HomeMy WebLinkAboutSD-24-13 - Supplemental - 1580 Dorset StreetCITY OF SOUTH BURLINGTON
DEVELOPMENT REVIEW BOARD
SD-24-13_1580 Dorset St_Cider Mill_FP_SC_DRAFT
DEPARTMENT OF PLANNING & ZONING
Report preparation date: July 10, 2024
Plans received: June 14, 2024
1580 Dorset Street / 1699 Hinesburg Road – JJJ South Burlington, LLC
Site Plan Application #SD-24-13
Meeting date: July 16, 2024
Owner
JJJ South Burlington, LLC
21 Carmichael Street, Ste. 201
Essex Junction, VT 05452
Engineer
O’Leary-Burke Civil Associates
13 Corporate Drive
Essex Town, VT 05452
Property Information
Tax Parcels 0570-R1580, 0860-01731, 0860-01625_R
SEQ Zoning District- Neighborhood Residential, SEQ
Zoning District- Village Residential, SEQ Zoning
District- Natural Resource Protection
65.49 acres
Applicants
JJJ South Burlington, LLC & South Burlington DPW
21 Carmichael Street, Ste. 201 & 104 Landfill Road
Essex Junction, VT 05452 & South Burlington, VT 05403
Location Map
Project Area
#SP-23-03
2
PROJECT DESCRIPTION
Final plat application SD‐24-13 of JJJ South Burlington, LLC and the City of South Burlington to
amend a previously approved 291 unit planned unit development in two (2) phases. The
amendment is to Phase II (Cider Mill II) of the project and consists of removing a requirement to
prepare a scoping study for the intersection of Cheesefactory Road & Route 116, and shifting that
responsibility to VTrans as requested by VTrans, 1580 Dorset Street & 1699 Hinesburg Road.
CONTEXT
This project is subject to General Planned Unit Development Review Standards and the standards
of the Southeast Quadrant – Neighborhood Residential, – Village Residential, and – Natural
Resource Protection Zoning Districts.
This project received final plat approval for Phase II in 2018 when JJJ South Burlington, LLC obtained
approval to add 33 units to a previously approved 258-unit Planned Unit Development via final plat
application #SD-18-28. That approval included a Condition of Approval (Condition #36) that requires
JJJ South Burlington, LLC to prepare a scoping study of the Cheesefactory Road/Hinesburg Road
intersection, prepare a cost estimate for any necessary improvements, and pay a mitigation
contribution not to exceed 21.3% of the necessary improvement costs to the City of South Burlington
prior to the issuance of the 26th Zoning Permit in the second phase of the PUD, known as Cider Mill
II. JJJ South Burlington, LLC has obtained Zoning Permits for 24 units in Cider Mill II and is at risk
of having to suspend construction of Cider Mill II until Condition of Approval #36 of #SD-18-28 is
met.
The application at hand proposes to modify #SD-18-28 by amending Condition of Approval #36 to
reflect the changed factual circumstances applicable to the management of the intersection of
Cheesefactory Road & Hinesburg Road. Specifically, the applicants (JJJ South Burlington, LLC and
the City of South Burlington) are proposing to shift the responsibility for preparing a scoping study
for the subject intersection from JJJ South Burlington, LLC to VTrans (as requested by VTrans), shift
the recipient of JJJ South Burlington, LLC’s mitigation contribution not to exceed 21.3% of the
necessary improvement costs from the City of South Burlington to VTrans (as requested by VTrans),
and eliminate the requirement that these events take place prior to the issuance of the 26th Zoning
Permit in Cider Mill II.
Given the limited scope of the proposed change, Staff has determined this application constitutes a
minor amendment to an existing PUD per Article 15.C.07.C(3). A minor amendment is defined as
one which does not significantly alter the overall intent or scale of the PUD, or the relationship of
the approved PUD to its surroundings. Staff has accordingly limited the scope of this review to
criteria relevant to the minor amendment being sought. As a minor PUD, this application is not
required to be preceded by a sketch plan or a preliminary subdivision and has therefore proceeded
directly to final plat.
COMMENTS
Development Review Planners Marla Keene and Marty Gillies, hereinafter referred to as Staff, have
reviewed the plans submitted on 6/14/2024 and offer the following comments. Numbered
comments for the Board’s attention are indicated in red.
#SP-23-03
3
A) ZONING DISTRICT & DIMENSIONAL REQUIREMENTS
No Zoning District standards or dimensional requirements are proposed to be impacted as part of
this application.
B) STOWE CLUB HIGHLANDS ANALYSIS
The Stowe Club Highlands Analysis (SCHA) identifies that previous permit condition or terms can
only be modified or removed if a specific set of circumstances are met. Specifically, SCHA states
that an applicant may only obtain relief from a permit condition or term if they can show one of
the following.
(a) changes in factual or regulatory circumstances beyond the control of a permittee;
Staff considers that the facts at the time of the adoption of #SD-18-28 and associated Condition of
Approval #36 include an assumption that the City of South Burlington would eventually make
improvements to the intersection of Cheesefactory Road and Hinesburg Road, which is why the
applicant was required to both perform a scoping study on behalf of the City of South Burlington
and to make a payment to the City of South Burlington for a portion of the cost of any required
improvements. This assumption was reflected in the corresponding Act 250 permit, which includes
a condition identical to Condition of Approval #36 of #SD-18-28.
The applicants have testified that, since the time of the adoption of #SD-18-28, the City has never
developed plans for future improvements for the subject intersection. The State informed the
applicants in April of 2024 that VTrans has plans to conduct a scoping study of the intersection in
the fall of 2024, and that VTrans prefers to conduct the scoping study itself and finds no utility in
having a redundant scoping study completed. Any necessary improvements to the intersection will
be constructed by VTrans.
Staff consider that these factual circumstances are beyond the control of JJJ South Burlington,
LLC and that they have changed since the adoption of #SD-18-28 and associated Condition of
Approval #36. As such, Staff considers that JJJ South Burlington, LLC may obtain relief from
Condition of Approval #36 of #SD-18-28 as per this standard of SCHA.
1. Staff recommends the Board and applicants discuss whether the proposed minor amendment
meets the above test of SCHA and is therefore eligible for modification.
(b) changes in the construction or operation of the permittee’s project, not reasonably foreseeable
at the time the permit was issued; or
Not applicable.
(c) changes in technology.
Not applicable.
Assuming the Board accepts that the proposed modification meets one or more conditions of SCHA, the
applicants have proposed a draft version of a modified Condition that would supersede the
existing Condition in the analogous Act 250 approval. That language is as follows.
If the Vermont Agency of Transportation (“VTrans”) scoping study for improvements to the
Cheesefactory Road/Vermont Route 116 intersection planned for the Fall of 2024
determines safety improvements are warranted to this intersection, the Permittee shall
submit to VTrans a transportation impact fee equivalent to the Permittee’s “fair share” of
the cost of improvements, as determined by VTrans, not to exceed 21.3 percent of the total
cost of the improvements. The transportation impact fee shall be paid by the Permittee
#SP-23-03
4
within six months of its establishment by VTrans. The Permittee shall submit to the
Commission documentation that the transportation impact fee has been paid in
accordance with this permit condition within two weeks of making payment to VTrans.
2. Staff recommends the Board and applicants discuss the above language and how it might be best
modified to serve as a Condition of Approval for this Final Plat application. Staff considers that the
elimination of Condition of Approval #36 of #SD-18-28 is also a potential solution, as the above
proposed Condition of Approval has been proposed as a condition in the applicant’s updated
associated Act 250 permit.
C) SUBDIVISION REVIEW STANDARDS
No Subdivision standards are proposed to be impacted as part of this application.
RECOMMENDATION
Staff recommends that the Board discuss the project with the applicant and close the hearing.
Respectfully submitted,
Marty Gillies, Development Review Planner I