Loading...
HomeMy WebLinkAboutPermit Wastewater Allocation Supplemental Info (3) (1111111111416P:tiNVIA,IP BUN sou CITY OF SOUTH BURLINGTON i kit DEPARTMENT OF PLANNING & ZONING `,11 4,� �cii: 575 DORSET S 1'REET ,. / SOUTH BURLINGTON, VERMONT 05403 (802) 846-4106 row..00*� FAX(802) 846-4101 December 5,2001 Mr.Andy Rowe Lamoureux&Dickinson 14 Morse Drive Essex Junction,VT 05452 RE: Skiff Subdivision,Springhouse Road Dear Andy, This is to confirm that the City of South Burlington has allocated 810 gallons per day of municipal wastewater capacity for the existing Skiff residence on ( Springhouse Road, and that the City will allocate an additional 1,200 gallons per day of municipal wastewater capacity to serve the approved subdivision. The total allocated wastewater flow from this subdivision will be 2,010 gallons per day. Each of the new homes will be individually permitted for four bedrooms or 480 gallons per day of wastewater capacity,based on 150 gallons per bedroom less the 10% municipal connection and 10% water conservation credits. The fee for the additional 1,200 gallons per day will be$5,520.00. If you need any additional information,please call me. Sincerely, Juli Beth Hoover,AICP Director of Planning&Zoning cc: Robert&Marley Skiff (, Ray Belair,Administrative Officer 12/05/2001 13:05 802-878-3135 LAMOUREUX DICKINBON PAGE 02 LAMOUREUX & DICKINSON MEV 14 Morse Drive Consulting Engineers, inc. C802)478-4450 Essexiunction,Vermont 03432 Fax i802)878.31 33 • May 31, 2001 Sarah MacCallum Department of Planning&Zoning City of South Burlington 575 Dorset Street South Burlington, VT 05403 RE: Robert& Marley Skiff Proposed 3 Lot Subdivision Springhouse Road Dear Sarah: We are writing on behalf of Robert&Marley Skiff regarding their proposed 3 lot subdivision located off Springhouse Road. We are requesting sewer allocation of 960 GPD to serve the two proposed single family residences,in addition to 810 GPD for the existing dwelling on Lot 1. The total design flow of 2010 GPD, based upon the State of Vermont Environmental Protection Rules, is summarized below: Lot 1 6 bedrooms x 150 GPD/bedroom x 0.90** = 810 GPD Lots 2 & 3: 2 houses x 4 bedrooms/house x 150 GPD/bedroom x 0.80k= 960 GEL? Infiltration 0.13 mile x 6" pipe x 300 GPD/inch/mile = 240 GPD Total design flow =2010 GPD 10%reduction taken for connection to municipal collection system * 20%reduction taken for water conserving fixtures and connection to municipal collection system The existing Skiff home, as well as two adjacent properties are currently served by an existing 6" sewer line that connects to the municipal system on Meadowood Drive. The two proposed lots will also be served by this existing connection to the municipal sanitary sewer. We are requesting a letter stating the ability of the City of South Burlington to provide sewer service for this project(please reference the total design flow in the letter). Please call our office with any questions. Sincerely,a4— Andrew Rowe cc: Bob& Marley Skiff Peter Collins • • — Civil • Environmental • Transportation • Planning • Landscape Architecture • hlydrogeology • Land Surveying ---