HomeMy WebLinkAboutAgenda 08_SP-24-20_200 Davinci Dr_BSD Aviation TechCITY OF SOUTH BURLINGTON
DEVELOPMENT REVIEW BOARD
SP-24-20_200 Davinci Dr_BSD Aviation Tech_2024-06-
04
DEPARTMENT OF PLANNING & ZONING
Report preparation date: May 29, 2024
Plans received: May 1, 2024
200 da Vinci Drive – Burlington School District
Site Plan Application #SP-24-20
Meeting date: June 4, 2024
Owner
City of Burlington
Patrick Leahy Burlington International Airport
1200 Airport Drive
South Burlington, VT 05403
Applicant
Tom Flanagan, Burlington School District
Superintendent
150 Colchester Avenue
Burlington, VT 05401
Property Information
Tax Parcel ID: 2000-00000
Airport Industrial Zoning District
Engineer
McFarland Johnson
426 Industrial Avenue, Suite 146
Williston, VT 05495
Location Map
#SP-24-20
2
PROJECT DESCRPTION
Site plan application #SP-24-20 of Burlington School District to amend a previously approved plan
for an airport complex. The amendment consists of renovating an existing hangar for the use of
Burlington School District’s Aviation Technical Center, including reconfiguration of the parking and
site circulation, 200 Davinci Drive
CONTEXT
The project area is at the south end of the airport property immediately adjacent to the recently
approved Beta manufacturing facility on Davinci Drive. The project involves lands within the airport
PUD as well as within the Beta Master Plan area. Therefore the project is being considered in two
parts.
The subject application is a site plan for the portion of the project located within the airport PUD.
The application has also submitted a minor Master Plan amendment application for the portion of
the project within the Beta Master Plan Area, which will be reviewed by the Board on June 18, 2024.
The proposed changes consist of installation of a significant amount of doors and windows on the
existing building façade, removal of a smaller number of doors, interior renovation, and
modifications to the site access and circulation at the south end of the site.
COMMENTS
Development Review Planner Marla Keene and Director of Planning and Zoning Paul Conner
(‘Planning Staff’) have reviewed the plans submitted on 5/1/2024 and offer the following
comments. Numbered comments for the Board’s attention are indicated in red.
A) ZONING DISTRICT & DIMENSIONAL REQUIREMENTS
Airport Industrial Zoning District
(AIR-I)
Required Proposed
Min. Lot Size 3 acres No change
Max. Building Coverage 30% No change
Max. Overall Coverage 50% 36.5%
Max Front Setback Coverage 30% Unknown
Max Front Setback 50 ft. No change
Min. Side Setback 35 ft. No change
Min. Rear Setback 50 ft. No change
Building Height (flat roof) 35 ft. No change
Meets requirement
Airport Industrial Zoning District
The purpose of the Airport Industrial Zoning District is to provide sufficient land area for Airport-
related uses, support facilities, and commercial activities that may be incompatible with general
residential or commercial uses. The standards and regulations for the Airport Industrial District
recognize the importance of these facilities and uses to the operation of the City and regional
#SP-24-20
3
economies while providing appropriate setbacks and buffering to offset their impacts on adjacent
land uses.
Applications involving new or expanded buildings within the AIR-I district must comply with the
regulations pertaining to airport approach cones. No building construction or expansion is
proposed.
B) SITE PLAN REVIEW STANDARDS
14.06 General Review Standards
A. Relationship of Proposed Structures to the Site.
(1) The site shall be planned to accomplish a desirable transition from structure to site, from
structure to structure, and to provide for adequate planting, safe pedestrian movement, and
adequate parking areas.
Staff considers the applicant is proposing to improve the street presence of the structure by
adding glazing to the street facing and side facades.
The applicant is proposing to add a flush pedestrian walkway from the proposed expanded
parking area west of the building to the improved main entrance.
1. There is no safe pedestrian access to the building from Davinci Drive either existing or
proposed, though there is a sidewalk along Davinci Drive. Given the proposed use of the
building for students, and the City’s prioritization of personal mobility (ie biking and walking),
Staff recommends the Board discuss with the applicant how to improve access to the site for
users that are not arriving in cars or buses.
Adequacy of planting is discussed elsewhere in this document.
(2) Parking:
(a) Parking shall be located to the rear or sides of buildings. Any side of a building
facing a public street shall be considered a front side of a building for the purposes of this
subsection.
(b) The Development Review Board may approve parking between a public street and one
or more buildings if the Board finds that one or more of the following criteria are met.
The Board shall approve only the minimum necessary to overcome the conditions
below.
(viii) The building, or a portion thereof, being served by the parking area is
contained within the Security Identification Display Area of a publicly-owned and
operated airport.
Staff considers that the front side of this building is Davinci Drive, since the City has an
irrevocable offer of dedication for the street.
The applicant is proposing to reconfigure and expand existing parking areas to the front of
the adjacent hangar buildings to the west. Those buildings are not the subject of this
application, though they and the subject buildings are within the airport security fence.
2. Staff recommends the Board ask the applicant to demonstrate that the parking is the
minimum necessary and discuss whether they will allow this exemption for parking.
(3) Without restricting the permissible limits of the applicable zoning district, the height and
scale of each building shall be compatible with its site and existing or anticipated adjoining
buildings.
#SP-24-20
4
No changes to the height of the building are proposed. The applicant is proposing to add a
canopy at the new main entrance to the building, but the canopy will be contained within the
width and height of the existing building.
B. Relationship of Structures and Site to Adjoining Area.
(1) The Development Review Board shall encourage the use of a combination of common
materials and architectural characteristics (e.g., rhythm, color, texture, form or detailing),
landscaping, buffers, screens and visual interruptions to create attractive transitions between
buildings of different architectural styles.
Staff comments pertaining to buffering and screening are included in 14.07 below. The
applicant is proposing to paint the building but otherwise not to modify the materials of the
building.
(2) Proposed structures shall be related harmoniously to themselves, the terrain and to
existing buildings and roads in the vicinity that have a visual relationship to the proposed
structures.
Staff considers the proposed modifications to the structure to be sufficiently related to setting
given the magnitude of the modifications.
(3) To accomplish (1) and (2), the DRB shall consider:
(a) Pattern and Rhythm. Update or maintain or extend the overall pattern of
development defined by the planned or existing street grid, block configurations, position
and orientation of principal buildings, prevalence of attached or detached building types.
No modifications affecting compliance with this standard are proposed.
(b) Architectural Features. Respond to recurring or representative architectural
features that define neighborhood character, without adhering to a particular architectural
style.
The proposed modification to architectural features include addition of an entrance canopy
and glazing.
(c) Privacy. Limit impacts and intrusions to privacy on adjoining properties, including
side and back yard areas through context sensitive design.
No changes to privacy of adjoining properties are proposed.
C. Site Amenity Requirement
This criterion is only applicable to expansions and new residential conversions.
14.07 Specific Review Standards
In all Zoning Districts and the City Center Form Based Codes District, the following standards
shall apply:
A. Environmental Protection Standards. All proposed development shall be subject to the
applicable requirements of Article 12, Environmental Protection Standards.
There are no impacts to resources considered in Article 12 proposed as part of this project.
B. Site Design Features. All proposed development shall comply with standards for the
placement of buildings, parking and loading areas, landscaping and screening, open space,
#SP-24-20
5
stormwater, lighting, and other applicable standards related to site design pursuant to
these Land Development Regulations.
These standards are contained in Article 13 and are discussed below.
C. Access and Circulation. All proposed development shall comply with site access and
circulation standards of Section 15.A.14.
The applicant is proposing to modify the access and circulation in front of the existing
hangars to the west of the subject building by formalizing one parking area, expanding
another, and realigning and widening the driveway at the east end of the parking areas. They
are not proposing modifications to the access and circulation in front of the subject building.
Relevant standards of 15.A.14 include those pertaining to safe pedestrian access and to
minimizing curb cuts by providing shared vehicular access. Davinci Drive is not currently a
public street, but there is an irrevocable offer of dedication to the City therefore it should be
treated as a public street for the purposes of layout and design.
3. Staff recommends the Board ask the applicant to demonstrate that the proposed pavement
is minimized near the entrance to Davinci Drive. Too wide open a pavement area with
multiple (four in this case) non-perpendicular locations for cars to come from can lead to
safety issues. The driveway at the west end is narrow, so it does not appear this area is
needed for large vehicle circulation.
D. Transportation Demand Management (TDM) [reserved]
E. Building Form. Development within the City Center Form Based Code District, the Urban
Design Overlay District, and other districts with supplemental building form standards shall
adhere to the standards contained therein.
Not applicable.
F. Streetscape Improvements. A proposed new construction or extension/expansion of an
existing structure exceeding the thresholds listed in either (a) Section 14.09(B) or (b) Section
8.11(D) within the City Center Form Based Code, or Section 3.11(D) in all other zoning
districts, shall be required to upgrade adjacent sidewalks, greenbelts, and related street
furniture (trees, benches, etc.) to the standards contained within the applicable Street Type
and Building Envelope Standard. Nothing in this subsection shall be construed to limit
requirements for additional upgrades as necessary to meet the requirements of these
Regulations.
Staff considers no upgrades to be required.
G. Access to Abutting Properties. The reservation of land may be required on any lot for
provision of access to abutting properties whenever such access is deemed necessary to
reduce curb cuts onto an arterial or collector street, to provide additional access for
emergency or other purposes, or to improve general access and circulation in the area.
13.02F requires driveway connections between adjacent commercial lots. The airport is
generally one large lot. Driveway connections between buildings are generally provided
and not reduced by this application.
H. Utility Services. Electric, telephone and other wire-served utility lines and service
connections shall be underground insofar as feasible and subject to state public utilities
regulations. Any utility installations remaining above ground shall be located so as to have
a harmonious relation to neighboring properties and to the site. Standards of Section
15.A.18, Infrastructure, Utilities, and Services, shall also be met.
#SP-24-20
6
The property is currently served by overhead utilities. The applicant is proposing to
remove the existing transformer at the building, but it is unclear how the utilities are
proposed to be routed to the replacement transformer.
4. Staff recommends the Board ask the applicant to explain at what point the existing
overhead utilities will be located underground, and consider requiring the utilities to be
located underground at the upstream most pole that is impacted by the work.
The South Burlington Director of Public Works reviewed the plans on 5/23/2024 and offers
the following comments:
• The applicant will need to work with the wastewater superintendent to confirm that the
project has a sufficient wastewater allocation for the change in use.
• The wastewater pump station will remain privately owned.
• Does the property have an existing oil / water / grease / grit separator? Will the change
in use require that one be installed?
• Are any water (or other) easements proposed to be transferred to the City?
5. Staff recommends the Board ask the applicant to verbally answer the questions of the
Director of Public Works and include conditions for any necessary modifications.
I. Disposal of Wastes. All dumpsters and other facilities to handle solid waste, including
compliance with any recycling, composting, or other requirements, shall be accessible,
secure and properly screened with opaque fencing to ensure that trash and debris do not
escape the enclosure(s). Small receptacles intended for use by households or the public (ie,
non-dumpster, non-large drum) shall not be required to be fenced or screened.
There are no proposed changes to the location or screening of the existing dumpster, which
meets this criterion.
C) SUPPLEMENTAL REGULATIONS
13.02 Off Street Parking and Loading
G. Design requirements for Parking Spaces, Parking Aisles, Lighting and Landscaping
(1) Design requirements for off-street parking and loading are provided in Table 13-2 and
Figure 13-1, Section 13.04, Landscaping , Screening, and Street Trees, and Section 13.07,
Exterior Lighting. All paved parking spaces shall be striped or otherwise physically
delimited.
Sections 13.04 and 13.07 are discussed below. Parking is proposed to meet the required
dimensional standards.
(2) The location of parking areas and loading docks shall prevent conflicts with entering
and existing traffic onto a public street and prevent conflicts between vehicles and
pedestrians. The distance between access points and parking areas shall be adequate to
minimize blockage and prevent back-ups onto the public street.
Staff considers this criterion met.
(3) Provision shall be made for access by police, fire and emergency vehicles.
The Fire Marshal reviewed the project on 5/22/2024 and indicated there were no comments
pertaining to the Development Review Board’s review of the project.
#SP-24-20
7
(4) Pedestrian safety. Insofar as practicable, pedestrian and bicycle circulation shall be
separated from motor vehicle circulation. Safe and convenient pedestrian circulation,
including appropriate sidewalks, shall be provided on the site and its approaches. The
pedestrian circulation on site shall be designed to minimize adverse effects of vehicular
traffic on sidewalks and recreation paths.
6. The applicant is proposing an on-grade striped pathway from the parking area to the
building. Staff recommends the Board consider requiring the pathway to be raised by a
curb and consider requiring a sidewalk connection and crosswalk to Davinci Drive, as
alluded to above.
(5) Bicycle parking or storage facility.
Bicycle parking is discussed under 13.03 below.
(6) Stormwater management strategies that facilitate infiltration including but not limited
to recessed planting islands, bioretention facilities, and pervious parking spaces are
encouraged in the design of any off-street parking or loading area.
The applicant is proposing a bioretention area between the two sections of parking lot.
Infiltration is not proposed. Stormwater management is discussed under 13.05 below.
13.03 Bicycle Parking and Storage.
7. The building is 34,445 sf and is proposed to be used by 12 employees and 100 students.
One short term space is required for each 20 students of planned capacity, or five spaces.
It does not appear the applicant has proposed any bicycle parking. Staff recommends the
Board require the applicant to add short term bicycle parking to the plan proximate to a
student entrance.
As an existing building, long-term bicycle parking requirements do not apply.
13.04 Landscaping, Screening & Street Trees
B. Except for parking spaces accessory to a one-family or two-family dwelling, all off-street
parking areas subject to review by the Development Review Board shall be curbed and
landscaped with appropriate trees, shrubs, and other plants including ground covers, as
approved by the Development Review Board. Sections of recessed curb are permitted if their
purpose is to allow stormwater runoff from the adjacent parking area to reach stormwater
collection, treatment and management infrastructure. The Development Review Board shall
consider the adequacy of the proposed landscaping to assure the establishment of a safe,
convenient, and attractive parking area and the privacy and comfort of abutting properties.
The applicant is proposing to reconfigure and add parking so that there are 68 parking spaces
west of the building. Staff considers these standards apply to those 68 spaces.
(1) All off-street parking areas shall be landscaped around the perimeter of the lot
with trees, shrubs and other plants. Perimeter planting shall be set back from the curb
sufficiently to allow for snow storage. The purpose of perimeter planting shall be to
mitigate the view of the parking lot from the public way and from adjacent uses and
properties, and to provide shade and canopy for the parking lot. In some situations it may
be necessary, both for surveillance purposes and for the perception of safety, to install the
#SP-24-20
8
size and type of plants that leave visual access between the parking lot to the public way
or other pedestrian areas.
8. No parking lot landscaping is proposed. Staff recommends the Board require the applicant
to revise their plans to provide landscaping to screen the proposed and reconfigured
parking from the future public street.
(2) In all parking areas containing twenty-eight (28) or more contiguous parking
spaces and/or in parking lots with more than a single circulation lane, at least ten percent
(10%) of the interior of the parking lot shall be landscaped islands planted with trees,
shrubs and other plants. Such requirement shall not apply to structured parking or below-
ground parking.
9. Staff recommends the Board require the applicant to demonstrate compliance with this
criterion by providing a figure showing the parking area and the fraction landscaped.
(3) All interior and perimeter planting shall be protected by curbing unless specifically
designed as a collection and treatment area for management of stormwater runoff as per
13.04(B)(5)(c) below. Interior planted islands shall have a minimum dimension of six (6)
feet on any one side, and shall have a minimum square footage of sixty (60) square feet.
Large islands are encouraged.
10. No curbing is proposed. Staff considers curbing will be required to protect adjacent
landscaping except where the adjacent area is specifically designed as a stormwater
collection or treatment area.
(4) Landscaping Requirements
(a) Landscaping shall include a variety of trees, shrubs, grasses and ground covers. All
planting shall be species hardy for the region and, if located in areas receiving road
runoff or salt spray, shall be salt-tolerant.
(b) At least one (1) major deciduous shade tree shall be provided within or near the
perimeter of each parking area, for every five (5) parking spaces. The trees shall be
placed evenly throughout the parking lot to provide shade and reduce glare. Trees
shall be placed a minimum of thirty (30) feet apart.
(c) Trees shall have a caliper equal to or greater than two and one-half (2 ½) inches
when measured on the tree stem, six (6) inches above the root ball.
(d) Where more than ten (10) trees are installed, a mix of species is encouraged; the
species should be grouped or located in a manner that reinforces the design and
layout of the parking lot and the site.
These criteria apply to parking lot landscaping and should be used in designing the
proposed landscaping for the revised and expanded parking lot.
(e) Within the City Center FBC District, landscaping required within this section shall
not count towards meeting minimum landscape budget requirements as detailed in
Section 13.04(G).
Not applicable.
(7) Snow storage areas must be specified and located in an area that minimizes the
potential for erosion and contaminated runoff into any adjacent or nearby surface waters.
Snow storage areas have been specified. Staff considers this criterion met.
#SP-24-20
9
C. Screening or buffering. The Development Review Board will require landscaping, fencing,
land shaping and/or screening along property boundaries (lot lines) whenever it determines that
a) two adjacent sites are dissimilar and should be screened or buffered from each other, or b) a
property’s appearance should be improved, which property is covered excessively with pavement
or structures or is otherwise insufficiently landscaped, or c) a commercial, industrial, and multi-
family use abuts a residential district or institutional use, or (d) a parking or loading area is
adjacent to or visible from a public street.
(1) There shall be sufficient landscaping, walls, or fencing of sufficient height (minimum of three
(3) feet) and opacity to effectively screen the parking or loading area year-round from adjacent
public streets.
(2) Screening of a parking or loading shall be provided where headlights from vehicles on site may
be visible and project parallel to a public street.
These two criteria should be taken into considering in the design of the parking lot landscaping.
(3) There shall be sufficient landscaping, walls, or fencing of sufficient height and opacity to
effectively screen outdoor storage areas, refuse, recycling, and compost collection (excluding
on-site composting) areas.
Staff considers no additional outdoor storage screening to be necessary.
(4) The landscaping shall be designed to minimize erosion and stormwater runoff, and to protect
neighboring residential properties from the view of uses and parking areas on the site. The
landscaping shall be of such type, height, and spacing, as in the judgment of the Development
Review Board, will effectively screen the activities on the lot from the view of persons standing
on adjoining properties. The plan and specifications for such planting shall be filed with the
approved plan for the use of the lot
This criterion should be taken into considering in the design of the parking lot landscaping.
G(3) Landscaping Budget Requirements.
There is no minimum landscaping budget because no building addition is proposed.
I. Landscape Maintenance.
Maintenance and responsibility. All planting shown on an approved site plan shall be maintained
by the property owner in a vigorous growing condition throughout the duration of the use. Plants
not so maintained shall be replaced with new plants at the beginning of the next immediately
following growing season. Trees with a caliper of less than 5” may be replaced on an inch-by-inch
basis with trees of the same genus of at least 2” caliper each. No permit shall be required for such
replacements provided they conform to the approved site plan. Replacement of trees with a caliper
of greater than 5” shall require an amendment to the site plan.
The applicant is proposing to remove four (4) 8 to 10-inch caliper trees from the front of the
building. The applicant is proposing to plant seven shrubs and 32 ornamental grasses.
11. While Staff considers the proposed plantings to not be sufficient replacement for the removed
trees, as described above, the applicant must also provide parking lot landscaping, including
shade trees. Staff considers the combined resulting planting likely to be adequate to replace
the removed trees, and recommends the Board confirm once the proposed parking lot planting
plan is complete.
13.05 Stormwater Management
#SP-24-20
10
Stormwater standards apply when one-half acre or more of impervious surface exists or is
proposed to exist, and where 5,000 sf of impervious is created or reconstructed. At the time of this
writing, Staff had not yet received comments from the City Stormwater section.
12. Staff recommends the Board provide Staff an opportunity to provide an update at the time of
the hearing.
13.06 Airport Approach Cones
All applications for development within the Airport Approach Cones, as shown on the Overlay
Districts Map, involving new or expanded buildings or structures shall provide documentation
that either a Notice to the Federal Aviation Authority (FAA) is not required, or an application for a
Determination of No Hazard has been submitted to the FAA. Where an application for
Determination of No Hazard has been submitted, no zoning permit for construction shall be
issued without demonstration of receipt of an issued Determination.
13. Staff recommends the Board require the applicant to demonstrate submission of an
application for Determination of No Hazard, and condition the approval on receipt of an issued
determination.
13.07 Exterior Lighting
Lighting requirements are summarized as follows.
(1) Fixtures must be downcast and shielded
(2) Illumination must be evenly distributed
(3) Fixtures must be placed to minimize lighting from becoming a nuisance
(4) Poles shall be rustproof metal, cast iron, fiberglass, finished wood or similar
structural material, with a decorative surface or finish
(5) Poles & building mounted fixtures may be no higher than 30-ft
(6) Poles must be located in safe locations
Specific requirements for maximum illumination levels are included in Appendix A and are limited
to 3-foot candles average at ground level. The applicant has provided a photometric drawing but
has not indicated an average illumination level, though Staff considers it is likely to be below 3
foot candles.
14. Staff notes there is one “hotspot” of 15 footcandles near the eastern entrance of the building
and recommends the Board discuss whether to direct the applicant to reconfigure the
proposed lighting to reduce this hotspot to on the order of 8 – 10 footcandles.
13.11 Fences
The applicant has proposed to relocate 75 ft of airport security fence as part of this project. The
Board has typically considered airport security fence exempt from local regulation under 24 VSA
4413, and Staff recommends the Board do the same here.
13.12 Utility Cabinets and Similar Structures
#SP-24-20
11
B. Specific Standards for Utility Cabinets and Similar Structures.
(4) There shall be sufficient landscaping or fencing of sufficient height and opacity to screen
effectively the facility year-round from streets and abutting unaffiliated properties.
15. Screening is proposed for the proposed generator but not for the proposed utility
transformer. Staff recommends the Board ask the applicant to describe the proposed
height of the generator in order to determine if screening is adequate.
16. Staff recommends the Board require the applicant to provide screening of sufficient height
to screen the transformer from the street.
(5) The location of the facility shall be shown on all relevant site plans.
(6) Utility cabinets and similar structures shall be located a minimum of five (5) feet from all
existing or planned public roads or rights-of-way.
Staff considers criterion #5 and 6 to be met.
RECOMMENDATION
Staff recommends that the Board work with the applicant to address the issues identified herein. The
related master plan application is scheduled to be reviewed on June 18. Staff considers if the applicant
can provide the required information prior to concluding the hearing on June 4 that the Board may
continue to June 18 and Staff will incorporate review of the revised materials into the June 18 packet.
Respectfully submitted,
Marla Keene, Development Review Planner
E
PAVEME
N
T
J
O
I
N
T
PAVEMENT
J
O
I
N
T
36"CMP
19-1
19-1
19-1
19-1
19-1
19-
1
19-1
19-1
19-
1
E
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
RSA
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
RSA
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
R
S
A
TS
A
TS
A
TO
F
A
TO
F
A
LAT:N044° 28' 50"
LONG:W073° 09' 57"
LAT:N044° 27' 57"
LONG:W073° 08' 30"
LAT:N044° 28' 30"
LONG:W073° 09' 12"
LAT:N044° 27' 50"
LONG:W073° 09' 04"
LAT:N044° 28' 50"
LONG:W073° 09' 57"
LAT:N044° 27' 57"
LONG:W073° 08' 30"
LAT:N044° 27' 50"
LONG:W073° 09' 04"
LAT:N044° 27' 50"
LONG:W073° 09' 04"
LAT:N044° 28' 50"
LONG:W073° 09' 57"
LAT:N044° 27' 57"
LONG:W073° 08' 30"
LAT:N044° 28' 30"
LONG:W073° 09' 12"
LAT:N044° 27' 50"
LONG:W073° 09' 04"
TO
F
A
TO
F
A
RO
F
A
/
R
O
F
Z
RO
F
A
/
R
O
F
Z
RO
F
A
/
R
O
F
Z
RO
F
A
/
R
O
F
Z
RO
F
A
/
R
O
F
Z
RO
F
A
/
R
O
F
Z
RO
F
A
/
R
O
F
Z
RO
F
A
/
R
O
F
Z
RO
F
A
/
R
O
F
Z
RO
F
A
/
R
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
P
O
F
Z
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
ROF
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
ROF
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
R
O
F
A
RS
A
RS
A
RS
A
RS
A
RS
A
RS
A
RS
A
RS
A
RS
A
RS
A
RS
A
RS
A
RS
A
RS
A
TS
A
NA
T
I
O
N
A
L
G
U
A
R
D
A
V
E
APPROXIMATE
ZONING BOUNDARY
AIRPORT ZONING DISTRICT
AIRPORT INDUSTRIAL
ZONING DISTRICT
WI
L
L
I
S
T
O
N
R
O
A
D
A
I
R
P
O
R
T
D
R
I
V
E
KENN
E
D
Y
D
R
I
V
E
PROPOSED AVIATION
TECH CENTER LOCATION
BETA LEASE BOUNDARYEXISTING UTILITY EASEMENT
1
1
MIXED INDUSTRIAL &
COMMERCIAL ZONING 1
CL
I
E
N
T
:
PR
O
J
E
C
T
:
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
NO.DATE DESCRIPTION
DRAWING TITLE
DRAWING NUMBER
PROJECT MILESTONE
K:
\
B
U
R
L
I
N
G
T
O
N
I
N
T
E
R
N
A
T
I
O
N
A
L
A
I
R
P
O
R
T
\
T
-
1
8
7
1
5
.
0
2
A
V
I
A
T
I
O
N
T
E
C
H
N
I
C
A
L
D
E
S
I
G
N
\
D
R
A
W
\
D
R
A
W
I
N
G
S
\
S
H
E
E
T
F
I
L
E
S
\
1
8
7
1
5
.
0
2
-
S
I
T
E
L
O
C
A
T
I
O
N
.
D
W
G
NOT FOR
CONSTRUCTION
426 INDUSTRIAL AVENUE, SUITE 146
WILLISTON, VT 05495
P: (802)862-9381
WWW.MJINC.COM
81 Maple Street▪ Burlington VT 05401
802▪864▪6844▪ www.fffinc.com
Architecture▪ Planning▪ Interiors
BU
R
L
I
N
G
T
O
N
A
V
I
A
T
I
O
N
T
E
C
H
N
I
C
A
L
C
E
N
T
E
R
20
0
D
A
V
I
N
C
I
D
R
I
V
E
,
S
O
U
T
H
B
U
R
L
I
N
G
T
O
N
,
V
T
0
5
4
0
3
BU
R
L
I
N
G
T
O
N
S
C
H
O
O
L
D
I
S
T
R
I
C
T
BU
R
L
I
N
G
T
O
N
,
V
E
R
M
O
N
T
OVERALL SKETCH
PLAN
1"=80'
----
AJF
AJF
18715.02
03/01/2024
SL-01
PERMIT SET
SCALE
0 450 900 1350 FT
LEGEND:
LONG TERM EASEMENTS AND
RIGHT OF WAYS
AIRPORT PARCEL
PROPOSED WORK AREA
ZONING LINE
BETA PUD BOUNDARY
BETA LEASE BOUNDARY
1 4/10/2024 CITY COMMENTS
S
S
D
D
D
D
D
D
D
8"
ø
G
T
S
8"
ø
G
T
R
4"PO
P
L
A
R
(
2
)
VEN
T
P
I
P
E
14"M
A
P
L
E
CO
N
C
.
W
A
L
K
GATE
10"A
P
P
L
E
11
23
21
EXISTING
HANGER
BUILDING
EXISTING
HANGER
BUILDING
EXISTING HANGER BUILDING
PROPOSED
BSD AVIATION
TECHNICAL CENTER
(REHABILITATION OF
EXISTING HANGER
BUILDING)
EXISTING
VERMONT
FLIGHT
ACADEMY
BUILDING
BETA
TECHNOLOGIES
BUILDING
EXISTING APRON TO REMAIN
UE
2
4
'
207'
198'
200'
15
'
2'
24'
13.37
'
1
1
.
2
2
'
R10'
R5'
R5'
R3'
R10'
9'
1
2
.
1
'
R5'
R3'R38'R5'
R5'
±75' RELOCATED
SECURITY FENCE
50'± RETAINING WALL
(HIGHEST WALL HEIGHT=±2')
RECONFIGURE/EXPAND PARKING
66 SPACES (26 NET INCREASE)
STRIPED ADA COMPLIANT
PEDESTRIAN WALKWAY
EXISTING
RETENTION BASIN
RELOCATED
FIRE HYDRANT
EXISTING OVERHEAD DOOR TYP.
BETA LIGHT POLE, TYP.
BETA LEASE LINE
PROPOSED
BIORETENTION
AREA
EXISTING ASPHALT
PAVEMENT TO BE
REHABILITATED
(20,084 SF)
PROPOSED FULL DEPTH
ASPHALT PAVEMENT
(7778 SF)
PROPOSED CONCRETE
PAD EXPANSION
(2.8'x6.3')
PROPOSED CONCRETE
SIDEWALK (34.5'x4.1')
64.79'
64.79'47.91'
30.67'
VERMONT FLIGHT
ACADEMY LEASE LINE
RELOCATED GATE
CARD READER
7
4
'
R62'
RIP RAP CHANNEL LINING
EXISTING SECURITY
FENCE & GATE TO REMAIN
SEE SHEET SP-02 FOR DETAILED VIEW
PROPOSED CONCRETE HVAC
EQUIPMENT PAD (24' X 5')
15'
PROPOSED OVERHEAD DOOR
PROPOSED GENERATOR PAD
PROPOSED TRANSFORMER PAD
PROPOSED LAWN AREA
ADA PARKING SIGNS
MOUNTED ON EXISTING
SECURITY FENCE
PROPOSED LANDSCAPING AREAMAIN ENTRANCE
EXISTING HANGER
DOOR TO REMAIN
EXISTING DUMPSTER, COMPOSTING, RECYCLING AREA
1
PROPOSED SNOW STORAGE AREA
PROPOSED SNOW
STORAGE AREA
PROPOSED SNOW STORAGE AREA
1
1
1
9' TYP.
18' TYP.
24' TYP.
5'
R49'
R164.5'
12
CL
I
E
N
T
:
PR
O
J
E
C
T
:
K:
\
B
U
R
L
I
N
G
T
O
N
I
N
T
E
R
N
A
T
I
O
N
A
L
A
I
R
P
O
R
T
\
T
-
1
8
7
1
5
.
0
2
A
V
I
A
T
I
O
N
T
E
C
H
N
I
C
A
L
D
E
S
I
G
N
\
D
R
A
W
\
D
R
A
W
I
N
G
S
\
S
H
E
E
T
F
I
L
E
S
\
1
8
7
1
5
.
0
2
-
L
A
Y
O
.
D
W
G
NOT FOR
CONSTRUCTION
426 INDUSTRIAL AVENUE, SUITE 146
WILLISTON, VT 05495
P: (802)862-9381
WWW.MJINC.COM
81 Maple Street▪ Burlington VT 05401
802▪864▪6844▪ www.fffinc.com
Architecture▪ Planning▪ Interiors
BU
R
L
I
N
G
T
O
N
A
V
I
A
T
I
O
N
T
E
C
H
N
I
C
A
L
C
E
N
T
E
R
20
0
D
A
V
I
N
C
I
D
R
I
V
E
,
S
O
U
T
H
B
U
R
L
I
N
G
T
O
N
,
V
T
0
5
4
0
3
BU
R
L
I
N
G
T
O
N
S
C
H
O
O
L
D
I
S
T
R
I
C
T
BU
R
L
I
N
G
T
O
N
,
V
E
R
M
O
N
T
SCALE
0 20 40 60 FT
LEGEND
PROPOSED HYDRANT
LEASE LINES
PROPOSED PAVEMENT
REHABILITATION
PROPOSED FULL DEPTH PAVEMENT
PROPOSED LAWN AREA'S
PROPOSED PEDESTRIAN WALKWAY
CONCRETE PADS
MANDOOR
OVERHEAD DOOR
SITE PLAN
1"=20'
JES
AJF
AJF
18715.02
03/01/2024
SP-01
PERMIT SET
PROJECT DATA
1. APPLICANT / LAND OWNER:
BURLINGTON SCHOOL DISTRICT
200 DAVINCI DRIVE
SOUTH BURLINGTON, VERMONT 05403
2.EXISTING ZONING: AIRPORT INDUSTRIAL
PARKING:
1 SPACE FOR EACH 2 EMPLOYEES ON MAXIMUM WORKING SHIFT.
TOTAL EMPLOYEES = 10
REQUIRED:
5 TOTAL SPACES REQUIRED
PROVIDED:
12 (UNSHARED), 79 TOTAL SPACES
ADA SPACES REQUIRED:
PER 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN
REQUIRED (75-100 SPACE LOT): 4 SPACES)
FOR TOTAL PARKING 50-100 SPACES
PROVIDED (79 SPACE LOT): 4 SPACES
ZONING:
EXISTING:±796 ACRES AIRPORT INDUSTRIAL
PROPOSED:±796 ACRES AIRPORT INDUSTRIAL
TAX ACCOUNT NUMBERS:600-188-10911
SITE DATA
FEATURE REQUIRED PROPOSED
MINIMUM LOT SIZE,
NONRESIDENTIAL 3 ACRES 796.05 ACRES
MINIMUM FRONT YARD,
FROM RIGHT-OF-WAY 50 FEET > 50 FT
MINIMUM SIDE YARD 35 FEET > 35 FEET
MINIMUM REAR YARD 50 FEET > 50 FEET
MAXIMUM HEIGHT 40 FEET N/A
MAXIMUM LOT
COVERAGE 50%N/A
1 4/10/2024 CITY COMMENTS
S
S
D
D
D
D
FDFDFDFDFD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FDFDFD
D
D
D
FD
FD
FD
FD
FDFD
FD
FDFDFD
8"
ø
G
T
S
8"
ø
G
T
R
4"PO
P
L
A
R
(
2
)
VEN
T
P
I
P
E
14"M
A
P
L
E
CO
N
C
.
W
A
L
K
FM
FM
FM
SD
SD
SD
FM
FM
FM
F
M
F
M
F
M
F
M
F
M
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM FM FM
GATE
10"A
P
P
L
E
EXISTING
RETENTION BASIN
EXISTING
HANGER
BUILDING
EXISTING
HANGER
BUILDING
EXISTING HANGER BUILDING
PROPOSED
BSD AVIATION
TECHNICAL CENTER
(REHABILITATION OF
EXISTING HANGER
BUILDING)
EXISTING
VERMONT
FLIGHT
ACADEMY
BUILDING
BETA
TECHNOLOGIES
BUILDING
MILLINGS GRAVEL AREA
ASPHALT
PARKING AREA
ASPHALT P
A
V
E
M
E
N
T
L
I
M
I
T
EXISTING
CONCRETE
PAD
EXISTING
ASPHALT
44
'
12
4
'
23'
23
.
5
'
25'
EXISTING DUMPSTER
ENCLOSURE FENCE
EXISTING
ASPHALT
EXISTING HYDRANT
EXISTING GATE
CARD READER
RETAINING WALL
WITH HANDRAIL
PUMP STATION PANEL
EXISTING SANITARY PUMP STATION
EXISTING ELECTRIC TRANSFORMER
EXISTING 8-10" DIA. TREE
(TYP.OF 4)
VERMONT FLIGHT
ACADEMY LEASE LINE
BETA TECHNOLOGIES
LEASE LINE
ZONING BOUNDARY
EXISTING SITE
LIGHT TYP.
EXISTING SECURITY GATE
ASPHALT PAVEMENT LIMITS
1 NEW PLAN SHEET TO PROVIDE
SEPARATE EXISTING CONDITIONS PLAN
CL
I
E
N
T
:
PR
O
J
E
C
T
:
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
NO.DATE DESCRIPTION
DRAWING TITLE
DRAWING NUMBER
PROJECT MILESTONE
K:
\
B
U
R
L
I
N
G
T
O
N
I
N
T
E
R
N
A
T
I
O
N
A
L
A
I
R
P
O
R
T
\
T
-
1
8
7
1
5
.
0
2
A
V
I
A
T
I
O
N
T
E
C
H
N
I
C
A
L
D
E
S
I
G
N
\
D
R
A
W
\
D
R
A
W
I
N
G
S
\
E
X
-
0
1
A
\
1
8
7
1
5
.
0
2
_
E
X
-
0
1
A
.
D
W
G
NOT FOR
CONSTRUCTION
426 INDUSTRIAL AVENUE, SUITE 146
WILLISTON, VT 05495
P: (802)862-9381
WWW.MJINC.COM
81 Maple Street▪ Burlington VT 05401
802▪864▪6844▪ www.fffinc.com
Architecture▪ Planning▪ Interiors
BU
R
L
I
N
G
T
O
N
A
V
I
A
T
I
O
N
T
E
C
H
N
I
C
A
L
C
E
N
T
E
R
20
0
D
A
V
I
N
C
I
D
R
I
V
E
,
S
O
U
T
H
B
U
R
L
I
N
G
T
O
N
,
V
T
0
5
4
0
3
BU
R
L
I
N
G
T
O
N
S
C
H
O
O
L
D
I
S
T
R
I
C
T
BU
R
L
I
N
G
T
O
N
,
V
E
R
M
O
N
T
SCALE
0 20 40 60 FT
LEGEND:
EXISTING BUILDINGS
EXISTING GRAVEL AREA
EXISTING SECURITY FENCE
EXISTING UTILITY POLES
EXISTING DRAINAGE STRUCTURES
EXISTING STORM DRAINAGE STRUCTURES
EXISTING PARKING LOT LIGHT FIXTURES
EXISTING SEWER STRUCTURES
EXISTING OVERHEAD ELECTRICAL WIRES
EXISTING LEASE LINES
D
S
EXISTING CONDITIONS
PLAN
1"=20'
DEL
AJF
AJF
18715.02
03/01/2024
EX-01A
PERMIT SET
1 5/28/2024 CITY COMMENTS
UE
UE
UE
UE
UE
UE
UE
20
'
5'
5' WIDE
CONCRETE WALK
PROPOSED 35.55'X10'
ENTRANCE CANOPY
EXISTING DUMPSTER/COMPOST
RECYCLING ENCLOSURE
LEVEL 2 EV
CHARGING
STATION
(2 PORTS)
PROPOSED BOLLARD
(TYP.OF 4)
8' HIGH CHAINLINK FENCE WITH VINYL SLAT
WITH 16' WIDE MANUEL SWING GATE
EXISTING ASPHALT
PAVEMENT SLOPE TO
BE MODIFIED
PROPOSED FRONT
CONCRETE ENTRANCE
AREA (471 SF)
BIKE RACKS - 8 PROPOSED COVERED BIKE SPACES
EXISTING LOADING DOCK
WALL WITH HANDRAIL
TO REMAIN
PROPOSED LAWN AREA
NO PARKING SIGN
SIDEWALK CURB
RAMP (TYP.)
6" CONCRETE CURB
10'
PROPOSED EMERGENCY
GENERATOR PAD (16' X 5')
PROPOSED TRANSFORMER VAULT PAD
(SEE ELECTRICAL PLANS)
(12.5' X 7')
5'
5'
BETA INSTALLED SITE LIGHT
DETECTABLE WARNING STRIPS (TYP)
SIDEWALK RAMP (TYP)
ADA PARKING SIGN
ADA PARKING SIGN
BETA INSTALLED SITE LIGHT
PROPOSED BOLLARD
DETECTABLE WARNING UNITS (TYP)
DETECTABLE WARNING
UNITS (TYP)
PROPOSED OVERHEAD DOOR
OVERHEAD DOORWAY BOLLARDS (TYP. OF 6)
EXISTING OVERHEAD DOOR
PROPOSED
BSD AVIATION
TECHNICAL CENTER
(REHABILITATION OF
EXISTING HANGER
BUILDING)
27
.
7
1
'
GAS METER
PROPOSED WHEEL STOPS
BEGIN FLUSH CURB
PROPOSED LANDSCAPING AREA
(SEE DRAWING LL-01)
MAIN ENTRANCE
2'
1'
PROPOSED 6"
CONCRETE CURB
CL
I
E
N
T
:
PR
O
J
E
C
T
:
K:
\
B
U
R
L
I
N
G
T
O
N
I
N
T
E
R
N
A
T
I
O
N
A
L
A
I
R
P
O
R
T
\
T
-
1
8
7
1
5
.
0
2
A
V
I
A
T
I
O
N
T
E
C
H
N
I
C
A
L
D
E
S
I
G
N
\
D
R
A
W
\
D
R
A
W
I
N
G
S
\
S
H
E
E
T
F
I
L
E
S
\
1
8
7
1
5
.
0
2
-
L
A
Y
O
.
D
W
G
NOT FOR
CONSTRUCTION
426 INDUSTRIAL AVENUE, SUITE 146
WILLISTON, VT 05495
P: (802)862-9381
WWW.MJINC.COM
81 Maple Street▪ Burlington VT 05401
802▪864▪6844▪ www.fffinc.com
Architecture▪ Planning▪ Interiors
BU
R
L
I
N
G
T
O
N
A
V
I
A
T
I
O
N
T
E
C
H
N
I
C
A
L
C
E
N
T
E
R
20
0
D
A
V
I
N
C
I
D
R
I
V
E
,
S
O
U
T
H
B
U
R
L
I
N
G
T
O
N
,
V
T
0
5
4
0
3
BU
R
L
I
N
G
T
O
N
S
C
H
O
O
L
D
I
S
T
R
I
C
T
BU
R
L
I
N
G
T
O
N
,
V
E
R
M
O
N
T
SCALE
0 5 10 15 FT
BLDG PLAN
1"=5'
DEL
AJF
AJF
18715.02
03/01/2024
SP-02
PERMIT SET
LEGEND
PROPOSED HYDRANT
LEASE LINES
PROPOSED PAVEMENT
REHABILITATION
PROPOSED FULL DEPTH PAVEMENT
PROPOSED LAWN AREA'S
PROPOSED PEDESTRIAN WALKWAY
MANDOOR
OVERHEAD DOOR
BOLLARD
S
S
D
D
D
D
FDFDFDFDFD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FDFDFD
D
D
D
FD
FD
FD
FD
FDFD
FD
FDFDFD
8"
ø
G
T
S
8"
ø
G
T
R
4"PO
P
L
A
R
(
2
)
VEN
T
P
I
P
E
14"M
A
P
L
E
CO
N
C
.
W
A
L
K
SD
SD
SD
GATE
10"A
P
P
L
E
EXISTING
RETENTION BASIN
EXISTING
HANGER
BUILDING
EXISTING
HANGER
BUILDING
EXISTING HANGER BUILDING
PROPOSED
BSD AVIATION
TECHNICAL CENTER
(REHABILITATION OF
EXISTING HANGER
BUILDING)
EXISTING
VERMONT
FLIGHT
ACADEMY
BUILDING
BETA
TECHNOLOGIES
BUILDING
ADJUST RIM TO ±313.5
BETA SAND FILTER SYSTEM
FFE=318'
PROPOSED BIO
RETENTION AREA
EXISTING DMH98: 48" Ø
RIM ELEV = 316.50'
EXISTING DMH109: 48" Ø
RIM ELEV = 319.05'
EXISTING CB43: 60" Ø
RIM ELEV = 316.50
TC=317.90'
BC=317.90'
CURRENT DRIVEWAY
RECENTLY INSTALLED
BY BETA TO REMAIN
W
W
G G G
UE
EXISTING SD-142
RIM: 315.89
INV IN: 303.48 (15")
INV IN: 304.20 (15")
INV OUT: 306.02 (15")
PROPOSED D-1
RIM: 312.55
INV OUT: 307.38 (15")
EXISTING CB-63
RIM: 310.60
INV IN: 304.20 (15")
INV OUT: 304.20 (15")
EXISTING CB-66
RIM: 310.19
INV OUT: 304.58 (15")
312
3
1
3
315
31
2
3
1
2
312
31
3
314 316 317
318
317
TC=317.90
BC=317.40
TC=317.90
BC=317.40
317.33
317.09
317.10
317.40
317.54
320.49
319.00
317.84
314.50
313.00
312.90
313.76
313.15
312.57
311.67
314.00
316.00
315.50
TC=317.40
BC=317.40
MATCH EXISTING
MATCH EXISTING
MATCH EXISTING ASPHALT
CONCRETE PAD
ELEV. 318.00
GENERATOR PAD
ELEV. 318.00
TRANSFORMER PAD
ELEV. 318.00
318.00 MATCH EXISTING
317.00 MATCH EXISTING
12" THICK RIP RAP LINING
TC=317.70
BC=317.90
BEGIN RETAINING WALL
END RETAINING
WALL (43.5 LF)
79.4
8
'
MIN. DISTANCE TO EXISTING
WETLAND TOP OF BANK
1
CL
I
E
N
T
:
PR
O
J
E
C
T
:
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
NO.DATE DESCRIPTION
DRAWING TITLE
DRAWING NUMBER
PROJECT MILESTONE
K:
\
B
U
R
L
I
N
G
T
O
N
I
N
T
E
R
N
A
T
I
O
N
A
L
A
I
R
P
O
R
T
\
T
-
1
8
7
1
5
.
0
2
A
V
I
A
T
I
O
N
T
E
C
H
N
I
C
A
L
D
E
S
I
G
N
\
D
R
A
W
\
D
R
A
W
I
N
G
S
\
S
H
E
E
T
F
I
L
E
S
\
1
8
7
1
5
.
0
2
-
G
R
A
D
.
D
W
G
NOT FOR
CONSTRUCTION
426 INDUSTRIAL AVENUE, SUITE 146
WILLISTON, VT 05495
P: (802)862-9381
WWW.MJINC.COM
81 Maple Street▪ Burlington VT 05401
802▪864▪6844▪ www.fffinc.com
Architecture▪ Planning▪ Interiors
BU
R
L
I
N
G
T
O
N
A
V
I
A
T
I
O
N
T
E
C
H
N
I
C
A
L
C
E
N
T
E
R
20
0
D
A
V
I
N
C
I
D
R
I
V
E
,
S
O
U
T
H
B
U
R
L
I
N
G
T
O
N
,
V
T
0
5
4
0
3
BU
R
L
I
N
G
T
O
N
S
C
H
O
O
L
D
I
S
T
R
I
C
T
BU
R
L
I
N
G
T
O
N
,
V
E
R
M
O
N
T
SCALE
0 20 40 60 FT
LEGEND
EXISTING CONTOUR
PROPOSED CONTOUR
GRADING LIMITS
EXISTING CATCH BASIN
EXISTING DRAINAGE MANHOLE
EXISTING DRAINAGE PIPE
PAVEMENT RESURFACING AREA
PROPOSED DRAINAGE PIPE
SPOT ELEVATIONS (EXISTING/PROPOSED)
799
D
GRADING & DRAINAGE
1"=20'
JES
AJF
AJF
18715.02
03/01/2024
GR-01
PERMIT SET
1 4/10/2024 CITY COMMENTS
315.4/
S
S
D
D
D
D
FDFDFDFDFD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FDFDFD
D
D
D
FD
FD
FD
FD
FDFD
FD
FDFDFD
8"
ø
G
T
S
8"
ø
G
T
R
4"PO
P
L
A
R
(
2
)
VEN
T
P
I
P
E
10"A
P
P
L
E
14"M
A
P
L
E
CO
N
C
.
W
A
L
K
FM
FM
FM
FM
FM
FM
F
M
F
M
F
M
F
M
F
M
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM FM FM
GATE W
W
G G G
UE
EXISTING BETA SITE
LIGHT POLE, TYP.
EXISTING UTILITY
POLE TO REMAIN
EXISTING UTILITY
POLE TO REMAIN
EXISTING STORM CATCH
BASIN TO REMAIN
EXISTING STORM CATCH
BASIN TO REMAIN
EXISTING BIO
RETENTION BASIN
EXISTING STORM CATCH
BASIN TO REMAIN
RELOCATE FIRE
HYDRANT CAP EXISTING
HYDRANT LATERAL
EXISTING SANITARY PUMP
STATION TO REMAIN & BE
REFURBISHED
EXISTING TRANSFORMER
TO BE REMOVED
EXISTING WATER
SERVICE TO REMAIN
(8" DI PIPE)
SANITARY FORCEMAIN
TO REMAIN (2" SCH 80 PVC)
EXISTING
HANGER
BUILDING
EXISTING
HANGER
BUILDING
EXISTING HANGER BUILDING
PROPOSED
BSD AVIATION
TECHNICAL CENTER
(REHABILITATION OF
EXISTING HANGER
BUILDING)
EXISTING
VERMONT
FLIGHT
ACADEMY
BUILDING
BETA
TECHNOLOGIES
BUILDING
EXISTING SANITARY FORCE
MAIN BELIEVED TO BE
ABANDONED
24' X 5' HVAC PAD AREA
NEW PUMP STATION
CONTROL PANEL
PROPOSED DRAINAGE
INLET & PIPE
12.5'
PROPOSED EMERGENCY
GENERATOR
(SEE ELECTRICAL PLANS)
EXISTING WATER SERVICE TO REMAIN
(SEE PLUMBING PLANS)
PROPOSED TRANSFORMER
(SEE ELECTRICAL PLANS)
RELOCATED 2" GAS SERVICE
(SEE BUILDING PLANS)
RELOCATED FIRE HYDRANT
NEW TAPPING SLEEVE & VALVE
ON EXISTING 8" DI WATER LINE
UNDERGROUND ELECTRICAL
SERVICE TO EV CHARGING STATION
(SEE ELECTRICAL PLANS)
WINTER SERVICE ROOM
ELECTRICAL
SERVICE ROOM
CL
I
E
N
T
:
PR
O
J
E
C
T
:
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
NO.DATE DESCRIPTION
DRAWING TITLE
DRAWING NUMBER
PROJECT MILESTONE
K:
\
B
U
R
L
I
N
G
T
O
N
I
N
T
E
R
N
A
T
I
O
N
A
L
A
I
R
P
O
R
T
\
T
-
1
8
7
1
5
.
0
2
A
V
I
A
T
I
O
N
T
E
C
H
N
I
C
A
L
D
E
S
I
G
N
\
D
R
A
W
\
D
R
A
W
I
N
G
S
\
S
H
E
E
T
F
I
L
E
S
\
1
8
7
1
5
.
0
2
-
U
T
I
L
.
D
W
G
NOT FOR
CONSTRUCTION
426 INDUSTRIAL AVENUE, SUITE 146
WILLISTON, VT 05495
P: (802)862-9381
WWW.MJINC.COM
81 Maple Street▪ Burlington VT 05401
802▪864▪6844▪ www.fffinc.com
Architecture▪ Planning▪ Interiors
BU
R
L
I
N
G
T
O
N
A
V
I
A
T
I
O
N
T
E
C
H
N
I
C
A
L
C
E
N
T
E
R
20
0
D
A
V
I
N
C
I
D
R
I
V
E
,
S
O
U
T
H
B
U
R
L
I
N
G
T
O
N
,
V
T
0
5
4
0
3
BU
R
L
I
N
G
T
O
N
S
C
H
O
O
L
D
I
S
T
R
I
C
T
BU
R
L
I
N
G
T
O
N
,
V
E
R
M
O
N
T
SCALE
0 20 40 60 FT
LEGEND
EXISTING CATCH BASIN
EXISTING DRAINAGE MANHOLE
EXISTING DRAINAGE PIPE
EXISTING/PROPOSED HYDRANT
FORCE MAIN
WATER
OVERHEAD ELECTRICAL WIRES
UNDERGROUND ELECTRICAL WIRES
EXISTING LIGHT POLES
D
FM
UE
UTILITY PLANS
1"=20'
DEL
AJF
AJF
18715.02
03/01/2024
UT-01
PERMIT SET
S
S
D
D
D
D
FDFDFDFDFD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FDFDFD
D
D
D
FD
FD
FD
FD
FDFD
FD
FDFDFD
8"
ø
G
T
S
8"
ø
G
T
R
4"PO
P
L
A
R
(
2
)
VEN
T
P
I
P
E
10"A
P
P
L
E
14"M
A
P
L
E
CO
N
C
.
W
A
L
K
FM
FM
FM
SD
SD
SD
FM
FM
FM
F
M
F
M
F
M
F
M
F
M
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM FM FM
GATE W
W
G G G
UE
EXISTING
RETENTION BASIN
EXISTING
HANGER
BUILDING
EXISTING
HANGER
BUILDING
EXISTING HANGER BUILDING
PROPOSED
BSD AVIATION
TECHNICAL CENTER
(REHABILITATION OF
EXISTING HANGER
BUILDING)
EXISTING
VERMONT
FLIGHT
ACADEMY
BUILDING
BETA
TECHNOLOGIES
BUILDING
ADJUST RIM TO ±313.5
RIM INV.
BETA SAND FILTER SYSTEM
FFE=318'
CONCRETE WASHOUT AREA
312.00
EXISTING SD-142
RIM: 315.89
INV IN: 303.48 (15")
INV IN: 304.20 (15")
INV OUT: 306.02 (15")
PROPOSED D-1
RIM: 312.55
INV OUT: 307.38 (15")
EXISTING CB-63
RIM: 310.60
INV IN: 304.20 (15")
INV OUT: 304.20 (15")
EXISTING CB-66
RIM: 310.19
INV OUT: 304.58 (15")
314.69
315.04
315.40
314.50
313.62
316.00314.00
313.00
312.50
312.00
313.00311.67
313.75
313.15
312.72
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
IP
IP
IP
316
317
318
319
315
31
2
31
3
314
3
1
2
3
1
3
317
3
1
2
IP
SF SF SF
PROPOSED SILT FENCE
SITE DEMARCATION FENCE
SITE DEMARCATION FENCE
SITE DEMARCATION
FENCE
CL
I
E
N
T
:
PR
O
J
E
C
T
:
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
NO.DATE DESCRIPTION
DRAWING TITLE
DRAWING NUMBER
PROJECT MILESTONE
K:
\
B
U
R
L
I
N
G
T
O
N
I
N
T
E
R
N
A
T
I
O
N
A
L
A
I
R
P
O
R
T
\
T
-
1
8
7
1
5
.
0
2
A
V
I
A
T
I
O
N
T
E
C
H
N
I
C
A
L
D
E
S
I
G
N
\
D
R
A
W
\
D
R
A
W
I
N
G
S
\
S
H
E
E
T
F
I
L
E
S
\
1
8
7
1
5
.
0
2
-
E
R
O
S
.
D
W
G
NOT FOR
CONSTRUCTION
426 INDUSTRIAL AVENUE, SUITE 146
WILLISTON, VT 05495
P: (802)862-9381
WWW.MJINC.COM
81 Maple Street▪ Burlington VT 05401
802▪864▪6844▪ www.fffinc.com
Architecture▪ Planning▪ Interiors
BU
R
L
I
N
G
T
O
N
A
V
I
A
T
I
O
N
T
E
C
H
N
I
C
A
L
C
E
N
T
E
R
20
0
D
A
V
I
N
C
I
D
R
I
V
E
,
S
O
U
T
H
B
U
R
L
I
N
G
T
O
N
,
V
T
0
5
4
0
3
BU
R
L
I
N
G
T
O
N
S
C
H
O
O
L
D
I
S
T
R
I
C
T
BU
R
L
I
N
G
T
O
N
,
V
E
R
M
O
N
T
SCALE
0 20 40 60 FT
LEGEND
EXISTING CONTOUR
PROPOSED CONTOUR
GRADING LIMITS
EXISTING CATCH BASIN
EXISTING DRAINAGE MANHOLE
EXISTING DRAINAGE PIPE
INLET PROTECTION
799
D
IP
EROSION PREVENTION
& SEDIMENTATION
CONTROL
1"=20'
JES
AJF
AJF
18715.02
03/01/2024
EPSC-01
PERMIT SET
S
S
D
D
FD
FDFDFDFDFD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FDFDFDFD
D
D
D
FD
FD
FD
FD
FDFD
FD
FDFDFD
8"
ø
G
T
S
8"
ø
G
T
R
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM FM FMEXISTING
HANGER
BUILDING
PROPOSED
BSD AVIATION
TECHNICAL CENTER
(REHABILITATION OF
EXISTING HANGER
BUILDING)
BETA
TECHNOLOGIES
BUILDING
EXISTING BETA SITE
LIGHT POLE, TYP.
EXISTING TREE TYP.
5.3
4.2
2.8
5.8
5.6
4.4
3.0
1.9
4.4
5.0
4.7
3.8
2.6
1.7
1.1
3.3
3.6
3.7
3.5
2.9
2.1
1.4
3.8
3.2
2.9
2.7
2.4
2.0
1.5
5.5
4.2
3.1
2.4
2.0
1.7
1.4
6.6
6.4
5.4
4.0
2.9
2.1
1.6
1.3
5.7
5.5
5.3
4.5
3.4
2.4
1.7
4.0
3.7
3.2
2.5
1.8
2.4
2.1
1.71.4
3.72.8
4.7
3.9
1.6
2.7
7.6
12.8
5.8
0.8
0.7
1.7
4.5
8.8
10.0
1.6
0.5
0.4
0.4
0.4
0.8
1.9
4.7
4.9
1.7
0.8
0.2
0.2
0.2
0.2
0.3
0.4
0.8
1.5
1.7
1.2
0.9
0.1
0.1
0.1
0.1
0.2
0.2
0.3
0.5
0.7
0.9
1.0
1.5
2.3
0.1
0.1
0.1
0.1
0.2
0.2
0.3
0.5
0.7
1.2
2.8
8.0
11.6
0.1
0.1
0.1
0.2
0.2
0.3
0.4
0.7
1.2
3.0
9.9
18.3
15.7
0.1
0.1
0.1
0.2
0.3
0.4
0.6
1.1
2.3
5.3
13.7
15.6
10.6
0.1
0.1
0.2
0.2
0.4
0.6
1.0
1.7
3.4
6.5
8.7
8.2
6.0
0.1
0.1
0.2
0.3
0.5
0.8
1.3
2.2
3.5
4.7
4.8
3.8
2.5
0.1
0.1
0.2
0.2
0.4
0.6
0.9
1.4
2.0
2.5
2.6
2.2
1.7
1.4
0.1
0.1
0.2
0.3
0.4
0.6
0.9
1.2
1.4
1.5
1.4
1.3
1.3
0.1
0.2
0.2
0.3
0.4
0.6
0.7
0.9
0.9
1.0
1.2
1.5
2.2
0.1
0.2
0.2
0.3
0.4
0.5
0.6
0.7
0.9
1.2
1.9
3.1
5.1
0.1
0.2
0.2
0.3
0.3
0.4
0.6
0.8
1.3
2.1
3.9
6.8
9.9
0.1
0.2
0.2
0.3
0.4
0.5
0.7
1.2
2.1
3.9
6.8
9.9
10.3
0.1
0.2
0.2
0.3
0.4
0.7
1.1
1.8
3.1
5.1
7.0
7.3
6.1
0.1
0.2
0.2
0.3
0.5
0.8
1.4
2.1
3.2
4.1
4.3
0.1
0.2
0.3
0.4
0.6
0.9
1.4
1.8
2.3
0.1
0.2
0.2
0.3
0.4
0.6
0.9
1.1
0.1
0.2
0.2
0.3
0.4
0.1
0.2
0.20.1
0.30.8
0.5
0.4
0.7
2.0
1.6
1.2
0.9
0.6
1.3
1.1
1.0
0.8
2.9
2.7
2.2
1.8
1.4
1.0
0.7
1.8
1.8
1.7
1.5
1.2
0.9
2.4
3.0
3.7
3.4
3.0
2.5
2.0
1.5
1.0
0.7
2.4
2.5
2.6
2.5
2.3
1.9
1.3
2.6
3.3
3.6
4.2
4.2
3.6
3.2
2.6
2.0
1.5
1.1
2.8
3.1
3.3
3.7
3.8
3.6
2.9
1.8
1.1
3.7
4.9
4.1
3.9
3.8
3.6
3.2
2.7
2.1
1.6
1.4
3.1
3.6
4.0
4.2
5.0
5.7
5.6
3.9
2.4
1.4
0.8
0.6
4.3
4.5
3.9
3.8
3.8
3.6
3.2
2.7
2.2
1.9
1.9
3.4
4.1
4.7
4.9
5.2
6.3
8.0
7.2
4.9
2.9
1.7
1.0
3.7
4.5
4.3
4.5
4.1
4.0
3.7
3.2
2.8
2.6
2.8
3.9
4.4
5.0
5.6
5.6
6.7
7.8
8.8
7.8
5.7
3.5
3.6
5.2
4.8
4.2
4.3
4.3
3.9
3.5
3.5
3.7
4.0
4.4
4.8
5.2
5.5
5.7
7.0
7.3
8.2
8.1
7.5
5.6
3.6
4.5
4.5
4.5
4.9
4.5
4.3
4.4
4.6
4.9
5.2
5.8
6.1
6.2
6.6
6.8
3.6
6.8
6.3
5.7
3.9
4.9
4.9
4.8
4.8
4.8
5.0
5.4
5.6
6.1
7.4
8.3
8.3
7.3
6.6
5.6
3.3
4.3
5.1
4.6
4.4
4.9
5.5
6.0
6.2
7.1
9.3
11.5
11.2
8.0
5.5
4.1
4.4
4.4
4.5
5.2
5.9
6.5
6.8
8.9
14.2
15.0
11.1
7.6
5.2
4.1
5.0
5.4
5.9
6.2
8.4
14.7
22.0
15.8
8.7
4.7
5.0
4.8
5.9
8.5
15.7
19.0
7.8
4.0
4.2
4.9
5.9
6.2
5.0
3.6
3.8
3.3
3.0
FL1 FL1
FL1
FL1
WP1
WP1
FL1 FL1WP1
CL
I
E
N
T
:
PR
O
J
E
C
T
:
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
NO.DATE DESCRIPTION
DRAWING TITLE
DRAWING NUMBER
PROJECT MILESTONE
K:
\
B
U
R
L
I
N
G
T
O
N
I
N
T
E
R
N
A
T
I
O
N
A
L
A
I
R
P
O
R
T
\
T
-
1
8
7
1
5
.
0
2
A
V
I
A
T
I
O
N
T
E
C
H
N
I
C
A
L
D
E
S
I
G
N
\
D
R
A
W
\
D
R
A
W
I
N
G
S
\
S
H
E
E
T
F
I
L
E
S
\
1
8
7
1
5
.
0
2
-
L
I
G
H
T
I
N
G
-
E
.
D
W
G
NOT FOR
CONSTRUCTION
426 INDUSTRIAL AVENUE, SUITE 146
WILLISTON, VT 05495
P: (802)862-9381
WWW.MJINC.COM
81 Maple Street▪ Burlington VT 05401
802▪864▪6844▪ www.fffinc.com
Architecture▪ Planning▪ Interiors
BU
R
L
I
N
G
T
O
N
A
V
I
A
T
I
O
N
T
E
C
H
N
I
C
A
L
C
E
N
T
E
R
20
0
D
A
V
I
N
C
I
D
R
I
V
E
,
S
O
U
T
H
B
U
R
L
I
N
G
T
O
N
,
V
T
0
5
4
0
3
BU
R
L
I
N
G
T
O
N
S
C
H
O
O
L
D
I
S
T
R
I
C
T
BU
R
L
I
N
G
T
O
N
,
V
E
R
M
O
N
T
SCALE
0 20 40 60 FT
LEGEND
EXISTING SITE
LIGHT POLES
EXISTING BUILDING
MOUNTED LIGHTS
EXISTING TREES
EXISTING LIGHTING &
LANDSCAPING
----
----
AJF
AJF
18715.02
03/01/2024
LL-01
PERMIT SET
FL1/WP1
Luminaire Schedule
Symbol Qty Label Arrangement Total Lamp Lumens LLF Description Lum. Watts
4 Exist Pole SINGLE N.A.0.950 GALN-SA6A-740-U-T4W 182
6 EX FL1 SINGLE 8522640 1.000 EXISTING FLOOD LIGHT 75
3 EX WP1 SINGLE N.A.1.000 EXISTING WALL PACK 40
S
S
D
D
FD
FDFDFDFDFD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FDFDFDFD
D
D
D
FD
FD
FD
FD
FDFD
FD
FDFDFD
8"
ø
G
T
S
8"
ø
G
T
R
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM FM FM
W
W
G G G
UE
EXISTING
HANGER
BUILDING
PROPOSED
BSD AVIATION
TECHNICAL CENTER
(REHABILITATION OF
EXISTING HANGER
BUILDING)
BETA
TECHNOLOGIES
BUILDING
X2
X2
X2
X2
X2
X1 (2)
X2
X2
EXISTING BETA SITE
LIGHT POLE, TYP.
PROPOSED
LANDSCAPING BED
PROPOSED LAWN
AREA
CS
2CS
5
BG
9
SC
23
0.3
0.2
1.4
0.8
0.4
2.5
2.6
1.6
0.9
4.3
3.0
2.2
1.7
3.4
4.0
2.8
2.1
4.8
4.3
3.2
2.5
11.5
3.5
2.9
2.6
3.2
2.7
2.4
0.2
1.2
1.8
1.8
0.3
0.8
1.00.4
3.5
3.3
1.56.6
3.5
6.0
2.0
1.5
0.7
0.5
0.60.6
1.4
1.53.6
5.0
1.88.1
4.9
1.94.3
3.5
6.5
6.5
15.2
7.4
11.2
5.310.2
8.8
2.85.3
2.6
1.01.1
0.5
0.4
0.3
0.2
0.3
0.7
0.6
0.5
0.3
0.2
0.3
0.5
0.7
0.8
0.9
1.0
0.9
0.7
0.5
0.3
0.2
0.5
0.7
1.0
1.2
1.3
1.4
1.3
1.0
0.8
0.5
0.4
0.2
0.3
0.7
1.1
1.4
1.6
1.7
1.8
1.7
1.5
1.1
0.8
0.6
0.4
0.2
0.5
0.7
1.5
1.9
2.0
2.0
2.1
2.2
2.0
1.6
1.2
0.9
0.6
0.4
0.2
1.0
0.9
0.7
0.6
2.6
2.4
2.3
2.5
2.8
2.6
2.2
1.7
1.3
0.9
0.6
0.4
0.3
1.2
1.3
1.2
1.1
0.9
0.6
2.3
2.4
2.8
3.6
3.4
2.9
2.4
1.9
1.4
0.9
0.6
0.4
0.4
1.5
1.7
1.7
1.6
1.5
1.3
1.0
0.5
3.3
3.5
4.2
4.1
3.5
3.1
2.6
2.0
1.4
1.0
0.7
0.7
1.8
2.1
2.2
2.0
1.9
2.0
2.1
1.9
4.9
4.1
4.1
3.9
3.6
3.2
2.6
1.9
1.4
1.1
1.1
1.2
2.1
2.4
2.7
2.7
2.2
2.3
2.3
4.6
3.9
4.0
3.8
3.6
3.2
2.6
2.0
1.7
1.6
1.8
2.2
2.4
2.8
3.2
3.5
3.1
2.3
2.3
2.6
2.2
4.4
4.5
4.0
3.9
3.7
3.2
2.7
2.4
2.4
2.6
2.9
3.1
3.4
3.9
4.1
3.3
3.2
2.5
2.0
0.8
4.7
4.1
4.2
4.2
3.8
3.4
3.2
3.2
3.4
3.5
3.6
3.7
3.6
3.7
4.6
3.7
2.9
1.1
4.6
4.5
4.4
4.9
4.4
4.1
4.0
4.0
4.0
4.0
3.9
3.7
3.6
4.0
3.9
3.9
5.2
4.9
4.9
4.9
4.6
4.6
4.6
4.5
4.3
4.5
4.5
4.1
3.8
3.3
5.3
4.6
4.5
4.8
5.1
5.2
4.8
4.3
4.7
5.3
5.0
2.6
4.5
4.5
4.9
5.4
5.6
4.8
4.6
4.5
4.9
2.8
4.8
5.0
5.2
4.9
5.3
6.9
11.3
2.5
4.5
4.4
5.1
9.8
10.8
10.4
4.2
4.1
10.3
8.6
4.73.8
4.4
6.02.2
4.5
8.31.6
3.8
3.21.1
1.2
0.6
1.10.9
2.4
4.8
0.5
2.3
7.60.8
3.0
3.60.8
1.3
0.80.5
0.3
0.8
X2
X3 X3
CL
I
E
N
T
:
PR
O
J
E
C
T
:
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
NO.DATE DESCRIPTION
DRAWING TITLE
DRAWING NUMBER
PROJECT MILESTONE
K:
\
B
U
R
L
I
N
G
T
O
N
I
N
T
E
R
N
A
T
I
O
N
A
L
A
I
R
P
O
R
T
\
T
-
1
8
7
1
5
.
0
2
A
V
I
A
T
I
O
N
T
E
C
H
N
I
C
A
L
D
E
S
I
G
N
\
D
R
A
W
\
D
R
A
W
I
N
G
S
\
S
H
E
E
T
F
I
L
E
S
\
1
8
7
1
5
.
0
2
-
L
I
G
H
T
I
N
G
.
D
W
G
NOT FOR
CONSTRUCTION
426 INDUSTRIAL AVENUE, SUITE 146
WILLISTON, VT 05495
P: (802)862-9381
WWW.MJINC.COM
81 Maple Street▪ Burlington VT 05401
802▪864▪6844▪ www.fffinc.com
Architecture▪ Planning▪ Interiors
BU
R
L
I
N
G
T
O
N
A
V
I
A
T
I
O
N
T
E
C
H
N
I
C
A
L
C
E
N
T
E
R
20
0
D
A
V
I
N
C
I
D
R
I
V
E
,
S
O
U
T
H
B
U
R
L
I
N
G
T
O
N
,
V
T
0
5
4
0
3
BU
R
L
I
N
G
T
O
N
S
C
H
O
O
L
D
I
S
T
R
I
C
T
BU
R
L
I
N
G
T
O
N
,
V
E
R
M
O
N
T
SCALE
0 20 40 60 FT
LEGEND
EXISTING SITE
LIGHT POLES
PROPOSED BUILDING
MOUNTED LIGHTS
PROPOSED PLANTINGS
X2
SC
3
LIGHTING &
LANDSCAPING PLAN
1"=20'
DEL
AJF
AJF
18715.02
03/01/2024
LL-02
PERMIT SET
PLANTING NOTES
1.ALL NEW PLANT MATERIAL SHALL CONFORM TO THE MINIMAL GUIDELINES
ESTABLISHED BY THE AMERICAN STANDARD FOR NURSERY STOCK PUBLISHED BY THE
AMERICAN ASSOCIATION OF NURSERYMEN, INC. PROVIDE QUALITY, SIZE, GENUS,
SPECIES, VARIETY OF TREES AND SHRUBS INDICATED, AND ROOT BALL SIZE
COMPLYING WITH APPLICABLE REQUIREMENTS OF ANSI Z60.1 “AMERICAN STANDARD
FOR NURSERY STOCK.” ALL PLANTS SHOULD BE NURSERY GROWN UNDER CLIMATIC
CONDITIONS SIMILAR TO THOSE IN THE LOCALITY OF THE PROJECT.
2.PLANT SIZES: MEASURE TREES AND SHRUBS ACCORDING TO ANSI Z60.1 WITH
BRANCHES AND TRUNKS OR CANES IN THEIR NORMAL POSITION. TAKE CALIPER
MEASUREMENTS 6 INCHES ABOVE GROUND FOR TREES UP TO 4-INCH CALIPER SIZE,
MEASURE MAIN BODY OF TREE OR SHRUB FOR HEIGHT AND SPREAD; DO NOT MEASURE
BRANCHES OR ROOTS TIP-TO-TIP.
3.ALL CONTAINER GROWN PLANTS SHALL SIZED ACCORDING TO ANSI Z60.1 FOR TYPE
AND SIZE OF PLANT REQUIRED. PLANTS SHALL BE PREMIUM QUALITY, APPEAR 'FULL',
OR 'HEAVY' WITHIN THEIR CONTAINER, AND BE REPRESENTATIVE OF THE CONTAINER
SIZE SPECIFIED. PLANTS DEEMED TO BE SUBSTANDARD IN SIZE BY THE OWNERS
REPRESENTATIVE WILL BE REJECTED.
4.ALL NEW PLANTS TO BE BALLED AND BURLAPPED OR CONTAINER GROWN UNLESS
OTHERWISE NOTED ON PLANT LIST.
5.TREES SHOULD BE FRESHLY DUG DURING THE SEASON OF PLANTING, MARCH 1ST TO
MAY 1ST FOR SPRING PLANTING AND OCTOBER 15TH TO DECEMBER 15TH FOR FALL
PLANTING. PLANTS KNOWN AS FALL DIG HAZARDS SHALL BE DUG IN THE SPRING ONLY.
6.THE CONTRACTOR SHALL SUPPLY ALL NEW PLANT MATERIAL IN QUANTITIES
SUFFICIENT TO COMPLETE THE PLANTING SHOWN ON THE DRAWINGS.
7.IN GENERAL, PLANT SPECIES SUBSTITUTIONS WILL NOT BE ACCEPTED. IF SPECIFIED
MATERIAL IS NOT OBTAINABLE, CONTRACTOR SHALL SUBMIT PROOF OF
NON-AVAILABILITY ALONG WITH PROPOSED SUBSTITUTION. ANY PROPOSED
SUBSTITUTIONS OF PLANT SPECIES SHALL BE MADE WITH PLANTS OF EQUIVALENT
OVERALL FORM, HEIGHT, SIZE, BRANCHING HABIT, FLOWER, LEAF, COLOR, FRUIT AND
CULTURE, AND ONLY AFTER WRITTEN APPROVAL OF THE OWNERS REPRESENTATIVE.
8.THE OWNERS REPRESENTATIVE RETAINS THE RIGHT TO INSPECT TREES AND SHRUBS
FOR SIZE AND CONDITION OF BALLS AND ROOT SYSTEMS, INSECTS, INJURIES AND
LATENT DEFECTS, AND TO REJECT UNSATISFACTORY OR DEFECTIVE MATERIAL AT ANY
TIME DURING PROGRESS OF WORK. CONTRACTOR SHALL REMOVE REJECTED TREES
OR SHRUBS IMMEDIATELY FROM PROJECT SITE.
9.CONTRACTOR SHALL LOCATE AND VERIFY ALL EXISTING UTILITY LINES PRIOR TO
PLANTING AND SHALL REPORT ANY CONFLICTS TO THE OWNERS REPRESENTATIVE.
10.INSTALLED PLANTS SHALL BEAR THE SAME RELATIONSHIP TO PROPOSED GRADE AS
THEY BORE TO PREVIOUS GRADE. NO TREES SHALL BE PLANTED BEFORE ACCEPTANCE
OF ROUGH GRADING.
11.CONTRACTOR SHALL PROVIDE LONG LASTING, SLOW RELEASE STARTER FERTILIZER IN
EACH PLANTING PIT FOR TREES, SHRUBS AND PERENNIALS.
12.ALL PLANT BEDS SHALL RECEIVE THREE INCHES (3") OF SHREDDED BARK MULCH.
MULCH SHALL BE FREE FROM DELETERIOUS MATERIALS AND SUITABLE AS A TOP
DRESSING OF TREES AND SHRUBS, CONSISTING OF DOUBLE HAMMERED SHREDDED
BARK MULCH COMPRISED OF EITHER HARDWOOD OR SOFTWOOD SHREDDED BARK.
SHREDDED BARK MULCH SHALL NOT EXCEED 3" IN GREATEST DIMENSION, AND SHALL
BE DARK BROWN IN COLOR.
13.PLANTS SHALL BE DELIVERED ONLY AS THEY CAN BE INSTALLED IN REASONABLE TIME.
ALL PLANTS ARE SUBJECTED TO INSPECTION AT DELIVERY BY THE OWNER'S
REPRESENTATIVE.
14.IF DISCREPANCIES EXIST BETWEEN THE NUMBER OF PLANTS DRAWN ON THE PLANTING
PLAN AND THE NUMBER OF PLANTS IN THE PLANT LIST, THE PLANTING PLAN SHALL
GOVERN.
15.MAINTENANCE SHALL BEGIN IMMEDIATELY AFTER EACH PLANT IS PLANTED AND SHALL
CONTINUE FOR A MINIMUM 30-DAY MONITORING PERIOD AFTER NOTIFICATION OF
SUBSTANTIAL COMPLETION OF PLANTING, AND UNTIL FINAL ACCEPTANCE.
MAINTENANCE INCLUDES PRUNING, WEEDING, WATERING, FERTILIZATION, AND
RE-SEEDING AS NECESSARY.
16.PROTECT PLANTS FROM DAMAGE DUE TO LANDSCAPE OPERATIONS AND OPERATIONS
OF OTHER CONTRACTORS AND TRADES. MAINTAIN PROTECTION DURING INSTALLATION
AND MAINTENANCE PERIODS. TREAT, REPAIR, OR REPLACE DAMAGED PLANTINGS.
17.ACCEPTANCE STANDARDS:
17.1.PLANTS SHALL BE FREE OF FROST CRACKS; SUN SCALD; DAMAGE DUE TO INSECTS,
PESTS, AND DISEASE; STRUCTURAL DEFECTS; AND DAMAGE RESULTING FROM
MACHINERY OR TOOLS. ALL PLANTS REGARDLESS OF THE SEASON OF REVIEW
SHALL HAVE A MINIMUM OF 75 PERCENT HEALTHY, BALANCED BRANCHING
STRUCTURE WITH A HEALTHY TERMINAL LEADER(S) WITH VIABLE TERMINAL BUD(S).
TREES SHALL BE PLUMB AND SHOW NO SIGNS OF UNEVEN SETTLING OR LEANING.
17.2.LAWN AREAS SHALL HAVE A HEALTHY, UNIFORM STAND OF GRASS FREE OF
WEEDS, SURFACE IRREGULARITIES, WITH COVERAGE EXCEEDING 90% OVER ANY
10 SQ. FT. AND BARE SPOTS NOT EXCEEDING 5"X5"
18.CONTRACTOR SHALL REPLACE ALL PLANTS THAT ARE MORE THAN 25% DEAD OR, AS
DETERMINED BY THE OWNERS REPRESENTATIVE, ARE IN AN UNHEALTHY OR
UNSIGHTLY CONDITION. CONTRACTOR SHALL BEAR THE COST OF COMPLETE
REPLACEMENT(S). REPLACEMENTS SHALL BE OF THE SAME SIZE AND SPECIES AS
SPECIFIED ON THE PLANTING LIST.
19.GUARANTEE: CONTRACTOR SHALL GUARANTEE ALL PLANT MATERIAL TO REMAIN ALIVE
AND BE IN A HEALTHY, VIGOROUS CONDITION FOR A PERIOD OF ONE YEAR AFTER FINAL
ACCEPTANCE OF PLANTING WORK, AGAINST DEFECTS INCLUDING DEATH AND
UNSATISFACTORY WORK.
20.GRASS SEED SHALL BE FRESH, CLEAN, DRY, NEW-CROP SEED COMPLYING WITH
AOSA'S "RULES FOR TESTING SEEDS" FOR PURITY AND GERMINATION TOLERANCES.
PROVIDE SEED MIXTURE COMPOSED OF SPECIES, PROPORTIONS AND MINIMUM
PERCENTAGES OF PURITY, GERMINATION, AND MAXIMUM PERCENTAGE OF WEED
SEED, AS FOLLOWS:
PROPORTION GERMINATION PURITY
COMMON NAME BY WEIGHT MINIMUM MINIMUM
CREEPING RED FESCUE 50% 85%95%
OR CHEWINGS FESCUE
KENTUCKY BLUEGRASS 25% 85% 90%
PERENNIAL RYE 25%90%90%
21.PLANTING SOIL & TOPSOIL SHALL HAVE A SANDY LOAM, LOAMY SAND, OR LOAM
TEXTURE AS DETERMINED BY MECHANICAL ANALYSIS (ASTM 422) AND BASED ON THE
'USDA CLASSIFICATION SYSTEM' MAXIMUM CLAY CONTENT SHALL BE 10%. TOPSOIL
SHALL BE FERTILE, FRIABLE SOIL FREE OF STONES LARGER THAN ONE INCH IN ANY
DIRECTION, LUMPS, PLANTS AND THEIR ROOTS, DEBRIS AND OTHER EXTRANEOUS
MATTER AS DETERMINED BY THE OWNER'S REPRESENTATIVE, AND TOXIC MATTER
HARMFUL TO PLANT GROWTH,
PLANTING SOIL /TOPSOIL SPECIFICATION:
GRADATION:
SIEVE % PASSING BY WEIGHT CHEMICAL ANALYSIS
MIN. MAX.
#10 100 PH RANGE 5.2-7.0
#20 78 95 ORGANIC MATTER 4%-6%
#40 67 87 MAGNESIUM 35LB. PER AC
#60 48 78 PHOSPHORUS 75LB/AC
#100 40 75 POTASSIUM 85LB/AC
#200 28 63 SOLUBLE SALTS NOT TO EXCEED 500
#270 22 55 PPM
.002 2 7
PLANTING SCHEDULE:
SYM.QTY.BOTANICAL NAME COMMON NAME SIZE REMARKS/SPACING
SHRUBS
CS 7 Cornus sericea 'Artic Fire'DWARF RED TWIG DOGWOOD #3 3' O.C.
ORNAMENTAL GRASS
BG 9 Bouteloua gracilis 'Blonde Ambition'BLUE GRAMA GRASS PLUGS 24" O.C.
SC 23 Schizachyrium scoparium 'Blaze'LITTLE BLUESTEM PUGS 18" O.C.
1 SHRUB PLANTING
SCALE: NTS
2 GRASS PLANTING
SCALE: NTS
SPACE SHRUBS AS
INDICATED ON PLANS
3" BARK MULCH
SET CROWN FLUSH
WITH TOP OF MULCH
PLANT GRASSES IN
CONTINUOUS BED OF
SPECIFIED PLANTING
SOIL
COMPACTED /
UNDISTURBED SUBGRADE
3" DEPTH SHREDDED BARK
MULCH; PULL AWAY FROM
ROOT FLARE.
CUT AND REMOVE BURLAP
FROM TOP 1/3 OF ROOT
BALL
PLANT SHRUBS IN CONTINUOUS
BED OF SPECIFIED PLANTING
SOIL
UNDISTURBED SUBGRADE
ROOT FLARE SHALL BEAR
SAME RELATIONSHIP TO
FINISH GRADE AS IT BORE
TO PREVIOUS EXISTING
GRADE
12" MIN18
"
M
I
N
6" MIN
12
"
M
I
N
1. PROVIDE INTEGRAL EMERGENCY BATTERY (14 WATT OR SIMILAR) FOR ALL FIXTURES WITH "E" EMERGENCY DESIGNATION
NOTES:
LIGHT FIXTURE SCHEDULE
TYPE MARK DESCRIPTION WATTS
(W)MANUFACTURER MODEL VOLTAGE MOUNTING SWITCH ID COMMENTS
X1 SURE-LITES EUX SERIES UNIVERSAL MOUNT 11 COOPER LIGHTING EUX7-1-R-WH MVOLT SURFACE AND
WALL
X2 Wavestream and 1-2 Light Squares 32 COOPER LIGHTING CCW LED UNV.SURFACE AND
WALL
X3 Wavestream and 1-2 Light Squares 32 COOPER LIGHTING CCW LED UNV.SURFACE AND
WALL
FD
S
S
S
S
D
D
D
D
D
D
D
D
D
DD
D
D
D
D
D
D
D
D
D
D D
D D
D
D D
D
D
D
D
DD
D
D
D
D
D
D
D
D
D
D
D
D
UG
T
U
G
T
UG
T
UG
T
UGT
UGT
UG
T
G
8"
ø
G
T
S
8"
ø
G
T
R
8"
ø
G
T
S
8"ø
G
T
R
X X X X
>
X
X
4"POP
L
A
R
(
2
)
VENT
P
I
P
E
14"MA
P
L
E
14"MA
P
L
E
CON
C
.
W
A
L
K
GATE
10"AP
P
L
E
11
12
23
21
EXISTING
HANGER
BUILDING
EXISTING
HANGER
BUILDING
EXISTING HANGER BUILDING
PROPOSED
BSD AVIATION
TECHNICAL CENTER
(REHABILITATION OF
EXISTING HANGER
BUILDING)
EXISTING
VERMONT
FLIGHT
ACADEMY
BUILDING
BETA
TECHNOLOGIES
BUILDING
BETA LEASE LINES`
BETA TECHNOLOGY
MASTER PLAN BOUNDARY
OVERALL AIRPORT PROPERTY LINE
VERMONT FLIGHT ACADEMY LEASE LINE
EXISTING UTILITY EASEMENT
ZONING BOUNDARY
1
1
CL
I
E
N
T
:
PR
O
J
E
C
T
:
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
NO.DATE DESCRIPTION
DRAWING TITLE
DRAWING NUMBER
PROJECT MILESTONE
K:
\
B
U
R
L
I
N
G
T
O
N
I
N
T
E
R
N
A
T
I
O
N
A
L
A
I
R
P
O
R
T
\
T
-
1
8
7
1
5
.
0
2
A
V
I
A
T
I
O
N
T
E
C
H
N
I
C
A
L
D
E
S
I
G
N
\
D
R
A
W
\
D
R
A
W
I
N
G
S
\
S
H
E
E
T
F
I
L
E
S
\
1
8
7
1
5
.
0
2
-
M
A
S
T
E
R
P
L
A
N
L
I
M
I
T
S
.
D
W
G
NOT FOR
CONSTRUCTION
426 INDUSTRIAL AVENUE, SUITE 146
WILLISTON, VT 05495
P: (802)862-9381
WWW.MJINC.COM
81 Maple Street▪ Burlington VT 05401
802▪864▪6844▪ www.fffinc.com
Architecture▪ Planning▪ Interiors
BU
R
L
I
N
G
T
O
N
A
V
I
A
T
I
O
N
T
E
C
H
N
I
C
A
L
C
E
N
T
E
R
20
0
D
A
V
I
N
C
I
D
R
I
V
E
,
S
O
U
T
H
B
U
R
L
I
N
G
T
O
N
,
V
T
0
5
4
0
3
BU
R
L
I
N
G
T
O
N
S
C
H
O
O
L
D
I
S
T
R
I
C
T
BU
R
L
I
N
G
T
O
N
,
V
E
R
M
O
N
T
MASTER PLAN LIMITS
1"=80'
----
AJF
AJF
18715.02
03/01/2024
MP-01
PERMIT SET
SCALE
0 80 160 240 FT
LEGEND
PROPOSED EXISTING PAVEMENT
REHABILITATION
PROPOSED NEW FULL DEPTH PAVEMENT
EXISTING IMPERVIOUS AREAS TO BECOME
LAWN
EXISTING BUILDINGS
BETA MASTER PLAN BOUNDARY
LEASE LINES
PROPERTY LINES
EXISTING UTILITY EASEMENT
ZONING BOUNDARY
1 4/10/2024 CITY COMMENTS
UP
FLOOR PLAN GENERAL NOTES
1. DIMENSIONS: ALL INTERIOR DIMENSIONS ARE TO FACE OF GWB OR
TILE FINISH UNLESS OTHERWISE NOTED. EXTERIOR DIMENSIONS
ARE TO NOMINAL CORNER OF MASONRY UNLESS NOTED
OTHERWISE.
2. PLANS ARE TO BE VIEWED IN CONJUNCTION WITH CIVIL, LANDSCAPE,
STRUCTURAL, MEP/FP AND ALL OTHER TRADES, AS APPROPRIATE.
DISCREPANCIES ARE TO BE BROUGHT TO THE ARCHITECT’S
ATTENTION FOR RESOLUTION BEFORE COMMENCING WORK.
3. ALL NON-ARCHITECTURAL INFORMATION SHOWN HERE IS FOR
REFERENCE ONLY.
4. REFER TO CIVIL PLANS FOR LIMIT OF WORK.
5. REFER TO G200 LIFE SAFETY PLANS FOR LOCATIONS OF SMOKE AND
FIRE RESISTANT RATED CONSTRUCTION.
6. THE DISTANCE FROM THE HINGE SIDE OF THE DOOR TO THE FACE
OF ADJACENT PERPENDICULAR WALL SHALL BE 6 INCHES
(INCLUDING FRAME) UNLESS NOTED OTHERWISE.
7. ALL VERTICAL AND HORIZONTAL PENETRATIONS THROUGH RATED
ASSEMBLIES ARE TO BE BE SEALED WITH UL-LISTED FIRESAFING
AND/OR SEALANT ASSEMBLIES TO MAINTAIN RATING.
8. KEEP STANDPIPES AND ASSOCIATED ASSEMBLIES CLEAR OF THE
REQUIRED PATH OF EGRESS.
ALSO SEE SYMBOL LEGEND ON COVER SHEET.
EXISTING WALL/ COLUMN TO REMAIN
NEW METAL STUD / GYPSUM WALLBOARD WALL
NEW STEEL/ CONCRETE COLUMN - SEE STRUCTURAL
FLOOR PLAN LEGEND
FIRE EXTINGUISHER CABINET:
FEC-1: SEMI-RECESSED CABINET W/ FE-1
FEC-2: SURFACE MOUNT CABINET W/ FE-1
FIRE EXTINGUISHER ON WALL BRACKET:
FE-1: MULTI-PURPOSE DRY CHEM. EXTINGUISHER
(TYPE A-B-C)
FE-2: KITCHEN/ GREASE EXTINGUISHER (TYPE K)
FEC-X
FE-X
GWB COLUMN ENCLOSURE
GCE
ALSO SEE WALL TYPES SHEET A004
NEW MASONRY WALL
101
Room name
101
150 SF
1i
A
ROOM NAME
ROOM NUMBER
ROOM TAG - SEE A900 FOR FINISHES
DOOR NUMBER
DOOR TAG - SEE SHEET A800
WALL TYPE
WALL TAG - SEE SHEETS A003, A004
WINDOW TAG
SEE SHEET A810
WHERE A WALLTYPE LEADER PASSES
THROUGH 2 OR MORE WALLS, ALL OF
THOSE WALLS SHALL BE OF THE TYPE
INDICATED
CURTAINWALL TYPE
SEE SHEET A700
CW
N N - PROJECT NORTH
T - TRUE NORTH
m - MAGNETIC NORTHTm4'0 8' 16'
GRAPHIC SCALE
A2002
A201
2
A201
1
A200 1
-
-
-
-
--
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A
B
C
D
E
F
G
H
I
127 SF
ENTRY
VESTIBULE
101
191 SF
WATER SERVICE
AND FIRE PUMPS
102
159 SF
ELECTRIC SERVICE
ENTRY
103
5,379 SF
AVIATION SHOPS
132
11,695 SF
AVIATION HANGAR
150
754 SF
ADULT AVIATION
CLASSROOM
144
126 SF
OFFICE
143
55 SF
RESTROOM
136
211 SF
REFERENCE
139
204 SF
OFFICE AND RECORDS
141
229 SF
CATERING KITCHEN /
KITCHENETTE
115
633 SF
AVIATION CLASSROOM
133
576 SF
BTC PROGRAM
CLASSROOM
121
178 SF
STORAGE
116.2
575 SF
ADV. MAN.
CLASSROOM
123
233 SF
STORAGE
132.2
HEADROOM AT DOOR LIMITED AT
27'-11" TO 28' -0" VIA HORIZONTAL PIPE
14
0
'
-
2
"
14
'
-
7
"
6'-8 3/4"238'-6 3/4"
84 SF
PAINT BOOTH
132.3
57 SF
JC
135
104 SF
BATTERY
132.5
104 SF
BATTERY
132.4
18'-6" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 19'-0" 1'-0 3/4"
8"
2
0
'
-
1
3
/
8
"
1
1
'
-
8
1
/
2
"
1
7
'
-
8
1
/
8
"
2
0
'
-
0
"
2
0
'
-
0
"
2
0
'
-
0
"
2
0'-
0
"
9
'
-
4
"
8
"
8'-0"
1,194 SF
ENTRY COMMONS /
BUS WAITING
110
28'-8"
OVERHEAD COILING
FIRE SHUTTER 1-HR
38'-7 1/8"6'-0"
6'-
0
"
19
'
-
8
"
9'-6"15'-6"
13
'
-
3
"
LOCATION OF EXISTING
PLUMBING WALL
NEW TWO HOUR RATED EXTERIOR WALL
CONSTRUCTION EXTENDS TO EAVE LINE
16'-0"
SECURED HANGER
ACCESS
SECURED APRON
ACCESS
SECURED HANGER
ACCESS
SECURED HANGER
ACCESS - 1 HOUR
RATED COILING DOOR
SECURED HANGER DOOR
(EMERGENCY EGRESS ONLY)
6'-
4
"
+/
-
6
'
-
6
1
/
8
"
8'-7 3/4"
56 SF
RESTROOM
138
6'-0"5'-1 5/8"
SECURED AVIATION PROGRAMS
ACCESS (EGRESS TOWARD NORTH
ON 15 SECOND ALARMED TIME DELAY)
6,829 SF
BTC SHOPS
116
6'-6"5'-2 5/8"
263 SF
CORRIDOR
120
42 SF
JC
126
52 SF
RR
124
52 SF
RR
122
EXIST. OVERHEAD DOOR
LOCATION, INFILL WALL
GLAZED OVERHEAD
SECTIONAL DOORS
BICYCLE PARKING
4 U-RACKS - 8 SPOTS
SEE
CANOPY
ABOVE
SECURED APRON ACCESS
EXTERIOR DUST
COLLECTION
240 SF
SIMULATOR AND
SAMPLES
132.1
992 SF
CORRIDOR
130
13'-9 3/4"
OBSERVATION
WINDOW
27'-0"28'-8"9'-8 5/8"
109 SF
OFFICE
113
108 SF
OFFICE
111
8'-0"12'-0"
STRUCTURAL
CROSS-BRACING STRUCTURAL
BRACING
13
'
-
8
"
BUS ARRIVAL /
PICK-UP MONITOR
150C 116.1B116.1A132D132C
101B
141
150B
134B
150A
134C
134D
143
115A
144
139
136
138
135
133 123
103
114D
116.2 116
124 122126
132.5
132.4
132.3
103
113 111
121
130A
130B
228 SF
AM - CONDITIONED
TOOLS
116.3
116.3B
RATED WALL CONTINUES
AT MEZZANINE ABOVE
6'-6 1/2"
3
A300
SECURED AVIATION
PROGRAMS ACCESS -
1 HOUR RATED
COILING DOOR
SECURED AVIATION
PROGRAMS ACCESS
SECURED HANGER
ACCESS
ADULT AVIATION
NON-HANGER SHOP
HIGH SCHOOL
AVIATION SHOP
ADVANCED
MANUFACTURING SHOP
BTC PROGRAM 4 SHOP
6'-
0
"101A
8'-
0
"
84 SF
IT RACK
134
132.1
134
--
2 WALL MOUNT BIKE
PARKING - SEE
130
15 16
C.1
A.1
3'-0" 4'-0" 13'-0"
-
-
/2 A100
/2 A100
U-RACK AT EXTERIOR BIKE
PARKING, BOLTED TO CONCRETE
WALL-MOUNTED RACK, DOUBLEUP
(THEPARKCATALOG.COM) OR
SIMILAR WITH LOCKING BAR
DURABLE/WASHABLE WALL
FINISH TO RESIST SCUFFING
OF
CL
I
E
N
T
:
PR
O
J
E
C
T
:
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
DRAWING TITLE
DRAWING NUMBER
PROJECT MILESTONE
1 2 3 4 5 6 7 8
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY
ARE ACTING UNDER THE DIRECT DIRECTION OF A LICENSED
PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE
ARCHITECT, OR LAND SURVEYOR, TO ALTER AN ITEM IN ANY
WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED
PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER,
ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION
"ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE
OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF
THE ALTERATION.
E
D
C
B
A
F
1 234 5 6 7 8
T-18715.02
426 INDUSTRIAL AVENUE, SUITE 146
WILLISTON, VT 05495
P: (802)862-9381
WWW.MJINC.COM
BU
R
L
I
N
G
T
O
N
S
C
H
O
O
L
D
I
S
T
R
I
C
T
BU
R
L
I
N
G
T
O
N
,
V
E
R
M
O
N
T
BU
R
L
I
N
G
T
O
N
A
V
I
A
T
I
O
N
T
E
C
H
N
I
C
A
L
C
E
N
T
E
R
F
E
D
C
B
A
F
F
9
9
10
10
81 Maple Street ▪Burlington VT 05401
802▪864▪6844 ▪www.fffinc.com
Architecture ▪Planning ▪Interiors
20
0
D
A
V
I
N
C
I
D
R
I
V
E
,
S
O
U
T
H
B
U
R
L
I
N
G
T
O
N
,
V
T
0
5
4
0
3
As
indicated
BDL
Designer
Checker
11/17/2023
FLOOR PLAN
A100
Permit Set
SCALE:1/8" = 1'-0"A100
1 GROUND LEVEL
NO. DATE DESCRIPTION
SCALE:1/2" = 1'-0"A100
2 BIKE PARKING
UP
A2002
A201
2
A201
1
A200 1
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A
B
C
D
E
F
G
H
I
2,057 SF
MEZZANINE
200
434 SF
MECHANICAL
201
OPEN TO HANGAR BELOW
HEADROOM AT DOOR LIMITED AT
27'-11" TO 28' -0" VIA HORIZONTAL PIPE
14'-6"
14'-6"
WALL EXTENDS FLOOR TO ROOF DECK
18" COLD FORMED METAL STUDS
2 LAYERS TYPE 'X' GWB EA. SIDE
(FOR ACOUSTICS)
ALL PENETRATIONS FIRE CAULKED
1 - FIRE HOUR RATED PARTITION
WALLS IN THIS AREA (INCLUDING AT PERIMETER)
EXTEND 14' TO NEW STRUCTURAL SUBFRAME
6" COLD FORMED METAL STUDS SPANNING WITH
1/2" PLYWOOD AND 1/2" GWB SHEATHING LAYERS
6" MINERAL FIBER INSULATION ON TOP
APPROXIMATE LENGTH OF NEW TWO HOUR RATED EXTERIOR WALL
RATED EXTERIOR WALL CONSTRUCTION EXTENDS TO EAVE LINE
3
A300
OPEN TO AVIATION SHOPS BELOW OPEN TO BTC SHOPS BELOW
WALL EXTENDS FLOOR TO ROOF DECK
18" COLD FORMED METAL STUDS
--
15 16
C.1
A.1
-
-
N N - PROJECT NORTH
T - TRUE NORTH
m - MAGNETIC NORTHTm4'0 8' 16'
GRAPHIC SCALE
OF
CL
I
E
N
T
:
PR
O
J
E
C
T
:
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
DRAWING TITLE
DRAWING NUMBER
PROJECT MILESTONE
1 2 3 4 5 6 7 8
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY
ARE ACTING UNDER THE DIRECT DIRECTION OF A LICENSED
PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE
ARCHITECT, OR LAND SURVEYOR, TO ALTER AN ITEM IN ANY
WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED
PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER,
ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION
"ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE
OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF
THE ALTERATION.
E
D
C
B
A
F
1 234 5 6 7 8
T-18715.02
426 INDUSTRIAL AVENUE, SUITE 146
WILLISTON, VT 05495
P: (802)862-9381
WWW.MJINC.COM
BU
R
L
I
N
G
T
O
N
S
C
H
O
O
L
D
I
S
T
R
I
C
T
BU
R
L
I
N
G
T
O
N
,
V
E
R
M
O
N
T
BU
R
L
I
N
G
T
O
N
A
V
I
A
T
I
O
N
T
E
C
H
N
I
C
A
L
C
E
N
T
E
R
F
E
D
C
B
A
F
F
9
9
10
10
81 Maple Street ▪Burlington VT 05401
802▪864▪6844 ▪www.fffinc.com
Architecture ▪Planning ▪Interiors
20
0
D
A
V
I
N
C
I
D
R
I
V
E
,
S
O
U
T
H
B
U
R
L
I
N
G
T
O
N
,
V
T
0
5
4
0
3
1/8" = 1'-0"
BDL
Designer
Checker
11/17/2023
MEZZANINE FLOOR PLAN
A101
Permit Set
SCALE:1/8" = 1'-0"A101
1 MEZZANINE
NO. DATE DESCRIPTION
GROUND LEVEL
0"
MEZZANINE
14'-6"
ROOF-MAIN SPRING LINE
39'-3"
A B C D E F G H I
LOWER MEZZANINE
13'-2 1/2"
C.1A.1
RECEPTACLE, SEE ELEC.
DOUBLE GLAZED THERMALLY BROKEN
STOREFRONT ENTRY DOORS
EXISTING SIDING, PAINT
SOUTH ELEVATION
3'-0" X 7'-0" R.O. DOUBLE GLAZED PULTRUDED
FIBERGLASS WINDOW, TYP. OF 18
INFILL AT REMOVED OPENING WITH
SIDING TO MATCH EXISTING, TYP.
MECHANICAL EQUIPMENT DISCONNECT,
TYP. OF 3, SEE MECH. AND ELEC.
KNOX BOX DISCONNECT PANEL AND
METER, TYP. OF 2, SEE ELEC.
PAD MOUNTED TRANSFORMER,
SEE ELEC.
PAD MOUNTED EMERGENCY
GENERATOR, SEE ELEC.
ALUMINUM COMPOSITE
MATERIAL CANOPY FASCIA
PAINTED OVER GALVANIZED
6X6 HSS STEEL COLUMNS
+/
-
4
5
'
-
5
"
E
X
I
S
T
I
N
G
H
E
I
G
H
T
GROUND LEVEL
0"
MEZZANINE
14'-6"
ROOF-MAIN SPRING LINE
39'-3"
ABCDEFGHI
LOWER MEZZANINE
13'-2 1/2"
EXISTING HANGAR DOOR TO REMAIN, REPLACE ALL SEALS
DOWNLIGHT, SEE ELEC.
RECEPTACLE, SEE ELEC.
WEST SIDING REPAINT EXTEND
AND END AT INSIDE CORNER
+/
-
4
5
'
-
5
"
E
X
I
S
T
I
N
G
H
E
I
G
H
T
OF
CL
I
E
N
T
:
PR
O
J
E
C
T
:
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
DRAWING TITLE
DRAWING NUMBER
PROJECT MILESTONE
1 2 3 4 5 6 7 8
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY
ARE ACTING UNDER THE DIRECT DIRECTION OF A LICENSED
PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE
ARCHITECT, OR LAND SURVEYOR, TO ALTER AN ITEM IN ANY
WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED
PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER,
ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION
"ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE
OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF
THE ALTERATION.
E
D
C
B
A
F
1 2 3 4 5 6 7 8
T-18715.02
426 INDUSTRIAL AVENUE, SUITE 146
WILLISTON, VT 05495
P: (802)862-9381
WWW.MJINC.COM
BU
R
L
I
N
G
T
O
N
S
C
H
O
O
L
D
I
S
T
R
I
C
T
BU
R
L
I
N
G
T
O
N
,
V
E
R
M
O
N
T
BU
R
L
I
N
G
T
O
N
A
V
I
A
T
I
O
N
T
E
C
H
N
I
C
A
L
C
E
N
T
E
R
F
E
D
C
B
A
F
F
9
9
10
10
81 Maple Street ▪Burlington VT 05401
802▪864▪6844 ▪www.fffinc.com
Architecture ▪Planning ▪Interiors
20
0
D
A
V
I
N
C
I
D
R
I
V
E
,
S
O
U
T
H
B
U
R
L
I
N
G
T
O
N
,
V
T
0
5
4
0
3
1/8" = 1'-0"
BDL
Designer
Checker
11/17/2023
EXTERIOR ELEVATIONS -
NORTH AND SOUTH
A200
Permit Set
SCALE:1/8" = 1'-0"A200
2 PROJECT SOUTH ELEVATION
NO. DATE DESCRIPTION
SCALE:1/8" = 1'-0"A200
1 PROJECT NORTH ELEVATION
GROUND LEVEL
0"
MEZZANINE
14'-6"
ROOF-MAIN SPRING LINE
39'-3"
1 2 3 4 5 6 7 8 9 10 11 12 13 14
LOWER MEZZANINE
13'-2 1/2"BOILER MEZZANINE
12'-0"
AREA OF NEW EXTERIOR 2 HOUR RATED WALL RE-BUILD
3
A300 15 16
RECEPTACLE, TYP. OF 3,
SEE ELEC.
INSULATED HOLLOW METAL DOOR IN THERMALLY
BROKEN FRAME, PAINTED, TYP. OF 2.
ELECTRICAL EQUIPMENT AND
CANOPY, SEE SOUTH ELEVATION
EXISTING SIDING, PAINT
WEST ELEVATION
EXISTING ROOF, TO REMAINDOWNLIGHT, TYP. OF 2,
SEE ELEC.
6'-0" X 4'-6" R.O. DOUBLE GLAZED PULTRUDED
FIBERGLASS WINDOW, TYP. OF 18
LIMIT OF REPAINTED SIDING, INSIDE
CORNER BEYOND, SEE NORTH ELEVATION
INFILL AT REMOVED OPENING WITH
SIDING TO MATCH EXISTING, TYP.
MECHANICAL EQUIPMENT DISCONNECT,
TYP. OF 3, SEE MECH. AND ELEC.
1'-2" X 1'-2" LOUVER,
TYP. OF 4, SEE MECH.
3'-6" X 3'-6" LOUVER,
TYP. OF 2, SEE MECH.
GROUND MOUNTED MECHANICAL EQUIPMENT,
TYP. OF 3, SEE MECH. AND CIVIL
KNOX BOX
COILING OVERHEAD DOOR OPENING PROTECTIVES
FOR 2 HOUR RATED WALL, TYP. OF 3
90 MINUTE INSULATED HOLLOW METAL DOOR
IN THERMALLY BROKEN FRAME, PAINTED
GROUND LEVEL
0"
MEZZANINE
14'-6"
ROOF-MAIN SPRING LINE
39'-3"
1234567891011121314
LOWER MEZZANINE
13'-2 1/2"
BOILER MEZZANINE
12'-0"
3
A3001516
RECEPTACLE, TYP. OF 4,
SEE ELEC.
INSULATED HOLLOW METAL DOOR IN THERMALLY
BROKEN FRAME, PAINTED, TYP. OF 5.
EXISTING OVERHEAD
DOOR, TO REMAIN
10' X 10' DOUBLE GLAZED INSULATED
SECTIONAL DOOR, TYP. OF 2.
ELECTRICAL EQUIPMENT AND
CANOPY, SEE SOUTH ELEVATION
EXISTING SIDING, TO REMAINEXISTING ROOF, TO REMAIN
DOWNLIGHT, TYP. OF 5,
SEE ELEC.
3'-0" X 5'-6" R.O. DOUBLE GLAZED PULTRUDED
FIBERGLASS WINDOW, TYP. OF 5
3'-0" X 7'-0" R.O. DOUBLE GLAZED PULTRUDED
FIBERGLASS WINDOW, TYP. OF 22
3'-0" X 4'-0" R.O. DOUBLE GLAZED PULTRUDED
FIBERGLASS WINDOW, TYP. OF 7
INTAKE HOOD, TYP.
OF 4, SEE MECH.
INTAKE HOOD, TYP.
OF 2, SEE MECH.
EXTEND REPAINT 8" ON EAST
ELEVATION, SEE SOUTH ELEVATION
OF
CL
I
E
N
T
:
PR
O
J
E
C
T
:
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
DRAWING TITLE
DRAWING NUMBER
PROJECT MILESTONE
1 2 3 4 5 6 7 8
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY
ARE ACTING UNDER THE DIRECT DIRECTION OF A LICENSED
PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE
ARCHITECT, OR LAND SURVEYOR, TO ALTER AN ITEM IN ANY
WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED
PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER,
ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION
"ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE
OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF
THE ALTERATION.
E
D
C
B
A
F
1 234 5 6 7 8
T-18715.02
426 INDUSTRIAL AVENUE, SUITE 146
WILLISTON, VT 05495
P: (802)862-9381
WWW.MJINC.COM
BU
R
L
I
N
G
T
O
N
S
C
H
O
O
L
D
I
S
T
R
I
C
T
BU
R
L
I
N
G
T
O
N
,
V
E
R
M
O
N
T
BU
R
L
I
N
G
T
O
N
A
V
I
A
T
I
O
N
T
E
C
H
N
I
C
A
L
C
E
N
T
E
R
F
E
D
C
B
A
F
F
9
9
10
10
81 Maple Street ▪Burlington VT 05401
802▪864▪6844 ▪www.fffinc.com
Architecture ▪Planning ▪Interiors
20
0
D
A
V
I
N
C
I
D
R
I
V
E
,
S
O
U
T
H
B
U
R
L
I
N
G
T
O
N
,
V
T
0
5
4
0
3
1/8" = 1'-0"
Author
Designer
Checker
06/10/21
EXTERIOR ELEVATIONS -
EAST AND WEST
A201
Permit Set
NO. DATE DESCRIPTION
SCALE:1/8" = 1'-0"A201
1 PROJECT WEST ELEVATION
SCALE:1/8" = 1'-0"A201
2 PROJECT EAST ELEVATION
GROUND LEVEL
0"
MEZZANINE
14'-6"
ROOF-MAIN SPRING LINE
39'-3"
A B C D E F G H I
BOILER MEZZANINE
12'-0"
6,829 SF
BTC SHOPS
116
178 SF
STORAGE
116.252 SF
RR
122
263 SF
CORRIDOR
120
576 SF
BTC PROGRAM
CLASSROOM
121
3'-
9
3
/
4
"
10
'
-
0
"
RATED DOOR AT HANGAR
FIRE BARRIER BEYOND
SEMI-CONDITIONED SPACE (HEATED TO
MAINTAIN MIN. 50 F) ABOVE INSULATED CEILINGS
C.1A.1
EXISTING HANGAR / SHOP SPACE SPACE
HEATING MAINTAINED WITH UPDATED
VERSION OF EXISTING SYSTEMS
RENOVATED AN D CHANGE-OF-USE SPACES FOR EDUCATIONAL
FUNCTIONS ISOLATED AND INSULATED WITHIN BUILDING. SPACES FULLY
CONDITIONED WITH ELECTRIC HEAT PUMP AND VENTILATION SYSTEMS
OF
CL
I
E
N
T
:
PR
O
J
E
C
T
:
DRAWN
DESIGNED
CHECKED
SCALE
DATE
PROJECT
DRAWING TITLE
DRAWING NUMBER
PROJECT MILESTONE
1 2 3 4 5 6 7 8
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY
ARE ACTING UNDER THE DIRECT DIRECTION OF A LICENSED
PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE
ARCHITECT, OR LAND SURVEYOR, TO ALTER AN ITEM IN ANY
WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED
PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER,
ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION
"ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE
OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF
THE ALTERATION.
E
D
C
B
A
F
1 234 5 6 7 8
T-18715.02
426 INDUSTRIAL AVENUE, SUITE 146
WILLISTON, VT 05495
P: (802)862-9381
WWW.MJINC.COM
BU
R
L
I
N
G
T
O
N
S
C
H
O
O
L
D
I
S
T
R
I
C
T
BU
R
L
I
N
G
T
O
N
,
V
E
R
M
O
N
T
BU
R
L
I
N
G
T
O
N
A
V
I
A
T
I
O
N
T
E
C
H
N
I
C
A
L
C
E
N
T
E
R
F
E
D
C
B
A
F
F
9
9
10
10
81 Maple Street ▪Burlington VT 05401
802▪864▪6844 ▪www.fffinc.com
Architecture ▪Planning ▪Interiors
20
0
D
A
V
I
N
C
I
D
R
I
V
E
,
S
O
U
T
H
B
U
R
L
I
N
G
T
O
N
,
V
T
0
5
4
0
3
3/16" =
1'-0"
BDL
Designer
Checker
11/22/2023
BUILDING SECTION AND
AXONOMETRIC
A300
Permit Set
SCALE:3/16" = 1'-0"A300
3 E-W BUILDING SECTION THROUGH CLASSROOMS AND SHOPS
SCALE:A300
1 AXONOMETRIC OVERVIEW -SOUTHEAST
NO. DATE DESCRIPTION
SCALE:A300
2 AXONOMETRIC OVERVIEW -NORTHWEST
Project Catalog #Type
Prepared by Notes Date
PS517016EN page 1
November 8, 2023 3:26 PM
Top Product Features
• New construction/remodel series; 500 to 6,000 lumens
• Narrow, Medium and Wide distributions; Wall wash with rotatable linear spread lens
• 2700K, 3000K, 3500K, 4000K, 5000K CCT; 80 or 90 CRI
• Universal voltage 120V-277V; Standard 0-10V driver dims to 1%
• Mounting frame converts to remodel that installs from below the ceiling
• Rapid Response emergency backup mounting frames - fast delivery option
Dimensional and Mounting Details
HC6 | HM6 | 61 | 61PS
6-inch LED downlight and wall wash
Typical Applications
Office • Healthcare • Hospitality • Institutional • Mixed-Use/Retail
Interactive Menu
• Order Information page 2
• Product Specifications page 4
• Photometric Data page 5
• Energy & Performance Data page 8
• Connected Systems page 10
• Product Warranty
additionalproduct diagrams
NEW CONSTRUCTION - MID LUMEN3000 AND 4000 LUMEN NEW CONSTRUCTION - HIGH LUMEN4500 – 6000 LUMEN
.5"[12.70mm](ceiling thickness)
6.06" [153.92mm](reflector inner aperture)
7.25" [184.15mm]
(ceiling cut out)
7.75" [196.85mm]
(trim flange)
trim height
(see table)
max module height(see table)
LED height(see table)3.42"[86.77mm](driver height)
.5"[12.70mm](ceiling thickness)
6.05" [153.72mm](reflector inner aperture)
7.25" [184.15mm]
(ceiling cut out)
7.75" [196.85mm]
(trim flange)
trim height
(see table)
max module height(see table)
LED height(see table)3.42"[86.77mm](driver height)
6.06" [153.92mm](reflector inner aperture)
7.25" [184.15mm]
(ceiling cut out)
7.75" [196.85mm]
(trim flange)
trim height
(see table)
LED height
(see table)
max moduleheight
(see table)
.5"[12.70mm](ceiling thickness)
NEW CONSTRUCTION - LOW LUMEN500 – 2500 LUMENS
4.2"[107.34mm]
hanger bar bracketheight (removable)
3.42"[86.77mm](driver height)
8.6"[217.35mm]
26.4"[670.56mm]
NEW CONSTRUCTION - MID LUMEN3000 AND 4000 LUMEN NEW CONSTRUCTION - HIGH LUMEN4500 – 6000 LUMEN
.5"
[12.70mm](ceiling thickness)
6.06" [153.92mm](reflector inner aperture)
7.25" [184.15mm](ceiling cut out)
7.75" [196.85mm](trim flange)
trim height(see table)
max module height
(see table)
LED height(see table)3.42"
[86.77mm](driver height)
.5"
[12.70mm](ceiling thickness)
6.05" [153.72mm](reflector inner aperture)
7.25" [184.15mm](ceiling cut out)
7.75" [196.85mm](trim flange)
trim height(see table)
max module height
(see table)
LED height(see table)3.42"
[86.77mm](driver height)
6.06" [153.92mm](reflector inner aperture)
7.25" [184.15mm](ceiling cut out)
7.75" [196.85mm](trim flange)
trim height(see table)
LED height(see table)
max module
height(see table)
.5"[12.70mm]
(ceiling thickness)
NEW CONSTRUCTION - LOW LUMEN500 – 2500 LUMENS
4.2"
[107.34mm]hanger bar bracketheight (removable)
3.42"
[86.77mm](driver height)
8.6"[217.35mm]
26.4"[670.56mm]
Mid Lumen (3000 – 4000 Lumens)
Distribution Max. Module Height Trim Height LED Height
Narrow 6.6"3.4”3.8”
Medium 6.7”3.5”3.9”
Wide 6.5”3.3”3.7”
Baffle 6.5”3.3”3.7”
Product Certification Product Features
Control Compatibility
LITEWaveLinx PROWaveLinx
Product Certifications
NOTES: 1. Visit https://www.designlights.org/search/ to confirm qualification. Not all product variations are DLC qualified.
1 1
Project Catalog #Type
Prepared by Notes Date
PS516151EN page 1May 23, 2022 8:46 AM
16"[406mm]
Front View
Side View
Back View
Front View
Side View
Back Box
12-13/16"[326mm]
6-13/16"[173mm]
16"[406mm]
0.28"[7mm]
3"[76mm]
5-1/4"[133.4mm]
6-13/16"[173mm]
12-13/16"[326mm]
Ø3-3/16"[81mm]
1-61/64"[50mm]
1-11/16"[43mm]
2-5/32"[55mm]
1- 15/64"[31mm]
1- 1/4"[32mm]
2- 1/2"[63mm]
Wall Mount Luminaire
Invue ClearCurve Wall
Quick Facts
• Available with Visual Comfort or Discrete optics configurations
• Lumen packages from 1,600 to over 14,000 lumens (18W to 110W)
• Efficacy up to 157 lumens per watt
• Available with internal battery for emergency lighting
Interactive Menu
• Ordering Information page 2
• Product Specifications page 3
• Energy and Performance Data page 3
• Control Options page 8
Dimensional Details
AVAILABLE
COMP LIANT OPTIONSBAABUY AMERICAN ACT
16"[406mm]
Front View
Side View
Back View
Front View
Side View
Back Box
12-13/16"[326mm]
6-13/16"[173mm]
16"[406mm]
0.28"[7mm]
3"[76mm]
5-1/4"[133.4mm]
6-13/16"[173mm]
12-13/16"[326mm]
Ø3-3/16"[81mm]
1-61/64"[50mm]
1-11/16"[43mm]
2-5/32"[55mm]
1- 15/64"[31mm]
1- 1/4"[32mm]
2- 1/2"[63mm]
WaveStream
LightSquares
Connected Systems
• WaveLinx
Product Features
Project Catalog #Type
Prepared by Notes Date
PS500052EN page 1September 29, 2023 1:22 PM
Quick Facts
• Lumen packages range from 3,300 - 73,500 (33W - 552W)
• 17 optical distributions
• Efficacy up to 159 lumens per watt
Interactive Menu
• Ordering Information page 2
• Mounting Details page 3
• Optical Distributions page 5
• Product Specifications page 5
• Energy and Performance Data page 6
• Control Options page 11
Dimensional Details
Area / Site Luminaire
McGraw-Edison GALN Galleon II
"A"
9-1/2" [241mm]"B"
"A"
"B"9 1/2"241mm
3-3/4"[94mm]
"A"
9-1/2" [241mm]"B"
"A"
"B"9 1/2"241mm
3-3/4"[94mm]
Number of Light Squares Width "A" Housing Length "B" Weight with Standard or QM Arm EPA with Standard or QM Arm
1-4 16"22"29 lb 0.95
5-6 22"22"39 lb 0.95
7-9 22"28-1/8"48 lb 1.1
NOTES: For arm selection requirements and additional line art, see Mounting Details section.
Connected Systems
• WaveLinx Lite
• WaveLinx
Standard Pole Mount Arm
Light ARchitectTM
NOTES: 1. Visit https://www.designlights.org/search/ to confirm qualification. Not all product variations are DLC qualified. 2. IDA Certified (3000K CCT and warmer only, fixed mounting options)
1
2
1
Product Certifications
Product Features
AVAILABLE
COM PLIANT OPTIONSBAABUY AMERICAN ACT
Pole Drilling Pattern
Type "N"TYPE "N"
3/4" [19mm]DiameterHole
(2) 9/16" [14mm]DiameterHoles
1-3/4"[44mm]
7/8" [22mm]
2"
[51mm]
355 Main Street | Suite 500 | Winooski, VT 05404 | w. eivtech.com
May 1, 2024
Marla Keene, PE
Development Review Planner
City of South Burlington
180 Market Street
South Burlington, VT 05403
Re: Burlington International Airport
Burlington School District’s Aviation Technical Center Project
Master Plan and Site Plan Review Application
Dear Marla Keene,
Thank you for your time to review our concurrent master plan and site plan application for the above reference project.
We have included the list of application requirements, and our team’s response to where this information is now
included in the chart below. Updated plansheets and exhibits have been included in our file transfer folder with the
revision date in the file name.
Master Plan Application Requirement City Comments Design Team Response
Location of existing restrictions on land, such as
easements and covenants.
I believe there are stormwater
easements & a ROW that has
been offered to the City. There
may be others?
The overall sketch plan has
been updated to include all
existing restrictions on land.
A complete survey of the subdivision, prepared
by a licensed land surveyor, showing the
location, bearing and length of every street line,
lot line and boundary line, and existing and
proposed restrictions on the land, including but
not limited to access ways and utility
easements. Where applicable, this information
shall be tied to reference points previously
established by the City.
Since you are not proposing a
subdivision, this is largely the
same as the above
The overall sketch plan has
been updated to include all
existing restrictions on land.
355 Main Street | Suite 500 | Winooski, VT 05404 | w. eivtech.com
Master Plan Application Requirement City Comments
Existing water courses & buffers, wetlands &
buffers, base flood elevations if located in an
area of special flood hazard, wooded areas,
ledge outcrops, and other natural features.
The buffer for the
wetland to the south may
encroach into the project
area. Please show.
The maximum number of vehicle trip ends
(VTEs) and associated parking proposed for
the property or properties subject to the
master plan.
The actual trip generation
is omitted from the memo
Site Plan Application Requirement City Comments
Location of existing restrictions on land,
such as easements and covenants.
Maybe nothing on the
actual site, but since these
are the same plans as for
the MP, please update as
well
Location of planned restrictions on land,
such as easements and covenants.
I assume there is a new
easement on the Beta MP
area proposed to support
this project?
The location of any outdoor storage for
equipment and materials if any, and the
location, type and design of all solid
waste-related facilities, including dumpsters
and recycling bins.
Where will dumpsters /
waste disposal be for this
project?
Design Team Response
Wetland areas and their buffers will
not be impacted by this
project. The distance from the top
of the bank to the nearest project
disturbance is 79 feet. This
dimension has been added to
the Grading Drainage Plan, GR-01.
The traffic memo was updated
to include trip generation details.
Design Team Response
The overall sketch plan has been
updated to include all existing
restrictions on land.
The overall sketch plan has been
updated to include all existing
restrictions on land.
The Site Plan, SP-01, has been
updated to label the location of the
dumpsters/waste disposal for this
project. In addition to the dumpster
area, the revised site plan has the
snow storage area labeled.
355 Main Street | Suite 500 | Winooski, VT 05404 | w. eivtech.com
Site Plan Application Requirement City Comments
Existing water courses & buffers, wetlands & buffers,
base flood elevations if located in an area of special
flood hazard, wooded areas, ledge outcrops, and other
natural features.
Same as for MP, please
show wetland buffer and
how it relates to project
area
A list of existing vegetation, with the location, type, and
size of existing trees of six inches or greater in caliper.
Existing veg is shown but
labels are omitted
A written plan to preserve and protect significant
existing vegetation during and after construction. Such
plan will be of sufficient detail that the City of South
Burlington will be able to inspect the site during
construction to ensure that existing vegetation is
protected as per the plan.
It doesn’t appear you’re
proposing to protect
existing veg. This may
benefit from some
narrative, because I see
you are providing some
plantings.
Detailed landscaping plan, specification of materials,
costs, and phasing plan, including vegetation to remain,
types of new plant materials, identified by common
name and botanical name, sizes of all new plant
materials by height and/or diameter at time of planting
and at maturity, quantities of each of the planting
materials, and treatment of the ground surface (paving,
seeding, or groundcover) for all plantings, screening,
buffering, and stormwater infiltration.
Budget omitted
Design Team Response
Wetland areas and their buffers
will not be impacted as part of
this project. The distance from
the top of the bank to the
nearest project disturbance is
79 feet. This dimension has
been added to the Grading
and Drainage Plan, GR-01.
EX-01 has been updated to label
these trees as being removed.
This is the only vegetation within
the project disturbance limits.
EX-01 has been updated to label
these trees as being removed.
This is the only vegetation within
the project disturbance limits.
The landscaping budget for the
project is approximately
$50,000. The existing vegetation
will be removed and new
vegetation will be planted as
shown on sheet LL-02, Lighting
and Landscaping Plan. This
plansheet includes a planting
schedule and details.
355 Main Street | Suite 500 | Winooski, VT 05404 | w. eivtech.com
Feel free to contact Larry Lackey, or Jacqueline Dagesse at EIV with any questions regarding this submission,
802-324-5522.
Very Respectfully,
EIV Technical Services
Jacqueline Dagesse, MBA, CPESC
President / Environmental Engineer
Site Plan Application Requirement City Comments Design Team Response
One set of preliminary plans, elevations, floor plans,
and sections of proposed structures showing the
proposed location, use, design and height of all
structures, roads, parking areas, access points, sidewalks
and other walkways, loading docks, outdoor storage
areas, sewage disposal areas, landscaping, screening,
site grading, and recreation areas if required. Plans shall
also show any proposed division of buildings into units
of separate occupancy and location of drives and access
thereto.
Dumpster area? Snow
storage?
The Site Plan, SP-01, has been
updated to label the location of
the dumpsters/waste disposal for
this project. In addition to the
dumpster area, the revised site
plan has the snow storage area
labeled.
Analysis of traffic impacts, if required by the traffic
overlay district and/or the DRB.
# of trips omitted The traffic memo was updated to
include trip generation details.
355 Main Street | Suite 500 | Winooski, VT 05404 | w. eivtech.com
Photo 1: Existing conditions at the front of the existing hangar.
Photo 2: Existing conditions of the parking lot.
426 Industrial Avenue, Suite 164 • Williston, VT 05495
Phone: (585) 905-0970 • Fax: (585) 905-0882
www.mjinc.com
March 11, 2024
(Updated 4/10/2024)
Larry B. Lackey
Director of Planning, Engineering and Sustainability
Patrick Leahy Burlington International Airport
1200 Airport Drive, #1
South Burlington, VT 05403
RE: Burlington Aviation Tech Center – 200 DaVinci Drive, South Burlington, VT
Traffic Generation Memo
Dear Mr. Lackey,
McFarland Johnson, Inc. (MJ) has reviewed existing and future traffic generation associated with the
renovation of the existing hangar building to become the Burlington School District’s Aviation Tech Center.
The property is within the Burlington Internation Airport property parcel located in the City of South
Burlington under the property Tax ID 2000-00000 (600-188-10911). The intent of this letter is to define
the traffic operations of the proposed Burling School District Aviation Technical Center, which is the
intended use for the building renovations.
Existing Conditions
For some time, the building has been leased by an aviation repair company that serviced airplanes. This
operation consisted of roughly 2-8 employees accessing the building on a daily basis and utilizing the
existing 10 parking spaces in front of the building. General Aviation (GA) hangars and the Vermont Flight
Academy are located adjacent to the project site to the west and utilize the existing/proposed parking lot
area adjacent to DaVinci Drive for their operations. Within one of these Hangar buildings is the home of
the BSD’s adult aviation tech program which will be relocated into the proposed building renovation.
In 2023, the Beta Technologies Assembly building was constructed immediately east of the subject
building and included loading docks and shipping areas immediately in front of the subject building. This
project also included the construction of DaVinci Drive as well as other roadway improvements to
accommodate the Beta traffic. Detailed information regarding their traffic analysis and proposed
improvements can be found in their BETA Campus Master Plan Traffic Study completed by VHB dated
January 12, 2022.
Proposed Conditions
The Burlington International Airport in conjunction with Burlington School District (BSD) is proposing to
renovate the existing hanger building to house the BSD Aviation Technical Center. Components of the
project include demolition of the current interior spaces, new classrooms, new shop spaces for teaching,
new entrance foyer with an exterior canopy, new restrooms, new offices, expansion to the parking area
and addition of a bus loading area. The existing airport hangar door and adjacent 12,000 SF of the existing
building will remain airplane hangar space.
BSD - Traffic Generation Memo - 2 - March 11, 2024 (Updated 4/10/24)
There will be no noticeable impacts on the existing traffic circulation or roadway geometry to
accommodate the renovations; however, the new bus loading area will provide a secondary access point
to the existing parking lot currently serving the Vermont Flight Academy and the GA Hangars. Exterior
improvements to the building have been limited to save on costs that are not directly related to the
school’s programming needs, but improvements do include the installation of 8 covered bike parking
spaces, a new bus loading area and expansion to the parking lot. Interior to the building are 2 proposed
bike lockers as well.
Trip Generation
The BSD’s aviation technical programing consists of full day and half day student options. In a typical day
there will be 4-8 instructors in the building and the front 12 parking spaces will be reserved for visitors
and instructors, which includes two accessible spaces and two EV charging spaces. Students are bused
to the tech center from various schools within the BSD resulting in as many as 6 buses being utilized to
drop off and pick up students. The school and busing schedule typically results in 2 buses
loading/unloading students at one time; however, the proposed bus staging area created as part of the
adjacent parking lot expansion has capacity for 6 buses without impacting the adjacent parking
movements.
In addition to the buses, some students elect to drive to the tech center. The adjacent parking lot currently
utilized by the Vermont Flight Academy and the GA Hangars is proposed to be reconfigured to create
better circulation and staging/drop off areas for the buses. This reconfiguration also results in an
additional 26 parking spaces which can be utilized by the driving students. The BSD’s technical vocational
school program has various locations and buildings in addition to this proposed location. No BSD vehicles
are anticipated to be stored on-site at this facility.
The school schedule runs Monday through Friday at typical school hours of 7:00am to roughly 3:00pm
with some adult aviation programs running until roughly 5:00pm. No nighttime classes or operations are
anticipated at this time based on their current BSD programs. One existing and two proposed overhead
doors will be utilized for access into the technical shop spaces. These doors are utilized regularly for air
circulation in the warm months as well as infrequent equipment and material deliveries. These deliveries
typically occur on average once a month by a standard box truck. The BSD’s operations within this building
do not require any regular shipping and receiving to the site.
Based on the operations of the buildings, there is not an applicable ITE Land Use code and data to use to
approximate the trips from national resources. Below is the trip generation table based on current
operations of the BSD programs that will be relocated into this facility:
Enter Exit Total Enter Exit Total
33 33
80%20%100%20%80%100%
26 7 33 7 26 33
*Trips estimated based on 6 buses, 15 students driving personal vehicles and 6 instructors.
* Average Rate =
Type of Land Use Independent
Variable (IV)
Weekday Morning Arrival Weekday Evening Dismissal
Vocational School 60 Students
* Average Rate =
BSD - Traffic Generation Memo - 3 - March 11, 2024 (Updated 4/10/24)
Conclusion
The proposed use of the building will result in a minor amount of additional traffic to the site. A portion
of the proposed aviation tech center traffic is already accounted for today as the BSD’s Technical Aviation
Adult program is currently located within the adjacent hangar. The surrounding roadway network
including the recently constructed DaVinci Drive and other adjacent roadway infrastructure constructed
as part of the Beta Technologies projects, will be able to serve the minor increase in traffic generated by
the proposed BSD’s operations.
Please do not hesitate to call should you require additional information or have any questions.
Sincerely yours,
McFARLAND-JOHNSON, INC.
Adam J. Frosino, PE, PTOE
Project Manager