HomeMy WebLinkAboutSD-24-12 - Supplemental - 0500 Old Farm Road (20) O’Brien Eastview, LLC
Prelim and Final Plat Amendment Application May 4, 2025
Exhibit Table of Contents
Exhibit Name Exhibit Description Last Update
Exhibit 000 Application Narrative 04/14/2022
Exhibit 001 City of South Burlington Application
for Final Plat Review
04/08/22
Exhibit 002 Project Abutters List 04/11/24
Exhibit 003 PUD Density Matrix Calculation 03/09/22
Exhibit 004 Home and Townhome Model
Availability Matrix by Lot
03/09/22
Exhibit 005 Eastview Coverage Chart 04/22/24
Exhibit 006 Final Plat Regulation Appendix E
Annotated with Application Locations
for Ease of Reference
04/12/2022
Exhibit 007 Preliminary Plat Permit SD-20-40 8/31/21
Exhibit 008 Project Infrastructure Budget by Phase
Includes all 16 Project Phases
03/09/22
Exhibit 009 Eastview PUD Transportation System
Review, Pedestrian and Bicycle
03/22/22
Exhibit 010 Eastview PUD TIA 03/30/2022
Exhibit 10.1 Eastview PUD Trip Generation Update 06/03/24
Exhibit 011 Eastview PUD TIA Appendices 03/30/2022
Exhibit 012 Preliminary Water Allocation 03/17/22
Exhibit 013 Preliminary Wastewater Allocation 03/30/22
Exhibit 014 Lot 19 Open Space Structure Plan 03/15/22
Exhibit 015 C1LR Character Imagery 08/16/22
Exhibit 016 C1-LR Concept Layout 08/18/22
Exhibit 016.1 C1-LR Frontage Site Plan 08/17/22
Exhibit 016.2 C1-LR Presentation from 09/06/22
Hearing
09/06/22
Exhibit 017 Class III Wetland Description and
Impact Discussion Memo, Art Gilman
03/16/22
Exhibit 018 Design Guide for C1-LR Lands 10/25/22
Exhibit 019 Balsam Townhome Plan Available on
Lots Noted at Exhibit 004
03/21/22
Exhibit 020 Cedar Townhome Plan, Available on
Lots Noted at Exhibit 004
03/21/22
Exhibit 021 Juniper Townhome Plan Available on
Lots Noted at Exhibit 004
03/21/22
Exhibit 022 Pine Townhome Plan, Available on
Lots Noted at Exhibit 004
03/21/22
Exhibit 023 Birch Townhome Plan, Available on
Lots Noted at Exhibit 004
03/21/22
Exhibit 024 Maple Townhome Plan, Available on
Lots Noted at Exhibit 004
03/21/22
Exhibit 025 Trillium Single-Family Plan Available on
Lots Noted at Exhibit 004
03/21/22
Exhibit 026 Lupine Single-Family Plan, Available on
Lots Noted at Exhibit 004
03/21/22
Exhibit 027 Daisy Single Family Plan, Available on
Lots Noted at Exhibit 004
03/21/22
Exhibit 028 Aster Single Family-Plan, Available on
Lots Noted at Exhibit 004
03/21/22
Exhibit 029 Primrose Single-Family Plan, Available
on Lots Noted at Exhibit 004
03/21/22
Exhibit 030 Clover Single-Family Plan, Available on
Lots Noted at Exhibit 004
03/21/22
Exhibit 031 SF1 Single Family Plan, Available on
Lots Noted at Exhibit 004
03/21/22
Exhibit 032 SF2 Single Family Plan, Available on
Lots Noted at Exhibit 004
03/21/22
Exhibit 033 SF3 Single Family Plan, Available on
Lots Noted at Exhibit 004
03/21/22
Exhibit 034 SF5 Single Family Plan, Available on
Lots Noted at Exhibit 004
03/21/22
Exhibit 035 SF6 Single Family Plan, Available on
Lots Noted at Exhibit 004
03/21/22
Exhibit 036 SF7 Single Family Plan, Available on
Lots Noted at Exhibit 004
03/21/22
Exhibit 037 SF8 Single Family Plan, Available on
Lots Noted at Exhibit 004
03/21/22
Exhibit 038 SF9 Single Family Plan, Available on
Lots Noted at Exhibit 004
03/21/22
Exhibit 039 SF10 Single Family Plan, Available on
Lots Noted at Exhibit 004
03/21/22
Exhibit 040 Triplex, TH1-1, TH2-1, TH2-2, Available
on Lots Noted at Exhibit 004
03/21/22
Exhibit 041 Duplex, TH2-1 and TH2-2 Available on
Lots Noted At Exhibit 004
03/21/22
Exhibit 042 Landscape Budget 03/30/22
Exhibit 043 Digital Renderings of Planned Project 04/08/22
Exhibit 044 Inclusionary Housing Mean Bedroom
Calculator
03/29/22
Exhibit 045 Blasting Plan for Borrow Pit, Maine
Drilling and Blasting
03/10/2022
Exhibit 046 Noise Study of Borrow Pit Operations 03/10/2022
Exhibit 047 Blast Plan Review Letter Jay Perkins 03/14/2022
Exhibit 048 Blasting Question and Answer
Handout
03/14/22
Exhibit 049 Stormwater computations and basis of
design capacity analysis
04/05/2022
Exhibit 050 Lot area acres and square foot matrix
required by Appendix E
03/29/22
Exhibit 051 Written Plan to Protect Vegetation on
Site
03/23/22
Exhibit 052 Barn Lot Pic Nic Shelter Plan 03/24/22
Exhibit 053 Notice of Conditions on Herbicide,
Mowing, Per DRB Decision
04/08/2022
Exhibit 054 Irrevocable Offer of Dedication
Roadways
04/08/2022
Exhibit 055 Report on Title 04/11/2022
Exhibit 056 Irrevocable offer of Dedication for
O’Brien Farm Road
04/12/2022
Exhibit 057 O’Brien Eastview Quitclaim Deed from
City
04/08/2022
Exhibit 058 Easement Deed to City, Rec Paths 04/08/2022
Exhibit 059 Easement across Business Park North 04/08/2022
Exhibit 060 Irrevocable Offer of Dedication Parks 04/08/2022
Exhibit 061 Declaration of Planned Community
(Residential)
04/08/2022
Exhibit 062 Bylaws for Planned Community
(Residential)
04/12/2022
Exhibit 063 Declaration of Planned Community
(Commercial)
04/11/2022
Exhibit 064 Bylaws for Planned Community
(Commercial)
04/12/2022
Exhibit 065 L100 Overall Site Plan 03/28/24
Exhibit 066 L101 Planting Plan Old Farm South 04/08/24
Exhibit 067 L102 Planting Plan Old Farm at Barn 03/28/24
Exhibit 068 L103A Planting Plan Leo Lane North 10/21/2022
Exhibit 069 L103B Planting Plan Eastview Lane 10/21/2022
Exhibit 070 L104A Planting Plan Lot 19 04/08/24
Exhibit 071 L104B Planting Plan Eastview Lane
Mabel Way and Old Farm
10/21/2022
Exhibit 072 L105 Planting Plan Old Farm and
O’Brien Farm Road
10/21/2022
Exhibit 073 L106 Kimball Avenue 03/28/24
Exhibit 074 L107 Daniel Drive, Barn Road Mabel
Way
03/28/24
Exhibit 075 L108A Barn Lot and Mabel Way 10/21/2022
Exhibit 076 L108B 10/21/2022
Exhibit 077 L109 Mabel Way and Eastview Lane 03/28/24
Exhibit 078 L110 O’Brien Farm Road Extension 10/21/2022
Exhibit 079 L111 Kimball Avenue 10/21/2022
Exhibit 080 L112 Lot 47 Open Space 10/21/2022
Exhibit 081 L113 Lot 47 Open Space 10/21/2022
Exhibit 082 L114 Lot 47 Open Space 10/21/2022
Exhibit 083 L115 Lot 47 Open Space and Kimball
Avenue
10/21/2022
Exhibit 084 L116 Business Park North Lot 4 10/21/2022
Exhibit 085 L117 IC Trail/Path 10/21/2022
Exhibit 086 L118 Potash Road 10/21/2022
Exhibit 087 L119 Potash Road 03/28/24
Exhibit 088 L120 IC Trail and Gravel Wetland 03/28/24
Exhibit 089 L200 Barn Lot Specific 10/21/2022
Exhibit 090 Lot 201 Natural Play Area 10/21/2022
Exhibit 091 L202 Playground 10/21/2022
Exhibit 092 L203 IC Training Loop 10/21/2022
Exhibit 093 L204 IC Training Loop 10/21/2022
Exhibit 094 L205 IC Training Loop 10/21/2022
Exhibit 095 L206 Dog Park Plan 10/21/2022
Exhibit 095.1 Lot 18 Detail Sheet 03/28/24
Exhibit 096 L300 Planting Details 10/21/2022
Exhibit 097 L301 Typical Unit Planting Details 10/21/2022
Exhibit 098 L302 Typical Utility Screening Details 10/21/2022
Exhibit 099 K1 Traffic Signal Kimball and Old Farm 10/22/2022
Exhibit 100 K2 Traffic Signal Kimball and Potash
Road
10/22/2022
Exhibit 101 K3 Cantilever and Pole Sections
Kimball and Old Farm
10/22/2022
Exhibit 102 K4 Cantilever and Pole Sections
Kimball and Potash Road
10/22/2022
Exhibit 103 K5 Cantilever Pole Details 10/22/2022
Exhibit 104 K6 Traffic Signal Specifications 10/22/2022
Exhibit 105 K7 Traffic Control Plan Short Term
Lane Closures
10/22/2022
Exhibit 106 T1 Kimball Avenue and Old Farm
Pavement Marking
10/22/2022
Exhibit 107 T2 Old Farm Pavement Marking 10/22/2022
Exhibit 108 T3 Old Farm and Leo Lane/Meadow
Loop Former Pavement Marking
10/22/2022
Exhibit 109 T4 O’Brien Farm Road East Pavement
Marking
10/22/2022
Exhibit 110 T5 Mabel Way Pavement Marking 10/22/2022
Exhibit 111 01 Signal Configuration Test Fit for
Future Signal at Old Farm Road and
O’Brien Farm Road, NOT PROPOSED
OR REQUIRED BY PROJECT
02/28/2022
Exhibit 112 Civil Plans Cover Page and Index 06/05/24
Exhibit 113 X-1 Existing Conditions Plan 10/21/2022
Exhibit 114 X-2 Existing Conditions Plan 10/21/2022
Exhibit 115 X-3 Existing Conditions Plan 10/21/2022
Exhibit 115.1 X-4 Existing Conditions Aerial Overlay 10/21/2022
Exhibit 116 PL-1 Final Plat 06/05/24
Exhibit 117 PL-2 Final Plat 06/05/24
Exhibit 118 E-1 Easement Plan 06/05/24
Exhibit 119 E-2 Easement Plan 06/05/24
Exhibit 120 Pl-3 Final Plat Footprint Lots 10/21/2022
Exhibit 121 Pl-4 Final Plat Footprint Lots 10/21/2022
Exhibit 122 Pl-5 Final Plat Footprint Lots 06/05/24
Exhibit 123 PH-1 Phasing Plan 06/05/24
Exhibit 124 C-1 Overall Site Plan 06/05/24
Exhibit 125 C-1.1 Overall Zoning Plan 06/05/24
Exhibit 126 C-2 Site Plan Leo Lane 06/05/24
Exhibit 127 C2.1 Site Plan Leo Lane Multi-Use Path 10/21/2022
Exhibit 128 C-3 Site Plan Leo Lane Old Farm 10/21/2022
Exhibit 129 C-4 Site Plan Leo Lane Old Farm,
Mabel Way
06/05/24
Exhibit 130 C-5 Site Plan Old Farm and O’Brien
Farm
10/21/2022
Exhibit 131 C-5.1 Site Plan Gravel Wetland #3 10/21/2022
Exhibit 132 C-6 Site Plan O’Brien Farm Road East 06/05/24
Exhibit 132.1 C-6.1 Site Plan O’Brien Farm Road East
and Park
06/05/24
Exhibit 133 C-7 Site Plan Old Farm Road 10/21/2022
Exhibit 134 C-7.1 Site Plan Kimball Avenue 10/21/2022
Exhibit 135 C-8 Site Plan Kimball Avenue 10/21/2022
Exhibit 136 C-8.1 Site Plan Kimball Avenue 10/21/2022
Exhibit 137 C-9 Site Plan Historic Barn 06/05/24
Exhibit 138 C-10 Site Plan Mabel Way and Daniel
Drive
06/05/24
Exhibit 139 C-11 Site Plan Mabel Way and Barn
Road
10/21/2022
Exhibit 140 C-12 Site Plan Mabel Way 10/21/2022
Exhibit 141 C-13 Site Plan Mabel Way 10/21/2022
Exhibit 142 C-14 Site Plan Mabel Way 10/21/2022
Exhibit 143 C-15 Site Plan Mabel Way 10/21/2022
Exhibit 144 C-16 Site Plan Potash Road 10/21/2022
Exhibit 145 C-16.1 Site Plan IC Sewer And Gravel
Wetland #7
06/05/24
Exhibit 146 C-17 Site Plan Potash Road 10/21/2022
Exhibit 147 C-18 Site Plan Potash Road 10/21/2022
Exhibit 148 C-18.1 Site Plan IC Stormwater Gravel
Wetland #8
10/21/2022
Exhibit 149 C-18.2 Site Plan IC Stormwater Gravel
Wetland #8
06/05/24
Exhibit 150 C-19 Site Plan Old Farm Road Sidewalk 10/21/2022
Exhibit 151 C-20 Watershed Map-Post
Development
06/05/24
Exhibit 152 C-20.1 Watershed Map Pre-
Development
10/21/2022
Exhibit 153 C-20.2 Post Construction Soil Depth &
Quality Plan
06/05/24
Exhibit 154 C-20.3 Stormwater Maintenance Plan 06/05/24
Exhibit 155 C-21 Open Space and Resident
Amenity Plan
06/05/24
Exhibit 156 Q-1 Overall Site Plan Rock Extraction
and Crushing Area
06/05/24
Exhibit 157 Q-2 Site Plan Rock Extraction and
Crushing Area
10/21/2022
Exhibit 158 Q-3 Site Sections, Rock Extraction and
Crushing Area
10/21/2022
Exhibit 159 Q-4 Site Reclamation Plan Rock
Extraction and Crushing Area
10/21/2022
Exhibit 160 CP-1 Road Leo Lane Profile 10/21/2022
Exhibit 161 CP-2 Road O’Brien Farm Road East
Profile
10/21/2022
Exhibit 162 CP-3 Road Relocated Old Farm Road
Profile
10/21/2022
Exhibit 163 CP-4 Road Relocated Old Farm Road
Profile
10/21/2022
Exhibit 164 CP-5 Road Mabel Way Profile 10/21/2022
Exhibit 165 CP-6 Road Mabel Way Profile 10/21/2022
Exhibit 166 CP-7 Road Mabel Way Profile 10/21/2022
Exhibit 167 CP-8 Road Barn Road Profile 10/21/2022
Exhibit 168 CP-9 Road Daniel Drive Profile 10/21/2022
Exhibit 169 CP-10 Road Eastview Lane Profile 10/21/2022
Exhibit 170 CP-11 Road Potash Road Profile 10/21/2022
Exhibit 171 CP-12 Road Potash Road Profile 10/21/2022
Exhibit 172 D-1 Civil Details Road Sections 10/21/2022
Exhibit 173 D-1.1 Road Sections 10/21/2022
Exhibit 174 D-1.2 Road Sections 10/21/2022
Exhibit 175 D-1.3 Road Sections 10/21/2022
Exhibit 176 D-2 Civil Details 10/21/2022
Exhibit 177 D-3 Civil and Water Details 10/21/2022
Exhibit 178 D-4 Civil and Water Details 10/21/2022
Exhibit 179 D-5 Civil and Water Details 10/21/2022
Exhibit 180 D-6 Civil and Sanitary Details 10/21/2022
Exhibit 181 D-7 Civil and Stormwater Details 10/21/2022
Exhibit 182 D-8 Civil and Stormwater Details 10/21/2022
Exhibit 183 D-9 Civil and Stormwater Details 10/21/2022
Exhibit 184 D-10 Erosion Prevention and Sediment
Details
10/21/2022
Exhibit 185 D-11 Erosion Prevention and Sediment
Details
10/21/2022
Exhibit 186 D-12 EPSC & Tree Protection Details 10/21/2022
Exhibit 187 D-13 Site Electric Details 10/21/2022
Exhibit 188 EPSC 1 Pre Construction Plan 10/21/2022
Exhibit 189 EPSC 2 Pre Construction Plan 10/21/2022
Exhibit 190 EPSC 3 Pre Construction Plan 10/21/2022
Exhibit 191 EPSC 4 Pre Construction Plan 10/21/2022
Exhibit 192 EPSC 5 Pre Construction Plan 10/21/2022
Exhibit 193 EPSC 6 Pre Construction Plan 10/21/2022
Exhibit 194 EPSC 7 Construction Plan 06/05/24
Exhibit 194.1 EPSC 7.1 Construction Plan 06/05/24
Exhibit 195 EPSC 8 Construction Plan 06/05/24
Exhibit 196 EPSC 9 Construction Plan 10/21/2022
Exhibit 197 EPSC 10 Construction Plan 10/21/2022
Exhibit 198 EPSC 11 Construction Plan 06/05/24
Exhibit 199 EPSC 12 Construction Plan 06/05/24
Exhibit 200 EPSC 13 Construction Plan 06/05/24
Exhibit 201 EPSC 14 Construction Plan 06/05/24
Exhibit 202 EPSC 15 Construction Plan 10/21/2022
Exhibit 203 EPSC 16 Construction Plan 06/05/24
Exhibit 204 EPSC 17 Construction Plan 06/05/24
Exhibit 205 EPSC 18 Construction Plan 10/21/2022
Exhibit 206 EPSC 18.1 Construction & Stabilization
Plan- Sidewalk Connection
10/21/2022
Exhibit 207 EPSC 19 Construction Plan 10/21/2022
Exhibit 208 EPSC 20 Construction Plan 10/21/2022
Exhibit 209 EPSC 21 Stabilization Plan 06/05/24
Exhibit 210 EPSC 22 Stabilization Plan 06/05/24
Exhibit 211 EPSC 23 Stabilization Plan 06/05/24
Exhibit 212 EPSC 24 Stabilization Plan 10/21/2022
Exhibit 213 Overall Landscape Plan with 40’ Street
Tree Sample Plan
09/28/22
Exhibit 214 Street Tree Spacing Comparison
Exhibit
09/28/22
Exhibit 215 Wetland Disturbance Summary 10/06/22
Exhibit 216 Traffic Question Email Response 10/06/22
Exhibit 217 DRB Narrative Supplement 06 10 22 06/10/22
Exhibit 218 DRB Narrative Supplement 08 22 22 08/22/22
Exhibit 219 DRB Narrative Supplement 09 29 22 09/29/22
Exhibit 220 Footprint Lot Height Table and Waiver
Requests
10/25/22
Exhibit 221 Lot 18 Open Space Images 10/19/22
Exhibit 222 Digital Aerial Renderings Hillside 12/14/23
Exhibit 223 Digital Rendering of Potential Battery
Building Lot 18
12/14/23
Exhibit 224 SF-10 Cottage Walkout Plans and
Elevation
12/11/23
Exhibit 225 Digital Rendering of Planned Barn EV
Charging Stations and Parking Area
12/14/23
Exhibit 226 Overall Existing Conditions Plan 02/14/23
Exhibit 227 Update to Landscape Budget for
Amendment Application
04/22/24
Exhibit 228 DRB Narrative Supplement 05/17/24
Exhibit 229 Prelim and Final Plat Amendment
Application
05/17/24
Exhibit 230 Eastview Amendment Site Plan
Application
05/17/24
Exhibit 231 Eastview PUD Original WW Allocation
Request
2/08/22
Exhibit 232 Eastview PUD Amended WW
Allocation Request
06/05/24
Exhibit 233 Eastview Response to Incomplete
Notice 06 05 24 Cover Letter
06/05/24