Loading...
HomeMy WebLinkAboutSD-24-12 - Supplemental - 0500 Old Farm Road (20) O’Brien Eastview, LLC Prelim and Final Plat Amendment Application May 4, 2025 Exhibit Table of Contents Exhibit Name Exhibit Description Last Update Exhibit 000 Application Narrative 04/14/2022 Exhibit 001 City of South Burlington Application for Final Plat Review 04/08/22 Exhibit 002 Project Abutters List 04/11/24 Exhibit 003 PUD Density Matrix Calculation 03/09/22 Exhibit 004 Home and Townhome Model Availability Matrix by Lot 03/09/22 Exhibit 005 Eastview Coverage Chart 04/22/24 Exhibit 006 Final Plat Regulation Appendix E Annotated with Application Locations for Ease of Reference 04/12/2022 Exhibit 007 Preliminary Plat Permit SD-20-40 8/31/21 Exhibit 008 Project Infrastructure Budget by Phase Includes all 16 Project Phases 03/09/22 Exhibit 009 Eastview PUD Transportation System Review, Pedestrian and Bicycle 03/22/22 Exhibit 010 Eastview PUD TIA 03/30/2022 Exhibit 10.1 Eastview PUD Trip Generation Update 06/03/24 Exhibit 011 Eastview PUD TIA Appendices 03/30/2022 Exhibit 012 Preliminary Water Allocation 03/17/22 Exhibit 013 Preliminary Wastewater Allocation 03/30/22 Exhibit 014 Lot 19 Open Space Structure Plan 03/15/22 Exhibit 015 C1LR Character Imagery 08/16/22 Exhibit 016 C1-LR Concept Layout 08/18/22 Exhibit 016.1 C1-LR Frontage Site Plan 08/17/22 Exhibit 016.2 C1-LR Presentation from 09/06/22 Hearing 09/06/22 Exhibit 017 Class III Wetland Description and Impact Discussion Memo, Art Gilman 03/16/22 Exhibit 018 Design Guide for C1-LR Lands 10/25/22 Exhibit 019 Balsam Townhome Plan Available on Lots Noted at Exhibit 004 03/21/22 Exhibit 020 Cedar Townhome Plan, Available on Lots Noted at Exhibit 004 03/21/22 Exhibit 021 Juniper Townhome Plan Available on Lots Noted at Exhibit 004 03/21/22 Exhibit 022 Pine Townhome Plan, Available on Lots Noted at Exhibit 004 03/21/22 Exhibit 023 Birch Townhome Plan, Available on Lots Noted at Exhibit 004 03/21/22 Exhibit 024 Maple Townhome Plan, Available on Lots Noted at Exhibit 004 03/21/22 Exhibit 025 Trillium Single-Family Plan Available on Lots Noted at Exhibit 004 03/21/22 Exhibit 026 Lupine Single-Family Plan, Available on Lots Noted at Exhibit 004 03/21/22 Exhibit 027 Daisy Single Family Plan, Available on Lots Noted at Exhibit 004 03/21/22 Exhibit 028 Aster Single Family-Plan, Available on Lots Noted at Exhibit 004 03/21/22 Exhibit 029 Primrose Single-Family Plan, Available on Lots Noted at Exhibit 004 03/21/22 Exhibit 030 Clover Single-Family Plan, Available on Lots Noted at Exhibit 004 03/21/22 Exhibit 031 SF1 Single Family Plan, Available on Lots Noted at Exhibit 004 03/21/22 Exhibit 032 SF2 Single Family Plan, Available on Lots Noted at Exhibit 004 03/21/22 Exhibit 033 SF3 Single Family Plan, Available on Lots Noted at Exhibit 004 03/21/22 Exhibit 034 SF5 Single Family Plan, Available on Lots Noted at Exhibit 004 03/21/22 Exhibit 035 SF6 Single Family Plan, Available on Lots Noted at Exhibit 004 03/21/22 Exhibit 036 SF7 Single Family Plan, Available on Lots Noted at Exhibit 004 03/21/22 Exhibit 037 SF8 Single Family Plan, Available on Lots Noted at Exhibit 004 03/21/22 Exhibit 038 SF9 Single Family Plan, Available on Lots Noted at Exhibit 004 03/21/22 Exhibit 039 SF10 Single Family Plan, Available on Lots Noted at Exhibit 004 03/21/22 Exhibit 040 Triplex, TH1-1, TH2-1, TH2-2, Available on Lots Noted at Exhibit 004 03/21/22 Exhibit 041 Duplex, TH2-1 and TH2-2 Available on Lots Noted At Exhibit 004 03/21/22 Exhibit 042 Landscape Budget 03/30/22 Exhibit 043 Digital Renderings of Planned Project 04/08/22 Exhibit 044 Inclusionary Housing Mean Bedroom Calculator 03/29/22 Exhibit 045 Blasting Plan for Borrow Pit, Maine Drilling and Blasting 03/10/2022 Exhibit 046 Noise Study of Borrow Pit Operations 03/10/2022 Exhibit 047 Blast Plan Review Letter Jay Perkins 03/14/2022 Exhibit 048 Blasting Question and Answer Handout 03/14/22 Exhibit 049 Stormwater computations and basis of design capacity analysis 04/05/2022 Exhibit 050 Lot area acres and square foot matrix required by Appendix E 03/29/22 Exhibit 051 Written Plan to Protect Vegetation on Site 03/23/22 Exhibit 052 Barn Lot Pic Nic Shelter Plan 03/24/22 Exhibit 053 Notice of Conditions on Herbicide, Mowing, Per DRB Decision 04/08/2022 Exhibit 054 Irrevocable Offer of Dedication Roadways 04/08/2022 Exhibit 055 Report on Title 04/11/2022 Exhibit 056 Irrevocable offer of Dedication for O’Brien Farm Road 04/12/2022 Exhibit 057 O’Brien Eastview Quitclaim Deed from City 04/08/2022 Exhibit 058 Easement Deed to City, Rec Paths 04/08/2022 Exhibit 059 Easement across Business Park North 04/08/2022 Exhibit 060 Irrevocable Offer of Dedication Parks 04/08/2022 Exhibit 061 Declaration of Planned Community (Residential) 04/08/2022 Exhibit 062 Bylaws for Planned Community (Residential) 04/12/2022 Exhibit 063 Declaration of Planned Community (Commercial) 04/11/2022 Exhibit 064 Bylaws for Planned Community (Commercial) 04/12/2022 Exhibit 065 L100 Overall Site Plan 03/28/24 Exhibit 066 L101 Planting Plan Old Farm South 04/08/24 Exhibit 067 L102 Planting Plan Old Farm at Barn 03/28/24 Exhibit 068 L103A Planting Plan Leo Lane North 10/21/2022 Exhibit 069 L103B Planting Plan Eastview Lane 10/21/2022 Exhibit 070 L104A Planting Plan Lot 19 04/08/24 Exhibit 071 L104B Planting Plan Eastview Lane Mabel Way and Old Farm 10/21/2022 Exhibit 072 L105 Planting Plan Old Farm and O’Brien Farm Road 10/21/2022 Exhibit 073 L106 Kimball Avenue 03/28/24 Exhibit 074 L107 Daniel Drive, Barn Road Mabel Way 03/28/24 Exhibit 075 L108A Barn Lot and Mabel Way 10/21/2022 Exhibit 076 L108B 10/21/2022 Exhibit 077 L109 Mabel Way and Eastview Lane 03/28/24 Exhibit 078 L110 O’Brien Farm Road Extension 10/21/2022 Exhibit 079 L111 Kimball Avenue 10/21/2022 Exhibit 080 L112 Lot 47 Open Space 10/21/2022 Exhibit 081 L113 Lot 47 Open Space 10/21/2022 Exhibit 082 L114 Lot 47 Open Space 10/21/2022 Exhibit 083 L115 Lot 47 Open Space and Kimball Avenue 10/21/2022 Exhibit 084 L116 Business Park North Lot 4 10/21/2022 Exhibit 085 L117 IC Trail/Path 10/21/2022 Exhibit 086 L118 Potash Road 10/21/2022 Exhibit 087 L119 Potash Road 03/28/24 Exhibit 088 L120 IC Trail and Gravel Wetland 03/28/24 Exhibit 089 L200 Barn Lot Specific 10/21/2022 Exhibit 090 Lot 201 Natural Play Area 10/21/2022 Exhibit 091 L202 Playground 10/21/2022 Exhibit 092 L203 IC Training Loop 10/21/2022 Exhibit 093 L204 IC Training Loop 10/21/2022 Exhibit 094 L205 IC Training Loop 10/21/2022 Exhibit 095 L206 Dog Park Plan 10/21/2022 Exhibit 095.1 Lot 18 Detail Sheet 03/28/24 Exhibit 096 L300 Planting Details 10/21/2022 Exhibit 097 L301 Typical Unit Planting Details 10/21/2022 Exhibit 098 L302 Typical Utility Screening Details 10/21/2022 Exhibit 099 K1 Traffic Signal Kimball and Old Farm 10/22/2022 Exhibit 100 K2 Traffic Signal Kimball and Potash Road 10/22/2022 Exhibit 101 K3 Cantilever and Pole Sections Kimball and Old Farm 10/22/2022 Exhibit 102 K4 Cantilever and Pole Sections Kimball and Potash Road 10/22/2022 Exhibit 103 K5 Cantilever Pole Details 10/22/2022 Exhibit 104 K6 Traffic Signal Specifications 10/22/2022 Exhibit 105 K7 Traffic Control Plan Short Term Lane Closures 10/22/2022 Exhibit 106 T1 Kimball Avenue and Old Farm Pavement Marking 10/22/2022 Exhibit 107 T2 Old Farm Pavement Marking 10/22/2022 Exhibit 108 T3 Old Farm and Leo Lane/Meadow Loop Former Pavement Marking 10/22/2022 Exhibit 109 T4 O’Brien Farm Road East Pavement Marking 10/22/2022 Exhibit 110 T5 Mabel Way Pavement Marking 10/22/2022 Exhibit 111 01 Signal Configuration Test Fit for Future Signal at Old Farm Road and O’Brien Farm Road, NOT PROPOSED OR REQUIRED BY PROJECT 02/28/2022 Exhibit 112 Civil Plans Cover Page and Index 06/05/24 Exhibit 113 X-1 Existing Conditions Plan 10/21/2022 Exhibit 114 X-2 Existing Conditions Plan 10/21/2022 Exhibit 115 X-3 Existing Conditions Plan 10/21/2022 Exhibit 115.1 X-4 Existing Conditions Aerial Overlay 10/21/2022 Exhibit 116 PL-1 Final Plat 06/05/24 Exhibit 117 PL-2 Final Plat 06/05/24 Exhibit 118 E-1 Easement Plan 06/05/24 Exhibit 119 E-2 Easement Plan 06/05/24 Exhibit 120 Pl-3 Final Plat Footprint Lots 10/21/2022 Exhibit 121 Pl-4 Final Plat Footprint Lots 10/21/2022 Exhibit 122 Pl-5 Final Plat Footprint Lots 06/05/24 Exhibit 123 PH-1 Phasing Plan 06/05/24 Exhibit 124 C-1 Overall Site Plan 06/05/24 Exhibit 125 C-1.1 Overall Zoning Plan 06/05/24 Exhibit 126 C-2 Site Plan Leo Lane 06/05/24 Exhibit 127 C2.1 Site Plan Leo Lane Multi-Use Path 10/21/2022 Exhibit 128 C-3 Site Plan Leo Lane Old Farm 10/21/2022 Exhibit 129 C-4 Site Plan Leo Lane Old Farm, Mabel Way 06/05/24 Exhibit 130 C-5 Site Plan Old Farm and O’Brien Farm 10/21/2022 Exhibit 131 C-5.1 Site Plan Gravel Wetland #3 10/21/2022 Exhibit 132 C-6 Site Plan O’Brien Farm Road East 06/05/24 Exhibit 132.1 C-6.1 Site Plan O’Brien Farm Road East and Park 06/05/24 Exhibit 133 C-7 Site Plan Old Farm Road 10/21/2022 Exhibit 134 C-7.1 Site Plan Kimball Avenue 10/21/2022 Exhibit 135 C-8 Site Plan Kimball Avenue 10/21/2022 Exhibit 136 C-8.1 Site Plan Kimball Avenue 10/21/2022 Exhibit 137 C-9 Site Plan Historic Barn 06/05/24 Exhibit 138 C-10 Site Plan Mabel Way and Daniel Drive 06/05/24 Exhibit 139 C-11 Site Plan Mabel Way and Barn Road 10/21/2022 Exhibit 140 C-12 Site Plan Mabel Way 10/21/2022 Exhibit 141 C-13 Site Plan Mabel Way 10/21/2022 Exhibit 142 C-14 Site Plan Mabel Way 10/21/2022 Exhibit 143 C-15 Site Plan Mabel Way 10/21/2022 Exhibit 144 C-16 Site Plan Potash Road 10/21/2022 Exhibit 145 C-16.1 Site Plan IC Sewer And Gravel Wetland #7 06/05/24 Exhibit 146 C-17 Site Plan Potash Road 10/21/2022 Exhibit 147 C-18 Site Plan Potash Road 10/21/2022 Exhibit 148 C-18.1 Site Plan IC Stormwater Gravel Wetland #8 10/21/2022 Exhibit 149 C-18.2 Site Plan IC Stormwater Gravel Wetland #8 06/05/24 Exhibit 150 C-19 Site Plan Old Farm Road Sidewalk 10/21/2022 Exhibit 151 C-20 Watershed Map-Post Development 06/05/24 Exhibit 152 C-20.1 Watershed Map Pre- Development 10/21/2022 Exhibit 153 C-20.2 Post Construction Soil Depth & Quality Plan 06/05/24 Exhibit 154 C-20.3 Stormwater Maintenance Plan 06/05/24 Exhibit 155 C-21 Open Space and Resident Amenity Plan 06/05/24 Exhibit 156 Q-1 Overall Site Plan Rock Extraction and Crushing Area 06/05/24 Exhibit 157 Q-2 Site Plan Rock Extraction and Crushing Area 10/21/2022 Exhibit 158 Q-3 Site Sections, Rock Extraction and Crushing Area 10/21/2022 Exhibit 159 Q-4 Site Reclamation Plan Rock Extraction and Crushing Area 10/21/2022 Exhibit 160 CP-1 Road Leo Lane Profile 10/21/2022 Exhibit 161 CP-2 Road O’Brien Farm Road East Profile 10/21/2022 Exhibit 162 CP-3 Road Relocated Old Farm Road Profile 10/21/2022 Exhibit 163 CP-4 Road Relocated Old Farm Road Profile 10/21/2022 Exhibit 164 CP-5 Road Mabel Way Profile 10/21/2022 Exhibit 165 CP-6 Road Mabel Way Profile 10/21/2022 Exhibit 166 CP-7 Road Mabel Way Profile 10/21/2022 Exhibit 167 CP-8 Road Barn Road Profile 10/21/2022 Exhibit 168 CP-9 Road Daniel Drive Profile 10/21/2022 Exhibit 169 CP-10 Road Eastview Lane Profile 10/21/2022 Exhibit 170 CP-11 Road Potash Road Profile 10/21/2022 Exhibit 171 CP-12 Road Potash Road Profile 10/21/2022 Exhibit 172 D-1 Civil Details Road Sections 10/21/2022 Exhibit 173 D-1.1 Road Sections 10/21/2022 Exhibit 174 D-1.2 Road Sections 10/21/2022 Exhibit 175 D-1.3 Road Sections 10/21/2022 Exhibit 176 D-2 Civil Details 10/21/2022 Exhibit 177 D-3 Civil and Water Details 10/21/2022 Exhibit 178 D-4 Civil and Water Details 10/21/2022 Exhibit 179 D-5 Civil and Water Details 10/21/2022 Exhibit 180 D-6 Civil and Sanitary Details 10/21/2022 Exhibit 181 D-7 Civil and Stormwater Details 10/21/2022 Exhibit 182 D-8 Civil and Stormwater Details 10/21/2022 Exhibit 183 D-9 Civil and Stormwater Details 10/21/2022 Exhibit 184 D-10 Erosion Prevention and Sediment Details 10/21/2022 Exhibit 185 D-11 Erosion Prevention and Sediment Details 10/21/2022 Exhibit 186 D-12 EPSC & Tree Protection Details 10/21/2022 Exhibit 187 D-13 Site Electric Details 10/21/2022 Exhibit 188 EPSC 1 Pre Construction Plan 10/21/2022 Exhibit 189 EPSC 2 Pre Construction Plan 10/21/2022 Exhibit 190 EPSC 3 Pre Construction Plan 10/21/2022 Exhibit 191 EPSC 4 Pre Construction Plan 10/21/2022 Exhibit 192 EPSC 5 Pre Construction Plan 10/21/2022 Exhibit 193 EPSC 6 Pre Construction Plan 10/21/2022 Exhibit 194 EPSC 7 Construction Plan 06/05/24 Exhibit 194.1 EPSC 7.1 Construction Plan 06/05/24 Exhibit 195 EPSC 8 Construction Plan 06/05/24 Exhibit 196 EPSC 9 Construction Plan 10/21/2022 Exhibit 197 EPSC 10 Construction Plan 10/21/2022 Exhibit 198 EPSC 11 Construction Plan 06/05/24 Exhibit 199 EPSC 12 Construction Plan 06/05/24 Exhibit 200 EPSC 13 Construction Plan 06/05/24 Exhibit 201 EPSC 14 Construction Plan 06/05/24 Exhibit 202 EPSC 15 Construction Plan 10/21/2022 Exhibit 203 EPSC 16 Construction Plan 06/05/24 Exhibit 204 EPSC 17 Construction Plan 06/05/24 Exhibit 205 EPSC 18 Construction Plan 10/21/2022 Exhibit 206 EPSC 18.1 Construction & Stabilization Plan- Sidewalk Connection 10/21/2022 Exhibit 207 EPSC 19 Construction Plan 10/21/2022 Exhibit 208 EPSC 20 Construction Plan 10/21/2022 Exhibit 209 EPSC 21 Stabilization Plan 06/05/24 Exhibit 210 EPSC 22 Stabilization Plan 06/05/24 Exhibit 211 EPSC 23 Stabilization Plan 06/05/24 Exhibit 212 EPSC 24 Stabilization Plan 10/21/2022 Exhibit 213 Overall Landscape Plan with 40’ Street Tree Sample Plan 09/28/22 Exhibit 214 Street Tree Spacing Comparison Exhibit 09/28/22 Exhibit 215 Wetland Disturbance Summary 10/06/22 Exhibit 216 Traffic Question Email Response 10/06/22 Exhibit 217 DRB Narrative Supplement 06 10 22 06/10/22 Exhibit 218 DRB Narrative Supplement 08 22 22 08/22/22 Exhibit 219 DRB Narrative Supplement 09 29 22 09/29/22 Exhibit 220 Footprint Lot Height Table and Waiver Requests 10/25/22 Exhibit 221 Lot 18 Open Space Images 10/19/22 Exhibit 222 Digital Aerial Renderings Hillside 12/14/23 Exhibit 223 Digital Rendering of Potential Battery Building Lot 18 12/14/23 Exhibit 224 SF-10 Cottage Walkout Plans and Elevation 12/11/23 Exhibit 225 Digital Rendering of Planned Barn EV Charging Stations and Parking Area 12/14/23 Exhibit 226 Overall Existing Conditions Plan 02/14/23 Exhibit 227 Update to Landscape Budget for Amendment Application 04/22/24 Exhibit 228 DRB Narrative Supplement 05/17/24 Exhibit 229 Prelim and Final Plat Amendment Application 05/17/24 Exhibit 230 Eastview Amendment Site Plan Application 05/17/24 Exhibit 231 Eastview PUD Original WW Allocation Request 2/08/22 Exhibit 232 Eastview PUD Amended WW Allocation Request 06/05/24 Exhibit 233 Eastview Response to Incomplete Notice 06 05 24 Cover Letter 06/05/24