M Yusuf Ali, hereinafter referred to as the applicant, is seeking to amend a previously approved
plan for a 3-acre property that includes an 18,900 sf, 275-seat place of worship and a 100 sf
accessory structure. The amendment consists of constructing a 2,000 sf addition to the primary
structure and associated site improvements, 400 Swift Street.
Based on the plans and materials contained in the document file for this application, the
Administrative Officer finds, concludes, and decides the following:
FINDINGS OF FACT
1. The applicant is seeking to amend a previously approved plan for a 3-acre property that
includes an 18,900 sf, 275-seat place of worship and a 100 sf accessory structure. The
amendment consists of constructing a 1,424 sf addition to the primary structure and associated
site improvements, 400 Swift Street.
2. The owner of record of the subject property is the Islamic Society of Vermont.
3. The subject property is located in the Residential 2 (R2) zoning district. Portions of this property
not proposed to be impacted by this application are located within the Wetland Advisory Layer
and the River Corridor Overlays.
4. The application was received on September 3, 2024. The City Council published notice of a
public hearing on draft amendments to the land development regulations on August 22, 2024.
Pursuant to 24 VSA 4449(d), any new application filed after the date of the notice shall be
reviewed under the proposed amendment and applicable existing bylaws and ordinances
pending Council action on the amendment. Where they differ, both sets of standards are
identified herein. In all cases, compliance with the more restrictive standard applies.
5.
6. The plans submitted include the following:
Plan Sheet Number & Title Prepared By: Date Last Revised:
SP.1 – Site Plan GVV Architects 9/9/2024
A.1 – Partial Plan Wall Section GVV Architects 8/7/2024
A.2 – Elevations Building
Section
GVV Architects 8/7/2024
A.3 – Roof Plan Details GVV Architects 8/7/2024
F.1 – Foundation Plan GVV Architects 8/7/2024
L.1 – Landscape Plan GVV Architects 9/19/2024
Only the standards below are affected by this application. All other standards will continue to be
met.
#SP-24-15
- 2 -
DIMENSIONAL REQUIREMENTS
Existing Zoning – R2 Zoning District Required Existing Proposed
Min. Lot Size 40,000 S.F. 3 acres No change
Max. Building Coverage 40% 14.46% 15.55%
Max. Overall Coverage 70% 55.0% 56.09 %
Max. Front Yard Coverage 30% 8.33% No change
Min. Front Setback 30 ft ~86 ft 84 ft
Min. Side Setback 10 ft ~30 ft No change
Min. Rear Setback 30 ft ~165 ft No change
Max. Building Height (pitched roof) 40 ft Not calculated No change
Zoning Compliance
Draft Zoning Amendments – LSN Zoning District Required Existing Proposed
Min. Lot Size 7,000 S.F. 3 acres No change
Max. Building Coverage 50% 14.46% 15.55%
Max. Overall Coverage 70% 55.0% 56.09 %
Max. Front Yard Coverage 30% 8.33% No change
Min. Front Setback 20 ft ~86 ft 84 ft
Min. Side Setback 10 ft ~30 ft No change
Min. Rear Setback 30 ft ~165 ft No change
Max. Building Height (pitched roof) 40 ft Not calculated No change
SITE PLAN REVIEW STANDARDS
Only the standards below are affected by this application. All other standards will continue to be
met.
14.06 General Standards
A. Relationship of Proposed Structures to the Site
1) The site shall be planned to accomplish a desirable transition from structure to site,
from structure to structure, and to provide for adequate planting, safe pedestrian
movement, and adequate parking areas.
The proposed building addition will be of the same style and scale as the existing
building. The applicant is not proposing to impact the existing pedestrian walkways,
which allow for safe pedestrian movement, or the existing vehicle parking areas. The
applicant is proposing to install supplemental landscaping, which is discussed under
13.04 below.
2) Without restricting the permissible limits of the applicable zoning district, the height
and scale of each building shall be compatible with its site and existing or anticipated
adjoining buildings.
The proposed building addition will increase the footprint of the building by
approximately 7.5% and is proposed to have a pitched roof with a calculated height of
approximately 17’4”. The proposed addition will be one story and will be no taller than
the existing principal structure to which it will be attached. The Administrative Officer
finds the scale and height of the proposed structure to be compatible with the structures
on site and in the area.
3) Parking
#SP-24-15
- 3 -
No new off-street parking areas and no modifications to the existing off-street parking
areas are proposed.
B. Relationship of Structures and Site to Adjoining Area.
(1) The Development Review Board shall encourage the use of a combination of common
materials and architectural characteristics (e.g., rhythm, color, texture, form or detailing),
landscaping, buffers, screens and visual interruptions to create attractive transitions
between buildings of different architectural styles.
The existing building’s exterior finish materials include brick, stone, and vinyl siding. The
proposed building addition will have a similar stone accent and will utilize vinyl siding that
matches the color of the existing vinyl siding. The Administrative Officer finds that no
buffering or screening is required for this building addition since it is of the same
architectural style as the existing building.
(2) Proposed structures shall be related harmoniously to themselves, the terrain and to
existing buildings and roads in the vicinity that have a visual relationship to the proposed
structures.
As noted above, the proposed building addition will be harmoniously related to the
existing principal structure to which it will be attached. The vicinity does not include any
elements that appear to clash with the proposed addition. The Administrative Officer finds
this criterion met.
(3) To accomplish (1) and (2), the DRB shall consider:
(a) Pattern and Rhythm. Update or maintain or extend the overall pattern of
development defined by the planned or existing street grid, block configurations,
position and orientation of principal buildings, prevalence of attached or detached
building types.
The proposed addition extends the façade of the existing building to the west and
maintain the position and prevalence of the existing principal structure.
(b) Architectural Features. Respond to recurring or representative architectural
features that define neighborhood character, without adhering to a particular
architectural style.
The Administrative Officer finds that the proposed addition meets the general features
of the neighborhood character without adhering to any particular style of construction.
(c) Privacy. Limit impacts and intrusions to privacy on adjoining properties, including
side and back yard areas through context sensitive design.
No changes impacting the privacy of adjoining properties are proposed.
C. Site Amenity Requirement
This non-residential expansion adds fewer than 5,000 square feet to the building area. As such,
this criterion is not applicable.
14.07 Specific Review Standards
D. Transportation Demand Management.
Transportation Demand Management analysis is required for all site plans. See Section 13.01.
See analysis of TDM standards under Section 13.01 below. This standard is part of the proposed
LDR amendments applicable to this application.
#SP-24-15
- 4 -
H. Utility Services
The proposed addition is intended to replace existing facilities with a better worship space for
existing congregation members, not to increase the capacity of the place of worship. Although the
intention of the addition is not to increase attendance, the applicant testified that the proposed
building addition will increase the principal structure’s existing maximum occupancy of 143 people
to a theoretical maximum occupancy of 243 people. The property has an existing Wastewater
Allocation that can support a congregation of up to 275 people – as such, the Administrative
Officer finds that the applicant is not required to update the existing Wastewater Allocation
approval or obtain a new Wastewater Allocation approval as part of this application.
I. Disposal of Wastes
The applicant has testified that the existing dumpster is enclosed in a manner that meets all
standards of the LDR. The Administrative Officer finds this criterion met.
OTHER APPLICABLE STANDARDS
13.01 Transportation Demand Management
A. Purpose.
Transportation Demand Management (TDM) is a strategy to increase the overall efficiency
of the transportation system by diversifying transportation options and reducing single-
occupancy vehicle (SOV) trips and/or vehicle miles traveled (VMT). The primary objectives
of TDM are to mitigate traffic congestion, reduce vehicle emissions, provide users mobility
choice, and improve community livability.
B. Applicability.
(1) TDM requirements shall apply in all zoning districts and to land development as
follows:
(a) Master plans shall apply TDM requirements to the entire area of land
development, or to each phase if the project includes phasing.
(b) Site Plan Review shall apply TDM requirements.
This application for Site Plan review triggers applicable TDM requirements.
C. Calculation Of Trips Generated.
(1) Reference Materials. Trips generated will be evaluated using the methodology
established in Appendix B.
Using the methodology established in Appendix B, the Administrative Officer finds
that the proposed soil remediation will not create any additional vehicle trips beyond
that which has already been approved, since the property is approved for a 275-seat
place of worship and the proposed addition will only bring the maximum theoretical
occupancy to 243 people. As such, the remainder of Section 13.01 does not apply to
this application.
13.03 Bicycle Parking & Storage
Including the proposed building addition, the use of the property consists of a 20,324 sf place of
worship, which is classified as an “other non-residential” use by this section of the LDRs, requiring
a minimum of 5 short-term bicycle parking spaces. The applicant is not required to provide any
long-term bike parking, as the proposed building addition does not impact more than 50% of load-
#SP-24-15
- 5 -
bearing elements in the existing building. The applicant is proposing to meet the short-term bike
parking requirement by installing three ‘inverted-U’ racks on a proposed 10’ x 9’ concrete pad at
the edge of a lawn area near two primary building entrances. The Administrative Officer finds this
criterion met.
13.04 Landscaping, Screening & Street Trees
B(7) Snow Storage
The applicant has indicated the snow storage areas on the associated plans. The
Administrative Officer finds this criterion met.
C. Screening or Buffering
Landscaping, fencing, land shaping and/or screening along property boundaries is required
when two adjacent sites are dissimilar and should be screened or buffered from each other, or
when a property’s appearance should be improved. The Administrative Officer finds that the
existing place of worship use is not dissimilar from the adjacent place of worship use to the
east. The existing place of worship use is relatively dissimilar from the residential development
to the west. The applicant has proposed to install six maple trees and four flowering crabapple
trees of at least 2.5” caliper each on the west side of the building. The Administrative Officer
finds that the proposed screening is sufficient and finds this criterion met.
G(3) Landscaping Budget Requirements. The Development Review Board shall require
minimum planting costs for all site plans, as shown in Table 13-4 below. In evaluating
landscaping requirements, some credit may be granted for existing trees or for site
improvements other than tree planting as long as the objectives of this section are not
reduced. The costs below are cumulative; for example, a landscaping budget shall be required
to show a planned expenditure of three percent of the first $250,000 in construction or
improvement cost plus two percent of the next $250,000 in construction or improvement cost,
plus one percent of the remaining cost over $500,000. The landscaping budget shall be
prepared by a landscape architect or professional landscape designer.
The cost of the proposed building addition is $400,000, requiring a minimum of $10,050 worth
of landscaping plantings. The applicant has proposed fifteen 3” caliper trees, sixteen large
shrubs, and a 500 sf area of creeping myrtle. The value of this landscaping is $13,000, which
exceeds the minimum required landscaping value of $10,050. The applicant has posted a
landscaping surety of $10,500, representing the required surety for the provided landscaping,
in accordance with the methodology in 17.15B(1)(b). This bond shall remain in full effect for
three (3) years to assure that the landscaping has taken root and has a good chance of survival.
13.07 Exterior Lighting
Lighting requirements are summarized as follows.
(1) Fixtures must be downcast and shielded.
(2) Illumination must be evenly distributed.
(3) Fixtures must be placed to minimize lighting from becoming a nuisance.
(4) Poles shall be rustproof metal, cast iron, fiberglass, finished wood or similar
structural material, with a decorative surface or finish.
(5) Poles & building mounted fixtures may be no higher than 30 feet.
(6) Poles must be located in safe locations.
#SP-24-15
- 6 -
Specific requirements for maximum illumination levels are included in Appendix A and are limited
to 3-foot candles average at ground level. The applicant has indicated that no changes to existing
exterior lighting fixtures and no new exterior lighting fixtures are proposed.
DECISION
Based on the above Findings of Fact, the Administrative Officer hereby approves site plan
application #SP-24-15 of M Yusuf Ali, subject to the following conditions:
1. All previous approvals and stipulations which are not superseded by this approval shall remain
in effect.
2. This project shall be completed as shown on the plan and shall be on file in the South
Burlington Department of Planning and Zoning.
3. The Administrative Officer concurrently issues ZP-24-291.
4. The applicant shall obtain a Certificate of Occupancy from the Administrative Officer prior to
use of the building addition.
5. Temporary structures used in conjunction with construction work shall be permitted only
during the period that the construction is in progress.
6. Any exterior lighting must be installed or shielded in such a manner as to conceal light sources
and reflector surfaces from view beyond the perimeter of the area to be illuminated.
7. The applicant’s posted landscaping bond shall remain in full effect for three (3) years to assure
that the landscaping has taken root and has a good chance of survival.
8. The applicant must continue to maintain the approved landscaping in a vigorous growing
condition throughout the duration of the use.
9. Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines,
services, and service modifications must be underground.
10. The proposed project must adhere to standards for erosion control as set forth in Section 16.03
of the South Burlington Land Development Regulations. In addition, the grading plan must
meet the standards set forth in Section 16.04 of the South Burlington Land Development
Regulations.
11. Bicycle racks must meet the minimum requirements of 13.14 and Appendix G.
12. Any change to the site plan shall require approval by the South Burlington Administrative
Officer or the Development Review Board, as allowed under the Land Development
Regulations.
Signed on this 27th day of September, 2024 by
Marty Gillies, acting Administrative Officer
#SP-24-15
- 7 -
PLEASE NOTE: Pursuant to 24 VSA §4465, an interested person may appeal this decision by filing
a Notice of Appeal with the secretary of the Development Review Board. This Notice of Appeal
must be accompanied with a $233 filing fee and be filed within 15 days of the date of this decision.
The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state
permits for this project. Call 802.477.2241 to speak with the regional Permit Specialist.