HomeMy WebLinkAboutSP-24-08 - Supplemental - 0870 Williston Road (37)Version: 1/29/2018 Treatment Wetlands (4.3.5) 1 2 3 4 5 6 * Questions preceded by an asterix (*) may change based on previously entered values 7 8 9 10 11* 12* 13* 14 15 16 17 18 19* 20* 21 22 23 24 25 26 27 28 29 30 Attachment location: Indicate the specific location (i.e. appendix, page, plan sheet) where the requisite support documentation has been provided within the application. Practice Drainage Area New Impervious (acres) Redeveloped Impervious Practice Type Discharges to Cold or Warm Water Fishery? Note: Designers may use the Practice Drainage Area Runoff Calculator (second tab) for calculation of practice-specific runoff volumes for other treatment standards. Conveyance (4.3.5.2) Are inlets stabilized to ensure that non-erosive conditions exist for at least the 1-year, 24 hour storm? Has a low for orifice been provided to meet the the WQV and CPV extended detention requirements and designed to ensure no clogging will occur? Have the outfalls and the conveyance to the discharge point been designed and protected to avoid erosion? Has a liner designed in accordance with Section 4.3.5.2 been provided if the infiltration rate exceed 0.05 inches per hour and the wetland is located above the average groundwater table? Have inlet pipes been set at the permanent pool or the base of the gravel bed? Is outlet elevation designed such that a sub-surface water level is maintained in the gravel wetland? If the gravel wetland is designed with an organic soil layer at the surface, have vertical perforated riser pipes been provided to deliver stormwater stormwater from the surface down to the gravel bed? Pre-Treatment (4.3.6.3) Has pretreatment been provided for non-rooftop runoff? What type of pretreatment is being used? Treatment (4.3.6.4) What is the volume stored in the forebay or other volumetric pre-treatment if used? (minimum 10% WQV) What is the volume stored in the permanent pool? What is the total WQV stored at the normal water level (pre-treatment + permanent pool)? Does the pre-treatment volume plus the permanent pool equal at least 50% of the WQV? Is the remaining WQV provided for by extended detention over 24 hours? Has a minimum flow path at normal water level of 3:1 been provided? What is the Storage Volume of the practice. Include the permanent pool and any volume used for providing extended detention. Landscaping (4.3.6.5) Are all deep pool areas of ≥ 4 feet depth with side slopes steeper than 4:1 (H:V) surrounded by a safety bench with ≤6% slope extending 10 feet outward from the normal water edge to the toe of the side slope? Has an aquatic been been provided that extends at least 5 feet inward from the normal water edge and is no more than 18 inches deep? Has a planting plan been prepared showing how aquatic and terrestrial areas will be stabilized, including plant species, plant locations, sources of plant material and any required soil amendments? Has a setback been provided that extends 25 feet from the maximum design water surface elevation of the practice? Does the planting plan specify that no woody vegetation >2 inches in diameter shall be planted or allowed to grow on the dam, within 15 feet of the dam or the toe of the embankment, or within 25 of a principal spillway outlet? Are any donor organic soils used in the practice obtained from a source other than natural wetlands? Total Area (acres) WQV to practice For Permit Coverage 13.9123908218549 1.42736328512397 8.54555926538108 WQV for credit 0.511564746718128 ↑Enter this value on the Standards Compliance Workbook Not for Permit Coverage 0 0 0 WQV not for credit 0 2 Total to Practice 13.9123908218549 1.42736328512397 8.54555926538108 Total WQV 0.511564746718128 2 Project Name: Discharge Point: Treatment Wetland # Modified CN for WQ (1.0") storm ft3 ft3 ft3 ac-ft DoubleTree & Catamount Woods 1 1 Response Response Response 0 11989 11989 0.538015119644352 1.23 Response 92.8173018766671 Attachment location No direct pipe inlets Modeling Plans Plans N/A Plans Plans Attachment location Plans Attachment location N/A Modeling Yes Modeling Plans Enter this on the eNOI Attachment location No deep pools N/A Plans N/A Plans Practice Drainage Area Runoff Calculator This tool may be used to calculate the required treatment volumes for the area draining to an individual practice where the practices drainage area is only a portion of of the area draining to a discharge point. Where the practice receives runoff from the entire area to a discharge point, this calculator will give the same information as the Standards Compliance Workbook. Precipitation Data Storm Precipitation (inches) Drainage Area Information Pre Development Land Use (acres) Landuse Grass Meadow Woods Pavement, roofs, and other impervious Total Post Development Land Use (acres) Landuse Grass Meadow Woods Pavement, roofs, and other impervious Total TV of upstream practices: Treatment Standard Channel Protection (Hydrologic Condition Method) Overbank Flood Extreme Flood Information for Calculating TC by the Watershed Lag Method Pre Development Post Development, upstream of practice Post Development, with TV credit from practice * Preciptation values shall be obtained from WQ Storm 1 Hydrologic Soil Group A 0 0 0 0 0 Hydrologic Soil Group A 1.96844934113866 0 0 3.65542956382002 5.62387890495868 0 Required Treatment Volume 1.43006621899151 2.66135090129748 4.19407065870067 Average Catchment Slope, Y (%) 0.0765 0.0765 0 1 yr, 24 hr 1.87 B 0 0 0 0 0 B 0.18314822543618 0 0 1.05950447658402 1.2426527020202 ac-ft Post Development Runoff Volume 1.43006621899151 2.66135090129748 4.19407065870067 Hydraulic Length, l (ft) 915 575 10 yr, 24 hr 3.2 C 0 0 0 0 0 C 0.736161724058769 0 0 3.57051078282828 4.30667250688705 Pre-development Runoff Volume 0 0 0 Time of Concentration, TC (min) 1 yr 0 4.44617521855735 0 Project Name: Discharge Point: Treatment Wetland # NOAA Atlas 14 100 yr, 24 hr 4.78 D 0 0 0 0 0 D 1.03795491505969 0 0 1.70123180211203 2.73918671717172 TV credit of this practice: Post Composite CN (to practice) 93.4812600526039 91.4070250234256 89.5456425183993 10 yr 0 4.88228827895215 0 DoubleTree & Catamount Woods 1 1 Total (acres) 0 0 0 0 0 Total (acres) 3.9257142056933 0 0 9.98667662534435 13.9123908310376 0 CNAdj (with TV practice credit) 93.4812600526039 91.4070250234256 89.5456425183993 100 yr 0 5.2761826739282 0 ac-ft Pre Composite CN 0 0 0 Practice Drainage Area Runoff Calculator This tool may be used to calculate the required treatment volumes for the area draining to an individual practice where the practices drainage area is only a portion of of the area draining to a discharge point. Where the practice receives runoff from the entire area to a discharge point, this calculator will give the same information as the Standards Compliance Workbook. Precipitation Data Storm Precipitation (inches) Drainage Area Information Pre Development Land Use (acres) Landuse Grass Meadow Woods Pavement, roofs, and other impervious Total Post Development Land Use (acres) Landuse Grass Meadow Woods Pavement, roofs, and other impervious Total TV of upstream practices: Treatment Standard Channel Protection (Hydrologic Condition Method) Overbank Flood Extreme Flood Information for Calculating TC by the Watershed Lag Method Pre Development Post Development, upstream of practice Post Development, with TV credit from practice * Preciptation values shall be obtained from WQ Storm 1 Hydrologic Soil Group A 0 0 0 0 0 Hydrologic Soil Group A 0 0 0 0 0 0 Required Treatment Volume 0.31388034807053 0.599086061799498 0.955880534659443 Average Catchment Slope, Y (%) 0.0765 0.0651 0 1 yr, 24 hr 1.87 B 0 0 0 0 0 B 0.133139129935721 0 0 0.335057291092746 0.468196421028466 ac-ft Post Development Runoff Volume 0.31388034807053 0.599086061799498 0.955880534659443 Hydraulic Length, l (ft) 915 397 10 yr, 24 hr 3.2 C 0 0 0 0 0 C 0.335762559687787 0 0 1.10331776170799 1.43908032139578 Pre-development Runoff Volume 0 0 0 Time of Concentration, TC (min) 1 yr 0 3.47628111427668 0 Project Name: Discharge Point: Treatment Wetland # NOAA Atlas 14 100 yr, 24 hr 4.78 D 0 0 0 0 0 D 0.336748014233241 0 0 0.687822268135905 1.02457028236915 TV credit of this practice: Post Composite CN (to practice) 94.1162633194491 93.0648474562001 92.3534558269923 10 yr 0 3.65408972047494 0 DoubleTree & Catamount Woods 1 1 Total (acres) 0 0 0 0 0 Total (acres) 0.805649703856749 0 0 2.12619732093664 2.93184702479339 0 CNAdj (with TV practice credit) 94.1162633194491 93.0648474562001 92.3534558269923 100 yr 0 3.77455576716007 0 ac-ft Pre Composite CN 0 0 0 Practice Drainage Area Runoff Calculator This tool may be used to calculate the required treatment volumes for the area draining to an individual practice where the practices drainage area is only a portion of of the area draining to a discharge point. Where the practice receives runoff from the entire area to a discharge point, this calculator will give the same information as the Standards Compliance Workbook. Precipitation Data Storm Precipitation (inches) Drainage Area Information Pre Development Land Use (acres) Landuse Grass Meadow Woods Pavement, roofs, and other impervious Total Post Development Land Use (acres) Landuse Grass Meadow Woods Pavement, roofs, and other impervious Total TV of upstream practices: Treatment Standard Channel Protection (Hydrologic Condition Method) Overbank Flood Extreme Flood Information for Calculating TC by the Watershed Lag Method Pre Development Post Development, upstream of practice Post Development, with TV credit from practice * Preciptation values shall be obtained from WQ Storm 1 Hydrologic Soil Group A 0 0 0 0 0 Hydrologic Soil Group A 0 0 0 0 0 0 Required Treatment Volume 0.159681363017431 0.287953441788715 0.440886509423278 Average Catchment Slope, Y (%) 0.0765 0.01 0 1 yr, 24 hr 1.87 B 0 0 0 0 0 B 0 0 0 0.420189912764004 0.420189912764004 ac-ft Post Development Runoff Volume 0.159681363017431 0.287953441788715 0.440886509423278 Hydraulic Length, l (ft) 915 194 10 yr, 24 hr 3.2 C 0 0 0 0 0 C 0 0 0 0.744244132231405 0.744244132231405 Pre-development Runoff Volume 0 0 0 Time of Concentration, TC (min) 1 yr 0 4.05458990847333 0 Project Name: Discharge Point: Treatment Wetland # NOAA Atlas 14 100 yr, 24 hr 4.78 D 0 0 0 0 0 D 0 0 0 0 0 TV credit of this practice: Post Composite CN (to practice) 98 97.9999999999999 97.9999999999999 10 yr 0 4.05458990847335 0 DoubleTree & Catamount Woods 1 1 Total (acres) 0 0 0 0 0 Total (acres) 0 0 0 1.16443404499541 1.16443404499541 0 CNAdj (with TV practice credit) 98 97.9999999999999 97.9999999999999 100 yr 0 4.05458990847335 0 ac-ft Pre Composite CN 0 0 0 Practice Drainage Area Runoff Calculator This tool may be used to calculate the required treatment volumes for the area draining to an individual practice where the practices drainage area is only a portion of of the area draining to a discharge point. Where the practice receives runoff from the entire area to a discharge point, this calculator will give the same information as the Standards Compliance Workbook. Precipitation Data Storm Precipitation (inches) Drainage Area Information Pre Development Land Use (acres) Landuse Grass Meadow Woods Pavement, roofs, and other impervious Total Post Development Land Use (acres) Landuse Grass Meadow Woods Pavement, roofs, and other impervious Total TV of upstream practices: Treatment Standard Channel Protection (Hydrologic Condition Method) Overbank Flood Extreme Flood Information for Calculating TC by the Watershed Lag Method Pre Development Post Development, upstream of practice Post Development, with TV credit from practice * Preciptation values shall be obtained from WQ Storm 1 Hydrologic Soil Group A 0 0 0 0 0 Hydrologic Soil Group A 0 0 0 0.193353257575758 0.193353257575758 0 Required Treatment Volume 4.36156205544904E-02 7.86520594331671E-02 0.120424439892214 Average Catchment Slope, Y (%) 0.0765 0.01 0 1 yr, 24 hr 1.87 B 0 0 0 0 0 B 0 0 0 2.69575987144169E-02 2.69575987144169E-02 ac-ft Post Development Runoff Volume 4.36156205544904E-02 7.86520594331671E-02 0.120424439892214 Hydraulic Length, l (ft) 915 70 10 yr, 24 hr 3.2 C 0 0 0 0 0 C 0 0 0 9.77445041322314E-02 9.77445041322314E-02 Pre-development Runoff Volume 0 0 0 Time of Concentration, TC (min) 1 yr 0 1.79384115352286 0 Project Name: Discharge Point: Treatment Wetland # NOAA Atlas 14 100 yr, 24 hr 4.78 D 0 0 0 0 0 D 0 0 0 0 0 TV credit of this practice: Post Composite CN (to practice) 98 97.9999999999999 97.9999999999999 10 yr 0 1.79384115352286 0 DoubleTree & Catamount Woods 1 1 Total (acres) 0 0 0 0 0 Total (acres) 0 0 0 0.318055360422406 0.318055360422406 0 CNAdj (with TV practice credit) 98 97.9999999999999 97.9999999999999 100 yr 0 1.79384115352286 0 ac-ft Pre Composite CN 0 0 0 Practice Drainage Area Runoff Calculator This tool may be used to calculate the required treatment volumes for the area draining to an individual practice where the practices drainage area is only a portion of of the area draining to a discharge point. Where the practice receives runoff from the entire area to a discharge point, this calculator will give the same information as the Standards Compliance Workbook. Precipitation Data Storm Precipitation (inches) Drainage Area Information Pre Development Land Use (acres) Landuse Grass Meadow Woods Pavement, roofs, and other impervious Total Post Development Land Use (acres) Landuse Grass Meadow Woods Pavement, roofs, and other impervious Total TV of upstream practices: Treatment Standard Channel Protection (Hydrologic Condition Method) Overbank Flood Extreme Flood Information for Calculating TC by the Watershed Lag Method Pre Development Post Development, upstream of practice Post Development, with TV credit from practice * Preciptation values shall be obtained from WQ Storm 1 Hydrologic Soil Group A 0 0 0 0 0 Hydrologic Soil Group A 0 0 0 0.695082465564738 0.695082465564738 0 Required Treatment Volume 0.318638312947249 0.578501264614191 0.890245666946976 Average Catchment Slope, Y (%) 0.0765 0.01 0 1 yr, 24 hr 1.87 B 0 0 0 0 0 B 0 0 0 0 0 ac-ft Post Development Runoff Volume 0.318638312947249 0.578501264614191 0.890245666946976 Hydraulic Length, l (ft) 915 70 10 yr, 24 hr 3.2 C 0 0 0 0 0 C 7.64121051423324E-02 0 0 1.23157564279155 1.30798774793388 Pre-development Runoff Volume 0 0 0 Time of Concentration, TC (min) 1 yr 0 1.84657432497283 0 Project Name: Discharge Point: Treatment Wetland # NOAA Atlas 14 100 yr, 24 hr 4.78 D 0 0 0 0 0 D 1.44863016528926E-02 0 0 0.379140890725436 0.393627192378329 TV credit of this practice: Post Composite CN (to practice) 97.5137474987763 97.3632972561251 97.2562582036521 10 yr 0 1.86286527278929 0 DoubleTree & Catamount Woods 1 1 Total (acres) 0 0 0 0 0 Total (acres) 0.090898406795225 0 0 2.30579899908173 2.39669740587695 0 CNAdj (with TV practice credit) 97.5137474987763 97.3632972561251 97.2562582036521 100 yr 0 1.874449055724 0 ac-ft Pre Composite CN 0 0 0 Practice Drainage Area Runoff Calculator This tool may be used to calculate the required treatment volumes for the area draining to an individual practice where the practices drainage area is only a portion of of the area draining to a discharge point. Where the practice receives runoff from the entire area to a discharge point, this calculator will give the same information as the Standards Compliance Workbook. Precipitation Data Storm Precipitation (inches) Drainage Area Information Pre Development Land Use (acres) Landuse Grass Meadow Woods Pavement, roofs, and other impervious Total Post Development Land Use (acres) Landuse Grass Meadow Woods Pavement, roofs, and other impervious Total TV of upstream practices: Treatment Standard Channel Protection (Hydrologic Condition Method) Overbank Flood Extreme Flood Information for Calculating TC by the Watershed Lag Method Pre Development Post Development, upstream of practice Post Development, with TV credit from practice * Preciptation values shall be obtained from WQ Storm 1 Hydrologic Soil Group A 0 0 0 0 0 Hydrologic Soil Group A 1.18251603305785 0 0 1.48459929063361 2.66711532369146 0 Required Treatment Volume 0.214137774228045 0.387013819121243 0.608927296831818 Average Catchment Slope, Y (%) 0.0765 0.03 0 1 yr, 24 hr 1.87 B 0 0 0 0 0 B 0 0 0 0 0 ac-ft Post Development Runoff Volume 0.214137774228045 0.387013819121243 0.608927296831818 Hydraulic Length, l (ft) 915 254 10 yr, 24 hr 3.2 C 0 0 0 0 0 C 0 0 0 0 0 Pre-development Runoff Volume 0 0 0 Time of Concentration, TC (min) 1 yr 0 4.44808908175174 0 Project Name: Discharge Point: Treatment Wetland # NOAA Atlas 14 100 yr, 24 hr 4.78 D 0 0 0 0 0 D 1.88140151515152E-02 0 0 7.13988429752066E-02 9.02128581267218E-02 TV credit of this practice: Post Composite CN (to practice) 89.1744549800749 84.0264609153965 79.4176821387466 10 yr 0 5.37449313947357 0 DoubleTree & Catamount Woods 1 1 Total (acres) 0 0 0 0 0 Total (acres) 1.20133004820937 0 0 1.55599813360882 2.75732818181818 0 CNAdj (with TV practice credit) 89.1744549800749 84.0264609153965 79.4176821387466 100 yr 0 6.24106802741743 0 ac-ft Pre Composite CN 0 0 0 Practice Drainage Area Runoff Calculator This tool may be used to calculate the required treatment volumes for the area draining to an individual practice where the practices drainage area is only a portion of of the area draining to a discharge point. Where the practice receives runoff from the entire area to a discharge point, this calculator will give the same information as the Standards Compliance Workbook. Precipitation Data Storm Precipitation (inches) Drainage Area Information Pre Development Land Use (acres) Landuse Grass Meadow Woods Pavement, roofs, and other impervious Total Post Development Land Use (acres) Landuse Grass Meadow Woods Pavement, roofs, and other impervious Total TV of upstream practices: Treatment Standard Channel Protection (Hydrologic Condition Method) Overbank Flood Extreme Flood Information for Calculating TC by the Watershed Lag Method Pre Development Post Development, upstream of practice Post Development, with TV credit from practice * Preciptation values shall be obtained from WQ Storm 1 Hydrologic Soil Group A 0 0 0 0 0 Hydrologic Soil Group A 0.452850748393021 0 0 0.764282525252525 1.21713327364555 0 Required Treatment Volume 0.174356171547034 0.335677508862599 0.542268768403967 Average Catchment Slope, Y (%) 0.0765 0.06 0 1 yr, 24 hr 1.87 B 0 0 0 0 0 B 0 0 0 0 0 ac-ft Post Development Runoff Volume 0.174356171547034 0.335677508862599 0.542268768403967 Hydraulic Length, l (ft) 915.2481 575 10 yr, 24 hr 3.2 C 0 0 0 0 0 C 0 0 0 0 0 Pre-development Runoff Volume 0 0 0 Time of Concentration, TC (min) 1 yr 0 5.74327646608346 0 Project Name: Discharge Point: Treatment Wetland # NOAA Atlas 14 100 yr, 24 hr 4.78 D 0 0 0 0 0 D 0.483521896235078 0 0 0.364660107897153 0.848182004132231 TV credit of this practice: Post Composite CN (to practice) 90.4409613974139 87.4357772134837 84.848132484932 10 yr 0 6.46695237563446 0 DoubleTree & Catamount Woods 1 1 Total (acres) 0 0 0 0 0 Total (acres) 0.936372644628099 0 0 1.12894263314968 2.06531527777778 0 CNAdj (with TV practice credit) 90.4409613974139 87.4357772134837 84.848132484932 100 yr 0 7.10175998971331 0 ac-ft Pre Composite CN 0 0 0 Practice Drainage Area Runoff Calculator This tool may be used to calculate the required treatment volumes for the area draining to an individual practice where the practices drainage area is only a portion of of the area draining to a discharge point. Where the practice receives runoff from the entire area to a discharge point, this calculator will give the same information as the Standards Compliance Workbook. Precipitation Data Storm Precipitation (inches) Drainage Area Information Pre Development Land Use (acres) Landuse Grass Meadow Woods Pavement, roofs, and other impervious Total Post Development Land Use (acres) Landuse Grass Meadow Woods Pavement, roofs, and other impervious Total TV of upstream practices: Treatment Standard Channel Protection (Hydrologic Condition Method) Overbank Flood Extreme Flood Information for Calculating TC by the Watershed Lag Method Pre Development Post Development, upstream of practice Post Development, with TV credit from practice * Preciptation values shall be obtained from WQ Storm 1 Hydrologic Soil Group A 0 0 0 0 0 Hydrologic Soil Group A 0.333082559687787 0 0 0.518112024793388 0.851194584481175 0 Required Treatment Volume 0.205756628626735 0.394466745678067 0.635437442542971 Average Catchment Slope, Y (%) 0.0765 0.08 0 1 yr, 24 hr 1.87 B 0 0 0 0 0 B 5.00090955004591E-02 0 0 0.277299674012856 0.327308769513315 ac-ft Post Development Runoff Volume 0.205756628626735 0.394466745678067 0.635437442542971 Hydraulic Length, l (ft) 915.2481 217 0 10 yr, 24 hr 3.2 C 0 0 0 0 0 C 0.32398705922865 0 0 0.393628741965106 0.717615801193756 Pre-development Runoff Volume 0 0 0 Time of Concentration, TC (min) 1 yr 0 2.18330771481379 0 Project Name: Discharge Point: Treatment Wetland # NOAA Atlas 14 100 yr, 24 hr 4.78 D 0 0 0 0 0 D 0.18438468778696 0 0 0.198209692378329 0.382594380165289 TV credit of this practice: Post Composite CN (to practice) 91.4724018723412 88.9506870318216 86.8558671969832 10 yr 0 2.42292003700018 0 DoubleTree & Catamount Woods 1 1 Total (acres) 0 0 0 0 0 Total (acres) 0.891463402203857 0 0 1.38725013314968 2.27871353535354 0 CNAdj (with TV practice credit) 91.4724018723412 88.9506870318216 86.8558671969832 100 yr 0 2.62448133888515 0 ac-ft Pre Composite CN 0 0 0 Curve Numbers Landuse Grass Meadow Woods Gravel/ Unpaved Roads Pavement, Roofs, and other impervious S=1000/CN - 10 Landuse Grass Meadow Woods Gravel/ Unpaved Roads Pavement, Roofs, and other impervious (not gravel) Recharge Factors Hydrologic Soil Group Recharge Factor Hydrologic Soil Group A 39 30 30 96 98 Hydrologic Soil Group A 15.6410256410256 23.3333333333333 23.3333333333333 0.416666666666666 0.204081632653061 A 0.6 B 61 58 55 96 98 B 6.39344262295082 7.24137931034483 8.18181818181818 0.416666666666666 0.204081632653061 B 0.35 C 74 71 70 96 98 C 3.51351351351351 4.08450704225352 4.28571428571429 0.416666666666666 0.204081632653061 C 0.25 D 80 78 77 96 98 D 2.5 2.82051282051282 2.98701298701299 0.416666666666666 0.204081632653061 D 0