Loading...
HomeMy WebLinkAboutMP-24-02 - Supplemental - 0200 da Vinci Drive (2)355 Main Street | Suite 500 | Winooski, VT 05404 | w. eivtech.com May 1, 2024 Marla Keene, PE Development Review Planner City of South Burlington 180 Market Street South Burlington, VT 05403 Re: Burlington International Airport Burlington School District’s Aviation Technical Center Project Master Plan and Site Plan Review Application Dear Marla Keene, Thank you for your time to review our concurrent master plan and site plan application for the above reference project. We have included the list of application requirements, and our team’s response to where this information is now included in the chart below. Updated plansheets and exhibits have been included in our file transfer folder with the revision date in the file name. Master Plan Application Requirement City Comments Design Team Response Location of existing restrictions on land, such as easements and covenants. I believe there are stormwater easements & a ROW that has been offered to the City. There may be others? The overall sketch plan has been updated to include all existing restrictions on land. A complete survey of the subdivision, prepared by a licensed land surveyor, showing the location, bearing and length of every street line, lot line and boundary line, and existing and proposed restrictions on the land, including but not limited to access ways and utility easements. Where applicable, this information shall be tied to reference points previously established by the City. Since you are not proposing a subdivision, this is largely the same as the above The overall sketch plan has been updated to include all existing restrictions on land. 355 Main Street | Suite 500 | Winooski, VT 05404 | w. eivtech.com Master Plan Application Requirement City Comments Existing water courses & buffers, wetlands & buffers, base flood elevations if located in an area of special flood hazard, wooded areas, ledge outcrops, and other natural features. The buffer for the wetland to the south may encroach into the project area. Please show. The maximum number of vehicle trip ends (VTEs) and associated parking proposed for the property or properties subject to the master plan. The actual trip generation is omitted from the memo Site Plan Application Requirement City Comments Location of existing restrictions on land, such as easements and covenants. Maybe nothing on the actual site, but since these are the same plans as for the MP, please update as well Location of planned restrictions on land, such as easements and covenants. I assume there is a new easement on the Beta MP area proposed to support this project? The location of any outdoor storage for equipment and materials if any, and the location, type and design of all solid waste-related facilities, including dumpsters and recycling bins. Where will dumpsters / waste disposal be for this project? Design Team Response Wetland areas and their buffers will not be impacted by this project. The distance from the top of the bank to the nearest project disturbance is 79 feet. This dimension has been added to the Grading Drainage Plan, GR-01. The traffic memo was updated to include trip generation details. Design Team Response The overall sketch plan has been updated to include all existing restrictions on land. The overall sketch plan has been updated to include all existing restrictions on land. The Site Plan, SP-01, has been updated to label the location of the dumpsters/waste disposal for this project. In addition to the dumpster area, the revised site plan has the snow storage area labeled. 355 Main Street | Suite 500 | Winooski, VT 05404 | w. eivtech.com Site Plan Application Requirement City Comments Existing water courses & buffers, wetlands & buffers, base flood elevations if located in an area of special flood hazard, wooded areas, ledge outcrops, and other natural features. Same as for MP, please show wetland buffer and how it relates to project area A list of existing vegetation, with the location, type, and size of existing trees of six inches or greater in caliper. Existing veg is shown but labels are omitted A written plan to preserve and protect significant existing vegetation during and after construction. Such plan will be of sufficient detail that the City of South Burlington will be able to inspect the site during construction to ensure that existing vegetation is protected as per the plan. It doesn’t appear you’re proposing to protect existing veg. This may benefit from some narrative, because I see you are providing some plantings. Detailed landscaping plan, specification of materials, costs, and phasing plan, including vegetation to remain, types of new plant materials, identified by common name and botanical name, sizes of all new plant materials by height and/or diameter at time of planting and at maturity, quantities of each of the planting materials, and treatment of the ground surface (paving, seeding, or groundcover) for all plantings, screening, buffering, and stormwater infiltration. Budget omitted Design Team Response Wetland areas and their buffers will not be impacted as part of this project. The distance from the top of the bank to the nearest project disturbance is 79 feet. This dimension has been added to the Grading and Drainage Plan, GR-01. EX-01 has been updated to label these trees as being removed. This is the only vegetation within the project disturbance limits. EX-01 has been updated to label these trees as being removed. This is the only vegetation within the project disturbance limits. The landscaping budget for the project is approximately $50,000. The existing vegetation will be removed and new vegetation will be planted as shown on sheet LL-02, Lighting and Landscaping Plan. This plansheet includes a planting schedule and details. 355 Main Street | Suite 500 | Winooski, VT 05404 | w. eivtech.com Feel free to contact Larry Lackey, or Jacqueline Dagesse at EIV with any questions regarding this submission, 802-324-5522. Very Respectfully, EIV Technical Services Jacqueline Dagesse, MBA, CPESC President / Environmental Engineer Site Plan Application Requirement City Comments Design Team Response One set of preliminary plans, elevations, floor plans, and sections of proposed structures showing the proposed location, use, design and height of all structures, roads, parking areas, access points, sidewalks and other walkways, loading docks, outdoor storage areas, sewage disposal areas, landscaping, screening, site grading, and recreation areas if required. Plans shall also show any proposed division of buildings into units of separate occupancy and location of drives and access thereto. Dumpster area? Snow storage? The Site Plan, SP-01, has been updated to label the location of the dumpsters/waste disposal for this project. In addition to the dumpster area, the revised site plan has the snow storage area labeled. Analysis of traffic impacts, if required by the traffic overlay district and/or the DRB. # of trips omitted The traffic memo was updated to include trip generation details. 355 Main Street | Suite 500 | Winooski, VT 05404 | w. eivtech.com Photo 1: Existing conditions at the front of the existing hangar. Photo 2: Existing conditions of the parking lot.