HomeMy WebLinkAboutSD-24-16 - Supplemental - 1200 Airport Drive (4)355 Main Street | Suite 500 | Winooski, VT 05404 | w. eivtech.com June 24, 2024 Marla Keene, PE Development Review Planner City of South Burlington 180 Market Street South Burlington, VT 05403 Re: Patrick Leahy Burlington International Airport Master Plan Sketch Plan Application Dear Marla Keene, The enclosed is the master plan permit application for the upcoming phases of the Patrick Leahy Burlington International Airport (BTV). Overall vision for and scope of the proposed development: BTV is proposing to develop approximately 21.81 Acres at various locations on the involved property. The overall vision for phase one is as follows: The scope for the NEXT North Concourse Replacement Project include demolishing the existing North Concourse wing, a space of approximately 4,250 square feet, serving Gates 3, 5, 6 and 7. This will allow for a more efficient and flexible gate layout as part of Project NEXT. The existing North Concourse wing will be replaced with the construction of a new 3-level building, with a footprint of 28,000 square feet. The lower level will include mechanical rooms and space to support the movement and storage of ground service equipment. The concourse level of this new building will include improved passenger amenities and seating areas. The upper level will include administrative space for Leahy BTV staff and a public viewing area with an outdoor space. The new building will be constructed adjacent to and connecting the existing passenger walkway between the North garage and the terminal. The existing structure will largely shield the new building from the Airport’s terminal roadway. The parking garages will block the view of this new building entirely from Airport Drive. The goal for the Recreation Path is to create a unified streetscape along the main corridor of the airport, namely along Airport Drive. This will be achieved through the careful and artistic placement of several cohesive elements: street trees, ornamental fencing, and a variety of other native plants, which will provide color and texture throughout the seasons while also supporting the pollution of pollinators like native bees, wasps, butterflies, and the non-native European honeybee. In addition to the proposed planting of native trees, shrubs and ornamental grasses, native stone walls, signage and sculpture by local artists is envisioned. 355 Main Street | Suite 500 | Winooski, VT 05404 | w. eivtech.com Land area and properties to be included under each phase of development: Phase 1: NEXT North Concourse Replacement Project (2024) Footprint: 28000 square feet Location: 44.470033, -73.155230 Description: The improvements include demolishing the existing North Concourse wing, a space of approximately 4,250 square feet, serving Gates 3, 5, 6 and 7. This will allow for a more efficient and flexible gate layout as part of Project NEXT. The existing North Concourse wing will be replaced with the construction of a new 3-level building, with a footprint of 28,000 square feet. The lower level will include mechanical rooms and space to support the movement and storage of ground service equipment. The concourse level of this new building will include improved passenger amenities and seating areas. The upper level will include administrative space for Leahy BTV staff and a public viewing area with an outdoor space. The new building will be constructed adjacent to and connecting the existing passenger walkway between the North garage and the terminal. The existing structure will largely shield the new building from the Airport’s terminal roadway. The parking garages will block the view of this new building entirely from Airport Drive. Recreation Path (2025) Footprint: 3.95 Acres Location: Airport Drive, Dumont Avenue, Airport Parkway, Kirby Road Description: The goal of this project is to create a unified streetscape along the main corridor of the airport, namely along Airport Drive. This will be achieved through the careful and artistic placement of several cohesive elements: street trees, ornamental fencing, and a variety of other native plants, which will provide color and texture throughout the seasons while also supporting the pollution of pollinators like native bees, wasps, butterflies, and the non-native European honeybee. In addition to the proposed planting of native trees, shrubs and ornamental grasses, native stone walls, signage and sculpture by local artists is envisioned. This project also involves the creation of a meandering Recreation Path through existing trees on the west side of Airport Drive. This will create connectivity to and with existing City walkways, Recreation paths, and Trails, so that the community can have better access for walking, running and biking. This paved path will meander through existing open area and among existing trees and will be punctuated by informal sitting areas composed of local boulders. The intent is to begin the streetscape construction first, beginning from the south end and moving toward the north end of Airport Drive. The Recreation Path would follow the completion of the Streetscape and would begin, again, at the south end of Airport Drive and move toward the north end of the Property as funds become available. 355 Main Street | Suite 500 | Winooski, VT 05404 | w. eivtech.com Land area and properties to be included under each phase of development: Phase 2: SRE Building (2025) Footprint: 8.34 Acres Location: 44.478857, -73.168567 Description: The Leahy Burlington International Airport (BTV) Snow Removal Equipment Building (SRE) is a one-story structure of approximately 41,500 sf, located adjacent to Taxiway G in the Northwest corner of the airfield. The building plan consists of two storage wings in a zee-shape configuration, united under a single gable roof. The Western wing is sized to accommodate the larger Multi-Tasking Equipment (MTE) with three bays of two stacked MTEs, with overhead and bi-fold doors at each end for pull-through traffic. The Eastern wing accommodates the remaining fleet of loaders, blowers, and plows in a double-loaded aisle, with overhead doors at the beginning and end, as well as flanking the sides for all pull-through traffic. In the center between these vehicle storage areas is a two-story space to house offices, locker rooms, and mezzanine storage. The zee-shape allows for maximum visibility on the surrounding apron and efficient maneuvering through the building, and the location and site layout are designed to provide maximum access to the runways and taxiways. The primary structure of the SRE will be a Pre-Engineered Metal Building (PEMB) frame of steel columns, beams, purlins, and girts. The building will be clad with insulated metal panels on the walls above an insulated precast concrete water table wall for enhanced durability at the ground level. Highlighting the envelope will be fiberglass panel clerestory ‘windows’, mounted high on the walls for safety and to bring diffuse natural light deep into the storage area. The sloped roof will also be of insulated metal panels, these with standing seams to lock the panels together and create a weathertight seal. The various materials are planned to be in earthy tones – tans and greens. Featured on the SRE will be angled signs for identification, but also to utilize elements that relate to the other buildings at BTV, including the main terminal. 355 Main Street | Suite 500 | Winooski, VT 05404 | w. eivtech.com Land area and properties to be included under each phase of development: Phase 3: Cargo Apron Project (2026) Footprint: 3.4 Acres Location: 44.465372, -73.149649 Description: Expand the existing cargo apron approximate 7,400 SY on the west side to accommodate a Boeing 767 cargo aircraft. Relocate the vehicle service road on the east side of Taxiway K to accommodate the apron expansion. Pratt and Whitney Hangar Expansion Footprint: 2.3 Acres Location: 44.464874, -73.145445 Description: This project will involve the expansion of the existing hangar and apron, as well as the relocation of the existing parking lot. South Concourse Footprint: 25,000 square feet Location: 44.467931, -73.154548 Description: This will be a southward extension of the Terminal Integration Project. The architectural elements of the TIP will be used for this extension, without significant adjustment. 355 Main Street | Suite 500 | Winooski, VT 05404 | w. eivtech.com Current zoning district designation: The NEXT North Concourse Replacement, South Concourse, Cargo Apron, Pratt and Whitney Hangar Expansion, and SRE Building are in the Airport Uses District (C1-Air). The SRE Building parking lot and driveway is inside the Mixed Industrial and Commercial District. The Recreation Path is located within the Residential 4 District. Proposed Planned Unit Development (PUD) types under Article 15.C as applicable: General PUD Feel free to contact Larry Lackey, or Jacqueline Dagesse at EIV with any questions regarding this submission, 802-324-5522. Very Respectfully, EIV Technical Services Jacqueline Dagesse, MBA, CPESC President / Environmental Engineer