HomeMy WebLinkAboutSP-24-28 - Supplemental - 1879 Williston Road (2)
180 Market Street South Burlington, VT 05403 tel 802.846.4106 www.southburlingtonvt.gov
Application #___-____-_____
(office use only) SITE PLAN / CONDITIONAL USE / MISCELLANEOUS / VARIANCE
APPLICATION FOR DEVELOPMENT REVIEW
All information requested on this application must be completed in full. Failure to provide the requested
information either on this application form or on the site plan will result in your application being rejected and a
delay in the review before the Development Review Board or Administrative Officer, as applicable.
Type of application (check):
( ) Site Plan Application
( ) Includes request for conditional use
( ) Stand-alone request for a conditional use (Form Based Code, single family and duplex residential
properties only)
( ) Miscellaneous Application
( ) Request for a variance. If you believe you are seeking a variance, please reach out to Planning and
Zoning Staff first.
1. PROJECT STREET ADDRESS:
2. OWNER(S) OF RECORD (Name(s) as shown on deed, mailing address, phone)
3. APPLICANT (Name, mailing address, phone)
4. CONTACT PERSON (person who will receive all correspondence from Staff. Include name, address, phone):
4a. Contact email address:
6. TAX PARCEL ID # (can be obtained at Assessor’s Office):
4
1879 Williston Road
PICVT, LLC
2176 Andrea Lane, Fort Myers, FL 33901
attn. Waasy Boddison, 239-275-5877
PICVT, LLC
2176 Andrea Lane, Fort Myers, FL 33901
attn. Jason McGahey, 239-275-5877 ext 134
Jeffrey P. Kershner, P.E.
Donald L. Hamlin Consulting Engineers, Inc.
136 Pearl Street, Essex Junction, VT 05452 phone: 802-878-3956
jkershner@dlhce.com
1810-01879
2 Site Plan Application Form. Rev. 01-2020
7. PROJECT DESCRIPTION
a. General project description (explain what you want approval for):
b. Existing Uses on Property (including description and size of each separate use):
c. Proposed Uses on property (include description and size of each new use and existing uses to remain):
d: Are Transfer of Development Rights (TDRs) being utilized? Yes No
If yes, please identify how many and from which parcel (street address)
e. Total building square footage on property (proposed buildings and existing buildings to remain):
f. Height of building & number of floors (proposed buildings and existing buildings to remain, specify if
basement and mezzanine):
g. Number of residential units (if applicable, new units and existing units to remain):
h. Number of employees (existing and proposed, note office versus non-office employees):
i. Type of existing or proposed encumbrances on property (easements, covenants, leases, rights of way, etc.)
The applicant is proposing to remove the existing soil piles and concrete blocks associated with the
previous pump track in the rear of the parcel, add additional fencing with a gate to isolate the rear
parking area, revise the location of the previously approved dumpster pad and enclosure, and revise the
previously approved landscaping in the front of the building.
Existing uses on the site include ±6,136 sf of light industrial space and ±1890 sf of professional
services.
No changes are proposed to the existing uses on the property.
4
The existing building is approximately 8,026 sf. No new buildings or additions are proposed
as part of this application.
The existing building is one story, with building heights varying from approximately 12-20 ft.
N/A
The existing light industrial space has 12 employees. The existing professional services facility
has 3 employees and approximately 20 clients per day.
There are three existing easements on the property: a City of South Burlington Storm Drainage
easement at the rear of the property, a Green Mountain Power Corporation utility easement on
the east edge of the property, and a City of South Burlington drainage and sewer easement on
the front of the property. No changes to existing easements are proposed.
3 Site Plan Application Form. Rev. 01-2020
j.Other (list any other information pertinent to this application not specifically requested above, please note
if Overlay Districts are applicable):
8. LOT COVERAGE (ALL information MUST be provided. For Planned Unit Developments involving multiple
parcels, attach additional sheets)
Total Parcel Size: acres / sq. ft.
a. Building:Existing % / sq. ft.
Proposed % / sq. ft.
b. Overall impervious coverage (building, parking, outside storage, etc)
Existing % / sq. ft.
Proposed % / sq. ft.
c. Front setback non-building coverage (along each street, commercial properties only)
Existing % / sq. ft.
Proposed % / sq. ft.
d. Total area to be disturbed during construction (sq. ft.) *
*Projects disturbing more than one-half acre of land must follow the City’s specifications for erosion
control in Article 16 of the Land Development Regulations. Projects disturbing more than one acre
require a permit from the Vermont Department of Environmental Conservation.
9.NATURAL RESOURCE INFORMATION
a. Are there any Natural Resources (as defined in the Land Development Regulations Article 12) on the
subject property?
Yes No
b. If yes, is the proposed development encroaching into any of these natural resources (list area of resource
encroachment by type)
c. If yes, please submit the following with this application:
i. A site specific or GIS based natural resource mapping or delineation of the entire property as required by
Table 12-01.
ii. Response to the standards described in the relevant section of Article 12 for the impacted Natural
Resource (applicant is strongly encouraged to have a resource expert respond to these criteria).
8.COST ESTIMATES
a.New Building or Addition, including initial fit-up (if initial fit-up cost not available, contact Department
staff): $
The site is located in the Transit Overlay District and Airport Approach Corridor.
79,900
19.3 15,397
19.3 15,397
72.2 57,651
72.2 57,655
29.3
29.3
1,912
1,912
2,500
4
A portion of this site is located in the River Corridor Overlay district. Within the RCO district on the project site, the Potash
Brook passes through the south-west edge of the lot through an existing 52' x 78' metal arch culvert. The existing parking area
behind the building is located within the RCO district over the existing culvert. A portion of the proposed dumpster pad is to be
located in the existing gravel parking area behind the building, as well as a portion of the proposed chain-link fence for security
purposes. No adverse impacts to the Potash Brook or RCO district are anticipated.
5 Site Plan Application Form. Rev. 01-2020
Date Issued Decision: or Date Referred to Development Review Board:
_______________________________________________________
Administrative Officer Date
The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state permits for this
project. Call (802) 879-5676 to speak with the regional Permit Specialist.