HomeMy WebLinkAboutSP-24-23 - Supplemental - 0200 Garden Street
575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburl.com
Application Number SP-______-__________ (office use only) APPLICATION FOR SITE PLAN REVIEW (City Center FBC District)
All information requested on this application must be completed in full. Failure to provide the requested information either
on this application form or on the site plan will result in your application being rejected and a delay in the review.
1. Street Address of Project: _________________________________________________________________
2. Brief project description (explain what you want approval for):
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
3. Applicant
Name __________________________________
Address________________________________
_______________________________________
Email _____________________________________
Telephone_________________________________
4. Primary Contact (person who will receive all correspondence from Staff)
Name __________________________________
Address________________________________
_______________________________________
Email _____________________________________
Telephone_________________________________
5. Owner(s) of Record (Name(s) as shown on deed, mailing address, phone and fax #):
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
6. Project Summary
a. Existing Uses on Property (including description and size of each separate use):
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
2
b. Proposed Uses on property (include description and size of each new use and existing uses to remain):
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
c. Building size (GFA) Existing _______________ Proposed _______________
d. Residential Units Existing _______________ Proposed _______________
e. Does this project require meeting Section 18.01, Inclusionary Zoning? Yes No
If yes to above, please indicate below the number of dwelling units that will be reserved in perpetuity
for households in each income category. Please see 18.01(C) for the proportion that must be devoted to
each income category and how to calculate fractional dwelling units.
Affordable Units #s 80% of Median _______ 100% of Median _______ 120% of Median _______
f. Qualifying open space (SF) Existing _______________ Proposed _______________
7. Project Details.
a. Completed Submission checklist □
b. Completed BES checklist & self-evaluation □
c. Supporting documents and narrative for certain circumstances (including but not limited to):
i. Section 8.06, Special Standards; Section 8.07 Materials; Section 8.08 Open Space Standards;
Section 8.09 Nonconformities
ii. Article 10, Overlay Districts
iii. Article 12, Surface Water Protection Standards
iv. Article 13, Supplemental Requirements
8. Total Parcel Size (sq. ft.) ______________ Total Impervious coverage (sq. ft.) ______________
9. Total area to be disturbed during construction (sq. ft.) ______________*
* Projects disturbing more than one-half acre of land must follow the City’s specifications for erosion control in Article 16
and Stormwater Management in Article 12 of the Land Development Regulations. Projects disturbing more than one acre require a permit from the Vermont Department of Environmental Conservation.
10. Cost Estimates.
a. Building (including interior renovations). $____________________
b. Landscaping: $____________________
c. Other site improvements (please list with cost): ____________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
10. Traffic / Trip Generation.