Loading...
HomeMy WebLinkAboutAgenda 05_SP-24-17 CU-24-06_1877 Williston Rd_Munson 180 Market Street, South Burlington, Vermont 05403 | 802-846-4106 | www.southburlingtonvt.gov TO: South Burlington Development Review Board FROM: Marty Gillies, Development Review Planner SUBJECT: #SP-24-17 & #CU-24-06, 1877 Williston Road DATE: June 18th, 2024 Development Review Board meeting This application is a combined Site Plan and Conditional Use application to construct a 1.02-acre paved parking lot on the subject property and change the use of that property from ‘outdoor storage yard’ to ‘commercial parking facility’. This application is relatively straight-forward as far as the LDR sections governing Site Plan and Conditional Use standards are concerned – for that reason, Staff felt that it was appropriate to format the Staff Report for this project as a draft Findings of Fact & Decision. However, in the latter stages of review, it became evident that the applicant still has work to do to fully demonstrate that they have met the City’s Environmental Protection Standards. The applicant and ANR were able to work together to provide the documentation necessary to meet the LDRs that govern ‘jurisdictional determination and interpretation’ for the River Corridor Overlay prior to publication of this packet, which is reflected in the associated draft Findings of Fact & Decision. There are still outstanding issues with the Floodplain Overlay District, which Staff has attempted to summarize in the draft FFD and has elaborated upon below. To come into compliance with the standards of the Floodplain Overlay District, the applicant has the following options: - Relocate the proposed access drive and associated fill to be entirely outside of the revised boundary of the Floodplain Overlay District Zone A. - Keep the location of the proposed access drive but remove the associated fill – this will require approval of a Floodplain Review Application that (A) includes the following application components; o A Floodplain Development Plan that depicts the proposed development, property boundaries, all water bodies, all boundaries (Floodplain Overlay District boundaries – all zones), the shortest horizontal distance from the proposed development to the top of bank of any river, any existing and proposed drainage, any proposed fill, pre- and post-development grades, and the elevation of the proposed lowest floor as referenced to the same vertical datum as the elevation on the current Flood Insurance Rate Maps. o A completed Vermont Agency of Natural Resources Project Review Sheet. The Project Review Sheet shall identify all State and Federal agencies from which permit approval is required for the proposal, and shall be filed as a required attachment to the municipal permit application. The identified permits, or letters indicating that such permits are not required, shall be submitted to the Administrative Officer and attached to the permit before work can begin. 180 Market Street, South Burlington, Vermont 05403 | 802-846-4106 | www.southburlingtonvt.gov and (B) complies with the following standards: o All development shall be reasonably safe from flooding, as determined by compliance with the specific standards of this subsection. o All development shall be designed (I) to minimize flood damage to the proposed development and to public facilities and utilities, and (II) to provide adequate drainage to reduce exposure to flood hazards. o All development shall be (I) designed (or modified) and adequately anchored to prevent flotation, collapse, or lateral movement of the structure during the occurrence of the base flood, (II) be constructed with materials resistant to flood damage, (III) be constructed by methods and practices that minimize flood damage, and (IV) be constructed with electrical, heating, ventilation, plumbing, and air conditioning equipment and other service facilities that are designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding. Respectfully submitted, Marty Gillies Development Review Planner 1 CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING AND ZONING SBRC PROPERTIES, LLC – 1877 WILLISTON ROAD SITE PLAN APPLICATION #SP-24-17 & CONDITIONAL USE APPLICATION #CU-24-06 FINDINGS OF FACT AND DECISION Site Plan application #SP-24-17 and Conditional Use application #CU-24-06 of SBRC Properties, LLC to amend a previously approved plan for an outdoor storage yard. The amendment consists of constructing a 1.02 acre paved parking lot and changing the use to commercial parking facility, 1877 Williston Road The Development Review Board held a public hearing on June 18, 2024. Tim McKenzie represented the applicant. Based on testimony provided at the above-mentioned public hearing and the plans and supporting materials contained in the document file for this application, the Development Review Board finds, concludes, and decides the following: FINDINGS OF FACT 1. The applicant is seeking to amend a previously approved plan for an outdoor storage yard. The amendment consists of constructing a 1.02 acre parking lot and changing the use to commercial parking facility, 1877 Williston Road. 2. The owner of record of the subject property is SBRC Properties, LLC 3. The subject property is located in the Mixed Industrial & Commercial (IC) Zoning District, Transit Overlay District, Wetland Advisory Overlay District, River Corridor Overlay District and the Floodplain Overlay District (100 Year Floodplain). 4. The application was received on April 15, 2024. 5. The plans submitted consist of: Sheet No. & Title Prepared by Last Revised Date C1-01 Existing Conditions TCE 03/21/2024 C2-01 Site Plan TCE 03/26/2024 C4-01 Stormwater Existing Conditions TCE 03/26/2024 C4-02 Stormwater Proposed Conditions TCE 03/26/2024 C4-03 Annotated Maintenance Plan TCE 03/26/2024 C5-01 EPSC Plan TCE 03/26/2024 C8-01 Site Details TCE 03/26/2024 C8-02 Stormwater Details TCE 01/04/2022 C8-03 Stormwater Notes TCE 03/26/2024 C8-04 Low Risk Handbook Sheet 1 TCE 01/04/2022 C8-05 Low Risk Handbook Sheet 2 TCE 01/04/2022 6. The applicant is proposing to utilize the subject lot as a ‘commercial or public parking facility’ by renting the space out for RV storage. Table C-1 of the LDRs identifies ‘commercial or public parking facility’ as a conditional use in the subject zoning district. 7. The proposed amendment to the subject property to include a ‘commercial or public parking facility’ necessitates that the project is subject to the review standards for both Site Plans and Conditional Uses. SP-24-17 & CU-24-06 2 ZONING DISTRICT & DIMENSIONAL REQUIREMENTS TABLE C-1 USES APPLICABLE IN ALL ZONING DISTRICTS The subject property is in the Mixed Industrial & Commercial Zoning District. This zoning district permits ‘commercial or public parking facilities’ as a Conditional Use. The LDRs define a ‘commercial or private parking facility’ as a “A parking area owned by a business establishment, membership association or organization, place of worship, or similar use and made available by the owners or occupants for the exclusive use of clients, customers, employees, members, owners, tenants, lessees, or occupants of said business establishment, membership association or organization, place of worship, or similar use. Such commercial or private parking may or may not exist on the same lot as the principal use”. The Board finds that the proposed use of the subject property by SBRC Properties, LLC, as an RV storage yard fits within this definition of a ‘commercial or private parking facility’. SITE PLAN REVIEW CRITERIA Pursuant to Section 14.03.A(1)(b) & (c) of the South Burlington Land Development Regulations, the proposed alteration to the approved site plan, which is also subject to conditional use approval, shall require site plan approval and shall meet the following standards of Section 14.06: 14.06 General Review Standards A. Relationship of Proposed Structures to the Site. (1) The site shall be planned to accomplish a desirable transition from structure to site, from structure to structure, and to provide for adequate planting, safe pedestrian movement, and adequate parking areas. The DRB shall consider the following: (a) Street Frontage. Maintain internally-consistent building setbacks and landscaping along the street. There are no proposed structures as part of this application. The Board finds that the proposed project does not impact compliance with this standard. (b) Building Placement, Orientation. Maintain or establish a consistent orientation to the street and, where a prevalent pattern exists, shall continue the manner in which the site’s existing building foundations relate to the site’s topography and grade. The Board finds that the proposed project does not impact compliance with this standard. (c) Transition Contrast in Scale. Minimize and mitigate abrupt contrasts in scale between existing, planned or approved development, and proposed development. The Board finds that the proposed project does not impact compliance with this standard. (d) Pedestrian Orientation. Improve and enhance pedestrian connections and walkability within the area proposed for development. IC Zoning District Required Existing Proposed Min. Lot Size 40,000 sf 2.94 acres No change Max. Building Coverage 40 % 0% 0% Max. Overall Coverage 70 % 0% 49% Min. Front Setback 30 ft. n/a n/a Min. Side Setback 10 ft. n/a n/a Min. Rear Setback 30 ft. n/a n/a Max Height, flat roof 35 ft. n/a n/a SP-24-17 & CU-24-06 3 The proposed project constitutes a change in use from a contractors yard to an outdoor storage facility. It is conceivable that the change will increase pedestrian use of the site. However, both vehicular and pedestrian traffic is anticipated to be light. The Board finds no improvement to pedestrian access to be necessary. (e) Solar Gain. Orient their rooflines to maximize solar gain potential, to the extent possible within the context of the overall standards of these regulations. The Board finds that the proposed project does not impact compliance with this standard. (2) Parking. Though the applicant is proposing to stripe the pavement in a manner similar to a parking lot, the use as an outdoor storage yard is considered separate and distinct from that of a parking lot and therefore the Board finds the criteria pertaining to parking location and layout to be irrelevant. (3) Without restricting the permissible limits of the applicable zoning district, the height and scale of each building shall be compatible with its site and existing or anticipated adjoining buildings. There are no buildings proposed as part of this project and no existing buildings on site. The Board finds that the proposed project does not impact compliance with this standard. B. Relationship of Structures and Site to Adjoining Area. (1) The Development Review Board shall encourage the use of a combination of common materials and architectural characteristics (e.g., rhythm, color, texture, form or detailing), landscaping, buffers, screens and visual interruptions to create attractive transitions between buildings of different architectural styles. There are no buildings proposed as part of this project and no existing buildings on site. The Board finds that the proposed project does not impact compliance with this standard. (2) Proposed structures shall be related harmoniously to themselves, the terrain and to existing buildings and roads in the vicinity that have a visual relationship to the proposed structures. There are no buildings proposed as part of this project and no existing buildings on site. The Board finds that the proposed project does not impact compliance with this standard. C. Site Amenity Requirement. (1) Sites are required to include a specific minimum area for appropriate Site Amenities. This section does not apply to projects within the City Center FBC District (which are governed by Section 8.08). (2) Applicability. Applications for the following shall be required to provide Site Amenities: (a) Any non-residential development over 5,000 SF. (b) Additions or expansions exceeding 5,000 SF for existing non-residential structures. (c) Any residential development, including conversion of non-residential structures to residential use. This project does not meet any of these three criteria; as such, there is no Site Amenity requirement associated with this project. SP-24-17 & CU-24-06 4 14.07 Specific Review Standards In all Zoning Districts and the City Center Form Based Codes District, the following standards shall apply: A. Environmental Protection Standards All proposed development shall be subject to the applicable requirements of Article 12, Environmental Protection Standards. Portions of the subject property in proximity to Potash Brook are within the River Corridor Overlay District and the Floodplain Overlay District (100 Year Floodplain). Potash Brook is daylighted for approximately 150 linear feet on the subject property, before being piped under portions of the adjacent and subject properties. The River Corridor Overlay District corresponds with the course of Potash Brook, regardless of whether it is underground. The Floodplain Overlay District also largely corresponds with the course of Potash Brook. Further discussion of the applicable standards can be found under 12.07 & 12.08 below. B. Site Design Features. All proposed development shall comply with standards for the placement of buildings, parking and loading areas, landscaping and screening, open space, stormwater, lighting, and other applicable standards related to site design pursuant to these Land Development Regulations. No changes to landscaping and screening, open space, or lighting are proposed. The comments of the stormwater section are provided below under Section 13.05. C. Access and Circulation. All proposed development shall comply with site access and circulation standards of Section 15.A.14. Relevant standards of 15.A.14 include those pertaining to safe pedestrian access. While there will likely be a small increase in pedestrian use of the site compared to the previously approved use, the Board finds no improvements to be necessary given the scale of the project. D. [Reserved for Transportation Demand Management (TDM)] E. Building Form. Development within the City Center Form Based Code District, the Urban Design Overlay District, and other districts with supplemental building form standards shall adhere to the standards contained therein. No building form standards are applicable to the proposed project. F. Streetscape Improvements. A proposed new construction or extension/expansion of an existing structure exceeding the thresholds listed in either (a) Section 14.09(B) or (b) Section 8.11(D) within the City Center Form Based Code, or Section 3.11(D) in all other zoning districts, shall be required to upgrade adjacent sidewalks, greenbelts, and related street furniture (trees, benches, etc.) to the standards contained within the applicable Street Type and Building Envelope Standard. Nothing in this subsection shall be construed to limit requirements for additional upgrades as necessary to meet the requirements of these Regulations. No structures are proposed to be impacted as part of this project. Therefore the Board finds that this criterion to be not applicable. G. Access to Abutting Properties. The reservation of land may be required on any lot for provision of access to abutting properties SP-24-17 & CU-24-06 5 whenever such access is deemed necessary to reduce curb cuts onto an arterial or collector street, to provide additional access for emergency or other purposes, or to improve general access and circulation in the area. No modifications to existing access between properties are proposed. H. Utility Services. Electric, telephone and other wire-served utility lines and service connections shall be underground insofar as feasible and subject to state public utilities regulations. Any utility installations remaining above ground shall be located so as to have a harmonious relation to neighboring properties and to the site. Standards of Section 15.A.18, Infrastructure, Utilities, and Services, shall also be met. No impacts to wire-served utilities are proposed. I. Disposal of Wastes. All dumpsters and other facilities to handle solid waste, including compliance with any recycling, composting, or other requirements, shall be accessible, secure and properly screened with opaque fencing to ensure that trash and debris do not escape the enclosure(s). Small receptacles intended for use by households or the public (i.e., non-dumpster, non-large drum) shall not be required to be fenced or screened. The Board finds that the applicant must clarify whether any dumpsters are proposed at this site. Assuming no dumpsters are proposed, the Board finds that this criterion is not applicable. ENVIRONMENTAL PROTECTION STANDARDS 12.01 General Protection Standards 12.06 Wetland Protection Standards A portion of the subject property is classified as a Class II wetland. That portion of the property is not proposed to be impacted by this project. 12.07 River Corridor Overlay District A. Purpose. B. Authority. C. Comprehensive Plan. D. Warning of Disclaimer of Liability. E. Precedence of Bylaw. F. District General Provisions. (1) Establishment of RCO District. (2) RCO District Boundaries. The boundaries of the RCO District are as follows: (a) All River Corridors as published by the Vermont Agency of Natural Resources (including the Statewide River Corridors and refinements to that data based on field-based assessments which are hereby adopted by reference). The Vermont ANR map classifies both the daylighted and underground sections of Potash Brook in this section as ‘small stream’, with an associated 50-foot setback. However, because City standards are stricter than State standards in this instance (as described below), City standards prevail. SP-24-17 & CU-24-06 6 (b) All land within one hundred (100) feet horizontal of the top of bank or top of slope, whichever is applicable given the stream’s fluvial geomorphology, along the reaches of the main stem of Potash Brook where a mapped River Corridor has not been developed by the Vermont Agency of Natural Resources. All land within 100 feet of the mapped course of Potash Brook is classified as a River Corridor, and is mapped as such on the South Burlington City Map Viewer. This includes a 100-foot distance from both the edge of the daylighted portions of Potash Brook, and a 100-foot distance from the edge of the pipe through which the underground section of Potash Brook travels. (c) All land within fifty (50) feet horizontal distance from the top of bank or top of slope, whichever is applicable given the stream’s fluvial geomorphology, of all other perennial rivers and streams. (d) All land within ten (10) feet horizontal distance from the top of the bank or top of slope of a natural intermittent stream, whichever is applicable given the stream’s fluvial geomorphology. (e) Requests to update a River Corridor map shall be in accordance with the procedure laid out in the ANR Flood Hazard Area and River Corridor Protection Procedure. (3) RCO District – Classification. (4) Jurisdictional Determination and Interpretation. The information presented on any maps, or contained in any studies, adopted by reference, is presumed accurate. If uncertainty exists with respect to the boundaries of the RCO the location of the boundary on the property shall be determined by the Administrative Officer (AO). If the applicant disagrees with the determination made by the AO or the river corridor as mapped, the applicant has the option to either: The applicant disagreed with the River Corridor as mapped as it pertains to the underground section of Potash Brook and engaged in the process described under (b) below. (a) Hire a licensed land surveyor or registered professional engineer to stake out the RCO boundary on the property; or (b) Request a letter of determination from ANR which shall constitute proof of the location of the river corridor boundary. In support of a letter of determination request, applicants must provide ANR a description of the physical characteristics that bring the river corridor delineation into question (e.g. the presence of bedrock or other features that may confine lateral river channel adjustment. When ANR receives a request for a letter of determination, ANR evaluates the site and existing data to see if a change to the river corridor delineation is justified, necessitating a river corridor map update. An ANR letter of determination will either confirm the existing river corridor delineation or will result in an update to the river corridor delineation for the area in question. If a map update is justified, an updated map will be provided with the letter of determination. The applicant received an email from ANR stating that “it appears the Potash Brook is relatively unaffected by the proposal”. The email from ANR stops short of making a determination that the South Burlington mapped river corridor is non- jurisdictional. However, subsequent correspondence between ANR & City Staff clarified that ANR considers that the culverted section of Potash Brook on and adjacent to the subject property is not subject to the River Corridor standards of the South Burlington LDRs. SP-24-17 & CU-24-06 7 G. Prohibited, Exempted, and Permitted Development in River Corridors. (1) Prohibited Development in the RCO District. The following types of development are prohibited in the RCO District: (a) All development, including new structures, structure additions, fill, accessory dwelling units, and any other development that is not expressly listed as at least one of the Exempted Activities or Permitted Development as described below; (b) Creation of new lawn or landscaped areas; and (c) Snow storage areas. The applicant is proposing snow storage areas within both the original boundaries of the River Corridor Overlay District and the potential updated boundaries of the River Corridor Overlay District. The Board finds that the applicant must amend the plans to relocate the snow storage areas to a location that complies with the standards of Section 12.07.G(1)(c). 12.08 Floodplain Overlay District The applicant is presently proposing Floodplain Overlay District impacts. The proposed impacts and the various mitigation strategies are described in greater detail throughout this section. A. Purpose. B. Authority. C. [Reserved] D. Administration. The most recently published FIRM showed the majority of the property within the Floodplain Overlay District Zone A. The applicant has obtained a LOMA on May 23, 2023 from FEMA (case number 23- 01-0339A) which results in the property now being only partially covered by Floodplain Overlay District Zone A. This process is explained in further detail below. (1) Floodplain Review. All development in the City of South Burlington located within the Floodplain Overlay District shall be subject to Floodplain Review. The Floodplain Overlay District overlays other existing zoning districts. All other requirements of the underlying district shall apply in addition to the provisions herein, unless otherwise indicated. The Floodplain Overlay District is composed of two areas: (a) Floodplain Overlay District Zones A, AE, and A1-30. The boundaries of these Zones include those areas of special flood hazard designated in and on the most current flood insurance studies and maps published by the Department of Homeland Security, Federal Emergency Management Agency, National Flood Insurance Program and mapped as Zones A, AE, or A1-30. Prior to the issuance of the LOMA by FEMA, almost the entirety of the subject property was located within Floodplain Overlay District Zone A. (b) Floodplain Overlay District Zones 0.2% B1 and B2. The boundaries of these Zones include those areas of special flood hazard designated in and on the most current flood insurance studies and maps published by the Department of Homeland Security, Federal Emergency Management Agency, National Flood Insurance Program, and as depicted on the Natural Resources Map as Zone 0.2% B1 and Zone 0.2% B2. Floodplain Overlay District Zone 0.2% B1 is composed of areas of the 500- year floodplain that are already substantially developed and where additional opportunities for infill development is appropriate. Floodplain Overlay District Zone 0.2% B2 is composed of areas of the 500-year floodplain that are not developed and SP-24-17 & CU-24-06 8 where future development is not appropriate. (2) Interpretation. The information presented on any maps, or contained in any studies, adopted by reference, is presumed accurate. However, if uncertainty exists regarding the Floodplain Overlay District boundary, the following procedure shall be followed: The applicant disagreed with the Floodplain Overlay District Zone A as mapped on the subject property and engaged in the process described under (a) below. (a) If uncertainty exists with respect to the boundaries of the Floodplain Overlay District Zones A, AE, and A1-30 the location of the boundary shall be determined by the Administrative Officer. If the applicant disagrees with the determination made by the Administrative Officer, a Letter of Map Amendment from FEMA shall constitute proof that the property is not located within the Special Flood Hazard Area. The applicant obtained a LOMA from FEMA on May 23, 2023, that identifies the revised boundaries of the Floodplain Overlay District Zone A. Those revised boundaries are reflected on the Site Plan and other maps submitted by the applicant as part of this application. (b) If uncertainty exists with respect to the boundaries of the Floodplain Overlay District Zones 0.2% B1 and B2 the location of the boundary shall be determined by the Administrative Officer. If the applicant disagrees with the determination made by the Administrative Officer, the applicant may appeal the determination in accordance with Article 17. (3) Base Flood Elevations and Floodway Limits. The LOMA does not provide a base flood elevation determination. Therefore determination of the base flood elevation at the site is the responsibility of the applicant. (4) Warning of Disclaimer of Liability. (5) Precedence of Bylaw. (6) Exempted Development. E. Floodplain Review Application Requirements. The applicant has not submitted a Floodplain Review Application, ostensibly because the applicant is not intending to develop within the Floodplain. However, the submitted application materials include a Site Plan that proposes development within the revised boundaries of the Floodplain Overlay District Zone A. Specifically, the submitted Site Plan shows the proposed northeastern corner of the access drive, and proposed fill associated with that proposed access drive as being within the revised Floodplain Overlay District Zone A boundary. F. Floodplain Review – Development Review Process All applications for development in the Floodplain Overlay District shall be reviewed according to the following procedures: (1) Referrals. (a) NFIP Coordinator. Upon receipt of a complete Floodplain Review application for a substantial improvement or new construction the Administrative Officer shall forward a copy of the application and supporting information to the State National Flood Insurance Program Coordinator at the Vermont Agency of Natural Resources, in accordance with 24 V.S.A. 4424. A permit may be issued only following receipt of comments from the Agency, or the expiration of 30 days from the date the application was mailed to the Agency, whichever is sooner. The Administrative Officer, and/or Development Review Board shall SP-24-17 & CU-24-06 9 consider all comments from ANR. Review by the NFIP Coordinator is required for the proposed floodplain impacts. In addition, the standards of 12.08.G apply, as discussed below. (2) Review Process The proposed impacts are not eligible for administrative review, therefore they must be reviewed by the Development Review Board. G. Floodplain Review Standards. (1) Prohibited Development (f) New fill except as necessary to elevate structures above the base flood elevation. Because the proposal involves fill for the purpose of constructing a driveway and not for the purpose of constructing a structure, it is prohibited, and the Board cannot approve the floodplain impacts. (3) Development in the Floodplain Overlay District [excerpt (a) through (c)] If the applicant were able to design the driveway so that no fill in the Floodplain Overlay District were proposed, the applicant would be allowed to pave; the paving would just be subject to 12.08.G(3)(a) through (c) and would require review by NFIP coordinator. To avoid Floodplain Review entirely, the applicant can relocate the driveway so that the driveway and the associated fill are both outside of the floodplain. The Board finds that the applicant must revise the Site Plan to alter the location of the proposed access drive so that the entirety of that drive is removed from within the revised boundary of the Floodplain Overlay District Zone A as a condition of approval. Alternatively, the applicant may apply for approval for the proposed floodplain impacts. This process involves the following (paraphrased) steps. • Determination of base flood elevation • Revision of design to remove fill from floodplain • Preparation of an ANR Project Review Sheet & obtaining necessary ANR permits • Demonstration of compliance with standards for Development in the Floodplain Overlay District (12.08(G)(3)(a) through (p), including demonstration of adequate construction methods and no rise demonstration CONDITIONAL USE CRITERIA Pursuant to Section 14.10.C of the South Burlington Land Development Regulations, the proposed creation of a conditional use must be reviewed under the conditional use review criteria and shall meet the following standards of Section 14.10.E: 14.10.E General Review Standards. The Development Review Board shall review the proposed conditional use for compliance with all applicable standards as contained in these regulations. The proposed conditional use shall not result in an undue adverse effect on any of the following: (1) The capacity of existing or planned community facilities. Traffic impacts are discussed under standard (3) below. The Board finds the proposed use will not have any other potential impact on any other community facilities. (2) The character of the area affected, as defined by the purpose or purposes of the zoning district within which the project is located, and specifically stated policies and standards of the municipal SP-24-17 & CU-24-06 10 plan. The Board finds that conversion of the subject property from an outdoor storage yard to a commercial or public parking facility will not negatively impact the character of this property. The Board finds this criterion met. (3) Traffic on roads and highways in the vicinity. The applicant testified that there will be no regular access to this property, and that no one will work at this property – as such, there are no projected increases in trip generation. The Board finds this criterion met. (4) Bylaws and ordinances then in effect. This project will not impact any other bylaws or ordinances in effect. (5) Utilization of renewable energy resources. This project will not affect renewable energy resources. OTHER APPLICABLE CRITERIA 13.04.B(7) Snow Storage As noted under 12.07 & 12.08 above, no snow storage areas can be located within the River Corridor Overlay. The applicant is proposing to locate snow storage areas within this boundary. The Board finds that the applicant must revise the proposed plans to relocate the snow storage areas to a location that complies with the standards of Section 12.07.G(1)(c). 13.05 Stormwater Management The South Burlington Stormwater Superintendent reviewed these plans on May 8, 2024 and offered the following comments: 1. This project is located in the stormwater impaired Potash Brook watershed. 2. Sheet C8-02, Gravel Wetland Basin Section: The 6” perforated subdrain is called out as “wrapped in filter fabric”. Staff recommends applicant not include filter fabric around any subdrains to minimize clogging and prolong the useful life of the gravel wetlands. 3. Sheet C8-02, Gravel Wetland Basin Section; HydroCAD Report: a. The HydroCAD Report indicates the presence of a 10-year orifice at an elevation of 300.90’ in the outlet structure of Gravel Wetland 1 and Gravel Wetland 2. Please add said orifice to the outlet structure detail on Sheet C8-02. b. The HydroCAD Report indicates the CPv orifice at an elevation of 300.2’ for Gravel Wetland 1 and 300.4’ for Gravel Wetland 2. Please specify the appropriate CPv orifice elevations for each Gravel Wetland outlet structure in the plan set. c. The HydroCAD Report indicates that the 10-year orifice for Gravel Wetland 1 is 12” wide by 2” high, while the 10-year orifice for Gravel Wetland 2 is 6” wide by 2” high. Please specify the appropriate 10-year orifice dimensions for each Gravel Wetland outlet structure in the plan set. 4. Staff notes the existing drainage easement for the benefit of the City of South Burlington that falls within the project area. Repair or replacement of any new aboveground features (security fence, a corner of the entrance drive) that fall within the easement will be the responsibility of the applicant/landowner should repair of the existing culvert be necessary. The Board finds that the applicant must comply with all comments of the City Stormwater SP-24-17 & CU-24-06 11 Superintendent as a condition of approval. 13.03 Bicycle Parking & Storage Table 13-3 identifies bike parking requirements for various uses. The table does not specifically identify a minimum required amount of short-term or long-term bicycle parking for uses that do not include any buildings or structures. As such, the Board finds that no short-term or long-term bicycle parking requirements are applicable to this project, and finds this criterion to be inapplicable. 13.07 Exterior Lighting The applicant has testified that no new or revised exterior light fixtures are proposed as part of this application. 13.11 Fences The Board finds that the applicant must provide details for the proposed fencing that demonstrate that all portions of the fence comply with all standards of Section 13.11 as a condition of approval. DECISION Motion by xxxxxxxx, seconded by xxxxxxxx, to approve site plan application #SP-24-17 and conditional use application #CU-24-06 of SBRC, LLC, subject to the following conditions: 1. All previous approvals and stipulations shall remain in full effect except as amended herein. 2. This project shall be completed as shown on the plan submitted by the applicant and on file in the South Burlington Department of Planning and Zoning as conditioned herein. 3. Prior to issuance of a Zoning Permit, the plans must be revised to show the changes below and shall require approval of the Administrative Officer. a. Relocate the snow storage areas to a location that complies with the standards of Section 12.07.G(1)(c). b. Demonstrate compliance with all comments of the Stormwater Superintendent. c. Alter the location of the proposed access drive so that the entirety of that driveway and the associated fill is removed from within the revised boundary of the Floodplain Overlay District Zone A, or apply for approval of the proposed floodplain impacts. d. Provide details for the proposed fencing that demonstrate that all portions of the fence comply with all standards of Section 13.11. 4. A digital PDF version of the full set of approved final plans as amended must be delivered to the Administrative Officer prior to issuance of a Zoning Permit. 5. The zoning permit must be obtained within six (6) months of this decision with the option for requesting a one (1) year extension as allowed in LDR 17.04. 6. The applicant must regularly maintain all stormwater treatment and conveyance infrastructure. 7. Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines, services, and service modifications must be underground. SP-24-17 & CU-24-06 12 8. The proposed project must adhere to standards for erosion control as set forth in Section 16.03 and the grading standards set forth in Section 16.04 of the South Burlington Land Development Regulations. 9. The applicant shall obtain a Certificate of Occupancy from the Administrative Officer upon completion of the modifications approved herein and prior to occupancy and/or use of the approved modifications. 10. Any change to the site plan shall require approval by the South Burlington Development Review Board or the Administrative Officer as allowed by the Land Development Regulations. John Moscatelli Yea Nay Abstain Not Present Mark Behr Yea Nay Abstain Not Present Frank Kochman Yea Nay Abstain Not Present Quin Mann Yea Nay Abstain Not Present Dawn Philibert Yea Nay Abstain Not Present Stephanie Wyman Yea Nay Abstain Not Present Charles Johnston Yea Nay Abstain Not Present Motion carried by a vote of x – x – x. Signed this ____ day of June, 2024, by _____________________________________ Dawn Philibert, Chair Please note: An appeal of this decision may be taken by filing, within 30 days of the date of this decision, a notice of appeal and the required fee by certified mail to the Superior Court, Environmental Division. See V.R.E.C.P. 5(b). A copy of the notice of appeal must also be mailed to the City of South Burlington Planning and Zoning Department at 180 Market Street, South Burlington, VT 05403. See V.R.E.C.P. 5(b) (4)(A). Please contact the Environmental Division at 802- 828-1660 or http://vermontjudiciary.org/GTC/environmental/default.aspx for more information on filing requirements, deadlines, fees and mailing address. The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state permits for this project. Call 802.477.2241 to speak with the regional Permit Specialist. January 19, 2024 Marla Keene, P.E. Development Review Planner Department of Planning & Zoning City of South Burlington 575 Dorset Street South Burlington, VT 05403 RE: Site Plan Application for 1877 Williston Road, South Burlington, VT TCE Project #: 21-229 Dear Marla, Trudell Consulting Engineers (TCE) is submitting this Site Plan Application on behalf of the Applicant, SBRC Properties, LLC, for a proposed change in use for 1877 Williston Road, herby referred to as the “project”. The project proposes a change in use from outside storage yard to outdoor vehicle storage and proposes to convert the existing dirt lot to a formal paved parking area. For the purpose of this application vehicle storage includes any type of motor vehicle including passenger vehicles, recreational vehicles, and boats. The project property is an existing 2.07 ac property located at 1877 Williston Road. The project property does not have frontage along any public roads. Access to the lot is provided via a 30’ right of way along the southeastern property boundary to Builders Boulevard which intersects with Williston Road. The project is within the Mixed Industrial- Commercial District (IC) and portions of the property are within the Floodplain Overlay District as well as the River Corridor Overlay District. Per Table C-1, private providers of public services, including vehicle storage and maintenance is a permitted use within the I District. The project property is generally flat, sloping from the south to the north at an approximately 3-6% slope. Potash Brook enters a culvert at the southernmost property corner and is culverted across the property, daylighting along the northern property boundary and flowing west. TCE performed a wetland delineation which was confirmed by State Wetland Ecologist, Tina Heath on 11/10/2021. As shown on the attached plans, Class II wetland exist within the northwest corner of the property. No impacts to wetlands or wetland buffers are proposed. The project property is within the FEMA Floodplain Hazard Area Zone A which has no established Base Flood Elevation (BFE) as this zone is determined using approximate methodologies. At the start of the project the FEMA Zone A was mapped over a majority of the project property. TCE sought a Letter of Map Amendment (LOMA) through FEMA to establish a BFE for the 100-yr floodplain and remove a portion of the property from the Zone A. The BFE was established at elevation 300.8 feet and the revised Zone A boundary is depicted on the attached plans. The LOMA is also attached for your review. With the revised elevation and boundary, no impacts are proposed within the FEMA Zone A or subsequently the Floodplain Overlay District. The River Corridor Overlay (RCO) District includes areas 100 feet from the top of bank or top of slope for the main stem of Potash Brook in sections of the stream which are not mapped as River Corridor by ANR. No river corridors are mapped within the project property by ANR, therefore, the RCO district boundary has been shows as 100’ from the top of bank of Potash Brook. As a portion of Potash Brook is culverted beneath the project parcel and does not have a top of bank or top of slope in this location, the RCO is depicted as a 100’ setback from the edge of the culvert. Due to the presence of the culvert, an existing structure which will be maintained, improvements are proposed within the RCO in the shadow of the culverted section of Potash Brook. TCE sent preliminary design plans to the City’s National Flood Insurance Program Coordinator, Kyle Medash, for comments on the proposed project. Comments from the NFIP Coordinator can be reviewed in the attached email correspondence, however, were summarized as follows, “It appears the Potash Brook is relatively unaffected by the proposal, the project avoids the hazard areas, the stormwater is directed toward an existing collection system (no outfalls to PB), opportunities for channel migration are low given the highly developed/managed surrounding areas, and the site generally remains in a similar condition/land use as it does today.” With the proposed improvement from a dirt storage lot to paved parking, the project proposes 1.03 ac of new impervious and will require an operational stormwater permit from the state as well as compliance with City stormwater treatment standards. All site impervious is proposed to be treated in two gravel wetlands along the northern pavement edge. Pre-treatment is provided via Rain Guardian Turret catch basins. The proposed treatment system provides water quality treatment, channel protection detention and reduces the peak discharge rate below the pre-existing rate for all rain events up to and including the 25-yr, 24-hr storm. A separate stormwater narrative, modeling, and design details are included as attachments. There will be no regular employees associated with the outdoor vehicle storage. The property will be gated and access to the property will typically occur during normal business hours. No change in traffic generation is expected from the proposed change in use and there is no specific peak AM or PM trips associated with this use. No outdoor lighting is proposed. Should you have any questions or concerns, please do not hesitate to contact me directly at (802) 879-6331 or by email at andrea.poulos@tcevt.com. Sincerely, Andrea Poulos, P.E. Environmental Engineer V Trudell Consulting Engineers 478 Blair Park Road Williston, VT 05495 D D D D D D D Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø 6 " P V C CB RIM=299.96 iIN=297.56 15" CMP 15" CMP RIM=304.57 iIN=299.82 iOUT=299.84 i=298.24 30 5 305 305 30 5 30 9 30 9 30 9 30 9 30 8 30 8 30 8 30 8 30 7 30 7 3 0 6 306 30 6 3 0 6 304 304 30 4 303 3 0 3 302 3 0 2 30 1 30 1 299 29 9 29 8 298 29 7 29 7 29 6 30 8 306 307 306 30 9 309 308 307 306 304 303 302 301 29 8 299 304 303 302 301 30 7 30 7 300 300 305 305 300 GATE i=303.62 N/F MACKENNA ALEXIS HOLDINGS LLC. N/F KIMBALL PARTNERS LLC. C/O NEVILLE COMPANIES N/F 20 KIMBALL COMMONS LLC. N/F VERMONT FEDERAL CREDIT UNION N/F O'BRIEN BROTHERS LLC. C/O O'BRIEN BROTHERS AGENCY N/F RSR REAL ESTATE LLC N/F CRESTA NEDDE 2 LLC. D 6" PVC ORIGIN UNKNOWN i=303.16 CULVERT 6' WIDE x 4.3' HIGH iOUT=294.16 FENCE CONTINUES NORTH WESTERLY APPROXIMATELY 4' HIGH CHAIN LINK FENCE 31 6 3 1 7 31 5 3 1 4 29 9 297 298 30 0 31 3 31 2 31 1 31 0 30 9 3 0 8 30 7 3 0 6 30 5 30 4 30 1 30 3 30 2 320 319 318 320 310 31 0 31 5 32 0 31 0 30 5 3 0 3 304 30 3 30 2 30 1 31 4 31 3 31 2 31 1 30 630 9 30 8 30 7 3 1 3 3 1 2 3 1 1 3 1 0 3 0 9 31 5 31 4 319 318 317 316 31 9 31 8 31 7 31 6 31 3 31 2 31 1 31 0 31 5 31 4 30 9 31 0 306 305 308 307 309 302 30 1 304 303 3 0 0 2 9 9 2 9 8 29 7 29 9 2 9 8 30 0 297 300 30 6 3 0 4 3 0 5 3 0 3 3 0 2 3 0 1 299 298 297 3 0 0 3 0 0 299 298 297 30 0 29 7 29 8 31 6 31 9 31 8 31 7 31 3 31 2 31 1 31 5 31 4 30 0 301 GRAVEL AREA CONCRETE HEADWALL CLASS II WETLAND 50' WETLAND BUFFER EXEMPT WETLAND (NEITHER CLASS II OR III) FLOODPLAIN OVERLAY DISTRICT BOUNDARY RIVER CORRIDOR OVERLAY DISTRICT BOUNDARY (SHADING PROVIDED TO DEPICT RIVER CORRIDOR AROUND OPEN WATER AREAS WHERE DEVELOPMENT IS PROHIBITED) APPROXIMATE DRAINAGE EASEMENT TO THE CITY OF SOUTH BURLINGTON (Bk. 512 Pg. 522) 30' COMMON RIGHT-OF-WAY EXISTING CATCH BASIN AND DRAIN LINE TO BE REMOVED EXISTING GATE TO BE REMOVED 10" 10" 10" 10" TRIPLE 10" 12" 12" 12" 12" 12" 14" 14" 16"/18" TWIN 16" 16" 16 " 18" 18" 22" 24" 26" 30" 6" 6" 6" TWIN 6" 6" 6" 6" (x4) 6" 6" 6" (x7) 6" 6" 6" 8" TWIN 8" 8" 8" 8" 8" 8" 8" 8" 8" TWIN 8" 8" TWIN 8" 8" (x4) 10" 12" 12" 14" 20" 6" 6" 8" 8" 6' WIDE x 4 . 3 ' H I G H C U L V E R T N 34°23'52" E 123.85' S 5 5 ° 2 4 ' 4 7 " E 28 8 . 0 6 ' S 34°23'48" W 183.47' S 34°23'48" W 56.00' S 34°23'48" W 80.53' N 5 5 ° 3 6 ' 1 2 " W 15 0 . 0 0 ' N 34°23'48" E 100.00' N 5 5 ° 3 6 ' 1 2 " W 19 2 . 5 0 ' N 34°23'43" E 96.15' S 5 6 ° 4 1 ' 2 8 " E 54 . 3 5 ' 30" 8" 10" (x2) 6" (x2) 6" 6" 6" 8" & 6" 6"6" 10" & 6" 10", 8", 6" (x2) 10", 8" (x2), 6" (x2) 8" & 6" 8" & 6" 8" & 6" D D D D D D D D D D D D D D D D D D D D D D D D D D Ø 42" PVC iOUT=294.30 ORIGIN UNKNOWN EDGE OF WATER PO T A S H B R O O K RO U T E 2 KENNEDY DRIVE KI M B A L L A V E . AIRP O R T DRIV E Sheet Title Project Title Use of These Drawings Scale: Project Number: Date: Drawn By: Project Engineer: Approved By: No. Description Date By For Permitting Only Revisions Field Book: 1. Unless otherwise noted, these Drawings are intended for preliminary planning, coordination with other disciplines or utilities, and/or approval from the regulatory authorities.  They are not intended as construction drawings unless noted as such or marked approved by a regulatory authority. 2. By use of these drawings for construction of the Project, the Owner represents that they have reviewed, approved, and accepted the drawings, obtained all necessary permits, and have met with all applicable parties/disciplines, including but not limited to, the Engineer and the Architect, to insure these plans are properly coordinated including, but not limited to, contract documents, specifications, owner/contractor agreements, building and mechanical plans, private and public utilities, and other pertinent permits for construction. 3. Owner and Architect, are responsible for final design and location of buildings shown, including an area measured a minimum five (5) feet around any building and coordinating final utility connections shown on these plans. 4. Prior to using these plans for construction layout, the user shall contact TCE to ensure the plan contains the most current revisions. 5. These Drawings are specific to the Project and are not transferable. As instruments of service, these drawings, and copies thereof, furnished by TCE are its exclusive property.  Changes to the drawings may only be made by TCE. If errors or omissions are discovered, they shall be brought to the attention of TCE immediately. 6. It is the User's responsibility to ensure this copy contains the most current revisions. No. 135032 CIVIL A N D R E D.PO U L O S ST A T E O F VER M O N T P R O F E SSIONAL E N GI NEER L ICEN S E D A 0 Feet Graphic Scale 20 40 60 1 5 ° ± VT G r i d Mag n e t i c Parcel ID: 1810-S1877 Existing Conditions C1-01 09/08/2021 1" = 20' 21-229 DBM/RMP AAD    361 Munson Parking Lot 1877 Williston Road South Burlington, Vermont EXISTING CONDITIONS NOTES: 1.THE PURPOSE OF THE EXISTING CONDITIONS PLAN IS TO DEPICT READILY APPARENT PERTINENT EXISTING CONDITIONS AS OF 09/08/2021. 2.BEARINGS SHOWN ARE BASED UPON VERMONT GRID NORTH USING VTVRS CORS STATION. 3.VERTICAL DATUM IS BASED ON NAVD88 (GEIOD 18). A TRIMBLE R8 RTK GPS UNIT WAS EMPLOYED FOR THESE OBSERVATIONS. 4.COORDINATE SYSTEM IS BASED ON VERMONT STATE PLANE (U.S. SURVEY FEET). 5.THE LOCATION OF EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS SHOWN ARE BASED ON RESEARCH, UTILITY PLANS PROVIDED BY OTHERS, AND/OR SURFACE EVIDENCE ENCOUNTERED AND WERE OBTAINED IN A MANNER CONSISTENT WITH THE ORDINARY STANDARD OF PROFESSIONAL CARE AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR THE DESIGN ENGINEER. ADDITIONAL UTILITIES NOT SHOWN MAY EXIST. ENGINEER SHALL BE NOTIFIED IF ANY DISCREPANCIES ARE ENCOUNTERED. ACTUAL LOCATION OF UNDERGROUND UTILITIES MAY VARY. DIGSAFE MUST BE CONTACTED PRIOR TO ANY EXCAVATION. CALL 1-888-DIG SAFE (344-7233) OR CALL 811. 6.PERIMETER BOUNDARIES SHOWN HEREON FROM TAX MAP INFORMATION, LIMITED VISIBLE BOUNDARY EVIDENCE LOCATED IN THE FIELD, AND PLANS OF RECORD. THIS PLAN DOES NOT DEPICT A FORMAL BOUNDARY SURVEY. 6.1. "PLAT OF SURVEY LANDS OF LEE ZACHARY #1891 WILLISTON ROAD SOUTH BURLINGTON VERMONT" BY A.W. HARRIS & ASSOCIATES DATED 01/20/94 AND RECORDED IN THE CITY OF SOUTH BURLINGTON LAND RECORDS AS MAP SLIDE 362. 6.2."FINAL PLAN BUSINESS PARK NORTH SOUTH BURLINGTON VERMONT" BY CIVIL ENGINEERING ASSOCIATES, INC. DATED AUGUST 1978 LAST REVISED 1/24/80 AND RECORDED IN THE CITY OF SOUTH BURLINGTON LAND RECORDS AS MAP SLIDE 127. 6.3."BOUNDARY PLAT AND PLAN OF COMMON INTEREST OWNERSHIP LAND OF CHARLES R. WOOD 1879 & 1881 WILLISTON ROAD SOUTH BURLINGTON, VERMONT" BY DONALD M. HAMLIN CONSULTING ENGINEERS, INC. DATED 5/13/02 AND IS PRELIMINARY & UNRECORDED. PROVIDED BY THE CLIENT. PROJECT LOCATION 1 07/20/23 ADPOverlay District Revisions LEGEND STREAM PROPERTY LINE (TAX) FENCE TREE LINE CATCH BASIN (CB) STORM DRAINAGE PAVED DRIVE OR ROAD TOPOGRAPHIC CONTOURS OUTLET OR END SECTION ØØØØ 298 D LEGEND NOTE: SOME INFORMATION MAY BE PROVIDED BY OTHERS AND COULD BE SHOWN WITH A DIFFERENT SYMBOL NOT SHOWN ON THIS LEGEND. HOWEVER, THEY ARE LABELED ON RESPECTIVE PLANS. IN SOME CASES A CHANGE IN SCALE OR PRINTER CAN ALTER INFORMATION TO NOT SHOW AN EXACT MATCH ON THIS LEGEND. IF ANY QUESTIONS EXIST CONTACT THE ENGINEER TO CLARIFY. ADDITIONAL LEGEND INFORMATION IS SUPPLIED SEPARATELY ON EROSION CONTROL PLANS AND SOME SURVEY PLATS. ADJOINING PROPERTY LINE (TAX) GRAVEL DRIVE OR ROAD IRON PIPE "T" STAKE OVERALL PLAN SCALE: 1" =150' LIDAR CONTOURS 298 2 01/18/24 ADPEasement Revisions 3 03/21/24 JGETree Locations, Culvert, & Easement Revisions D D D D D D D D D D D D D D D D D D D D D Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø 15" CMP 15" CMP RIM=304.57 iIN=299.82 iOUT=299.84 i=298.24 30 5 305 305 30 5 30 9 30 9 30 9 30 9 30 8 30 8 30 8 30 8 30 7 30 7 3 0 6 30 6 30 6 30 6 304 304 30 4 303 3 0 3 30 2 3 0 2 30 1 30 1 299 29 9 29 8 298 29 7 29 7 29 6 30 8 306 30 7 306 309 309 308 307 306 304 303 302 301 29 8 299 30 4 303 302 301 30 7 30 7 300 300 305 305 300 GATE i=303.62 N/F MACKENNA ALEXIS HOLDINGS LLC. N/F KIMBALL PARTNERS LLC. C/O NEVILLE COMPANIES N/F 20 KIMBALL COMMONS LLC. N/F VERMONT FEDERAL CREDIT UNION N/F O'BRIEN BROTHERS LLC. C/O O'BRIEN BROTHERS AGENCY N/F RSR REAL ESTATE LLC N/F CRESTA NEDDE 2 LLC. D FENCE CONTINUES NORTH WESTERLY APPROXIMATELY 4' HIGH CHAIN LINK FENCE 31 6 3 1 7 31 5 3 1 4 29 9 297 298 30 0 31 3 31 2 31 1 31 0 30 8 3 0 7 30 6 3 0 5 3 0 4 30 1 3 0 3 320 319 318 320 310 31 0 31 5 32 0 31 0 30 5 3 0 3 304 30 3 30 2 30 1 31 4 31 3 31 2 31 1 30 630 9 30 8 30 7 3 1 3 3 1 2 3 1 1 3 1 0 3 0 9 31 5 31 4 319 318 317 316 31 9 31 8 31 7 31 6 31 3 31 2 31 1 31 0 31 5 31 4 30 9 31 0 306 305 308 307 309 302 30 1 304 303 3 0 0 2 9 9 2 9 8 29 7 29 9 2 9 8 30 0 297 300 3 0 4 3 0 3 3 0 2 3 0 1 299 298 297 3 0 0 30 0 299 298 297 3 0 0 29 7 29 8 31 6 31 9 31 8 31 7 31 3 31 2 31 1 31 5 31 4 30 0 301CONCRETE HEADWALL CLASS II WETLAND 50' WETLAND BUFFER EXEMPT WETLAND (NEITHER CLASS II OR III) FLOODPLAIN OVERLAY DISTRICT BOUNDARY RIVER CORRIDOR OVERLAY DISTRICT BOUNDARY (SHADING PROVIDED TO DEPICT RIVER CORRIDOR AROUND OPEN WATER AREAS WHERE DEVELOPMENT IS PROHIBITED) APPROXIMATE DRAINAGE EASEMENT TO THE CITY OF SOUTH BURLINGTON (Bk. 512 Pg. 522) 30' COMMON RIGHT-OF-WAY EXISTING CATCH BASIN AND DRAIN LINE TO BE REMOVED EXISTING GATE TO BE REMOVED 10" 10" 10" 10" TRIPLE 10" 12" 12" 12" 12" 12" 14" 14" 16"/18" TWIN 16" 16" 16 " 18" 18" 22" 24" 26" 30" 6" 6" 6" TWIN 6" 6" 6" 6" (x4) 6" 6" 6" (x7) 6" 6" 6" 8" TWIN 8" 8" 8" 8" 8" 8" 8" 8" 8" TWIN 8" 8" TWIN 8" 8" (x4) 10" 12" 12" 14" 20" 6" 6" 8" 8" N 34°23'52" E 123.85' S 5 5 ° 2 4 ' 4 7 " E 28 8 . 0 6 ' S 34°23'48" W 183.47' S 34°23'48" W 56.00' S 34°23'48" W 80.53' N 5 5 ° 3 6 ' 1 2 " W 15 0 . 0 0 ' N 34°23'48" E 100.00' N 5 5 ° 3 6 ' 1 2 " W 19 2 . 5 0 ' N 34°23'43" E 96.15' S 5 6 ° 4 1 ' 2 8 " E 54 . 3 5 ' 30" 8" 10" (x2) 6" (x2) 6" 6" 6" 8" & 6" 6"6" 10" & 6" 10", 8", 6" (x2) 10", 8" (x2), 6" (x2) 8" & 6" 8" & 6" 8" & 6" D D D D D D D D D D D D D D D D D D D D D D D D D D Ø EDGE OF WATER PO T A S H B R O O K 30 ' S E T B A C K (T Y P ) PROPOSED LIMITS OF TREE CLEARING 30 ' S E T B A C K (T Y P ) 10' SETBACK (TYP) 10' SETBACK (TYP) D D D D D D D D 50' 9' 12 ' 40' 36 ' 50' 18' 30 4 30 3 30 2 302303 3 0 4 3 0 3 30 5 3 0 5 30 5 21 12' x 50' SPACES24 12' x 40' SPACES 26 9' x 18' SPACES 30 5 30 6 30 5 300 299 301 302 30 0 29 9 30 1 30 2 30 2 iOUT = 298.24 iIN = 303.0 PERFORATED RISER (TYP.) RAIN TURRET 1 RIM = 302.3 iOUT = 301.3 RAIN TURRET 3 RIM = 302.4 iOUT = 301.4 OUTLET STRUCTURE 1 OUTLET STRUCTURE 2 STMH 1 RIM = 302.3 iIN (S) = 298.4 iIN (E & W) = 298.4 iOUT (N) = 298.3 PERFORATED SUBDRAIN (TYP.) 18" CMP 24" CMP 30 4 30 3 30 6 30 7 30 8 30 9 SNOW STORAGE SNOW STORAGE TYPE I RIPRAP (TYP.) 305.6 TC 303.5 BC 303.0 TC 302.8 BC 302.3 BITUMINOUS CURB TC 303.0 BC 302.5 TC 303.8 BC 302.3 RAIN TURRET 2 RIM = 302.4 iOUT = 301.4 TC 303.2 BC 302.7 FENCE TO BE REMOVED AND REPLACED AS NECESSARY POLE-MOUNTED FULL CUT-OFF LED SECURITY FIXTURE (TYP) CHAIN LINK SECURITY FENCE WITH GATE 4 AB 3 CCI 3 AB Sheet Title Project Title Use of These Drawings Scale: Project Number: Date: Drawn By: Project Engineer: Approved By: No. Description Date By For Permitting Only Revisions Field Book: 1. Unless otherwise noted, these Drawings are intended for preliminary planning, coordination with other disciplines or utilities, and/or approval from the regulatory authorities.  They are not intended as construction drawings unless noted as such or marked approved by a regulatory authority. 2. By use of these drawings for construction of the Project, the Owner represents that they have reviewed, approved, and accepted the drawings, obtained all necessary permits, and have met with all applicable parties/disciplines, including but not limited to, the Engineer and the Architect, to insure these plans are properly coordinated including, but not limited to, contract documents, specifications, owner/contractor agreements, building and mechanical plans, private and public utilities, and other pertinent permits for construction. 3. Owner and Architect, are responsible for final design and location of buildings shown, including an area measured a minimum five (5) feet around any building and coordinating final utility connections shown on these plans. 4. Prior to using these plans for construction layout, the user shall contact TCE to ensure the plan contains the most current revisions. 5. These Drawings are specific to the Project and are not transferable. As instruments of service, these drawings, and copies thereof, furnished by TCE are its exclusive property.  Changes to the drawings may only be made by TCE. If errors or omissions are discovered, they shall be brought to the attention of TCE immediately. 6. It is the User's responsibility to ensure this copy contains the most current revisions. No. 135032 CIVIL A N D R E D.PO U L O S ST A T E O F VER M O N T P R O F E SSIONAL E N GI NEER L ICEN S E D A 0 Feet Graphic Scale 20 40 60   Site Plan C2-01 10/21/2021 1" = 20' 21-229 SRK AAD    361 Munson Parking Lot 1877 Williston Road South Burlington, Vermont 1 03/26/24 ADPCity Site Plan Parcel ID: 1810-S1877 PROJECT INFORMATION: 1.OWNER OF RECORD: SBRC PROPERTIES, LLC 85 SHUNPIKE RD WILLISTON, VT 05495 2.TAX PARCEL ID: Parcel ID: 1810-S1877 3.PHYSICAL ADDRESS 1877 WILLISTON ROAD OF PROPERTY:SOUTH BURLINGTON, VERMONT 05495 4.PARCEL SIZE: 2.07 ± ACRES 4.1.ZONING DISTRICT: MIXED INDUSTRIAL & COMMERCIAL (IC) 5.OVERLAY DISTRICT(S):100-YR FLOOD PLAIN RIVER CORRIDOR 6.SURFACE WATER PROTECTION STANDARDS: 12.01 GENERAL SURFACE WATER PROTECTION STANDARDS 12.02 WETLAND PROTECTION STANDARDS 12.03 STORMWATER MANAGEMENT STANDARDS 7.LOT SIZE: MINIMUM REQUIRED: TABLE C-2, 40,000 SF/ 0.92 AC PROPOSED: 2.94 AC (NO CHANGES TO LOT SIZE ARE PROPOSED) 8.LOT COVERAGE REGULATION PROPOSED MAXIMUM BUILDING COVERAGE 40% 0% MAXIMUM IMPERVIOUS COVERAGE 70% 49% 9.SETBACK REQUIREMENTS: FRONT:30 FT SIDE : 10 FT REAR:30 FT 11.MAXIMUM BUILDING HEIGHT: FLAT ROOF:35 FT PITCHED ROOF:40 FT ACCESSORY STRUCTURE:15 FT 1 5 ° ± VT G r i d Mag n e t i c PARKING PROVIDED: PARKING SPACE SIZE 9' x 18'26 SPACES 12' x 40'24 SPACES 12' x 50'21 SPACES TOTAL 71 SPACES TREE PLANTING SCHEDULE: SYM QTY SCIENTIFIC NAME COMMON NAME INSTALL SIZE CONDITION AB 7 Abies balsamea 'Phanerolepis'Caanan Fir 2.5" Cal B&B CCI 3 Crataegus crus-gali 'inermis'Dwarf Hawthorn 2.5" Cal B&B D D D D D D D D D D D D D D D D D D D D D Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø 15" CMP 15" CMP RIM=304.57 iIN=299.82 iOUT=299.84 i=298.24 30 5 305 305 30 5 30 9 30 9 30 9 30 9 30 8 30 8 30 8 30 8 30 7 30 7 3 0 6 30 6 30 6 30 6 304 304 30 4 303 3 0 3 30 2 3 0 2 30 1 30 1 299 29 9 29 8 298 29 7 29 7 29 6 30 8 306 30 7 306 309 309 308 307 306 304 303 302 301 29 8 299 30 4 303 302 301 30 7 30 7 300 300 305 305 300 GATE i=303.62 N/F MACKENNA ALEXIS HOLDINGS LLC. N/F KIMBALL PARTNERS LLC. C/O NEVILLE COMPANIES N/F 20 KIMBALL COMMONS LLC. N/F VERMONT FEDERAL CREDIT UNION N/F O'BRIEN BROTHERS LLC. C/O O'BRIEN BROTHERS AGENCY N/F RSR REAL ESTATE LLC N/F CRESTA NEDDE 2 LLC. D FENCE CONTINUES NORTH WESTERLY APPROXIMATELY 4' HIGH CHAIN LINK FENCE 31 6 3 1 7 31 5 3 1 4 29 9 297 298 30 0 31 3 31 2 31 1 31 0 30 8 3 0 7 30 6 3 0 5 3 0 4 30 1 3 0 3 320 319 318 320 310 31 0 31 5 32 0 31 0 30 5 3 0 3 304 30 3 30 2 30 1 31 4 31 3 31 2 31 1 30 630 9 30 8 30 7 3 1 3 3 1 2 3 1 1 3 1 0 3 0 9 31 5 31 4 319 318 317 316 31 9 31 8 31 7 31 6 31 3 31 2 31 1 31 0 31 5 31 4 30 9 31 0 306 305 308 307 309 302 30 1 304 303 3 0 0 2 9 9 2 9 8 29 7 29 9 2 9 8 30 0 297 300 3 0 4 3 0 3 3 0 2 3 0 1 299 298 297 3 0 0 30 0 299 298 297 3 0 0 29 7 29 8 31 6 31 9 31 8 31 7 31 3 31 2 31 1 31 5 31 4 30 0 301CONCRETE HEADWALL CLASS II WETLAND 50' WETLAND BUFFER EXEMPT WETLAND (NEITHER CLASS II OR III) FLOODPLAIN OVERLAY DISTRICT BOUNDARY RIVER CORRIDOR OVERLAY DISTRICT BOUNDARY (SHADING PROVIDED TO DEPICT RIVER CORRIDOR AROUND OPEN WATER AREAS WHERE DEVELOPMENT IS PROHIBITED) APPROXIMATE DRAINAGE EASEMENT TO THE CITY OF SOUTH BURLINGTON (Bk. 512 Pg. 522) 30' COMMON RIGHT-OF-WAY EXISTING CATCH BASIN AND DRAIN LINE TO BE REMOVED EXISTING GATE TO BE REMOVED 10" 10" 10" 10" TRIPLE 10" 12" 12" 12" 12" 12" 14" 14" 16"/18" TWIN 16" 16" 16 " 18" 18" 22" 24" 26" 30" 6" 6" 6" TWIN 6" 6" 6" 6" (x4) 6" 6" 6" (x7) 6" 6" 6" 8" TWIN 8" 8" 8" 8" 8" 8" 8" 8" 8" TWIN 8" 8" TWIN 8" 8" (x4) 10" 12" 12" 14" 20" 6" 6" 8" 8" N 34°23'52" E 123.85' S 5 5 ° 2 4 ' 4 7 " E 28 8 . 0 6 ' S 34°23'48" W 183.47' S 34°23'48" W 56.00' S 34°23'48" W 80.53' N 5 5 ° 3 6 ' 1 2 " W 15 0 . 0 0 ' N 34°23'48" E 100.00' N 5 5 ° 3 6 ' 1 2 " W 19 2 . 5 0 ' N 34°23'43" E 96.15' S 5 6 ° 4 1 ' 2 8 " E 54 . 3 5 ' 30" 8" 10" (x2) 6" (x2) 6" 6" 6" 8" & 6" 6"6" 10" & 6" 10", 8", 6" (x2) 10", 8" (x2), 6" (x2) 8" & 6" 8" & 6" 8" & 6" D D D D D D D D D D D D D D D D D D D D D D D D D D Ø EDGE OF WATER PO T A S H B R O O K L = 161', s = 0.03 FT/FT DA 1 1.03 AC TOTAL POLE-MOUNTED FULL CUT-OFF LED SECURITY FIXTURE (TYP) CHAIN LINK SECURITY FENCE WITH GATE Sheet Title Project Title Use of These Drawings Scale: Project Number: Date: Drawn By: Project Engineer: Approved By: No. Description Date By For Permitting Only Revisions Field Book: 1. Unless otherwise noted, these Drawings are intended for preliminary planning, coordination with other disciplines or utilities, and/or approval from the regulatory authorities.  They are not intended as construction drawings unless noted as such or marked approved by a regulatory authority. 2. By use of these drawings for construction of the Project, the Owner represents that they have reviewed, approved, and accepted the drawings, obtained all necessary permits, and have met with all applicable parties/disciplines, including but not limited to, the Engineer and the Architect, to insure these plans are properly coordinated including, but not limited to, contract documents, specifications, owner/contractor agreements, building and mechanical plans, private and public utilities, and other pertinent permits for construction. 3. Owner and Architect, are responsible for final design and location of buildings shown, including an area measured a minimum five (5) feet around any building and coordinating final utility connections shown on these plans. 4. Prior to using these plans for construction layout, the user shall contact TCE to ensure the plan contains the most current revisions. 5. These Drawings are specific to the Project and are not transferable. As instruments of service, these drawings, and copies thereof, furnished by TCE are its exclusive property.  Changes to the drawings may only be made by TCE. If errors or omissions are discovered, they shall be brought to the attention of TCE immediately. 6. It is the User's responsibility to ensure this copy contains the most current revisions. No. 135032 CIVIL A N D R E D.PO U L O S ST A T E O F VER M O N T P R O F E SSIONAL E N GI NEER L ICEN S E D A 0 Feet Graphic Scale 20 40 60   Stormwater Existing Conditions Plan C4-01 1/18/24  1" = 20' 21-229 ADP AAD    361 Munson Parking Lot 1877 Williston Road South Burlington, Vermont 1 03/26/24 ADPCity Site Plan Parcel ID: 1810-S1877 PROJECT INFORMATION: 1.OWNER OF RECORD: SBRC PROPERTIES, LLC 85 SHUNPIKE RD WILLISTON, VT 05495 2.TAX PARCEL ID: Parcel ID: 1810-S1877 3.PHYSICAL ADDRESS 1877 WILLISTON ROAD OF PROPERTY:SOUTH BURLINGTON, VERMONT 05495 4.PARCEL SIZE: 2.07 ± ACRES 5.EXISTING IMPERVIOUS 0.00 ACRES 1 5 ° ± VT G r i d Mag n e t i c D D D D D D D D D D D D D D D D D D D D D Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø 15" CMP 15" CMP RIM=304.57 iIN=299.82 iOUT=299.84 i=298.24 30 5 305 305 30 5 30 9 30 9 30 9 30 9 30 8 30 8 30 8 30 8 30 7 30 7 3 0 6 30 6 30 6 30 6 304 304 30 4 303 3 0 3 30 2 3 0 2 30 1 30 1 299 29 9 29 8 298 29 7 29 7 29 6 30 8 306 30 7 306 309 309 308 307 306 304 303 302 301 29 8 299 30 4 303 302 301 30 7 30 7 300 300 305 305 300 GATE i=303.62 N/F MACKENNA ALEXIS HOLDINGS LLC. N/F KIMBALL PARTNERS LLC. C/O NEVILLE COMPANIES N/F 20 KIMBALL COMMONS LLC. N/F VERMONT FEDERAL CREDIT UNION N/F O'BRIEN BROTHERS LLC. C/O O'BRIEN BROTHERS AGENCY N/F RSR REAL ESTATE LLC N/F CRESTA NEDDE 2 LLC. D FENCE CONTINUES NORTH WESTERLY APPROXIMATELY 4' HIGH CHAIN LINK FENCE 31 6 3 1 7 31 5 3 1 4 29 9 297 298 30 0 31 3 31 2 31 1 31 0 30 8 3 0 7 30 6 3 0 5 3 0 4 30 1 3 0 3 320 319 318 320 310 31 0 31 5 32 0 31 0 30 5 3 0 3 304 30 3 30 2 30 1 31 4 31 3 31 2 31 1 30 630 9 30 8 30 7 3 1 3 3 1 2 3 1 1 3 1 0 3 0 9 31 5 31 4 319 318 317 316 31 9 31 8 31 7 31 6 31 3 31 2 31 1 31 0 31 5 31 4 30 9 31 0 306 305 308 307 309 302 30 1 304 303 3 0 0 2 9 9 2 9 8 29 7 29 9 2 9 8 30 0 297 300 3 0 4 3 0 3 3 0 2 3 0 1 299 298 297 3 0 0 30 0 299 298 297 3 0 0 29 7 29 8 31 6 31 9 31 8 31 7 31 3 31 2 31 1 31 5 31 4 30 0 301CONCRETE HEADWALL CLASS II WETLAND 50' WETLAND BUFFER EXEMPT WETLAND (NEITHER CLASS II OR III) FLOODPLAIN OVERLAY DISTRICT BOUNDARY RIVER CORRIDOR OVERLAY DISTRICT BOUNDARY (SHADING PROVIDED TO DEPICT RIVER CORRIDOR AROUND OPEN WATER AREAS WHERE DEVELOPMENT IS PROHIBITED) APPROXIMATE DRAINAGE EASEMENT TO THE CITY OF SOUTH BURLINGTON (Bk. 512 Pg. 522) 30' COMMON RIGHT-OF-WAY EXISTING CATCH BASIN AND DRAIN LINE TO BE REMOVED EXISTING GATE TO BE REMOVED 10" 10" 10" 10" TRIPLE 10" 12" 12" 12" 12" 12" 14" 14" 16"/18" TWIN 16" 16" 16 " 18" 18" 22" 24" 26" 30" 6" 6" 6" TWIN 6" 6" 6" 6" (x4) 6" 6" 6" (x7) 6" 6" 6" 8" TWIN 8" 8" 8" 8" 8" 8" 8" 8" 8" TWIN 8" 8" TWIN 8" 8" (x4) 10" 12" 12" 14" 20" 6" 6" 8" 8" N 34°23'52" E 123.85' S 5 5 ° 2 4 ' 4 7 " E 28 8 . 0 6 ' S 34°23'48" W 183.47' S 34°23'48" W 56.00' S 34°23'48" W 80.53' N 5 5 ° 3 6 ' 1 2 " W 15 0 . 0 0 ' N 34°23'48" E 100.00' N 5 5 ° 3 6 ' 1 2 " W 19 2 . 5 0 ' N 34°23'43" E 96.15' S 5 6 ° 4 1 ' 2 8 " E 54 . 3 5 ' 30" 8" 10" (x2) 6" (x2) 6" 6" 6" 8" & 6" 6"6" 10" & 6" 10", 8", 6" (x2) 10", 8" (x2), 6" (x2) 8" & 6" 8" & 6" 8" & 6" D D D D D D D D D D D D D D D D D D D D D D D D D D Ø EDGE OF WATER PO T A S H B R O O K PROPOSED LIMITS OF TREE CLEARING D D D D D D D D 30 4 30 3 30 2 302303 3 0 4 3 0 3 30 5 3 0 5 30 5 30 5 30 6 30 5 300 299 301 302 30 0 29 9 30 1 30 2 30 2 iOUT = 298.24 iIN = 303.0 PERFORATED RISER (TYP.) RAIN TURRET 1 RIM = 302.3 iOUT = 301.3 RAIN TURRET 3 RIM = 302.4 iOUT = 301.4 OUTLET STRUCTURE 1 OUTLET STRUCTURE 2 STMH 1 RIM = 302.3 iIN (S) = 298.4 iIN (E & W) = 298.4 iOUT (N) = 298.3 PERFORATED SUBDRAIN (TYP.) PROPOSED GRAVEL WETLAND 1 PROPOSED GRAVEL WETLAND 2 18" CMP 24" CMP L = 17 5 ' , s = 0 . 0 1 5 F T / F T L = 168', s = 0.02 FT/FT 30 4 30 3 30 6 30 7 30 8 30 9 SNOW STORAGE SNOW STORAGEDA 2 0.359 AC IMPERVIOUS DA 1 0.670 AC IMPERVIOUS TYPE I RIPRAP (TYP.) RAIN TURRET 2 RIM = 302.4 iOUT = 301.4 POLE-MOUNTED FULL CUT-OFF LED SECURITY FIXTURE (TYP) CHAIN LINK SECURITY FENCE WITH GATE 4 AB 3 CCI 3 AB Sheet Title Project Title Use of These Drawings Scale: Project Number: Date: Drawn By: Project Engineer: Approved By: No. Description Date By For Permitting Only Revisions Field Book: 1. Unless otherwise noted, these Drawings are intended for preliminary planning, coordination with other disciplines or utilities, and/or approval from the regulatory authorities.  They are not intended as construction drawings unless noted as such or marked approved by a regulatory authority. 2. By use of these drawings for construction of the Project, the Owner represents that they have reviewed, approved, and accepted the drawings, obtained all necessary permits, and have met with all applicable parties/disciplines, including but not limited to, the Engineer and the Architect, to insure these plans are properly coordinated including, but not limited to, contract documents, specifications, owner/contractor agreements, building and mechanical plans, private and public utilities, and other pertinent permits for construction. 3. Owner and Architect, are responsible for final design and location of buildings shown, including an area measured a minimum five (5) feet around any building and coordinating final utility connections shown on these plans. 4. Prior to using these plans for construction layout, the user shall contact TCE to ensure the plan contains the most current revisions. 5. These Drawings are specific to the Project and are not transferable. As instruments of service, these drawings, and copies thereof, furnished by TCE are its exclusive property.  Changes to the drawings may only be made by TCE. If errors or omissions are discovered, they shall be brought to the attention of TCE immediately. 6. It is the User's responsibility to ensure this copy contains the most current revisions. No. 135032 CIVIL A N D R E D.PO U L O S ST A T E O F VER M O N T P R O F E SSIONAL E N GI NEER L ICEN S E D A 0 Feet Graphic Scale 20 40 60   Stormwater Proposed Conditions Plan C4-02 01/18/24 1" = 20' 21-229 ADP AAD    361 Munson Parking Lot 1877 Williston Road South Burlington, Vermont 1 03/28/24 ADPCity Site Plan Parcel ID: 1810-S1877 PROJECT INFORMATION: 1.OWNER OF RECORD: SBRC PROPERTIES, LLC 85 SHUNPIKE RD WILLISTON, VT 05495 2.TAX PARCEL ID: Parcel ID: 1810-S1877 3.PHYSICAL ADDRESS 1877 WILLISTON ROAD OF PROPERTY:SOUTH BURLINGTON, VERMONT 05495 4.PARCEL SIZE: 2.07 ± ACRES 5.EXISTING IMPERVIOUS:0.00 ACRES 6.PROPOSED IMPERVIOUS:1.03 ACRES 1 5 ° ± VT G r i d Mag n e t i c D D D D D D D D D D D D D D D D D D D D D Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø 15" CMP 15" CMP RIM=304.57 iIN=299.82 iOUT=299.84 i=298.24 30 5 305 305 30 5 30 9 30 9 30 9 30 9 30 8 30 8 30 8 30 8 30 7 30 7 3 0 6 30 6 30 6 30 6 304 304 30 4 303 3 0 3 30 2 3 0 2 30 1 30 1 299 29 9 29 8 298 29 7 29 7 29 6 30 8 306 30 7 306 309 309 308 307 306 304 303 302 301 29 8 299 30 4 303 302 301 30 7 30 7 300 300 305 305 300 GATE i=303.62 N/F MACKENNA ALEXIS HOLDINGS LLC. N/F KIMBALL PARTNERS LLC. C/O NEVILLE COMPANIES N/F 20 KIMBALL COMMONS LLC. N/F VERMONT FEDERAL CREDIT UNION N/F O'BRIEN BROTHERS LLC. C/O O'BRIEN BROTHERS AGENCY N/F RSR REAL ESTATE LLC N/F CRESTA NEDDE 2 LLC. D FENCE CONTINUES NORTH WESTERLY APPROXIMATELY 4' HIGH CHAIN LINK FENCE 31 6 3 1 7 31 5 3 1 4 29 9 297 298 30 0 31 3 31 2 31 1 31 0 30 8 3 0 7 30 6 3 0 5 3 0 4 30 1 3 0 3 320 319 318 320 310 31 0 31 5 32 0 31 0 30 5 3 0 3 304 30 3 30 2 30 1 31 4 31 3 31 2 31 1 30 630 9 30 8 30 7 3 1 3 3 1 2 3 1 1 3 1 0 3 0 9 31 5 31 4 319 318 317 316 31 9 31 8 31 7 31 6 31 3 31 2 31 1 31 0 31 5 31 4 30 9 31 0 306 305 308 307 309 302 30 1 304 303 3 0 0 2 9 9 2 9 8 29 7 29 9 2 9 8 30 0 297 300 3 0 4 3 0 3 3 0 2 3 0 1 299 298 297 3 0 0 30 0 299 298 297 3 0 0 29 7 29 8 31 6 31 9 31 8 31 7 31 3 31 2 31 1 31 5 31 4 30 0 301CONCRETE HEADWALL CLASS II WETLAND 50' WETLAND BUFFER EXEMPT WETLAND (NEITHER CLASS II OR III) FLOODPLAIN OVERLAY DISTRICT BOUNDARY RIVER CORRIDOR OVERLAY DISTRICT BOUNDARY (SHADING PROVIDED TO DEPICT RIVER CORRIDOR AROUND OPEN WATER AREAS WHERE DEVELOPMENT IS PROHIBITED) APPROXIMATE DRAINAGE EASEMENT TO THE CITY OF SOUTH BURLINGTON (Bk. 512 Pg. 522) 30' COMMON RIGHT-OF-WAY EXISTING CATCH BASIN AND DRAIN LINE TO BE REMOVED EXISTING GATE TO BE REMOVED 10" 10" 10" 10" TRIPLE 10" 12" 12" 12" 12" 12" 14" 14" 16"/18" TWIN 16" 16" 16 " 18" 18" 22" 24" 26" 30" 6" 6" 6" TWIN 6" 6" 6" 6" (x4) 6" 6" 6" (x7) 6" 6" 6" 8" TWIN 8" 8" 8" 8" 8" 8" 8" 8" 8" TWIN 8" 8" TWIN 8" 8" (x4) 10" 12" 12" 14" 20" 6" 6" 8" 8" N 34°23'52" E 123.85' S 5 5 ° 2 4 ' 4 7 " E 28 8 . 0 6 ' S 34°23'48" W 183.47' S 34°23'48" W 56.00' S 34°23'48" W 80.53' N 5 5 ° 3 6 ' 1 2 " W 15 0 . 0 0 ' N 34°23'48" E 100.00' N 5 5 ° 3 6 ' 1 2 " W 19 2 . 5 0 ' N 34°23'43" E 96.15' S 5 6 ° 4 1 ' 2 8 " E 54 . 3 5 ' 30" 8" 10" (x2) 6" (x2) 6" 6" 6" 8" & 6" 6"6" 10" & 6" 10", 8", 6" (x2) 10", 8" (x2), 6" (x2) 8" & 6" 8" & 6" 8" & 6" D D D D D D D D D D D D D D D D D D D D D D D D D D Ø EDGE OF WATER PO T A S H B R O O K D D D D D D D D 30 4 30 3 30 2 302303 3 0 4 3 0 3 30 5 3 0 5 30 5 30 5 30 6 30 5 300 299 301 302 30 0 29 9 30 1 30 2 30 2 30 4 30 3 30 6 30 7 30 8 30 9 POLE-MOUNTED FULL CUT-OFF LED SECURITY FIXTURE (TYP) CHAIN LINK SECURITY FENCE WITH GATE 4 AB 3 CCI 3 AB Sheet Title Project Title Use of These Drawings Scale: Project Number: Date: Drawn By: Project Engineer: Approved By: No. Description Date By For Permitting Only Revisions Field Book: 1. Unless otherwise noted, these Drawings are intended for preliminary planning, coordination with other disciplines or utilities, and/or approval from the regulatory authorities.  They are not intended as construction drawings unless noted as such or marked approved by a regulatory authority. 2. By use of these drawings for construction of the Project, the Owner represents that they have reviewed, approved, and accepted the drawings, obtained all necessary permits, and have met with all applicable parties/disciplines, including but not limited to, the Engineer and the Architect, to insure these plans are properly coordinated including, but not limited to, contract documents, specifications, owner/contractor agreements, building and mechanical plans, private and public utilities, and other pertinent permits for construction. 3. Owner and Architect, are responsible for final design and location of buildings shown, including an area measured a minimum five (5) feet around any building and coordinating final utility connections shown on these plans. 4. Prior to using these plans for construction layout, the user shall contact TCE to ensure the plan contains the most current revisions. 5. These Drawings are specific to the Project and are not transferable. As instruments of service, these drawings, and copies thereof, furnished by TCE are its exclusive property.  Changes to the drawings may only be made by TCE. If errors or omissions are discovered, they shall be brought to the attention of TCE immediately. 6. It is the User's responsibility to ensure this copy contains the most current revisions. No. 135032 CIVIL A N D R E D.PO U L O S ST A T E O F VER M O N T P R O F E SSIONAL E N GI NEER L ICEN S E D A 0 Feet Graphic Scale 20 40 60   Annotated Maintenance Plan C4-03 01/18/24 1" = 20' 21-229 ADP AAD    361 Munson Parking Lot 1877 Williston Road South Burlington, Vermont 1 03/28/24 ADPCity Site Plan Parcel ID: 1810-S1877 1 5 ° ± VT G r i d Mag n e t i c OUTLET TO BE INSPECTED ANNUALLY. ENSURE OUTLET IS FREE OF DEBRIS AND THAT NO EROSION HAS OCCURRED AT THE OUTLET. IF EROSION HAS OCCURRED, IT SHOULD BE REPAIRED WITH STONE. GRAVEL WETLAND SHOULD BE INSPECTED ANNUALLY. ANY ACCUMULATED SEDIMENT AND DEAD OR DYING VEGETATION WITHIN THE GRAVEL WETLAND SHOULD BE REMOVED. ANY EROSION IN THE GRAVEL WETLAND SHOULD BE REPAIRED. ANY SEDIMENT ACCUMULATED IN GRAVEL WETLAND SHOULD BE REMOVED.OUTLET STRUCTURE TO BE INSPECTED ANNUALLY TO ENSURE PROPER DRAINAGE. ANY ACCUMULATED DEBRIS WITHIN THE OVERFLOW STRUCTURE TO BE REMOVED. ENSURE THAT OVERFLOW GRATE IS CLEAR OF ANY DEBRIS. IF ACCUMULATED SEDIMENT IS NOTED IN THE OVERFLOW STRUCTURE, THE ENTIRE SYSTEM SHOULD BE FLUSHED AND DEBRIS COLLECTED AND PROPERLY DISPOSED. ALL PERFORATED RISERS IN GRAVEL WETLAND SHOULD BE INSPECTED ANNUALLY. IF ACCUMULATED SEDIMENT IS OBSERVED IN THE RISERS, THE UNDERDRAINS OF THE GRAVEL WETLAND SHOULD BE FLUSHED. ALL PRETREATMENT CATCH BASINS TO BE INSPECTED ANNUALLY. ANY ACCUMULATED SEDIMENT OR DEBRIS ON THE CATCH BASIN GRATE SHOULD BE REMOVED AND DISPOSED. RAIN GUARDIAN FILTER TO BE WASHED PER MANUFACTURERS RECOMMENDATIONS. STONE AT OUTLET TO BE INSPECTED, SHOULD EROSION BE NOTED OR STONE DISPLACED, IT SHOULD BE RESTORED TO ORIGINAL DESIGN PLANS. INLET TO BE INSPECTED ANNUALLY. ENSURE INLET IS FREE OF DEBRIS AND THAT NO EROSION HAS OCCURRED AT THE INLET. IF EROSION HAS OCCURRED, IT SHOULD BE REPAIRED TO ORIGINAL DESIGN PLANS. D D D D D D D D D D D D D D D D D D D D D Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø 15" CMP 15" CMP RIM=304.57 iIN=299.82 iOUT=299.84 i=298.24 30 5 305 305 30 5 30 9 30 9 30 9 30 9 30 8 30 8 30 8 30 8 30 7 30 7 3 0 6 30 6 30 6 30 6 304 304 30 4 303 3 0 3 30 2 3 0 2 30 1 30 1 299 29 9 29 8 298 29 7 29 7 29 6 30 8 306 30 7 306 309 309 308 307 306 304 303 302 301 29 8 299 30 4 303 302 301 30 7 30 7 300 300 305 305 300 GATE i=303.62 N/F MACKENNA ALEXIS HOLDINGS LLC. N/F KIMBALL PARTNERS LLC. C/O NEVILLE COMPANIES N/F 20 KIMBALL COMMONS LLC. N/F VERMONT FEDERAL CREDIT UNION N/F O'BRIEN BROTHERS LLC. C/O O'BRIEN BROTHERS AGENCY N/F RSR REAL ESTATE LLC N/F CRESTA NEDDE 2 LLC. D FENCE CONTINUES NORTH WESTERLY APPROXIMATELY 4' HIGH CHAIN LINK FENCE 31 6 3 1 7 31 5 3 1 4 29 9 297 298 30 0 31 3 31 2 31 1 31 0 30 8 3 0 7 30 6 3 0 5 3 0 4 30 1 3 0 3 320 319 318 320 310 31 0 31 5 32 0 31 0 30 5 3 0 3 304 30 3 30 2 30 1 31 4 31 3 31 2 31 1 30 630 9 30 8 30 7 3 1 3 3 1 2 3 1 1 3 1 0 3 0 9 31 5 31 4 319 318 317 316 31 9 31 8 31 7 31 6 31 3 31 2 31 1 31 0 31 5 31 4 30 9 31 0 306 305 308 307 309 302 30 1 304 303 3 0 0 2 9 9 2 9 8 29 7 29 9 2 9 8 30 0 297 300 3 0 4 3 0 3 3 0 2 3 0 1 299 298 297 3 0 0 30 0 299 298 297 3 0 0 29 7 29 8 31 6 31 9 31 8 31 7 31 3 31 2 31 1 31 5 31 4 30 0 301CONCRETE HEADWALL CLASS II WETLAND 50' WETLAND BUFFER EXEMPT WETLAND (NEITHER CLASS II OR III) FLOODPLAIN OVERLAY DISTRICT BOUNDARY RIVER CORRIDOR OVERLAY DISTRICT BOUNDARY (SHADING PROVIDED TO DEPICT RIVER CORRIDOR AROUND OPEN WATER AREAS WHERE DEVELOPMENT IS PROHIBITED) APPROXIMATE DRAINAGE EASEMENT TO THE CITY OF SOUTH BURLINGTON (Bk. 512 Pg. 522) 30' COMMON RIGHT-OF-WAY EXISTING CATCH BASIN AND DRAIN LINE TO BE REMOVED EXISTING GATE TO BE REMOVED 10" 10" 10" 10" TRIPLE 10" 12" 12" 12" 12" 12" 14" 14" 16"/18" TWIN 16" 16" 16 " 18" 18" 22" 24" 26" 30" 6" 6" 6" TWIN 6" 6" 6" 6" (x4) 6" 6" 6" (x7) 6" 6" 6" 8" TWIN 8" 8" 8" 8" 8" 8" 8" 8" 8" TWIN 8" 8" TWIN 8" 8" (x4) 10" 12" 12" 14" 20" 6" 6" 8" 8" N 34°23'52" E 123.85' S 5 5 ° 2 4 ' 4 7 " E 28 8 . 0 6 ' S 34°23'48" W 183.47' S 34°23'48" W 56.00' S 34°23'48" W 80.53' N 5 5 ° 3 6 ' 1 2 " W 15 0 . 0 0 ' N 34°23'48" E 100.00' N 5 5 ° 3 6 ' 1 2 " W 19 2 . 5 0 ' N 34°23'43" E 96.15' S 5 6 ° 4 1 ' 2 8 " E 54 . 3 5 ' 30" 8" 10" (x2) 6" (x2) 6" 6" 6" 8" & 6" 6"6" 10" & 6" 10", 8", 6" (x2) 10", 8" (x2), 6" (x2) 8" & 6" 8" & 6" 8" & 6" D D D D D D D D D D D D D D D D D D D D D D D D D D Ø EDGE OF WATER PO T A S H B R O O K 30 ' S E T B A C K (T Y P ) PROPOSED LIMITS OF TREE CLEARING 30 ' S E T B A C K (T Y P ) 10' SETBACK (TYP) 10' SETBACK (TYP) D D D D D D D D 30 4 30 3 30 2 302303 3 0 4 3 0 3 30 5 3 0 5 30 5 30 5 30 6 30 5 300 299 301 302 30 0 29 9 30 1 30 2 30 2 CHECK DAM (TYP.) SILT FENCE (TYP.)INLET PROTECTION (TYP.) 30 4 30 3 30 6 30 7 30 8 30 9 SC E SOIL STOCKPILE (TYP.) STABILIZED CONSTRUCTION ENTRANCE (TYP.) FENCE TO BE REMOVED AND REPLACED AS NECESSARY EROSION CONTROL BLANKET ON ALL SLOPES GREATER THAN 2:1 PROJECT DEMARCATION & TREE PROTECTION (TYP.) 4 AB 3 CCI 3 AB Sheet Title Project Title Use of These Drawings Scale: Project Number: Date: Drawn By: Project Engineer: Approved By: No. Description Date By For Permitting Only Revisions Field Book: 1. Unless otherwise noted, these Drawings are intended for preliminary planning, coordination with other disciplines or utilities, and/or approval from the regulatory authorities.  They are not intended as construction drawings unless noted as such or marked approved by a regulatory authority. 2. By use of these drawings for construction of the Project, the Owner represents that they have reviewed, approved, and accepted the drawings, obtained all necessary permits, and have met with all applicable parties/disciplines, including but not limited to, the Engineer and the Architect, to insure these plans are properly coordinated including, but not limited to, contract documents, specifications, owner/contractor agreements, building and mechanical plans, private and public utilities, and other pertinent permits for construction. 3. Owner and Architect, are responsible for final design and location of buildings shown, including an area measured a minimum five (5) feet around any building and coordinating final utility connections shown on these plans. 4. Prior to using these plans for construction layout, the user shall contact TCE to ensure the plan contains the most current revisions. 5. These Drawings are specific to the Project and are not transferable. As instruments of service, these drawings, and copies thereof, furnished by TCE are its exclusive property.  Changes to the drawings may only be made by TCE. If errors or omissions are discovered, they shall be brought to the attention of TCE immediately. 6. It is the User's responsibility to ensure this copy contains the most current revisions. No. 135032 CIVIL A N D R E D.PO U L O S ST A T E O F VER M O N T P R O F E SSIONAL E N GI NEER L ICEN S E D A 0 Feet Graphic Scale 20 40 60   EPSC Plan C5-01 1/18/24 1" = 20' 21-229 ADP AAD    361 Munson Parking Lot 1877 Williston Road South Burlington, Vermont SOIL STOCK PILE SILT FENCE STABILIZED CONSTRUCTION ENTRANCE STONE CHECK DAM INLET PROTECTION SCE EPSC LEGEND 1 03/28/24 ADPCity Site Plan Parcel ID: 1810-S1877 1 5 ° ± VT G r i d Mag n e t i c EROSION CONTROL BLANKET Sheet Title Project Title Use of These Drawings Scale: Project Number: Date: Drawn By: Project Engineer: Approved By: No. Description Date By For Permitting Only Revisions Field Book: 1. Unless otherwise noted, these Drawings are intended for preliminary planning, coordination with other disciplines or utilities, and/or approval from the regulatory authorities.  They are not intended as construction drawings unless noted as such or marked approved by a regulatory authority. 2. By use of these drawings for construction of the Project, the Owner represents that they have reviewed, approved, and accepted the drawings, obtained all necessary permits, and have met with all applicable parties/disciplines, including but not limited to, the Engineer and the Architect, to insure these plans are properly coordinated including, but not limited to, contract documents, specifications, owner/contractor agreements, building and mechanical plans, private and public utilities, and other pertinent permits for construction. 3. Owner and Architect, are responsible for final design and location of buildings shown, including an area measured a minimum five (5) feet around any building and coordinating final utility connections shown on these plans. 4. Prior to using these plans for construction layout, the user shall contact TCE to ensure the plan contains the most current revisions. 5. These Drawings are specific to the Project and are not transferable. As instruments of service, these drawings, and copies thereof, furnished by TCE are its exclusive property.  Changes to the drawings may only be made by TCE. If errors or omissions are discovered, they shall be brought to the attention of TCE immediately. 6. It is the User's responsibility to ensure this copy contains the most current revisions. No. 135032 CIVIL A N D R E D.PO U L O S ST A T E O F VER M O N T P R O F E SSIONAL E N GI NEER L ICEN S E D A   Site Details C8-01 01/04/2022 Shown 21-229 RMP AAD    361 Munson Parking Lot 1877 Williston Road South Burlington, Vermont 1 XX/XX/XX XXXRevision Parcel ID: 1810-S1877 SD 010.1.4LAST REVISED 03/02/2021TRUDELL CONSULTING ENGINEERS TYPICAL BITUMINOUS PAVEMENT NOTES: 1.SUBBASE, SAND CUSHION AND SUBGRADE SHOULD BE CONSTRUCTED AND COMPACTED TO THE DIMENSIONS SHOWN IN ACCORDANCE WITH VERMONT AGENCY OF TRANSPORTATION SPECIFICATIONS, STANDARD A-76. WHERE MORE STRINGENT LOCAL ORDINANCES HAVE BEEN ADOPTED RELATIVE TO ROAD DIMENSIONS AND CONSTRUCTION, THEY SHOULD GOVERN. 2.COMPACT ALL SUBBASE MATERIALS TO 95% MAXIMUM DENSITY (STANDARD PROCTOR). 3.IF GROUNDWATER OR SOFT SPOTS ARE ENCOUNTERED CONTACT THE ENGINEER TO DISCUSS ADDED MEASURES SUCH AS UNDERDRAIN. SLOPE SUBBASE TO UNDERDRAIN LOW POINTS. SECTION WEARING COURSE (TYPE III) (VAOT 406) BASE COURSE (TYPE II) (VAOT 406) CRUSHED GRAVEL (VAOT 704.05A FINE) GRAVEL BASE (VAOT 704.04) OR CRUSHED GRAVEL (VAOT 704.05A COARSE) MIRAFI 500X STABILIZATION FABRIC INSTALLATION IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS 6" SAND BORROW AND CUSHION TO BE USED IN POORLY DRAINED SOILS OR OVER BEDROCK FOR ROADS AND SIDEWALKS (VAOT 703.03) UNDISTURBED SUBGRADE OR COMPACTED FILL A B C D E 1" = 1' DRIVEWAYS E 6 66 66 RESIDENTIAL COMMERCIAL 1 1/2 6 18 2 1/2 4 12 N/A 2 3 18 6 COMMERCIAL 2 PRIVATEROADS THICKNESS (INCHES) PARKING LOTS 1 2 12 6 1-1/2 2-1/2 12 6 RESIDENTIAL D B C A SD 020.X.XLAST REVISED 01/04/2022TRUDELL CONSULTING ENGINEERS TYPICAL BITUMINOUS CURB TRUDELL CONSULTING ENGINEERS TYPICAL TEMPORARY SILT FENCE CONSTRUCTION SPECIFICATION FOR SILT FENCE 1.WOVEN WIRE FENCE TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES. WIRE FENCE REINFORCEMENT REQUIRED WITHIN 100 FT UPSLOPE OF RECEIVING WATERS. 2.FILTER CLOTH TO BE FASTENED SECURELY TO WOVEN WIRE FENCE WITH TIES SPACED EVERY 24" AT TOP AND MID SECTION. FENCE SHALL BE WOVEN WIRE, 6" MAXIMUM MESH OPENING. 3.WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE OVERLAPPED BY SIX INCHES AND FOLDED. FILTER CLOTH SHALL BE EITHER FILTER X, MIRAFI 100X, STABILINKA T140N, OR APPROVED EQUIVALENT. 4.PREFABRICATED UNITS SHALL BE GEOFAB, ENVIROFENCE, OR APPROVED EQUIVALENT. 5.MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVED WHEN SEDIMENT REACHED HALF OF FABRIC HEIGHT. 6.INSPECT SILT FENCE AT LEAST ONCE A WEEK AND WITHIN 24 HOURS AFTER EACH RAIN EVENT. MAINTENANCE SHALL BE PERFORMED AS NEEDED AND SEDIMENT REMOVED WHEN IT REACHES 1/3 THE HEIGHT OF THE FENCE. 7.UPON FINAL STABILIZATION OF THE AREA UPHILL OF THE SILT FENCE, IT SHALL BE REMOVED WITH THE APPROVAL OF THE ENGINEER. 6" E 020.1.1LAST REVISED 04/01/2021 (MIRAFI ENVIROFENCE, OR APPROVED EQUAL MAY BE SUBSTITUTED.) FLOW FILTER FABRIC, OR WOVEN WIRE FABRIC 1 1/2" HARDWOOD POSTS OR METAL STAKE (MAX. 10' O.C.) KEY FABRIC INTO GROUND (MIN. 6") 16" MIN. 20" MIN. UNDISTURBED SOIL BACKFILL E 030.1.1LAST REVISED 04/01/2021TRUDELL CONSULTING ENGINEERS STABILIZED CONSTRUCTION ENTRANCE CONSTRUCTION SPECIFICATIONS 1.STONE SIZE - USE 4-8" CRUSHED STONE, OR RECLAIMED OR RECYCLED CONCRETE EQUIVALENT. 2.LENGTH - NOT LESS THAN 50' (EXCEPT ON A SINGLE RESIDENCE LOT WHERE A 30' MINIMUM LENGTH APPLIES). 3.THICKNESS - NOT LESS THAN 8". 4.WIDTH - TWELVE (12) FOOT MINIMUM, BUT NOT LESS THAN THE FULL WIDTH AT POINTS WHERE INGRESS OR EGRESS OCCURS. TWENTY-FOUR (24) FOOT IF SINGLE ENTRANCE TO SITE. 5.GEOTEXTILES MUST BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING OF STONE. 6.SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARDS CONSTRUCTION ENTRANCES SHALL BE PIPED BENEATH THE ENTRANCE. IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED. 7.MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHTS-OF-WAY, ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC RIGHTS-OF-WAY MUST BE REMOVED IMMEDIATELY AND DISPOSED OF IN ACCORDANCE WITH THE EPSC PLANS. (i.e. PLACED IN A SOIL STOCKPILE OR AREA WHERE IT CAN BE STABILIZED PER EPSC DETAILS). IF SWEEPING IS THE CHOSEN METHOD FOR REMOVAL THE SWEPT MATERIAL MUST BE COLLECTED AND DISPOSED OF AS STATED ABOVE. 8.WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH STONE AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. 9.PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED ACCORDING TO PERMIT REQUIREMENTS BASED ON SITE CONDITIONS, WEATHER AND FLOW OF TRAFFIC. PUBLIC ROADWAY PROFILE EXCAVATION SITE PLAN SEE CONSTRUCTION SPECIFICATION 4 4-8" CRUSHED STONE AGGREGATE PLACED ON GEOTEXTILE FABRIC 4" ABOVE EXISTING GRADE 4" BELOW EXISTING GRADE 50' VARIES 8" EXCAVATION SITE EXISTING GRADE GEOTEXTILE FABRIC PROVIDE A DIVERSION RIDGE WHEN THE GRADE EXCEEDS 2% TO KEEP RUNOFF & SEDIMENT OUT OF THE PUBLIC ROAD R=12' BITUMINOUS PAVEMENT SEE SECTION DETAIL WIDTH VARIES CURB SL O P E V A R I E S 6" TOPSOIL 9" 1" ± 8" ±45% 75% R=2" GRAVEL BASE CRUSHED GRAVEL MIRAFI 500X FILTER FABRIC SAND BORROW SD 010.2.0 3/4" =1' LAST REVISED 11/19/2013TRUDELL CONSULTING ENGINEERS PAVEMENT/GRAVEL TRANSITION DETAIL 3'3' 8"8" 6" EDGE OF PAVEMENT AS SHOWN ON PLANS FINISHED GRAVEL TYPICAL PAVEMENT SUBBASE MATERIALS TOP COURSE PAVEMENT TY P I C A L P A V E M E N T SE C T I O N BASE COURSE PAVEMENT SD 070.3.1LAST REVISED 03/03/2021TRUDELL CONSULTING ENGINEERS TYPICAL GATE DETAIL 3' - 6" 4' 6"3' 2'PRIVATE PROPERTY 3/8" CHAIN WITH PADLOCK CONCRETE FOOTING CONCRETE FILLED PIPE 3 1/2" PIPE 6" ROAD OR DRIVE REFER TO SITE PLAN FOR TYPE AND WIDTH SD 000.1.1LAST REVISED 02/17/2021TRUDELL CONSULTING ENGINEERS SAFETY AND PROTECTION CONTRACTOR SHALL BE RESPONSIBLE FOR INITIATING, MAINTAINING AND SUPERVISING ALL SAFETY PRECAUTION AND PROGRAMS IN CONNECTION WITH THE WORK. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS FOR THE SAFETY OF, AND SHALL PROVIDE THE NECESSARY PROTECTION TO PREVENT DAMAGE INJURY OR LOSS TO: 1.ALL EMPLOYEES ON THE WORK AND OTHER PERSONS WHO MAY BE AFFECTED THEREBY. 2.ALL THE WORK AND ALL MATERIALS OR EQUIPMENT TO BE INCORPORATED THEREIN, WHETHER IN STORAGE ON OR OFF THE SITE, AND 3.OTHER PROPERTY AT THE SITE OR ADJACENT THERETO, INCLUDING TREES, SHRUBS, LAWNS, WALKS, PAVEMENTS, ROADWAYS, STRUCTURES AND UTILITIES NOT DESIGNATED FOR REMOVAL, RELOCATION OR REPLACEMENT IN THE COURSE OF CONSTRUCTION. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE STANDARDS (SPECIFICALLY INCLUDING OSHA, VOSHA AND ANY OTHER STATE ADOPTED OSHA PROGRAM), LAWS ORDINANCES, RULES, REGULATIONS AND ORDERS OF ANY PUBLIC BODY HAVING JURISDICTION FOR THE SAFETY OF PERSONS OR PROPERTY OR TO PROTECT THEM FROM DAMAGE, INJURY OR LOSS, AND SHALL ERECT AND MAINTAIN ALL NECESSARY SAFEGUARDS FOR SUCH SAFETY AND PROTECTION. CONTRACTOR SHALL NOTIFY OWNERS OF ADJACENT PROPERTY AND UTILITIES WHEN EXECUTION OF THE WORK MAY AFFECT THEM. CONTRACTOR'S RESPONSIBILITIES FOR THE SAFETY AND PROTECTION OF THE WORK SHALL CONTINUE UNTIL SUCH TIME AS ALL THE WORK IS COMPLETED. E 070.1.1LAST REVISED 04/01/2021TRUDELL CONSULTING ENGINEERS TEMPORARY STONE CHECK DAM 2 1 0.4' 9" CROSS SECTION 6" DITCHLINE PROFILE PLAN DIT C H L I N E CONSTRUCTION SPECIFICATIONS: 1.STONE WILL BE PLACED ON A FILTER FABRIC FOUNDATION TO THE LINES, GRADES, AND LOCATIONS SHOWN IN THE PLAN. 2.SET SPACING OF CHECK DAMS TO ASSUME THAT THE ELEVATIONS OF THE CREST OF THE DOWNSTREAM DAM IS AT THE SAME ELEVATION OF THE TOE OF THE UPSTREAM DAM.. 3.EXTEND THE STONE A MINIMUM OF 1.5 FEET BEYOND THE DITCH BANKS TO PREVENT CUTTING AROUND THE DAM.. 4.PROTECT THE CHANNEL DOWNSTREAM OF THE LOWEST CHECK DAM FROM SCOUR AND EROSION WITH STONE OR LINER AS APPROPRIATE. 5.ENSURE THAT CHANNEL APPURTENANCES SUCH AS CULVERT ENTRANCES BELOW CHECK DAMS ARE NOT SUBJECT TO DAMAGE OR BLOCKAGE FROM DISPLACED STONE. TOP OF SWALE STONE NEVER TO BE ABOVE TOP OF SWALE TOE OF SLOPE = TOP OF CHECK DAM SEPARATION = X 2" MIN. - 6" MAX. STONE SPILLWAY MIRAFI 500X FABRIC X =H (ft) SLOPE (ft/ft) 1.5' (TYP.) 18" 1/3 WIDTH OF CHANNEL E 040.1.1LAST REVISED 04/01/2021TRUDELL CONSULTING ENGINEERS FINE GRAVEL FACE (1' MIN. THICKNESS) 1' 3" STONE TEMPORARY SEDIMENT POOL 6' TYPICAL PIPE INLET PROTECTION 1' 3 1 PIPE PIPE21 3" STONE PREPARED SUBGRADE L-010.1.3 TREE PLANTING ON SLOPE TRUDELL CONSULTING ENGINEERS LAST REVISED 12/29/2020 EQEQ EQ 2:1 M A X S L O P E 4' 2"X2"X10' FIR STAKES; 3 PER TREE EQUALLY SPACED AROUND ROOT BALL; ALL POSTS SHALL BE PLUMB AND HAVE SAME HEIGHT ABOVE FINISH GRADE. GUY WIRE SHALL BE NEW PLIABLE ANNEALED GALVANIZED SOFT STEEL WIRE OF NO. TEN (10) GAUGE SIZE. ENCASE WIRE AROUND TRUNK IN TWO-PLY, BLACK, REINFORCED GARDEN HOSE, OR APPROVED EQUAL SLOPE LINE INSTALL TREE PLUMB TOP OF ROOTBALL SHALL BEAR SAME RELATIONSHIP TO FINISHED GRADE AS TO PREVIOUS EXISTING GRADE ROOT FLARE SHALL BE EXPOSED; MULCH SHOULD NOT BE WITHIN 4" OF TREE TRUNK PLACE BALL ON SUBSOIL. REMOVE AND DISCARD BURLAP EXCEPT UNDER BALL. REMOVE ALL SYNTHETIC SOIL WRAPPING MATERIALS (TREATED BURLAP, NYLON TWINE, WIRE BASKETS, ETC.) AND DISCARD EXCAVATED SOIL EXCAVATE SUBSOIL AS REQUIRED TO PLACE ROOTBALL TO PROPER ELEVATION. PLACE ROOTBALL DIRECTLY ON SUBSOIL EXCAVATE HOLE TO DIAMETER 3X WIDER THAN ROOTBALL. BACKFILL HOLE WITH PLANTING SOIL MIX AS SPECIFIED BARK MULCH, AS SPECIFIED FREE-DRAINING SCARIFIED SUBGRADE PLANTING SOIL BERM, DOWNHILL SIDE ONLY 1/4" = 1' Sheet Title Project Title Use of These Drawings Scale: Project Number: Date: Drawn By: Project Engineer: Approved By: No. Description Date By For Permitting Only Revisions Field Book: 1. Unless otherwise noted, these Drawings are intended for preliminary planning, coordination with other disciplines or utilities, and/or approval from the regulatory authorities.  They are not intended as construction drawings unless noted as such or marked approved by a regulatory authority. 2. By use of these drawings for construction of the Project, the Owner represents that they have reviewed, approved, and accepted the drawings, obtained all necessary permits, and have met with all applicable parties/disciplines, including but not limited to, the Engineer and the Architect, to insure these plans are properly coordinated including, but not limited to, contract documents, specifications, owner/contractor agreements, building and mechanical plans, private and public utilities, and other pertinent permits for construction. 3. Owner and Architect, are responsible for final design and location of buildings shown, including an area measured a minimum five (5) feet around any building and coordinating final utility connections shown on these plans. 4. Prior to using these plans for construction layout, the user shall contact TCE to ensure the plan contains the most current revisions. 5. These Drawings are specific to the Project and are not transferable. As instruments of service, these drawings, and copies thereof, furnished by TCE are its exclusive property.  Changes to the drawings may only be made by TCE. If errors or omissions are discovered, they shall be brought to the attention of TCE immediately. 6. It is the User's responsibility to ensure this copy contains the most current revisions. No. 135032 CIVIL A N D R E D.PO U L O S ST A T E O F VER M O N T P R O F E SSIONAL E N GI NEER L ICEN S E D A   Stormwater Details C8-02 01/04/2022 Shown 21-229 RMP AAD    361 Munson Parking Lot 1877 Williston Road South Burlington, Vermont Parcel ID: 1810-S1877 SW 010.1.1 1" = 1' LAST REVISED 03/15/2021TRUDELL CONSULTING ENGINEERS TYPICAL STORM DRAIN TRENCH 1' FINISHED ROAD GRADE D + 8 " 1' NOTES ON STORM DRAIN TRENCH: A WET TRENCH SHALL BE DEWATERED PRIOR TO INSTALLING BEDDING DEPTH OF STORM DRAIN LINES VARY, REFER TO PLANS FOR DEPTH IN APPROPRIATE LOCATIONS. D FOR PAVED SURFACES VA R I E S (S E E P A V E M E N T S E C T I O N ) FOR GRASSED AREAS REPLACE TOPSOIL, SEED, AND MULCH OVERFILL TO ALLOW FOR SETTLEMENT. THOROUGHLY COMPACTED SELECTED BACKFILL FROM TRENCH EXCAVATION, FREE OF STONES LARGER THAN 3" IN DIAMETER. COMPACT BACKFILL IN 6" LIFTS. STORM DRAIN, (SEE SITE PLAN FOR PIPE SIZE & MATERIAL) THOROUGHLY COMPACTED 3/4" CRUSHED STONE BEDDING FOR CMP, PVC, OR HDPE PIPE. UNDISTURBED SOIL PERFORATED SUBDRAIN CROSS SECTION 1" = 1' 2-3" CLEAN WASHED CRUSHED STONE WETLAND SOIL 3/4" PEA STONE VAOT 704.02B 8" 4" 2' NATIVE SOIL 3/4" PEA STONE VAOT 704.02B 2" 6" 6" PERFORATED SDR 35 PVC IMPERMEABLE LINER GRAVEL WETLAND BASIN SECTION CLEAN 2-3" WASHED STONE TOP ELEV. 298.0 WETLAND VEGETATION SEE PLANTING PLAN VEGETATED BASIN FLOOR 4" PEA STONE GRAVEL TOP ELEV. 298.3' 1 2 ELEV. 296.0' ELEV. 299' 2 1 ELEV. 302' OUTLET STRUCTURE WITH 18" BEEHIVE GRATE ELEV. 301.6' ELEV. 302' BOTTOM OF GRAVEL ELEV. 296.0' 18" CULVERT OUT ELEV. 298.5' NTS ELEV. 300.0' STORM RAX HDPE TRASH RACK OR APPROVED EQUAL 6" PERFORATED SUBDRAIN WRAPPED IN FILTER FABRIC LAID FLAT AT ELEV. 296.2' WITH END CAPS 8" WETLAND SOIL TOP ELEV. 299.0' IMPERMEABLE LINER OPTIONS: A.6-12" OF CLAY SOIL A.1.MINIMUM 15% PASSING THE #200 SIEVE A.2.MAX PERMEABILITY OF 1X10-5 CM/SEC B.30 MIL POLY-LINER C.BENTONITE D.APPROVED EQUAL 1" WQv ORIFICE DRILLED IN END CAP AT ELEV. 298.8' 1" CPv ORIFICE AT ELEV. 300.4' PERFORATED RISER (TYP.) SW 020.2.1 1/2"=1' LAST REVISED 03/15/2021TRUDELL CONSULTING ENGINEERS POLYETHYLENE (HDPE) END SECTION ELEVATION VIEW "D" POLYETHYLENE FLARED END SECTION, POLYETHYLENE FLARED END SECTION, SITE PLAN SLOPE AS PER SIDES OF END SECTION TO MATCH TAPERED FINISHED GRADE ADS OR EQUAL. PLAN VIEW ADS OR EQUAL. SITE PLAN SLOPE AS PER INLET CONDITION OUTLET CONDITION OUTLET CONDITION INLET CONDITION "D" MINIMUM AREA 5' WIDE x 20' LONG PROVIDE 18" TYPE II RIPRAP OVER 12" TYPE P204 RIPRAP UNLESS INDICATED OTHERWISE SMOOTH INTERIOR, CORRUGATED EXTERIOR, HIGH DENSITY POLYETHYLENE PIPE (HDPE). ADVANCED DRAINAGE SYSTEMS (ADS) N-12 OR EQUA. PERFORATED RISER DETAIL 2" 3/4" PEA STONE VAOT 704.02B 6"6" NATIVE SOIL SOLID PVC CAP AT TOP AND BOTTOM 8" 4" 2'2-3" CLEAN GRAVEL WASHED STONE WETLAND SOIL 3/4" PEA STONE VAOT 704.02B RUN A 24" LENGTH OF #4 REBAR THROUGH THE TUBE TO PROVIDE VERTICAL RESISTANCE AGAINST SLIPPAGE IMPERMEABLE LINER PERFORATED PIPE FOR RISERS TO HAVE SIX ROWS OF 5/8" PERFORATIONS Sheet Title Project Title Use of These Drawings Scale: Project Number: Date: Drawn By: Project Engineer: Approved By: No. Description Date By For Permitting Only Revisions Field Book: 1. Unless otherwise noted, these Drawings are intended for preliminary planning, coordination with other disciplines or utilities, and/or approval from the regulatory authorities.  They are not intended as construction drawings unless noted as such or marked approved by a regulatory authority. 2. By use of these drawings for construction of the Project, the Owner represents that they have reviewed, approved, and accepted the drawings, obtained all necessary permits, and have met with all applicable parties/disciplines, including but not limited to, the Engineer and the Architect, to insure these plans are properly coordinated including, but not limited to, contract documents, specifications, owner/contractor agreements, building and mechanical plans, private and public utilities, and other pertinent permits for construction. 3. Owner and Architect, are responsible for final design and location of buildings shown, including an area measured a minimum five (5) feet around any building and coordinating final utility connections shown on these plans. 4. Prior to using these plans for construction layout, the user shall contact TCE to ensure the plan contains the most current revisions. 5. These Drawings are specific to the Project and are not transferable. As instruments of service, these drawings, and copies thereof, furnished by TCE are its exclusive property.  Changes to the drawings may only be made by TCE. If errors or omissions are discovered, they shall be brought to the attention of TCE immediately. 6. It is the User's responsibility to ensure this copy contains the most current revisions. No. 135032 CIVIL AND R E D.PO U L O S ST A T E O F VER M O N T P R O F E SSIONAL E N GI NEER LICEN S E D A EPSC Low Risk Handbook Sheet 1 C8-04 01/04/2022 Shown 21-229 RMP AAD    361 Munson Parking Lot 1877 Williston Road South Burlington, Vermont Sheet Title Project Title Use of These Drawings Scale: Project Number: Date: Drawn By: Project Engineer: Approved By: No. Description Date By For Permitting Only Revisions Field Book: 1. Unless otherwise noted, these Drawings are intended for preliminary planning, coordination with other disciplines or utilities, and/or approval from the regulatory authorities.  They are not intended as construction drawings unless noted as such or marked approved by a regulatory authority. 2. By use of these drawings for construction of the Project, the Owner represents that they have reviewed, approved, and accepted the drawings, obtained all necessary permits, and have met with all applicable parties/disciplines, including but not limited to, the Engineer and the Architect, to insure these plans are properly coordinated including, but not limited to, contract documents, specifications, owner/contractor agreements, building and mechanical plans, private and public utilities, and other pertinent permits for construction. 3. Owner and Architect, are responsible for final design and location of buildings shown, including an area measured a minimum five (5) feet around any building and coordinating final utility connections shown on these plans. 4. Prior to using these plans for construction layout, the user shall contact TCE to ensure the plan contains the most current revisions. 5. These Drawings are specific to the Project and are not transferable. As instruments of service, these drawings, and copies thereof, furnished by TCE are its exclusive property.  Changes to the drawings may only be made by TCE. If errors or omissions are discovered, they shall be brought to the attention of TCE immediately. 6. It is the User's responsibility to ensure this copy contains the most current revisions. No. 135032 CIVIL AND R E D.PO U L O S ST A T E O F VER M O N T P R O F E SSIONAL E N GI NEER LICEN S E D A EPSC Low Risk Handbook Sheet 2 C8-05 01/04/2022 Shown 21-229 RMP AAD    361 Munson Parking Lot 1877 Williston Road South Burlington, Vermont D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø 6 " P V C CB RIM=299.96 iIN=297.56 15" CMP 15" CMP RIM=304.57 iIN=299.82 iOUT=299.84 i=298.24 30 5 305 305 30 5 30 9 30 9 30 9 30 9 30 9 30 8 30 8 30 8 30 8 30 7 30 7 3 0 6 306 30 6 3 0 6 304 304 30 4 303 3 0 3 302 3 0 2 30 1 30 1 299 29 9 29 8 298 29 7 29 7 29 6 30 8 306 307 306 30 9 309 308 307 306 304 303 302 301 29 9 29 8 299 304 303 302 301 30 7 30 7 300 300 305 305 300 225'± GATE i=303.62 N/F MACKENNA ALEXIS HOLDINGS LLC. N/F KIMBALL PARTNERS LLC. C/O NEVILLE COMPANIES N/F 20 KIMBALL COMMONS LLC. N/F VERMONT FEDERAL CREDIT UNION N/F O'BRIEN BROTHERS LLC. C/O O'BRIEN BROTHERS AGENCY N/F RSR REAL ESTATE LLC N/F CRESTA NEDDE 2 LLC. D APPR O X . L O C A T I O N 6 ' W I D E x 4 . 3 ' H I G H C U L V E R T 6" PVC ORIGIN UNKNOWN i=303.16 CULVERT 6' WIDE x 4.3' HIGH 42" PVC iOUT=294.30 ORIGIN UNKNOWN iOUT=294.16 FENCE CONTINUES NORTH WESTERLY APPROXIMATELY 4' HIGH CHAIN LINK FENCE 31 6 3 1 7 31 5 3 1 4 29 9 297 298 30 0 31 3 31 2 31 1 31 0 30 9 3 0 8 30 7 3 0 6 30 5 30 4 30 1 30 3 30 2 320 319 318 320 310 31 0 31 5 32 0 31 0 30 5 30 3 304 30 3 30 2 30 1 31 4 31 3 31 2 31 1 30 630 9 30 8 30 7 3 1 3 3 1 2 3 1 1 3 1 0 3 0 9 31 5 31 4 319 318 317 316 31 9 31 8 31 7 31 6 31 3 31 2 31 1 31 0 31 5 31 4 30 9 31 0 306 305 308 307 309 302 30 1 304 303 3 0 0 2 9 9 2 9 8 29 7 29 9 2 9 8 30 0 297 300 30 6 3 0 4 3 0 5 3 0 3 3 0 2 3 0 1 299 298 297 3 0 0 3 0 0 299 298 297 30 0 29 9 29 8 29 7 29 9 29 8 30 0 29 7 31 6 31 9 31 8 31 7 31 3 31 2 31 1 31 5 31 4 30 0 301 GRAVEL AREA CONCRETE HEADWALL CLASS II WETLAND 50' WETLAND BUFFER EXEMPT WETLAND (NEITHER CLASS II OR III) N 23°53'30" E 27.61' N 10°0 7 ' 2 8 " E 14.97' N 1 7 ° 4 8 ' 2 4 " W 34. 2 4 ' N 2 6 ° 1 2 ' 1 9 " W 24 . 9 0 ' N 5 1 ° 0 3 ' 2 7 " W 37 . 2 3 ' N 4 1 ° 4 0 ' 1 0 " W 19 . 8 8 ' N 5 4 ° 2 0 ' 4 9 " W 41 . 4 3 ' N 6 7 ° 5 8 ' 0 8 " W 12 . 9 3 ' N 3 3 ° 5 3 ' 0 3 " W 18 . 4 1 ' N 01 ° 0 0 ' 2 8 " W 26.8 3 ' N 4 3 ° 0 9 ' 2 9 " W 12 . 6 5 ' N 5 3 ° 5 5 ' 3 3 " W 17 . 8 1 ' N 6 8 ° 3 4 ' 2 9 " W 1 3 . 9 1 ' S 7 5 ° 4 4 ' 0 5 " W 5 0 . 7 5 ' S 55° 1 1 ' 2 3 " W 36.8 7 ' S 70°27'33" W 6.61'N 18°26'35" E 13.14' N 85°51'00" W 9.84' N 65°38'04" W 6.66' N 23°05'13" W 5.31'N 24°21'29" E 3.56' N 24°06'50" W 5.62' N 21°42'00" E 11.34' N:715275.45 E:1470066.15 S 62°40'35" W 5.36' N 34°23'52" E 123.85' S 5 5 ° 2 4 ' 4 7 " E 28 8 . 0 6 ' N 13°07'02" W 1.82' S 34°23'48" W 183.47' S 34°23'48" W 56.00' S 34°23'48" W 80.53' N 5 5 ° 3 6 ' 1 2 " W 15 0 . 0 0 ' N 34°23'48" E 100.00' N 5 5 ° 3 6 ' 1 2 " W 19 2 . 5 0 ' N 34°23'43" E 96.15' N 15°53'26" W 9.71' N 02°50'36" E 1.38' S 82°25'32" W 2.86' S 5 6 ° 4 1 ' 2 8 " E 54 . 3 5 ' RO U T E 2 KENNEDY DRIVE KI M B A L L A V E . AIRP O R T DRIV E Sheet Title Project Title Use of These Drawings Scale: Project Number: Date: Drawn By: Project Engineer: Approved By: No. Description Date By Revisions 478 BLAIR PARK ROAD | WILLISTON, VERMONT 05495 802 879 6331 | WWW.TCEVT.COM ENGINEERING SURVEY Field Book: 1. Unless otherwise noted, these Drawings are intended for preliminary planning, coordination with other disciplines or utilities, and/or approval from the regulatory authorities.  They are not intended as construction drawings unless noted as such or marked approved by a regulatory authority. 2. By use of these drawings for construction of the Project, the Owner represents that they have reviewed, approved, and accepted the drawings, obtained all necessary permits, and have met with all applicable parties/disciplines, including but not limited to, the Engineer and the Architect, to insure these plans are properly coordinated including, but not limited to, contract documents, specifications, owner/contractor agreements, building and mechanical plans, private and public utilities, and other pertinent permits for construction. 3. Owner and Architect, are responsible for final design and location of buildings shown, including an area measured a minimum five (5) feet around any building and coordinating final utility connections shown on these plans. 4. Prior to using these plans for construction layout, the user shall contact TCE to ensure the plan contains the most current revisions. 5. These Drawings are specific to the Project and are not transferable. As instruments of service, these drawings, and copies thereof, furnished by TCE are its exclusive property.  Changes to the drawings may only be made by TCE. If errors or omissions are discovered, they shall be brought to the attention of TCE immediately. 6. It is the User's responsibility to ensure this copy contains the most current revisions. PLAN NING ENVIRON MENT AL 0 Feet Graphic Scale 20 40 60 1 5 ° ± VT G r i d Mag n e t i c Parcel ID: 1810-S1877 FEMA Sketch Plan C1-02 09/16/2022 1" = 20' 21-229 GMS CMJ    361 Munson Parking Lot 1877 Williston Road South Burlington, Vermont EXISTING CONDITIONS NOTES: 1.THE PURPOSE OF THE EXISTING CONDITIONS PLAN IS TO DEPICT READILY APPARENT PERTINENT EXISTING CONDITIONS AS OF 09/08/2021. 2.BEARINGS SHOWN ARE BASED UPON VERMONT GRID NORTH USING VTVRS CORS STATION. 3.VERTICAL DATUM IS BASED ON NAVD88 (GEIOD 18). A TRIMBLE R8 RTK GPS UNIT WAS EMPLOYED FOR THESE OBSERVATIONS. 4.COORDINATE SYSTEM IS BASED ON VERMONT STATE PLANE (U.S. SURVEY FEET). 5.THE LOCATION OF EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS SHOWN ARE BASED ON RESEARCH, UTILITY PLANS PROVIDED BY OTHERS, AND/OR SURFACE EVIDENCE ENCOUNTERED AND WERE OBTAINED IN A MANNER CONSISTENT WITH THE ORDINARY STANDARD OF PROFESSIONAL CARE AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR THE DESIGN ENGINEER. ADDITIONAL UTILITIES NOT SHOWN MAY EXIST. ENGINEER SHALL BE NOTIFIED IF ANY DISCREPANCIES ARE ENCOUNTERED. ACTUAL LOCATION OF UNDERGROUND UTILITIES MAY VARY. DIGSAFE MUST BE CONTACTED PRIOR TO ANY EXCAVATION. CALL 1-888-DIG SAFE (344-7233) OR CALL 811. 6.PERIMETER BOUNDARIES SHOWN HEREON FROM TAX MAP INFORMATION, LIMITED VISIBLE BOUNDARY EVIDENCE LOCATED IN THE FIELD, AND PLANS OF RECORD. THIS PLAN DOES NOT DEPICT A FORMAL BOUNDARY SURVEY. 6.1. "PLAT OF SURVEY LANDS OF LEE ZACHARY #1891 WILLISTON ROAD SOUTH BURLINGTON VERMONT" BY A.W. HARRIS & ASSOCIATES DATED 01/20/94 AND RECORDED IN THE CITY OF SOUTH BURLINGTON LAND RECORDS AS MAP SLIDE 362. 6.2."FINAL PLAN BUSINESS PARK NORTH SOUTH BURLINGTON VERMONT" BY CIVIL ENGINEERING ASSOCIATES, INC. DATED AUGUST 1978 LAST REVISED 1/24/80 AND RECORDED IN THE CITY OF SOUTH BURLINGTON LAND RECORDS AS MAP SLIDE 127. 6.3."BOUNDARY PLAT AND PLAN OF COMMON INTEREST OWNERSHIP LAND OF CHARLES R. WOOD 1879 & 1881 WILLISTON ROAD SOUTH BURLINGTON, VERMONT" BY DONALD M. HAMLIN CONSULTING ENGINEERS, INC. DATED 5/13/02 AND IS PRELIMINARY & UNRECORDED. PROVIDED BY THE CLIENT. "T" STAKE OVERALL PLAN SCALE: 1" =150' LEGEND STREAM PROPERTY LINE (TAX) FENCE TREE LINE CATCH BASIN (CB) STORM DRAINAGE PAVED DRIVE OR ROAD TOPOGRAPHIC CONTOURS OUTLET OR END SECTION ØØØØ 298 D LEGEND NOTE: SOME INFORMATION MAY BE PROVIDED BY OTHERS AND COULD BE SHOWN WITH A DIFFERENT SYMBOL NOT SHOWN ON THIS LEGEND. HOWEVER, THEY ARE LABELED ON RESPECTIVE PLANS. IN SOME CASES A CHANGE IN SCALE OR PRINTER CAN ALTER INFORMATION TO NOT SHOW AN EXACT MATCH ON THIS LEGEND. IF ANY QUESTIONS EXIST CONTACT THE ENGINEER TO CLARIFY. ADDITIONAL LEGEND INFORMATION IS SUPPLIED SEPARATELY ON EROSION CONTROL PLANS AND SOME SURVEY PLATS. ADJOINING PROPERTY LINE (TAX) GRAVEL DRIVE OR ROAD IRON PIPE LIDAR CONTOURS 298 PROJECT LOCATION Certication: The elevations as shown on the face of this plan are, to the best of my knowledge, accurate. Gerald Stockman ㄱ⼲㤯㈰㈲ 1 Marty Gillies From:Medash, Kyle <Kyle.Medash@vermont.gov> Sent:Tuesday, June 11, 2024 4:03 PM To:Marla Keene Cc:Marty Gillies Subject:RE: 'EXTERNAL'RE: 21-229 - 1677 Williston Rd, South Burlington, VT Attachments:C1-02 FEMA Sketch Plan.pdf; Fema letter.pdf Hi Marla, Just tried giving you a call back, feel free to call me back to discuss if needed. The river corridor, in this case the ANR has it mapped as a small stream with a drainage area less than 2 sq. mi. and has an (ANR) setback defined as measured 50 feet on either side of the stream, measured horizontally and perpendicularly from the top of each streambank. In the SB regs, 12.07 F. (b) or (c) would define it as 50’ or 100’ (respectively) horizontal distance from the top of bank or slope, whichever is applicable given the streams geomorphology. Given that the stream is already highly managed in a concrete box culvert, there is really no opportunity for the stream to meander or change course assuming the structural integrity of the culvert is intact. Also, given it is in a box culvert, there really isn’t a top of bank or slope to measure from. In the daylighted portion on the north of the site, it does look like the “River Corridor Overlay District Boundary” has been largely avoided; depending on how you measure it “outlet structure 2” may fall within though I wouldn’t expect any major channel location changes at the culvert outlet. For the floodplain, they had submitted a LOMA to me for my prior review (attached). It looks like they have the area removed via LOMA on the plan you sent listed as “Floodplain Overlay District Boundary” which is largely avoided other than a portion of the “Snow Storage” and potentially a very small portion of the access shown to be within the 30’ common right of way. Overall, my understanding of the project remains similar to my original comments. If the City wants further reassurances you could ask the applicant for a better measurement on the river corridor and shift outlet structure 2 as needed, similar situation to the access – can it be shifted south to completely avoid the SFHA/can the snow storage be shifted. Please let me know if you have any questions, happy to discuss further if helpful. Respectfully, Kyle Medash | Western Floodplain Manager Vermont Agency of Natural Resources | Department of Environmental Conservation Watershed Management Division, Rivers Program 450 Asa Bloomer State Office Building, 88 Merchants Row | Rutland, VT 05701-5903 802-490-6154 cell kyle.medash@vermont.gov From: Marla Keene <mkeene@southburlingtonvt.gov> Sent: Tuesday, June 11, 2024 10:06 AM To: Medash, Kyle <Kyle.Medash@vermont.gov> Cc: Marty Gillies <mgillies@southburlingtonvt.gov> Subject: RE: 'EXTERNAL'RE: 21-229 - 1677 Williston Rd, South Burlington, VT 2 EXTERNAL SENDER: Do not open attachments or click on links unless you recognize and trust the sender. Hi Kyle, Following up on my voice message, I have a few questions on this application for RV storage at 1877 Williston Road. As we’re wrapping up our review of this project, can I ask you to please confirm that your determination as it pertains to river corridors in this location is that there is no jurisdictional river corridor adjacent to the culverted portion of the stream? The applicant has shown the remaining river corridor as orthogonal to the daylighted portion of Potash Brook. Is that correct, or is the river corridor a true “buffer,” extending in all directions from the surface water including upstream? In terms of the floodplain, it appears they do in fact have work in the floodplain. They are proposing to place about a foot of fill in order to construct a driveway access to the storage yard (see attached). Is this different from what you were looking at? The South Burlington LDR 12.08(G)(1)(f) prohibits fill for anything other than raising up a structure. Would you agree that the proposed work in the floodplain is prohibited? If they were to modify the driveway so it was just paving on grade as opposed to filling, I believe they would then be subject to the standards of 12.08G(3) which require review by NFIP coordinator to demonstrate the development is safe from flooding etc. Alternatively, they may have a path forward by relocating the driveway outside of the floodplain. The DRB is reviewing the project next week, so if at all possible can you send me a note or call (802) 846-4138 this week? Sincerely, Marla Keene, PE Development Review Planner City of South Burlington (802) 846-4106 From: Medash, Kyle <Kyle.Medash@vermont.gov> Sent: Tuesday, November 7, 2023 2:53 PM To: Andrea Poulos, PE <Andrea.Poulos@tcevt.com> Cc: Abby A. Dery, PE <Abby.Dery@tcevt.com>; Marla Keene <mkeene@southburlingtonvt.gov>; Timothy McKenzie <Tim@southburlingtonrealty.com> Subject: 'EXTERNAL'RE: 21-229 - 1677 Williston Rd, South Burlington, VT This message has originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. Hi Andrea, Thank you for checking in. Great work on the LOMA, per the attached FEMA Sketch Plan (Sheet C1-02) and the LOMA (Case No: 23-01-0339A, May 23, 2023) the area proposed for the regrading/parking and stormwater treatment shown on You don't often get email from mkeene@southburlingtonvt.gov. Learn why this is important 3 Site Plan (Sheet C2-01) is now officially outside the SFHA via LOMA. Presumably, no further floodplain review is necessary per Section 12.08, D. (2)(a) of SB LDRs (the City ultimately makes that call). For the River Corridor review, I’ll defer to the City as they’ll be issuing or reviewing for permitting. The Site Plan depicts the proposal as outside the 100’ setback, the northern stormwater basin and corners of the parking area are very close to that boundary but appear to be outside per the Site Plan. Again, presumably no further review necessary under Section 12.07 of SB LDRs. It appears the Potash Brook is relatively unaffected by the proposal, the project avoids the hazard areas, the stormwater is directed toward an existing collection system (no outfalls to PB), opportunities for channel migration are low given the highly developed/managed surrounding areas, and the site generally remains in a similar condition/land use as it does today. This email can be used as ANR comments for to the municipal review in accordance with SB LDRs (Section 12.07, H., (2)(a) or 12.08, F., (1)(a)). If the project has Act 250 jurisdiction please let me know and I can provide a review specific to the FHARC Procedure/Criterion 1(D) - at this point I don’t foresee any issues if that’s the case. Please let me know if you have any questions, happy to discuss further if helpful. Respectfully, Kyle Medash | Western Floodplain Manager Vermont Agency of Natural Resources | Department of Environmental Conservation Watershed Management Division, Rivers Program 450 Asa Bloomer State Office Building, 88 Merchants Row | Rutland, VT 05701-5903 802-490-6154 cell kyle.medash@vermont.gov From: Andrea Poulos, PE <Andrea.Poulos@tcevt.com> Sent: Friday, November 3, 2023 11:43 AM To: Medash, Kyle <Kyle.Medash@vermont.gov> Cc: Abby A. Dery, PE <Abby.Dery@tcevt.com>; Marla Keene <mkeene@southburlingtonvt.gov>; Timothy McKenzie <Tim@southburlingtonrealty.com> Subject: 21-229 - 1677 Williston Rd, South Burlington, VT EXTERNAL SENDER: Do not open attachments or click on links unless you recognize and trust the sender. Hi Kyle, Thanks for chatting with me briefly regarding the property at 1677 Williston Rd in South Burlington a couple weeks ago. As discussed, Potash Brook enters a culvert off the southeast corner of our project property. The culvert travels across the property, discharging at the northern edge of the property, where the stream then travels west towards Kennedy Drive. This area is mapped as Zone A, however, we did get a LOMA for the property and have established a flood elevation, letter attached. While the state does not have river corridor mapping on this portion of Potash Brook, the South Burlington LDRs define the River Corridor Overlay District to include 100 feet from top of bank or top of slope around Potash Brook. I’ve attached an Existing Conditions Plan which shows the property boundary, the extent of the existing gravel/dirt lot, as well as the culvert, river corridor overlay boundary and revised 100-yr flood boundary. I’ve also attached a Site Plan depicting the proposed paved parking/storage lot and associated stormwater treatment area. If you could please provide any comments you have regarding this project it would be appreciated. Please let me know if you have questions regarding the information provided. Thank you, You don't often get email from andrea.poulos@tcevt.com. Learn why this is important 4 tcevt.com Andrea Dotolo Poulos, P.E. Environmental Engineer V e. andrea.poulos@tcevt.com c. 207.259.0695 Civil Engineering Environmental Services Landscape Architecture Underground Locating Land Surveying