHEAD ELECTRIC UE PROPOSED UNDERGROUND ELECTRIC COM PROPOSED COMMUNICATIONS UNMARKED ANGLE POINT PROPOSED EASEMENT LINE DSM DSM SAL 1" = 40' 24110 C2.0 MAR., 2024 LOCATION MAP 1" = 2000' WGM ASSOCIATES c/o KEITH WRIGHT P.O. BOX 2352 SOUTH BURLINGTON VERMONT 05407 7-LOT SUBDIVISION PROPOSED IMPROVEMENTS PLAN A C CIVIL ENGINEERING ASSOCIATES, INC. E 10 MANSFIELD VIEW LANE, SOUTH BURLINGTON, VT 05403 P: 802-864-2323 FAX: 802-864-2271 web: www.cea-vt.com 850, 900 & 950 HINESBURG RD. SOUTH BURLINGTON, VT 116 89PROJECT LOCATION NOTE: NO SHRUBBERY SHALL BE ERECTED, MAINTAINED, OR PLANTED ON ANY LOT THAT OBSTRUCTS OF INTERFERES WITH TRAFFIC VISIBILITY, IN THE CASE OF CORNER LOTS, SUCH RESTRICTED AREA SHALL BE THE TRIANGULAR AREA FORMED BY THE LOT LINES ALONG THE STREETS AND A LINE CONNECTING THEM AT POINTS TWENTY-FIVE (25) FEET FROM THE INTERSECTION. P:\ A u t o C A D D P r o j e c t s \ 2 0 2 4 \ 2 4 1 1 0 - W G M A s s o c i a t e s \ 1 - C A D D F i l e s \ d w g \ 2 4 1 1 0 - S i t e . d w g , 4 / 2 4 / 2 0 2 4 7 : 1 5 : 3 9 A M DocuSign Envelope ID: C7627C2A-DB8E-40FE-80F6-1F47BCFF446E 3 8 0 SHED POOL W W W W W W W W W ELEC. METER ON BOARD HOUSE (#950) S ELEC. METER GAS REGULATOR PROPANE TANKS GARAGE COMM BOX HEDGE ROW APPROX. LOCATION OF EXIST. SEPTIC SYSTEM APPROX. LOCATION OF EXIST. SEPTIC SYSTEM APPROX. LOCATION OF EXIST. SEPTIC SYSTEM A/C ELEC. METER A/C PROPANE TANK GARAGE SHED HOUSE (#900) HOUSE (#850) SHED SILO ELEC. METER ELEC. METER PROPANE TANK HEDGE ROW EXIST. SOLAR PA N E L S HE D G E R O W EL. EASE. 10' FROM PL PROBABLE GAS & WATER EASEMENTS 40' FROM PL 20' SEWER EASEMENT 725.79' N 83°09'1 5 " E 59 8 . 9 4 ' S 0 4 ° 5 0 ' 1 1 " E S 83°07'45" W 727.48' N 0 5 ° 5 3 ' 2 1 " W 4 2 0 . 7 2 ' 17 8 . 9 1 ' N 0 1 ° 4 9 ' 1 2 " W OIL FILL GAS REGULATORGAS REGULATOR OIL FILL ELEC. METER ELEC. PANEL UTIL. CABINET SHED A/C FUEL PUMPS (3) OIL FILL GAS VALVE WATER VALVE BLUE PAINT COMM. VAULT WATER VALVE WATER PIPELINE MARKER MANHOLE (BLUE) BLUE PAINT W ? DE C K G G G G G G G G G G G G COMM. VAULT S S S S S S S S S S S S W W W W W W W W W W W W S S S 385 38 5 38 5 38 5 390 39 0 39 0 39 0 39 5 39 5 39 5 39 5 380 38 0 38 0 41 5 41 5 41 5 4 0 0 40 0 40 0 40 0 42 0 420 420 42 0 42 0 41 0 4 1 0 41 0 41 0 4 0 5 40 5 40 5 37 5 3 7 5 375 37 5 37 5 370 37 0 37 0 37 0 365 365 PRESUMED WETLAND (AS SHOWN ON PREVIOUS LANE PRESS PLANS) SS SS S S HI N E S B U R G R O A D O E O E OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE GAS REGULATOR S S S S S S W S S S C.O.C.O. C.O. C.O. C.O. SMH #3 RIM 411.4 INV. IN. 403.9 INV. IN. 403.9 INV. OUT 403.7 0+00 1+00 2+00 3+00 4+00 5+00 6+00 6+59.96 EX. SMH RIM 372.4 INV. 364.0 (8" NW) INV. 363.9 (8" N) INV. 363.8 (8" S)4" SDR 35 PVC (MIN. 2% SLOPE) 4" SDR 35 PVC (MIN. 2% SLOPE) C.O. C.O. C.O. C.O. 34" TYPE 'K' COPPER (TYP.) 4" SDR 35 PVC (MIN. 2% SLOPE) (TYP.) 100 ' WET L A N D BUF F E R 100' WETLAND BUFFER 112" TYPE 'K' CO P P E R 40 0 40 5410 39 5 39 0 38 5 38 0 EX. SMH RIM 370.2± INV. 358.4 INV. 358.3 EX. SMH RIM 373.2± INV. 37 9 S S C.O. C.O. INV. 405.9 2" RIGID INSULATION BOARD INV. 418.0 INV. 416.6 INV. 408.0 INV. 407.6 2" RIGID INSULATION BOARD C.O.C.O.S 37 7 37 6 37 4 37 3 37 5 37 6 MAINTAIN 18" VERTICAL SEPARATION AT ALL WATER/SEWER CROSSINGS (TYP.) INV. 401.0 INV. 389.0 INV. 380.0 F.F. 408.0 F.F. 396.0 F.F. 384.0 S 2" RIGID INSULATION BOARD 71 L.F. - 8 " S D R 35 PVC ( S = 5 . 5 % ) 37 8 37 8 37 8 37 7 37 7 S S SMH #1 RIM 377.2 INV. IN. 368.0 INV. OUT 367.9 ALL NEW BUILDINGS SHALL BE OUTFITTED WITH TYPE 13D SPRINKLER SYSTEMS 112" WATER SERVICE CONNECTION SMH #2 RIM 392.5 INV. IN. 385.1 INV. OUT 385.0 SMH #2 RIM 380.0 INV. IN. 373.3 INV. OUT 373.2 172 L.F. - 8" SD R 3 5 P V C ( S = 6 . 8 % ) 186 L.F. - 8" SD R 3 5 P V C ( S = 1 0 . 0 % ) VALVE & BLOWOFF 9 6 L . F . - 8 " S D R 35 P V C ( S = 5 . 4 % ) W W W W W W W W W W W W W W W W W C.O. INV. 376.0 F.F. 380.0 S S S S VALVE TO BE LOCATED OUTSIDE OF R.O.W. DSM DSM SAL 1" = 40' 24110 C2.2 MAR., 2024 LOCATION MAP 1" = 2000' WGM ASSOCIATES c/o KEITH WRIGHT P.O. BOX 2352 SOUTH BURLINGTON VERMONT 05407 7-LOT SUBDIVISION PROPOSED UTILITY PLAN A C CIVIL ENGINEERING ASSOCIATES, INC. E 10 MANSFIELD VIEW LANE, SOUTH BURLINGTON, VT 05403 P: 802-864-2323 FAX: 802-864-2271 web: www.cea-vt.com 850, 900 & 950 HINESBURG RD. SOUTH BURLINGTON, VT 116 89PROJECT LOCATION P:\ A u t o C A D D P r o j e c t s \ 2 0 2 4 \ 2 4 1 1 0 - W G M A s s o c i a t e s \ 1 - C A D D F i l e s \ d w g \ 2 4 1 1 0 - S i t e . d w g , 4 / 2 5 / 2 0 2 4 7 : 0 4 : 4 3 A M DocuSign Envelope ID: C7627C2A-DB8E-40FE-80F6-1F47BCFF446E Horizontal Scale = 1 :40 Vertical Scale = 1 :8 +50 1+00 +50 2+00 +50 3+00 +50 4+00 +50 5+00 +50 6+00 +50 368 376 384 392 400 408 416 424 432 368 376 384 392 400 408 416 424 432 42 2 . 0 42 0 . 9 41 8 . 0 41 6 . 5 41 5 . 1 41 2 . 9 40 7 . 0 40 7 . 9 6 40 1 . 2 40 2 . 9 6 39 5 . 7 39 7 . 9 6 39 0 . 5 39 2 . 9 6 38 6 . 1 38 7 . 9 7 38 2 . 7 38 4 . 4 7 38 0 . 3 38 1 . 9 9 37 8 . 5 38 0 . 1 0 10. 0 0 % 4.96% PV C S T A . 4 + 9 5 . 0 0 PVI STA. 5+20.00 PV T S T A . 5 + 4 5 . 0 0 K = 9.92 50.00 VC 3.00% PV C S T A . 6 + 0 7 . 5 0 PVI STA. 6+20.00 PV T S T A . 6 + 3 2 . 5 0 K = 12.76 25.00 VC EXISTING GROUND PROFILE PROPOSED GROUND PROFILE PROFILE - WRIGHT LANE DSM DSM SAL 1" = 40' 24110 C4.0 MAR., 2024 LOCATION MAP 1" = 2000' WGM ASSOCIATES c/o KEITH WRIGHT P.O. BOX 2352 SOUTH BURLINGTON VERMONT 05407 7-LOT SUBDIVISION ROAD PROFILE & DETAILS A C CIVIL ENGINEERING ASSOCIATES, INC. E 10 MANSFIELD VIEW LANE, SOUTH BURLINGTON, VT 05403 P: 802-864-2323 FAX: 802-864-2271 web: www.cea-vt.com 850, 900 & 950 HINESBURG RD. SOUTH BURLINGTON, VT 116 89PROJECT LOCATION C/L 3.0% 10' 4.0% 2' 3.0:1 CU T 6'2' 3.0% 10' 4.0% 2' 4.0:1 C U T 4.0:1 FI L L N.T.S. TYPICAL ROADWAY SECTION 4" MINIMUM TOPSOIL, SEED AND MULCH ALL SIDESLOPE - USE EROSION MATTING (WHEN REQUIRED) TO ESTABLISH VEGETATION, PARTICULARLY ON LOW SIDE OF ROADWAY UNDISTURBED SOIL or APPROVED COMPACTED GRANULAR FILL 4" MIN. OF 34" MINUS CRUSHED STONE SURFACE COURSE 6" TO 14" (DEPTH VARIES BY LOCATION) OF 1.5" CRUSHED STONE 8" OF 5" MINUS CRUSHED STONE ON MIRAFI 500X STABILIZATION FABRIC SLOPE TO FREE DRAIN TO DITCH 12" HDPE AT DRIVEWAY CROSSINGS C/L 3.0% 10' 4.0% 2' 4.0:1 F I L L SEE PLAN10' 4.0% 2' 4.0:1 FILL N.T.S. TYPICAL HAMMERHEAD SECTION 4" MINIMUM TOPSOIL, SEED AND MULCH ALL SIDESLOPE - USE EROSION MATTING (WHEN REQUIRED) TO ESTABLISH VEGETATION, PARTICULARLY ON LOW SIDE OF ROADWAY UNDISTURBED SOIL or APPROVED COMPACTED GRANULAR FILL 4" MIN. OF 34" MINUS CRUSHED STONE SURFACE COURSE 6" TO 14" (DEPTH VARIES BY LOCATION) OF 1.5" CRUSHED STONE 8" OF 5" MINUS CRUSHED STONE ON MIRAFI 500X STABILIZATION FABRIC SLOPE TO FREE DRAIN TO WEST WEST 3.0% EAST NORTH SOUTH 10" OF 5" MINUS CRUSHED STONE ON SEPARATION FABRIC N.T.S. TYPICAL DRIVEWAY SECTION S-004S- 0 0 4 G r a v e l S e c SEPARATION GEOTEXTILE REVISED 12/03/2020 3 1 OR AS SHOWN ON PLANS 4" MINIMUM TOPSOIL, SEED AND MULCH ALL SIDESLOPE - USE EROSION MATTING (WHEN REQUIRED) TO ESTABLISH VEGETATION, PARTICULARLY ON LOW SIDE OF ROADWAY 4" CRUSHED GRAVEL - FINE AOT SPECIFICATION 704.05 8" DENSE GRADED CRUSHED STONE AOT SPECIFICATION 704.06 UNDISTURBED SOIL or APPROVED COMPACTED GRANULAR FILL N.T.S. CURB CUT CLOSURE S-031S- 0 3 1 C U R B C U T C L O S U R E 6" TOPSOIL MIN. EXISTING SUBBASE UNDISTURBED SOIL OR APPROVED COMPACTED GRANULAR FILL REVISED 8/21/2018 EXISTING GRAVEL DRIVEWAY TO BE REMOVED TOP SOIL, SEED & MULCH EX. GRAVEL DRIVEWAY EX. BITUMINOUS PAVEMENT S-002bS- 0 0 2 b B i t C o n c W a l k REVISED 1/28/2021 N.T.S. BITUMINOUS CONCRETE APRON DETAIL 6"6" 40' MAX. EXCEPT AT RADIUS 8" COMPACTED CRUSHED GRAVEL (704.05 FINE) 2" THICK TYPE II BIT. CONC. PAVEMENT BASE COURSE 4" MINIMUM TOPSOIL AND HYDROSEED ALL SIDESLOPES - SEED AND STRAW MULCH OPTION ALSO ACCEPTABLE - USE EROSION MATTING (WHEN REQUIRED) TO ESTABLISH VEGETATION UNDISTURBED SOIL OR APPROVED COMPACTED GRANULAR FILL 1" THICK TYPE III BIT. CONC. PAVEMENT FINISH COURSE P:\ A u t o C A D D P r o j e c t s \ 2 0 2 4 \ 2 4 1 1 0 - W G M A s s o c i a t e s \ 1 - C A D D F i l e s \ d w g \ 2 4 1 1 0 - S i t e . d w g , 3 / 2 2 / 2 0 2 4 1 2 : 5 4 : 5 0 P M DocuSign Envelope ID: C7627C2A-DB8E-40FE-80F6-1F47BCFF446E VERMONT AGENCY OF TRANSPORTATION Workin to Get You There STANDARD COMMERCIAL DRIVES B-71B (MPH) DESIGN SPEED OR POSTED SPEED (FT)SIGHT DISTANCE STOPPING MINIMUM 610 555 500 445 390 335 280 495 425 360 305 250 200 155 55 50 45 40 35 30 25 SIGHT DISTANCE TABLE O L D G R OUND LEVEL C L12' MIN. A DETAIL E A SUBGRADE LINE DITCH LINE SECTION A-A CL DRIVE SEE DRIVE SIDE SLOPES TABLE. 18" SUBBASE MATERIAL LOCATION OF SLOPE SLOPE RATE 1:6 OR FLATTER 1:4 DESIRABLE 1:2 ALLOWABLE- OUTSIDE CLEAR ZONE 1:2 OR FLATTER DETAIL F -15 % M AX ( -0 .15 )-3 % M AX . G R AD E ( -0 .03 ) HIGHWAY LC SUBGRADE LINE LENGTH ROUNDING MIN 10' APPROACH AREA 20' MIN.SHOULDER EDGE OF TRAVELED WAY EDGE OF DETAIL C 5" DEPRESSION SHOULDER TRAVELED WAY HIGHWAY DRIVE GRADE LENGTH ROUNDING MIN 20' ORIGINAL APPROVAL DESCRIPTIONDATE JUL. 1, 2019 REV. 0 OTHER STANDARDS REQUIRED: 1. 2. 3. 4. 5. 6. 7. 8. 9. "A POLICY ON GEOMETRIC DESIGN OF HIGHWAYS & STREETS." THE ABOVE VALUES ARE TAKEN FROM THE 2011 AASHTO (FT)SIGHT DISTANCE INTERSECTION MINIMUM SLOPE 2% (TYP.) 24" MINIMUM COVER (FILL SECTION) PROFILE OF DRIVE INTERSECTION 40' MAXIMUM 24' MINIMUM HIGHWAY CL EDGE OF TRAVELED WAY SHOULDER EDGE CURB (IF PRESENT) LINE PROPERTY R.O.W. LINE SHOULDER PAVEMENT DETAIL B WIDTH MINUS SHOULDER THEORETICAL RADIUS MINIMUM RADIUS = CURB (IF PRESENT) SHOULDER EDGE EDGE OF TRAVELED WAY 12' MAX. 4' MIN. 24' MAX. 18' MIN. R.O.W. LINE SHOULDER PAVEMENT HIGHWAY CL 24' MAX. MIN. 20' EDGE OF TRAVELED WAY SHOULDER EDGE HIGHWAY CL TAPERS PAVEMENT SHOULDER CURB ( IF PRESENT ) T=**D=* MIN. RADIUS 30' LESS SHOULDER WIDTH 30' MIN. RADIUS R.O.W. LINE DETAIL A LC DRIVE 12 ' 4' 30 35 40 50 100 120 140 180 8:1 10:1 12:1 15:1 **T (MIN)(FT) RATE SPEED (MPH) 10. PROPERTY LINE PROJECTION ABOVE THE CURB HEIGHT WITHIN THE R.O.W. OR CLEAR ZONE) THE CURBED DIVISIONAL ISLAND SHALL NOT EXCEED 4" HEIGHT (AND HAVE NO TURN LANES ARE MET. WARRANTS FOR RIGHT AND D WHEN VOLUME USE WITH DETAILS B SHOULDER WIDTH RADIUS MINUS THEORETICAL MIN. RADIUS = TWO-WAY UNDIVIDED COMMERCIAL DRIVEDETAIL D 12. STANDARD E-192 REFER TO VTRANS DECELERATION LENGTH. PROVIDE PROPER MUST BE ADJUSTED TO TRAFFIC VOLUME AND VARIABLE DEPENDING ON * STORAGE LENGTH IS DETAIL D SEE ASEE DETAIL NEEDED (TYP.) GRADE AS 11. LIMIT OF ON SITE PARKING AREA 90 DESIRABLE ANGLE = 60 MINIMUM PARKING AREA LIMIT OF ON SITE 90 DESIRABLE ANGLE = 60 MINIMUM RURAL (TYP.) 10' URBAN 30' THEORETICAL RADIUS, ANGLE=60 MINIMUM, 90 DESIRABLE ROW LINE. WILL HAVE A "SERVICE VEHICLES ONLY" SIGN PLACED AT THE HIGHWAY AUTHORIZED, HAVING A MAXIMUM WIDTH OF 20'. THE SERVICE DRIVE THIS DETAIL WILL ALSO APPLY TO COMMERCIAL SERVICE DRIVES, WHEN PROFILE OF DRIVE INTERSECTION(CUT SECTION) INTERSECTION) POINT OF VERTICAL LEAST 12 FEET FROM (15% MAX. FOR AT DESIGN SPEED > 40 MPH DESIGN SPEED < 40 MPH URBAN AREAS, OR DRIVE SIDE SLOPES TABLE SEE DETAIL A PARKING AREA LIMIT OF ON SITE PAVEMENT. TWO INCHES OF BITUMINOUS CONCRETE (SEE NOTE 7) CULVERT IF REQUIRED DIVISIONAL ISLAND TWO-WAY COMMERCIAL DRIVE WITH ONLY) DRIVE(UNSIGNALIZED INTERSECTIONS RIGHT TURN LANE FOR COMMERCIAL 3.5 FEET TO AN OBJECT HEIGHT OF 2.0 FEET ON THE ROADWAY. ROADWAY.STOPPING SIGHT DISTANCE IS MEASURED FROM AN EYE HEIGHT OF OF EYE OF 3.5 FEET ON THE DRIVE TO A HEIGHT OF 3.5 FEET ON THE TRAVELED WAY OF THE ADJACENT ROADWAY AND MEASURED FROM A HEIGHT FROM A POINT ON THE DRIVE AT LEAST 15 FEET FROM THE EDGE OF AGENCY OF TRANSPORTATION. INTERSECTION SIGHT DISTANCE IS MEASURED ENTERING ON PUBLIC HIGHWAYS, UNLESS OTHERWISE APPROVED BY THE BELOW, SHOULD BE PROVIDED IN BOTH DIRECTIONS FOR ALL DRIVES INTERSECTION SIGHT DISTANCES, EQUAL TO OR GREATER THAN THOSE SHOWN GUIDELINES", LATEST REVISION. "VERMONT AGENCY OF TRANSPORTATION ACCESS MANAGEMENT PROGRAM FOR DRIVEWAY AND INTERSECTION SPACING DISTANCES REFER TO THE SERVING UP TO TWO SINGLE FAMILY HOMES OR A DUPLEX. B-71A FOR FIELD DRIVES, LOGGING DRIVES, AND RESIDENTIAL ACCESSES SUBDIVISIONS AND OTHER COMMERCIAL ACCESSES. SEE VTRANS STANDARD THIS STANDARD APPLIES TO LARGER RESIDENTIAL DEVELOPMENTS, BEFORE ENTERING THE HIGHWAY. AS A 20' APPROACH AREA IS ACHIEVED FOR THE VEHICLE TO PAUSE DRIVEWAY GRADES STEEPER THAN THOSE SHOWN MAY BE ALLOWED AS LONG END OF THE TURNING RADIUS WHICHEVER IS GREATEST. SHOWN PERTAIN ONLY TO THE AREA WITHIN THE HIGHWAY R.O.W. OR THE MAY BE GOVERNED BY LOCAL ZONING LAWS. DRIVEWAY WIDTH RESTRICTIONS THE OFFSET BETWEEN THE PROPERTY LINE AND THE EDGE OF THE DRIVEWAY MATCH THE SIZE OF THE UPSTREAM CULVERT. THE PROPOSED CULVERT THEN THE NEW CULVERT SHALL, AS A MINIMUM, CIRCULAR PIPE.IF A CULVERT LARGER THAN 15" IS LOCATED UPSTREAM OF CROSS-SECTIONAL AREA EQUIVALENT TO THAT PROVIDED BY A 15" PIPE ARCHES USED UNDER DRIVES SHALL HAVE A MINIMUM INSIDE INSIDE DIAMETER (I.D.) OF 15" OR AS OTHERWISE SHOWN ON THE PLANS. CIRCULAR DRAINAGE CULVERTS UNDER DRIVES SHALL HAVE A MINIMUM TREATMENT TO BE USED. BASED ON TRAFFIC STUDIES THE AGENCY WILL DETERMINE SPECIFIC REQUIRE SPECIAL LANES FOR TURNING, SIGNALS OR OTHER MODIFICATIONS. WHERE TRAFFIC VOLUME FOR A PROJECT IS SUBSTANTIAL THE AGENCY MAY IF CURB IS PRESENT, SEE APPROPRIATE CURB DETAIL STANDARD. OF CURBING OR OTHER SUITABLE PHYSICAL BARRIER. THAN APPROVED ACCESS POINTS WILL BE PREVENTED BY THE CONSTRUCTION VEHICULAR ACCESS FROM PARKING AREAS TO THE RIGHT-OF-WAY AT OTHER SHOWN IN DETAIL F WITHIN THE LIMITS OF THE HIGHWAY RIGHT-OF-WAY. DEPTH OF SUBBASE AND PAVEMENT TO BE THE SAME AS HIGHWAY OR AS (A, B AND D) BY HATCHING. TRANSPORTATION ADMINISTRATOR.THIS PAVING IS INDICATED IN DETAILS OF CURVATURE ON THE DRIVEWAY EDGE OR AS DIRECTED BY THE DISTRICT TRAVELED WAY TO THE HIGHWAY RIGHT-OF-WAY, TO THE FARTHEST POINT ALL COMMERCIAL DRIVES SHALL BE PAVED FROM THE EDGE OF THE WIDTHS, HORIZONTAL, VERTICAL AND GEOMETRIC CHARACTERISTICS. SHEET IS INTENDED TO BE A GUIDE FOR THE DESIGNER CONCERNING DRIVE WHEN USED WITH THE PLANS FOR A HIGHWAY CONSTRUCTION PROJECT, THIS SUBJECT TO THE APPROVAL OF THE VERMONT AGENCY OF TRANSPORTATION. THIS SHEET SHALL BE THE RESPONSIBILITY OF THE APPLICANT AND IS OF WAY. ALL CONSTRUCTION REQUIRED BY THE PERMIT AND INDICATED ON AND IN CONJUNCTION WITH A PERMIT FOR WORK WITHIN HIGHWAY RIGHTS THIS SHEET IS INTENDED FOR USE BY DESIGNERS ON HIGHWAY PROJECTS 10' URBAN 30' RURAL (TYP.), THEORETICAL RADIUS (TYP.) END SECTION OPTIONAL MIN. 12' DocuSign Envelope ID: C7627C2A-DB8E-40FE-80F6-1F47BCFF446E 1 Pierce, Ed From:David Marshall <dmarshall@cea-vt.com> Sent:Friday, March 22, 2024 4:07 PM To:Pierce, Ed; 'Keith Wright' Subject:RE: VT 116 - So. Burlington MM 2.43 Attachments:24110 - Site-C2.0.pdf; 24110 - Site-C4.0.pdf; Vt 116 - So. Burlington MM2.43 WGM Assoc. 1111 Application.pdf EXTERNAL SENDER: Do not open attachments or click on links unless you recognize and trust the sender. Hi Ed- Just following up on the correspondence we shared earlier this week. Please find attached the pdf version of the application materials which are being mailed to your office. The hard copy materials will also include the application fee. Please let us know if you have any questions. Thank you and Best Regards David S. Marshall, P.E. Civil Engineering Associates, Inc. 10 Mansfield View Lane South Burlington, VT 05403 P 802-864-2323 x310 F 864-2271 From: David Marshall <dmarshall@cea-vt.com> Sent: Tuesday, March 19, 2024 10:21 AM To: 'Pierce, Ed' <Ed.Pierce@vermont.gov>; 'Keith Wright' <Keith@kwrightinc.com> Subject: RE: VT 116 - So. Burlington MM 2.43 Hi Ed- Received. We will proceed with an application which addresses:  The north access does not conform to our commercial access standards; it needs to be paved per standard B-71B – A new paved apron which will extend to the end of the (rural road) intersection 30’ turning radius (which is beyond the ROW line) per standard B- 71b.  One of the other two accesses will need to be removed. The property may have a total of two accesses. The far south access will be eliminated. When the application form is received, we will forward this on with the application fee and updated plans and details. DocuSign Envelope ID: C7627C2A-DB8E-40FE-80F6-1F47BCFF446E 2 Best Regards David S. Marshall, P.E. Civil Engineering Associates, Inc. 10 Mansfield View Lane South Burlington, VT 05403 P 802-864-2323 x310 F 864-2271 From: Pierce, Ed <Ed.Pierce@vermont.gov> Sent: Friday, March 15, 2024 5:38 AM To: dmarshall <dmarshall@cea-vt.com>; 'Keith Wright' <Keith@kwrightinc.com> Subject: RE: VT 116 - So. Burlington MM 2.43 Hi Dave & Keith, Yes, an S1111 permit will be required:  The property does not have a current access permit  This change of use requires a permit  The north access does not conform to our commercial access standards; it needs to be paved per standard B-71B  One of the other two accesses will need to be removed. The property may have a total of two accesses. Thank you, Ed Pierce | Permit Coordinator Vermont Agency of Transportation 219 N. Main St. | Barre, VT 05641 802-498-8946 | ed.pierce@vermont.gov vtrans.vermont.gov/planning/permitting From: David Marshall <dmarshall@cea-vt.com> Sent: Thursday, March 14, 2024 12:03 PM To: 'Keith Wright' <Keith@kwrightinc.com> Cc: Pierce, Ed <Ed.Pierce@vermont.gov> Subject: RE: VT 116 - So. Burlington MM 2.43 EXTERNAL SENDER: Do not open attachments or click on links unless you recognize and trust the sender. Thanks Keith! David S. Marshall, P.E. Civil Engineering Associates, Inc. 10 Mansfield View Lane South Burlington, VT 05403 P 802-864-2323 x310 F 864-2271 From: Keith Wright <Keith@kwrightinc.com> Sent: Thursday, March 14, 2024 12:01 PM To: dmarshall@cea-vt.com Cc: Pierce, Ed <Ed.Pierce@vermont.gov> Subject: Re: VT 116 - So. Burlington MM 2.43 DocuSign Envelope ID: C7627C2A-DB8E-40FE-80F6-1F47BCFF446E 3 The truck total is 5. They only come and go once a day, if that. We haul the jet fuel into the airport, been doing that for the past 20 plus years. Thanks Keith On Thu, Mar 14, 2024, 11:51 AM David Marshall <dmarshall@cea-vt.com> wrote: The linked image cannot be displayed. The file may have been mov ed, renamed, or deleted. Verify that the link points to the correct file and location. Hi Ed- Keith, please correct me if I do not get this right. Current and proposed uses of the property  Three existing single family homes with E-911 addresses of 850 (north), 900 (middle) and 950 (south) all “Hinesburg Road”.  The commercial activity associated with the 850 Hinesburg Road address is K Wright, Inc. which is an active DOT registered motor carrier operating under USDOT Number 542979 and MC Number 355884 with 4 trucks owned and 6 drivers.  Three proposed single family homes with a maximum of two future Accessory Dwelling Units (ADUs) served by a common road (Name still TBD). Best Regards David S. Marshall, P.E. Civil Engineering Associates, Inc. 10 Mansfield View Lane South Burlington, VT 05403 P 802-864-2323 x310 F 864-2271 From: Pierce, Ed <Ed.Pierce@vermont.gov> Sent: Thursday, March 14, 2024 11:20 AM To: dmarshall <dmarshall@cea-vt.com> DocuSign Envelope ID: C7627C2A-DB8E-40FE-80F6-1F47BCFF446E 4 Cc: 'Keith Wright' <Keith@kwrightinc.com> Subject: RE: VT 116 - So. Burlington MM 2.43 Dave, can you describe the current and proposed uses of the property? It looks like there is some kind of commercial / agricultural use now, along with some residential? Ed Pierce | Permit Coordinator Vermont Agency of Transportation 219 N. Main St. | Barre, VT 05641 802-498-8946 | ed.pierce@vermont.gov vtrans.vermont.gov/planning/permitting The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. From: David Marshall <dmarshall@cea-vt.com> Sent: Thursday, March 14, 2024 11:09 AM To: Pierce, Ed <Ed.Pierce@vermont.gov> Cc: 'Keith Wright' <Keith@kwrightinc.com> Subject: RE: VT 116 - So. Burlington MM 2.43 EXTERNAL SENDER: Do not open attachments or click on links unless you recognize and trust the sender. Hi Ed- Thanks for getting back on this one. The property is already subject to Act 250 jurisdiction so the answer is yes. Best Regards DocuSign Envelope ID: C7627C2A-DB8E-40FE-80F6-1F47BCFF446E 5 David S. Marshall, P.E. Civil Engineering Associates, Inc. 10 Mansfield View Lane South Burlington, VT 05403 P 802-864-2323 x310 F 864-2271 From: Pierce, Ed <Ed.Pierce@vermont.gov> Sent: Thursday, March 14, 2024 11:04 AM To: dmarshall <dmarshall@cea-vt.com> Cc: 'Keith Wright' <Keith@kwrightinc.com> Subject: RE: VT 116 - So. Burlington MM 2.43 Received, thank you. Will this project be going through Act 250? Ed Pierce | Permit Coordinator Vermont Agency of Transportation 219 N. Main St. | Barre, VT 05641 802-498-8946 | ed.pierce@vermont.gov vtrans.vermont.gov/planning/permitting The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. From: David Marshall <dmarshall@cea-vt.com> Sent: Wednesday, March 13, 2024 12:41 PM To: Pierce, Ed <Ed.Pierce@vermont.gov> Cc: 'Keith Wright' <Keith@kwrightinc.com> Subject: VT 116 - So. Burlington MM 2.43 EXTERNAL SENDER: Do not open attachments or click on links unless you recognize and trust the sender. DocuSign Envelope ID: C7627C2A-DB8E-40FE-80F6-1F47BCFF446E 6 Hi Ed- Keith and Nicole right are proposing a subdivision of their 10-acre parcel located off of VT Route 116 at Mile Marker 2.43 (995 ft North of the Meadowland Drive Intersection) which will create three (3) additional single family home sites and perhaps one or two ADUs in the future. We have attached two location maps and the C1.0 Existing Condition Plan which identifies the existing access locations. The proposed residential road shown on the attached C2.0 sheet will utilize a portion of the existing commercial driveway. No changes are proposed within the Route 116 right-of-way other than a new water service. We are offering this in support of a request for determination on whether a Section 1111 permit is required for the proposed project. Our review of the Permit Listing found the following as it relates to the closest item to addressing access to this property. 2460 VT116 So. Burlington 0002.410/0000.000R 0127+24R ORMOND BUSHEY & SONS INC ACCESS 5/4/1991 D 5/3/1991 Remarks: TEMPORARY ACCESS FOR THE REMOVAL OF TOPSOIL ON 8 ACRES OF Project: LAND We look forward to hearing your thoughts. Best Regards DocuSign Envelope ID: C7627C2A-DB8E-40FE-80F6-1F47BCFF446E MM 2.37 SHARED RESIDENTIAL ACCESS TO REMAIN; NO WORK REQUIRED MM 2.36 ACCESS TO BE CLOSED SAW CUT AND REMOVE PAVED APRON DocuSign Envelope ID: C7627C2A-DB8E-40FE-80F6-1F47BCFF446E MM 2.43 SHARED RES./COMM. ACCESS TO BE PAVED 40' WIDE PER STANDARD B-71B DocuSign Envelope ID: C7627C2A-DB8E-40FE-80F6-1F47BCFF446E Certificate Of Completion Envelope Id: C7627C2ADB8E40FE80F61F47BCFF446E Status: Completed Subject: Complete with DocuSign: So Burlington Permit 46439 Wright 042524.pdf Source Envelope: Document Pages: 21 Signatures: 3 Envelope Originator: Certificate Pages: 2 Initials: 0 Ed Pierce AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-05:00) Eastern Time (US & Canada) One National Life Drive - Dewey Building Montpelier, VT 05620-2001 Ed.Pierce@vermont.gov IP Address: 73.119.220.51 Record Tracking Status: Original 4/25/2024 10:49:27 AM Holder: Ed Pierce Ed.Pierce@vermont.gov Location: DocuSign Security Appliance Status: Connected Pool: StateLocal Storage Appliance Status: Connected Pool: AOT - Agency of Transportation - AOT40 Location: DocuSign Signer Events Signature Timestamp Ed Pierce ed.pierce@vermont.gov SOV Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 73.119.220.51 Sent: 4/25/2024 10:51:12 AM Viewed: 4/25/2024 10:51:22 AM Signed: 4/25/2024 10:51:30 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Craig Keller Craig.Keller@vermont.gov Chief of Permitting Services SOV Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 73.182.132.17 Sent: 4/25/2024 10:51:31 AM Viewed: 4/25/2024 11:21:36 AM Signed: 4/25/2024 11:23:15 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 4/25/2024 10:51:12 AM Envelope Summary Events Status Timestamps Certified Delivered Security Checked 4/25/2024 11:21:36 AM Signing Complete Security Checked 4/25/2024 11:23:15 AM Completed Security Checked 4/25/2024 11:23:15 AM Payment Events Status Timestamps