Loading...
HomeMy WebLinkAboutSP-24-33 - Plans - Record - 0099 Proctor Avenues s s s s IR IR IR IR IR x2 8 8 . 5 0 288.50x x288.5028 5 2 8 6 283 28 4 286 2 8 4 28 7 288 28 8 2 8 9 28 9 286 2 8 7 2 8 7 28 8 28 7 . 6 x 2 8 3 2 8 2 28 6 28 5 28 4 28 3 28 5 28 3 401 TBM NORTH CORNER OF EXISTING CATCH BASIN RIM. ELEVATION = 281.59' 402 404 403 LANDSCAPE ARCHITECTURE WAGNERHODGSON VT802.864.0010 wagnerhodgson.comNY518.567.1791 99 Proctor Avenue South Burlington, Vermont ISSUED FOR PERMIT REVIEW NOT FOR CONSTRUCTION C-1.01 164 Main Street, Suite 201 P: (802) 878-0375 Colchester, Vermont 05446 www.krebsandlansing.com N OWNER/APPLICANT : Rice Memorial High School 99 Proctor Ave. South Burlington, VT 05403 PROPERTY INFORMATION: Address: 99 Proctor Ave., So. Burlington, VT SPAN: 600-188-15380 Parcel ID: 1390-00099 Area: ±30.1 Acres Zoning: Commercial 1 - Residential 15 STAMP: RICE MEMORIAL HIGH SCHOOL ATHLETIC FIELD IMPROVEMENTS CIVIL SITE PLAN STANDARD GRAPHIC SCALE (1" = 40') VALID WHEN PLOTTED ON 24" BY 36" MEDIA 0' 0"1"2"3" 40'80'120' Memorial High School 3 NOTES: 1.ASPECTS OF PLAN ARE APPROXIMATE AND DERIVED FROM AERIAL PHOTOGRAPHY. 2.THE HORIZONTAL COORDINATE SYSTEM IS BASED ON NAD83 VERMONT STATE PLANE 4400 (US SURVEY FEET). ELEVATIONS ARE BASED ON THE NAVD88 (US SURVEY FEET). 3.BOUNDARY INFORMATION TAKEN FROM A DIGITAL FILE PROVIDED BY BUTTON PROFESSIONAL LAND SURVEYORS. OTHER PROPERTY LINES SHOWN ON THIS PLAN ARE FROM TAX MAP INFORMATION PROVIDED BY THE CITY. THIS PLAN IS NOT A BOUNDARY SURVEY. 4.TOPOGRAPHIC INFORMATION BY KREBS & LANSING, FALL 2023, INFORMATION PROVIDED BY BUTTON PROFESSIONAL LAND SURVEYORS AND LIDAR DATA PROVIDED BY THE STATE OF VERMONT. 5.THE UNDERGROUND UTILITIES SHOWN ON THIS PLAN ARE BASED ON VISIBLE UTILITIES LOCATED DURING A TOPOGRAPHIC SURVEY PERFORMED BY KREBS & LANSING. UNDERGROUND UTILITIES ARE APPROXIMATE AND NOT WARRANTED TO BE EXACT OR COMPLETE. DIG SAFE SHALL BE CONTACTED PRIOR TO ANY EXCAVATION. 6.UTILITIES ARE NOT WARRANTED TO BE COMPLETE OR ACCURATE, CONTRACTOR SHALL CONTACT DIG SAFE BEFORE BEGINNING ANY EXCAVATION. EXISTING WETLAND FROM CITY MAPPING LEGEND APPROXIMATE PROPERTY LINES EXISTING GRADE CONTOUR LINES (5 FOOT INTERVALS) EXISTING TREELINE EXISTING GRADE CONTOUR LINES (1 FOOT INTERVALS) IRON PIPE / CONCRETE MONUNMENT FOUND EXISTING SEWER LINE/MANHOLE EXISTING STORM LINE/MANHOLE/BASIN EXISTING OVERHEAD ELECTRIC LINE/POWER POLE EXISTING UNDERGROUND POWER EXISTING WATER LINE/HYDRANT/VALVE/SHUTOFF EXISTING CHAIN LINK FENCE EXISTING IRRIGATION LINES/ IRRIGATION VALVE EXISTING UNDERGROUND GAS SYSTEMS EXISTING UNDERGROUND COMMUNICATIONS PROPOSED STORM UNDERDRAIN AND CLEANOUT PROPOSED GRADE CONTOUR LINES (5 FOOT INTERVALS) PROPOSED GRADE CONTOUR LINES (1 FOOT INTERVALS) PROPOSED PERVIOUS WALKWAYS AND GATHERING AREAS PROPOSED SHIFTED IRRIGATION LINES/ IRRIGATION VALVE PROPOSED SYNTHETIC SPORTS FIELD PROPOSED DIRT/SAND PROPOSED LIMITS OF DISTURBANCE (LOD) FOR THE CONSTRUCTION PROJECT PHASE 1: (SHOWN IN GREEN) ·CONSTRUCTION MOBILIZATION, INSTALL PERIMETER CONTROLS AROUND ENTIRE PHASE. CONSTRUCT TEMPORARY CONSTRUCTION ENTRANCE TO PROJECT. ·REMOVE EXISTING INFRASTRUCTURE; EXISTING BLEACHERS, EXISTING TRACK, EXISTING MISC. TRACK/FIELD ITEMS, AND MOVE EXISTING IRRIGATION LINES. ·PREPARE SUBBASE FOR FIELD BY EXCAVATING FOR PLANNED GRADE, RELOCATE EXCAVATED MATERIAL TO NEW PERMANENT LOCATION ONSITE. ·INSTALL PORTION OF UNDERDRAIN SYSTEM FOR FOOTBALL FIELD ONLY, DRAIN TO LOCATION NEAR SOCCER FIELD. ·INSTALL NEW TURF FIELD. ·INSTALL SMALL PORTION OF PERVIOUS PAVER WALKWAYS TO NEW FOOTBALL FIELD. ·INSTALL ALL BIKE RACK LOCATIONS IDENTIFIED IN ORIGINAL PROJECT SUBMISSION, INCLUDING THE ONE BY THE BASEBALL DUGOUT. ·PROJECT CLEANUP, FINAL STABILIZATION AND SEEDING. PLEASE NOTE THERE ARE TO BE NO SOIL STOCKPILES REMAINING POST THIS PHASE OF CONSTRUCTION. ALL MATERIAL WILL BE COMPACTED IN ITS PLANNED LOCATION ONSITE. ·AT THE END OF THIS PHASE THE SITE SHOULD EFFECTIVELY LOOK LIKE IT IS A COMPLETED PROJECT. · TOTAL DISTURBED AREA: ±4.4 ACRES PHASE 2: (SHOWN IN BLUE) ·CONSTRUCTION MOBILIZATION, INSTALL PERIMETER CONTROLS AROUND ENTIRE PHASE. CONSTRUCT TEMPORARY CONSTRUCTION ENTRANCE TO PROJECT. ·REMOVE EXISTING INFRASTRUCTURE; EXISTING BLEACHERS NEAR BASEBALL FIELD, EXISTING BASEBALL FIELD, EXISTING MISC. BASEBALL ITEMS, AND MOVE EXISTING IRRIGATION LINES IF NECESSESSARY. ·PREPARE SUBBASE FOR FIELD BY EXCAVATING FOR PLANNED GRADE, RELOCATE EXCAVATED MATERIAL TO NEW PERMANENT LOCATION ONSITE. ·INSTALL SECOND PORTION OF UNDERDRAIN SYSTEM FOR BASEBALL FIELD, DRAIN TO LOCATION SOUTHWEST OF BASEBALL FIELD. ·INSTALL NEW TURF FIELD. ·INSTALL REMAINING PORTIONS OF PERVIOUS PAVERS WALKWAYS BETWEEN NEW FOOTBALL AND BASEBALL FIELDS. ADD ALL OTHER PERVIOUS PAVER WALKWAYS IDENTIFIED ON THE PROJECT PLANS. ·PROJECT CLEANUP, FINAL STABILIZATION AND SEEDING. PLEASE NOTE THERE ARE TO BE NO SOIL STOCKPILES REMAINING POST THIS PHASE OF CONSTRUCTION. ALL MATERIAL WILL BE COMPACTED IN ITS PLANNED LOCATION ONSITE. ·AT THE END OF THIS PHASE THE SITE SHOULD EFFECTIVELY LOOK LIKE IT IS A COMPLETED PROJECT. TOTAL DISTURBED AREA: ±3.1 ACRES PHASING NOTES s s s s s IR IR IR IR IR x2 8 8 . 5 0 288.50x x288.5028 5 2 8 6 283 28 4 286 2 8 4 28 7 288 28 8 2 8 9 28 9 286 2 8 7 2 8 7 28 8 28 7 . 6 x 2 8 3 2 8 2 28 6 28 5 28 4 28 3 28 5 28 3 Stabilized construction entrance. See detail Silt fence and construction barrier limit fencing around entire project area. See detail Multiple rows of straw wattles check dam for water to leave the construction site. See detail Surround any stockpile with Silt fence. See detail Multiple rows of straw wattles check dam for water to leave the construction site. See detail Provide temporary erosion control straw wattles around construction of additional bike rack location. Silt fence and construction barrier limit fencing around entire project area. See detail Silt fence and construction barrier limit fencing around entire project area. See detail Stabilized construction entrance. See detail Surround existing tree with Silt fence to protect the tree from harm during construction. See silt fencing details. PHASE 2 PHASE 2 PHASE 2 PHASE 2 ±3.1 Acres PHASE 1 ±4.4 Acres PHASE 1 PHASE 1 PHASE 1 PHASE 1 PHASE 1 Surround any stockpile with Silt fence. See detail Additional stockpilling may be needed for phase 2, project will use this area to stockpile as needed. Surround any stockpile with Silt fence. See detail PHASE 2 Project will install bike rack as part of phase 1. Provide temporary erosion control straw wattles around construction of additional bike rack location. PHASE 1 PHASE 2 Install silt fence and construction barrier limit between phases for phase 1 and will be reinstalled for phase 2. See detail PHASE 1 & 2 PHASE 1 PHASE 1 LANDSCAPE ARCHITECTURE WAGNERHODGSON VT802.864.0010 wagnerhodgson.comNY518.567.1791 99 Proctor Avenue South Burlington, Vermont ISSUED FOR PERMIT REVIEW NOT FOR CONSTRUCTION C-1.02 164 Main Street, Suite 201 P: (802) 878-0375 Colchester, Vermont 05446 www.krebsandlansing.com OWNER/APPLICANT : Rice Memorial High School 99 Proctor Ave. South Burlington, VT 05403 PROPERTY INFORMATION: Address: 99 Proctor Ave., So. Burlington, VT SPAN: 600-188-15380 Parcel ID: 1390-00099 Area: ±30.1 Acres Zoning: Commercial 1 - Residential 15 STAMP: RICE MEMORIAL HIGH SCHOOL ATHLETIC FIELD IMPROVEMENTS CIVIL EROSION PREVENTION and SEDIMENT CONTROL PLAN (EPSC) STANDARD GRAPHIC SCALE (1" = 40') VALID WHEN PLOTTED ON 24" BY 36" MEDIA 0' 0"1"2"3" 40'80'120' Memorial High School 2 N NOTES: 1.ASPECTS OF PLAN ARE APPROXIMATE AND DERIVED FROM AERIAL PHOTOGRAPHY. 2.THE HORIZONTAL COORDINATE SYSTEM IS BASED ON NAD83 VERMONT STATE PLANE 4400 (US SURVEY FEET). ELEVATIONS ARE BASED ON THE NAVD88 (US SURVEY FEET). 3.BOUNDARY INFORMATION TAKEN FROM A DIGITAL FILE PROVIDED BY BUTTON PROFESSIONAL LAND SURVEYORS. OTHER PROPERTY LINES SHOWN ON THIS PLAN ARE FROM TAX MAP INFORMATION PROVIDED BY THE CITY. THIS PLAN IS NOT A BOUNDARY SURVEY. 4.TOPOGRAPHIC INFORMATION BY KREBS & LANSING, FALL 2023, INFORMATION PROVIDED BY BUTTON PROFESSIONAL LAND SURVEYORS AND LIDAR DATA PROVIDED BY THE STATE OF VERMONT. 5.THE UNDERGROUND UTILITIES SHOWN ON THIS PLAN ARE BASED ON VISIBLE UTILITIES LOCATED DURING A TOPOGRAPHIC SURVEY PERFORMED BY KREBS & LANSING. UNDERGROUND UTILITIES ARE APPROXIMATE AND NOT WARRANTED TO BE EXACT OR COMPLETE. DIG SAFE SHALL BE CONTACTED PRIOR TO ANY EXCAVATION. 6.UTILITIES ARE NOT WARRANTED TO BE COMPLETE OR ACCURATE, CONTRACTOR SHALL CONTACT DIG SAFE BEFORE BEGINNING ANY EXCAVATION. EXISTING WETLAND FROM CITY MAPPING LEGEND APPROXIMATE PROPERTY LINES EXISTING GRADE CONTOUR LINES (5 FOOT INTERVALS) EXISTING TREELINE EXISTING GRADE CONTOUR LINES (1 FOOT INTERVALS) IRON PIPE / CONCRETE MONUNMENT FOUND EXISTING SEWER LINE/MANHOLE EXISTING STORM LINE/MANHOLE/BASIN EXISTING OVERHEAD ELECTRIC LINE/POWER POLE EXISTING UNDERGROUND POWER EXISTING WATER LINE/HYDRANT/VALVE/SHUTOFF EXISTING CHAIN LINK FENCE EXISTING IRRIGATION LINES/ IRRIGATION VALVE EXISTING UNDERGROUND GAS SYSTEMS EXISTING UNDERGROUND COMMUNICATIONS PROPOSED STORM UNDERDRAIN AND CLEANOUT PROPOSED GRADE CONTOUR LINES (5 FOOT INTERVALS) PROPOSED GRADE CONTOUR LINES (1 FOOT INTERVALS) PROPOSED PERVIOUS WALKWAYS AND GATHERING AREAS PROPOSED SHIFTED IRRIGATION LINES/ IRRIGATION VALVE PROPOSED SYNTHETIC SPORTS FIELD PROPOSED DIRT/SAND PROPOSED EROSION PREVENTION AND SEDIMENT CONTROL SILT FENCE PERIMETER CONTROLS AND CONSTRUCTION LIMIT BARRIER FENCE PROPOSED STRAW WATTLES FOR AREAS WITH MINIMAL DISTURBANCE AND AREAS WHERE THERE WILL BE CONCENTRATED FLOW, WATTLES WILL TREAT RUNOFF BEFORE LEAVING THE CONSTRUCTION SITE. PROPOSED LIMITS OF DISTURBANCE (LOD) FOR THE CONSTRUCTION PROJECT