Loading...
HomeMy WebLinkAbout0500 Old Farm Road - Infrastructure - 9/25/2024Date 9/16/2024 TABLE 1 Eastview Master Plan Letter of Credit (LOC) Description Current Letter of Credit Balance Table 2 Value of Work Remaining to Complete Table 3 Value of Work Remaining to Complete LOC Excess/Deficit (Current LOC Balance less Value of Work Remaining to Complete from Tables 2 and 3 New/Adjusted LOC Total (Current LOC Balance less Excess/Deficit) Infrastructure 2,838,765.12$ 2,102,598.87$ -$ 736,166.25$ 2,838,765.12$ Landscape 152,855.00$ -$ 152,855.00$ -$ 152,855.00$ Total 2,991,620.12$ TABLE 2 Infrastructure Improvements Based on Plans in Approvals ZP Reference(s)Phase Number Hillside Master Plan Phase Name Blasting Restabilization Budget Approved by DPW Includes 10% Contingency Infrastructure Budget Approved by DPW Includes 10% Contingency Street Tree Budget Approved at Final Plat (Includes 10% Contingency) Total LOC Amount (Sum of Budgets for Infrastructure and Street Trees) Percentage of Total LOC Amount Complete Value of Work Remaining to Complete (Total LOC Amount less Amount Complete) Amount Required to Secure Remaining Work 1 IC Roadway and Construction Staging Area $ - 50,000.00$ 50,000.00$ 0% $ 50,000.00 $ 50,000.00 2 Leo Lane and Associated Homes. Lot 18 Open Space $ - 1,714,388.50$ 91,080.00$ 1,805,468.50$ 76% $ 437,280.23 $ 437,280.23 2A Lot 19 Open Space $ - -$ -$ -$ 0% $ - $ - 3 Daniel Drive, Barn Road and South Mabel Way $ - 2,065,061.92$ 116,100.00$ 2,181,161.92$ 30% $ 1,531,718.64 $ 1,531,718.64 4 Soil Stockpile and Fill Area $ 10,560.00 -$ -$ 10,560.00$ 0% $ 10,560.00 $ 10,560.00 5 Mabel Way North $ 30,800.00 -$ -$ 30,800.00$ 0% $ 30,800.00 $ 30,800.00 6 Existing Old Farm Road Improvements And Alley Load Homes $ 17,600.00 -$ -$ 17,600.00$ 0% $ 17,600.00 $ 17,600.00 7 Barn Improvements and Old Farm Parallel Parking, Sidewalk $ - -$ -$ -$ 0% $ - $ - 8 Relocated Old Farm Road, Stormwater and Rec Path from Old Farm Road to Kennedy Drive $ - -$ -$ -$ 0% $ - $ - 9 O'Brien Farm Road Cul-De- Sac $ 24,640.00 -$ -$ 24,640.00$ 0% $ 24,640.00 $ 24,640.00 10 O'Brien Farm Road Extension to Old Farm Road $ - -$ -$ -$ 0% $ - $ - 11 Open Space Park Amenity $ - -$ -$ -$ 0% $ - $ - 12 Open Space Park Amenitiy and Playground $ - -$ -$ -$ 0% $ - $ - 13 Old Farm Road and Kimball Avenue Intersection Traffic Light $ - -$ -$ -$ 0% $ - $ - 14 Potash Road $ - -$ -$ -$ 0% $ - $ - 15 Potash Road Kimball Avenue Intersection Traffic Light $ - -$ -$ -$ 0% $ - $ - 16 Open Space Amenity IC Trail Including Fitness Stations in Phase 11. $ - -$ -$ -$ 0% $ - $ - 17 Old Farm Road Sidewalk to 116 $ - -$ -$ -$ 0% $ - $ - 18 Kimball Ave. Rec Path $ - -$ -$ -$ 0% $ - $ - 83,600.00$ 3,829,450.42$ 207,180.00$ 4,120,230.42$ 2,102,598.87$ 2,102,598.87$ TABLE 3 Required Landscaping Based Landscape Plans In Approvals ZP Reference(s)Phase Number Hillside Master Plan Phase Landscaping Budget Approved at Final Plat LOC Amount Required Under LDR effective 2020- 12-28 Percent Complete as of 05/23/2022 Value of Work Remaining to Complete Value of Work Completed to Be Released 3-Years From Submission 0 Ordinance Base Fee $ 10,000.00 $ 10,000.00 0.00%10,000.00$ TBD 1 IC Roadway and Construction Staging Area -$ -$ 0.00%-$ TBD 2 Leo Lane and Associated Homes.154,761.00$ 72,380.50$ 0.00%72,380.50$ TBD 3 Daniel Drive, Barn Road and South Mabel Way 140,949.00$ 70,474.50$ 0.00%70,474.50$ TBD 4 Soil Stockpile and Fill Area -$ -$ 0.00%-$ TBD 5 Mabel Way North -$ -$ 0.00%-$ TBD 6 Existing Old Farm Road Improvements And Alley Load Homes -$ -$ 0.00%-$ TBD 7 Barn Improvements and Old Farm Parallel Parking, Sidewalk -$ -$ 0.00%-$ TBD 8 Relocated Old Farm Road, Stormwater and Rec Path from Old Farm Road to Kennedy Drive -$ -$ 0.00%-$ TBD 9 O'Brien Farm Road Cul-De- Sac -$ -$ 0.00%-$ TBD 10 O'Brien Farm Road Extension to Old Farm Road -$ -$ 0.00%-$ TBD 11 Open Space Park Amenity -$ -$ 0.00%-$ TBD 12 Open Space Park Amenitiy and Playground -$ -$ 0.00%-$ TBD 13 Old Farm Road and Kimball Avenue Intersection Traffic Light -$ -$ 0.00%-$ TBD 14 Potash Road -$ -$ 0.00%-$ TBD 15 Potash Road Kimball Avenue Intersection Traffic Light -$ -$ 0.00%-$ TBD 16 Open Space Amenity IC Trail Including Fitness Stations in Phase 11.-$ -$ 0.00%-$ TBD 17 Old Farm Road Sidewalk to 116 -$ -$ 0.00%-$ TBD 18 Kimball Ave. Rec Path -$ -$ 0.00%-$ TBD Totals 295,710.00$ 152,855.00$ 152,855.00$ -$ Date 9/5/2024 TABLE 1 Eastview Master Plan Letter of Credit (LOC) Description Current Letter of Credit Balance Table 2 Value of Work Remaining to Complete Table 3 Value of Work Remaining to Complete LOC Excess/Deficit (Current LOC Balance less Value of Work Remaining to Complete from Tables 2 and 3 New/Adjusted LOC Total (Current LOC Balance less Excess/Deficit) Infrastructure 2,838,765.12$ 2,102,598.87$ -$ 736,166.25$ 2,838,765.12$ Landscape 152,855.00$ -$ 152,855.00$ -$ 152,855.00$ Total 2,991,620.12$ TABLE 2 Infrastructure Improvements Based on Plans in Approvals ZP Reference(s)Phase Number Hillside Master Plan Phase Name Blasting Restabilization Budget Approved by DPW Includes 10% Contingency Infrastructure Budget Approved by DPW Includes 10% Contingency Street Tree Budget Approved at Final Plat (Includes 10% Contingency) Total LOC Amount (Sum of Budgets for Infrastructure and Street Trees) Percentage of Total LOC Amount Complete Value of Work Remaining to Complete (Total LOC Amount less Amount Complete) Amount Required to Secure Remaining Work 1 IC Roadway and Construction Staging Area $ - 50,000.00$ 50,000.00$ 0% $ 50,000.00 $ 50,000.00 2 Leo Lane and Associated Homes. Lot 18 Open Space $ - 1,714,388.50$ 91,080.00$ 1,805,468.50$ 76% $ 437,280.23 $ 437,280.23 2A Lot 19 Open Space $ - -$ -$ -$ 0% $ - $ - 3 Daniel Drive, Barn Road and South Mabel Way $ - 2,065,061.92$ 116,100.00$ 2,181,161.92$ 30% $ 1,531,718.64 $ 1,531,718.64 4 Soil Stockpile and Fill Area $ 10,560.00 -$ -$ 10,560.00$ 0% $ 10,560.00 $ 10,560.00 5 Mabel Way North $ 30,800.00 -$ -$ 30,800.00$ 0% $ 30,800.00 $ 30,800.00 6 Existing Old Farm Road Improvements And Alley Load Homes $ 17,600.00 -$ -$ 17,600.00$ 0% $ 17,600.00 $ 17,600.00 7 Barn Improvements and Old Farm Parallel Parking, Sidewalk $ - -$ -$ -$ 0% $ - $ - 8 Relocated Old Farm Road, Stormwater and Rec Path from Old Farm Road to Kennedy Drive $ - -$ -$ -$ 0% $ - $ - 9 O'Brien Farm Road Cul-De- Sac $ 24,640.00 -$ -$ 24,640.00$ 0% $ 24,640.00 $ 24,640.00 10 O'Brien Farm Road Extension to Old Farm Road $ - -$ -$ -$ 0% $ - $ - 11 Open Space Park Amenity $ - -$ -$ -$ 0% $ - $ - 12 Open Space Park Amenitiy and Playground $ - -$ -$ -$ 0% $ - $ - 13 Old Farm Road and Kimball Avenue Intersection Traffic Light $ - -$ -$ -$ 0% $ - $ - 14 Potash Road $ - -$ -$ -$ 0% $ - $ - 15 Potash Road Kimball Avenue Intersection Traffic Light $ - -$ -$ -$ 0% $ - $ - 16 Open Space Amenity IC Trail Including Fitness Stations in Phase 11. $ - -$ -$ -$ 0% $ - $ - 17 Old Farm Road Sidewalk to 116 $ - -$ -$ -$ 0% $ - $ - 18 Kimball Ave. Rec Path $ - -$ -$ -$ 0% $ - $ - 83,600.00$ 3,829,450.42$ 207,180.00$ 4,120,230.42$ 2,102,598.87$ 2,102,598.87$ TABLE 3 Required Landscaping Based Landscape Plans In Approvals ZP Reference(s)Phase Number Hillside Master Plan Phase Landscaping Budget Approved at Final Plat LOC Amount Required Under LDR effective 2020- 12-28 Percent Complete as of 05/23/2022 Value of Work Remaining to Complete Value of Work Completed to Be Released 3-Years From Submission 0 Ordinance Base Fee $ 10,000.00 $ 10,000.00 0.00%10,000.00$ TBD 1 IC Roadway and Construction Staging Area -$ -$ 0.00%-$ TBD 2 Leo Lane and Associated Homes.154,761.00$ 72,380.50$ 0.00%72,380.50$ TBD 3 Daniel Drive, Barn Road and South Mabel Way 140,949.00$ 70,474.50$ 0.00%70,474.50$ TBD 4 Soil Stockpile and Fill Area -$ -$ 0.00%-$ TBD 5 Mabel Way North -$ -$ 0.00%-$ TBD 6 Existing Old Farm Road Improvements And Alley Load Homes -$ -$ 0.00%-$ TBD 7 Barn Improvements and Old Farm Parallel Parking, Sidewalk -$ -$ 0.00%-$ TBD 8 Relocated Old Farm Road, Stormwater and Rec Path from Old Farm Road to Kennedy Drive -$ -$ 0.00%-$ TBD 9 O'Brien Farm Road Cul-De- Sac -$ -$ 0.00%-$ TBD 10 O'Brien Farm Road Extension to Old Farm Road -$ -$ 0.00%-$ TBD 11 Open Space Park Amenity -$ -$ 0.00%-$ TBD 12 Open Space Park Amenitiy and Playground -$ -$ 0.00%-$ TBD 13 Old Farm Road and Kimball Avenue Intersection Traffic Light -$ -$ 0.00%-$ TBD 14 Potash Road -$ -$ 0.00%-$ TBD 15 Potash Road Kimball Avenue Intersection Traffic Light -$ -$ 0.00%-$ TBD 16 Open Space Amenity IC Trail Including Fitness Stations in Phase 11.-$ -$ 0.00%-$ TBD 17 Old Farm Road Sidewalk to 116 -$ -$ 0.00%-$ TBD 18 Kimball Ave. Rec Path -$ -$ 0.00%-$ TBD Totals 295,710.00$ 152,855.00$ 152,855.00$ -$ 1 Betsy Brown From:Tom DiPietro Sent:Tuesday, August 27, 2024 5:50 PM To:Martha Machar; Marla Keene Cc:Scott Homsted; Evan Langfeldt; Betsy Brown; Andrew Gill Subject:Re: EXTERNAL: O'Brien Bond Release Attachments:Phase 2 Infrastrucure Update 08 08 24 release.pdf; Phase 3 Mabel Way, Daniel Drive and Barn Road Bond Release 08 08 24.pdf Follow Up Flag:Follow up Flag Status:Flagged Marla and Martha, I conducted a site visit today and recommend reduction of the O'brien bonds as requested. This includes:  Reduction of the phase 2 bond (Leo Lane) to $437,280.23.  Reduction of the phase 3 bond (Daniel, Barn, and South Mabel) to $1,531,718.64. Summary information for each bond is included in the attached. Please let me know if you need any additional information. -Tom From: Andrew Gill <andrew@obrienbrothersvt.com> Sent: Monday, August 19, 2024 11:29 AM To: Tom DiPietro <tdipietro@southburlingtonvt.gov> Cc: Scott Homsted <scott.homsted@krebsandlansing.com>; Evan Langfeldt <evan@obrienbrothersvt.com>; Marla Keene <mkeene@southburlingtonvt.gov>; Betsy Brown <bbrown@southburlingtonvt.gov> Subject: EXTERNAL: O'Brien Bond Release This message has originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. Good Morning Tom, As we prepare to file a zoning permit for the site preparation in Phase 5 (outlined in the draft budget you reviewed last week), I need to free up some bonding capacity. Given this, we are sending the attached documents for your review. As outlined in the attached, we have completed substantial work in both Phase 2 and Phase 3 of the project. We are not actually looking to reduce our letters of credit at this time, as future bonding will use these dollars. However, if you can confirm your concurrence with the attached, it will make those dollars available to allocate to the next phase. Attached please find both PDF and Excel files so that you can use what works best for you. Also attached are letters of concurrence from the project engineer. If you could provide your concurrence in the near term it will be appreciated. 2 Thank you. Andrew Gill Director of Development O’Brien Brothers Office: 802.658.5000 Cell: 802.734.2796 Fax: 802.658.5002 1855 Williston Road South Burlington, Vermont 05403 www.obrienbrothersvt.com Green, resilient Vermont living is here: www.HillsideVT.com