Loading...
HomeMy WebLinkAboutSP-24-21 - Plans - Record - 1068 Williston RoadINTERSTATE 89 Willis t o n R d . D o r s e t S t . SITE White S t . P a t c h e n R d . V T 1 1 6 \\ V H B . C O M \ G B L \ P R O J \ S B U R L I N G T O N \ 5 7 9 1 3 . 0 1 L A R K I N H O L I D A Y I N N \ C A D \ L D \ P L A N S E T \ 5 7 9 1 3 . 0 1 - C O V 2 M a y 2 0 2 4 Owner/Applicant: VH B P r o j e c t : vh b . c o m Is s u e d f o r : Champlain School Apartments Partnership 410 Shelburne Road Burlington, Vermont 05401 40 IDX Dr Building 100 Suite 200 South Burlington, VT 05403 802.497.6100 Feet0400800 Site Plans Issued for Date Issued Latest Issue Holiday Inn Redevelopment 1068 Williston Rd. South Burlington, VT Permitting July 29,2021 April 17, 2024 57 9 1 3 . 0 1 Co n s t r u c t i o n Sheet Index No.Drawing Title Latest Issue C1.00 Legend and General Notes 10/17/2022 C2.01 Proposed Site Plan 4/17/2024 C3.01 Grading and Drainage Plan 4/17/2024 C3.02 Intersection Grading Plan 2/7/2024 C4.01 Utility Plan 4/17/2024 C5.01 Roadway Profile Plan 6/8/2023 C5.02 Waterline Profiles Plan 5/23/2023 C5.03 Sewer Profile Plan 6/8/2023 C6.01 Erosion and Sediment Control Plan 4/17/2024 C7.01 Site Details 1 10/17/2022 C7.02 Site Details 2 10/17/2022 C7.03 Site Details 3 6/8/2023 C7.04 Site Details 4 8/8/2023 C8.00 EPSC Narrative and Notes 10/17/2022 C8.01 EPSC Details 10/17/2022 Reference Drawings No.Drawing Title Latest Issue Sv-1 Boundary and Topographic Survey Plat 10/18/2021 Sheet Index No.Drawing Title Latest Issue L0.00 General Notes & Abbreviations 2/7/2024 L2.00 Overall Landscape Layout & Materials 4/17/2024 L2.01 Landscape Layout and Materials Enlargement 2/7/2024 L2.02 Landscape Layout and Materials Enlargement 4/17/2024 L3.00 Landscape Details 2/7/2024 L3.01 Landscape Details 2/7/2024 L3.02 Landscape Details 2/7/2024 L3.03 Landscape Details 2/7/2024 L4.00 Overall Planting Plan 4/17/2024 L4.01 Planting Plan Enlargement 4/17/2024 L4.02 Planting Plan Enlargement 4/17/2024 L4.03 Planting Plan Enlargement 4/17/2024 L4.04 Landscape and Open Space 4/17/2024 L4.05 Open Space (Phase 2A)4/17/2024 L5.00 Planting Details 2/7/2024 L6.00 Overall Landscape Lighting Plan 4/17/2024 L6.01 Landscape Lighting Plan Enlargement 2/7/2024 L6.02 Landscape Lighting Plan Enlargement 4/17/2024 L6.03 Landscape Lighting Plan Enlargement 4/17/2024 L6.04 Landscape Lighting Plan Enlargement 4/17/2024 L6.05 Landscape Lighting Plan Enlargement 2/7/2024 WIL L I S T O N RO A D TO I-89 5' DIA. TOTAL GSF = 59,815 SF FFE = 313.95' TOTAL GSF = 136,561 SF FFE = 313.9' FUTURE PHASE HOLIDAY INN MULTI-FAMILY BUILDING 10 REMOVE EXISTING DRIVEWAY, RESTORE TO PERVIOUS GRASS SURFACE, GRADE TO DRAIN 12" MIN. TOTAL SOIL DEPTH (4" MIN TOPSOIL) TOTAL GSF = 59,815 SF FFE = 313.95' TOTAL GSF = 136,561 SF FFE = 313.9' FUTURE PHASE HOLIDAY INN MULTI-FAMILY BUILDING 10 (RENOVATION OF EXISTING BUILDING) LIMITS OF PHASE 2A 312.2313.3 313 TC312.5 BC 310.5 TC 310 BC 309.5 TC 309 BC 308.5 309 TC 308.5 BC 312.8 313.65 TC/BC 314.3 TC313.7 BC 313.7 313.2 314.2 TC313.6 BC 313.8 313.7 313.7 313.9313.9 313.85313.85 310.5 TC 311.5 TC 313.3 GT D GT D 313.3 314.1 314.7314.6 314.3314.2 312.15 313.3313.4 314.23 313.7 TC313.2 BC 313.8 TC313.3 BC 313.75 313.5 TC313.0 BC 313.9 310 TC309.5 BC 312.5 TC312 BC309 TC 313.9 313.9 313.9 313.75 313.75 TC313.25 BC 313.8 TC313.3 BC 313.8 TC 313.3 BC 312.6 TC 312.7 314.0 314.2 TC313.6 BC 313.45 314.0 313.65 TC/BC 313.7 312.8 313.0 312.6 312.7 312.6 313.4 313.1313.3312.7 312.5 312.5312.1 313.2 313.5 313.5 313.0 314.85 4" STEP EDGE OF DELINEATED WETLAND (TYP) 2013-3 50-FT WETLAND BUFFER (TYP) Br Fu HlB AdE AdA ScB 8" P V C 6 RIM=313.3 INV=308.2 OUT 7RIM=313.5 INV=308.4 INV=308.2 7B OUT CB 3 RIM=311.9 INV=306.6 OUT CB 4RIM=311.9 INV=306.6 OUT CB 15RIM=308.2 INV=304.8 INV=305.1 OUT CB 12RIM=312.8 INV=306.2 INV=306.2 INV=306.1 13 RD3 OUT CB 18 RIM=313.2 INV=308.3 INV=308.5 INV=308.5 INV=308.2 INV=308.5 17 21 6 IN OUT OUT DMH 17 RIM=313.0 INV=309.0 INV=309.0 INV=309.0 INV=309.0 RD2 16 DS3 OUT CB 19 RIM=312.5 INV=308.3 INV=308.2 INV=309.0 INV=308.5 20 OUT OUT DMH 20 RIM=312.1 INV=308.5 OUT CB REMOVE EXISTING PIPE AND CONNECT TO EXISTING STRUCTURE AT INV=302.0 15"H D P E 18"HDPE 18"HDPE 15"HDPE 15"PVC REMOVE EXISTING GREASE TRAP AND MANHOLE 21 RIM=312.6 INV=309.2 OUT CB 1A RIM=312.4 INV=302.3 1B DMH 24 " H D P E ELIMINATE EXISTING OUTFALL. PLUG OUTLET. BACKFILL PIPE WITH FLOWABLE FILL. COORDINATE ALL WORK WITH VTRANS. 2% M I N . SL O P E 2RIM=312.4 INV=306.4 INV=306.4 INV=304.4 INV=304.3 4 3 5 OUT DMH16RIM=313.1 INV=309.4 OUT CB 13RIM=312.6 INV=308.6 INV=308.5 13 B OUT CB 12 " H D P E 15"HDPE 15 " H D P E 15 " H D P E 1 5 " H D P E 15"HDPE 22 RIM=312.4 INV=307.2 INV=305.0 19 OUT DMH 15"HDPE 8 " P V C 5 RIM=313.6 INV=307.5 INV=307.5 INV=308.1 INV=305.5 6 7 1 6 OUT DMH 10"PVC 7B RIM=313.3 INV=308.8 INV=308.6 7A OUT CB 12" H D P E 12" HDPE ROOF DRAIN CONNECTION 15 " H D P E SUBSURFACE INFILTRATION SYSTEM #1 SUBSURFA C E INFILTRATIO N SYSTEM #2 1 5 " H D P E 13 B RIM=312.0 INV=308.7 OUT CB 6"PV C 18"HDPE 14ARIM=309.9 INV=304.9 INV=304.8 INV=305.1 INV=304.8 11 OUT OUT OUT CB 11 RIM=312.5 INV=306.0 INV=305.7 INV=305.6 RD4 12 OUT CB 1B RIM=312.4 INV=302.5 INV=302.4 2 OUT DMH 12 " P V C 18"HDPE 15"HDPE 15"HDPE CORE NEW INVERT AT 305.2 ADD RISER SECTION, MANHOLE FRAME, AND COVER, AND ADJUST TO FINISH GRADE. OUT (W) (E) (N) 14B RIM=310.0 INV=304.7 INV=305.7 INV=304.7 14A OUT OUT DMH (EX CB#1) (N) (S) (E) 12"HDPE12"HDPE 12"HDPE 12"HDPE 12"HDPE 8"PVC 12 " H D P E 8" P V C 8"PVC 8" P V C 8"PVC 12"H D P E CO CO GMP TO HOLD EXISTING POLE AND REINSTALL GUY WIRE. COORDINATE DRAINAGE WORK WITH GMP. RD INV=307.0 4" S D R 3 5 P V C @ 1 % M I N . CANOPY DRAIN INV=309.5 WYE INTO 12" HDPE BENDS AS NECESSARY 24 RIM=313.1 INV=300.1 INV=300.1 INV=300.0 23 OUT DMH 12"HDPE 12 " H D P E AS-BUILT INV W/ CAP = 300.6 FES INV = 299.0 18 " H D P E (2) 6" SDR 35 PVC. INV. = 309.2 EXTEND 6" PVC 5' BEYOND PHASE 2A PAVERS AND WITNESS FIELD VERIFIED LOCATION OF CWD WATER MAIN REMOVE EXISTING WATER SERVICE, VALVES AND HYDRANT. SHUTDOWN OF THIS LINE SHALL BE PERFORMED BY CWD/SBWD PERSONNEL ONLY. EXISTING HYDRANT 8" DI FIRE SERVICE. COORDINATE WITH MECHANICAL PLANS FIRE DEPARTMENT CONNECTION LOCATION (CONFIRM WITH SPRINKLER DESIGNER) 4" DOMESTIC SERVICE. FINAL SIZE PER MECHANICAL PLANS HYDRANT 8" GATE VALVE CAP LINE FOR FUTURE CONSTRUCTION 8x3 TEE 8" GATE VALVE EXISTING 8" DI WATER SERVICE 3" GATE VALVE 8x8 TEE 8X6 TEE NEW HYDRANT NEW 8" DI WATER MAIN REMOVE EXISTING WATER SERVICE. PROPOSED 8"x8" CUT-IN-TEE WITH VALVE CLUSTER NEW 8" D.I. CL52 WATER MAIN 6" GATE VALVE NEW 8" DI WATER MAIN 8" GATE VALVE 6" GATE VALVE 6" GATE VALVE 8" TO 6" REDUCER INV W/ CAP = 307.61 7A RIM=313.1 INV=310.0 OUT CB 12 " H D P E 8" D.I. CL52 WATER MAIN STUB (CAP WITH THRUST BLOCK) 8x8 TEE 10" SDR 35 PVC ROOF DRAIN INV = 309.8 CAP FOR FUTURE CONNECTION TEMPORARY 6" PERFORATED SDR35 PVC INFILTRATION TRENCH 8" SDR35 PVC INV. = 307.5 STUB, CAP AND WITNESS 8x6 TEE 8" TO 4" REDUCER 4" GATE VALVE 2% M I N . SL O P E 8" SDR35 PVC INV. = 304.5 STUB, CAP AND WITNESS CO INV.=309.3 CANOPY DRAIN INV.=309.5 CANOPY DRAIN INV.=309.4 CANOPY DRAIN INV.=310.0 CO INV=309.8 6" SDR 35 PVC @ 0.5% MIN. 15" HDPE INV. = 308.9. STUB, CAP AND WITNESS S 7 5 ° 5 6 ' 2 6 " W 300 305 310 NRCS Soils Summary SYMBOL SOIL NAME HYDROLOGIC GROUP HYDRIC SOILS FARMLAND SOIL AdA ADAMS AND WINDSOR LOAMY SANDS, 0 TO 5 PERCENT SLOPES A NO STATEWIDE AdE ADAMS AND WINDSOR LOAMY SANDS, 30 TO 60 PERCENT SLOPES A NO NPSL Br BORROW PITS N/A N/A NPSL Fu FILL LAND A N/A NPSL HlB HARTLAND VERY FINE SANDY LOAM, 2 TO 6 PERCENT SLOPES C/D YES STATEWIDE, IF DRAINED ScB SCANTIC SILT LOAM, 2 TO 6 PERCENT SLOPES C/D YES STATEWIDE, IF DRAINED of Project Number Sheet Drawing Number Drawing Title Issued for Checked byDesigned by Appvd.DateRevisionNo. vh b . c o m Date 40 IDX Drive, Building 100 Suite 200 South Burlington, VT 05403 Holiday Inn Redevelopment 1068 Williston Rd. South Burlington, Vermont Permitting July 29, 2021 35 57913.01 Grading and Drainage Plan C3.01 4 CHS PBS Feet6030015 Temp Drive Aisle Grading 10/04/2023 DJH7 Added Wetland Buffer / Revised Phase 2A Limits 10/31/2023 DJH8 Revised Phase 2A Limits / Courtyard 12/12/2023 DJH9 Added Landings to Northern NDMF I Entrances 2/7/2024 DJH10 Open Space / Parking Revisions 04/17/2024 DJH11 WIL L I S T O N R O A D TO I-89 FUTURE PHASE 10 PROPOSED UNDERGROUND ELECTRICAL SERVICE. PROPOSED TRANSFORMER PAD LOCATION (K30.6 VAULT). CONTRACTOR TO COORDINATE WITH GMP AND ELECTRICAL PLANS REMOVE EXISTING GREASE TRAP AND MANHOLE 2% M I N . SL O P E EXISTING 8x8 TEE 8" DI FIRE SERVICE. COORDINATE WITH MECHANICAL PLANS EXISTING GMP LIGHTING, POLES AND SERVICE TO BE REMOVED AND REPLACED WITH NEW POLES AND SERVICES BY OWNER. REFER TO LIGHTING PLANS AND COORDINATE WITH GMP AND ELECTRICAL PLANS. REMOVE EXISTING OVERHEAD ELECTRICAL SERVICE. COORDINATE WITH GMP PROPOSED 4'X10' GENERATOR PAD PROPOSED TRANSFORMER PAD LOCATION (K30.3 VAULT). CONTRACTOR TO COORDINATE WITH GMP AND ELECTRICAL PLANS MIN. 2" DOMESTIC SERVICE. FINAL SIZE PER MECHANICAL PLANS 3-PHASE CONCRETE ENCASED CONDUIT TRANSFORMER PAD LOCATION (K30.3 VAULT). CONTRACTOR TO COORDINATE WITH GMP AND ELECTRICAL PLANS THREE PHASE ELECTRICAL SERVICE. CONTRACTOR TO COORDINATE WITH GMP AND ELECTRICAL PLANS THREE PHASE ELECTRICAL SERVICE. CONTRACTOR TO COORDINATE WITH GMP AND ELECTRICAL PLANS REMOVE EXISTING UTILITY POLE AND OVERHEAD ELECTRICAL SERVICE. COORDINATE WITH GMP AND ENGINEER S2 RIM=313.9 INV=303.1 INV=304.4 INV=303.00 8"IN 8"IN OUT SMH 2" PE GAS MAIN 8" GATE VALVE CONSTRUCTED 6" DI WATER SERVICE. 6" GATE VALVE GAS METERS 8"x6" REDUCER TIE-IN TO EXISTING STEEL WITH 4" TRANSITION FITTING. 4"X2" REDUCER 3/4" PE GAS SERVICE 3/4" PE GAS SERVICE 3/4" PE GAS SERVICE END MAIN WITH 2" PURGE POINT CAP. LOC. BOX OVER END. CAP FOR FUTURE CONNECTION 1.5'x3' COMMUNICATIONS PEDESTAL (2) 2.2'x3.2' COMMUNICATIONS VAULT (2) A B C DABCD A B C D 6' MIN.PROVIDE 10' CLEARANCE THIS SIDE OF TRANSFORMER FIELD VERIFIED LOCATION OF CWD WATER MAIN REMOVE EXISTING WATER SERVICE, VALVES AND HYDRANT. SHUTDOWN OF THIS LINE SHALL BE PERFORMED BY CWD/SBWD PERSONNEL ONLY. EXISTING HYDRANT 8" DI FIRE SERVICE. COORDINATE WITH MECHANICAL PLANS FIRE DEPARTMENT CONNECTION LOCATION (CONFIRM WITH SPRINKLER DESIGNER) 4" DOMESTIC SERVICE. FINAL SIZE PER MECHANICAL PLANS HYDRANT 8" GATE VALVE CAP LINE FOR FUTURE CONSTRUCTION 8x3 TEE 8" GATE VALVE EXISTING 8" DI WATER SERVICE 3" GATE VALVE 8x8 TEE 8X6 TEE NEW HYDRANT NEW 8" DI WATER MAIN REMOVE EXISTING WATER SERVICE. PROPOSED 8"x8" CUT-IN-TEE WITH VALVE CLUSTER NEW 8" D.I. CL52 WATER MAIN 6" GATE VALVE NEW 8" DI WATER MAIN 8" GATE VALVE 6" GATE VALVE 6" GATE VALVE 8" TO 6" REDUCER CONCRETE ENCASED CONDUIT SLEEVE. CONTRACTOR SHALL COORDINATE WITH TELECOM UTILITIES ON REQUIRED CONDUIT SIZE AND MATERIALS 8" D.I. CL52 WATER MAIN STUB (CAP WITH THRUST BLOCK) 8x8 TEE 8" SDR35 PVC INV. = 307.5 STUB, CAP AND WITNESS S3 RIM=313.85 INV=306.9 INV=306.8 NDMF II OUT SMH 8x6 TEE 8" TO 4" REDUCER 4" GATE VALVE 2% M I N . SL O P E 8" SDR35 PVC INV. = 304.5 STUB, CAP AND WITNESS 30+50.55 30+00 12+03.02 10+00 11+00 12+00 HOLIDAY INN HAMPTON INN MULTI-USE BUILDING LIMITS OF PHASE 2A of Project Number Sheet Drawing Number Drawing Title Issued for Checked byDesigned by Appvd.DateRevisionNo. vh b . c o m Date 40 IDX Drive, Building 100 Suite 200 South Burlington, VT 05403 Holiday Inn Redevelopment 1068 Williston Rd. South Burlington, Vermont Permitting July 29, 2021 35 57913.01 Utility Plan C4.01 6 CHS PBS NOTE: 1.CONTRACTOR SHALL NOTIFY ENGINEER AND CWD AT LEAST 5 DAYS PRIOR TO WORK WITHIN 10 FEET OF CWDs TRANSMISSION MAIN. 2.CONTRACTOR SHALL PROVIDE SHEETING/SHORING SUPPORT DURING STRUCTURE EXCAVATION WHEN EXCAVATION IS WITHIN 10 FEET OF THE CWD TRANSMISSION MAIN. 3.ALL BUILDING SEWER SERVICES AND ROOF DRAINS SHALL HAVE A MINIMUM PIPE SLOPE OF 2% FROM THE BUILDING TO THE SEWER MAIN OR CONNECTION MANHOLE. 4.ALL WATER LINES AND APPURTENANCES SHALL BE INSTALLED IN ACCORDANCE WITH THE CHAMPLAIN WATER DISTRICT SPECIFICATIONS AND DETAILS FOR THE INSTALLATION OF WATER LINES AND APPURTENANCES, CURRENT EDITION 5.CONTRACTOR SHALL CONFIRM ALL BUILDING UTILITY SERVICE LOCATIONS WITH THE PROJECT MEP PRIOR TO INSTALLATION Feet6030015 Revised Sanitary Structure S3 08/14/2023 DJH5 Rvised Phase 2A Limits and Temp Drive Aisle 09/14/2023 DJH6 Revised Phase 2A Limits 10/31/2023 DJH8 Revised Phase 2A Limits / Courtyard 12/12/2023 DJH9 Open Space / Parking Revisions 04/17/2024 DJH11 EXISTING 8x8 TEE 8" GATE VALVE CONSTRUCTED 6" DI WATER SERVICE. 6" GATE VALVE 8"x6" REDUCER 300 305 310 WIL L I S T O N R O A D TO I-89 SUBSURFACE INFILTRATION SYSTEM #1 SUBSURFAC E I N F I L T R A T I O N SYSTEM #2 FUTURE PHASE HOLIDAY INN MULTI-FAMILY BUILDING FUTURE PHASE 10 POTENTIAL TEMPORARY SOIL STOCKPILE LOCATION PROJECT DEMARCATION (TYP) LIMIT OF DISTURBANCE (TYP) STANDARD SILT FENCE (TYP) INLET PROTECTION (TYP) SURROUND TEMPORARY SOIL STOCKPILE WITH FILTER SOCKS, GRAVEL BAGS, OR SILTFENCE. IF STOCKPILE IS TO REMAIN FOR MORE THAN 14 CONSECUTIVE CALENDAR DAYS STABILIZE WITH TEMPORARY MULCH MATERIAL. LIMITS OF VEGETATION PROTECTION LIMITS OF TREE PROTECTION (TYP) CONSTRUCTION LAYDOWN AREA LIMITS OF PHASE 2A of Project Number Sheet Drawing Number Drawing Title Issued for Checked byDesigned by Appvd.DateRevisionNo. vh b . c o m Date 40 IDX Drive, Building 100 Suite 200 South Burlington, VT 05403 Holiday Inn Redevelopment 1068 Williston Rd. South Burlington, Vermont Permitting July 29, 2021 35 57913.01 Erosion and Sediment Control Plan C6.01 10 CHS PBS Feet6030015 NOTE: 1.AREAS DRAINING TO STORMWATER INFILTRATION SYSTEMS OR BIORETENTION AREAS SHALL RECEIVE FINAL STABILIZATION PRIOR TO ALLOWING RUNOFF TO DRAIN TO THE TREATMENT SYSTEMS. Issued for Construction 10/17/2022 PBS1 Revised Phase 2A Limits 10/31/2023 DJH8 Revised Phase 2A Limits / Courtyard 12/12/2023 DJH9 Revised Silt Fence 01/22/2024 DJH10 Open Space / Parking Revisions 04/17/2024 DJH11 11 LANDSCAPE LAYOUT AND MATERIAL PLAN 2.02 MA T C H L I N E 2 . 0 2 LIMITS OF PHASE 2A LIMITS OF PHASE 2A LIMITS OF PHASE 2A DN UP UP DN UPDN Ground Floo r Second Floo r Ground Floo r Second Floo r TOTAL GSF = 59,815 SF FFE = 313.95' TOTAL GSF = 136,561 SF FFE = 313.9' FUTURE PHASE HOLIDAY INN MULTI-FAMILY BUILDING FUTURE PHASE 10 LANDSCAPE LAYOUT AND MATERIAL PLAN 2.01 of Project Number Sheet Drawing Number Drawing Title Issued for Checked byDesigned by Appvd.DateRevisionNo. vh b . c o m Date 40 IDX Drive, Building 100 Suite 200 South Burlington, VT 05403 Holiday Inn Redevelopment 1068 Williston Rd. South Burlington, Vermont Ph 2A Construction July 29, 2021 35 57913.01 Paver Coordination, Silva Cell Removal 08/14/20235 Address P&Z Comments 10/31/20238 Address P&Z Comments 12/12/20239 Added Landings to NDMF I North Ent.02/07/202410 Temporary Open Space Revision11 04/17/2024 Overall Landscape Layout and Materials L2.00 18 MKW MPH Feet6030015 WIL L I S T O N R O A D TO I-89 LIMITS OF FUTURE RIGHT OF WAY EXISTING PROPERTY LINE PROPOSED 7'x12.5' TRANSFORMER PAD LOCATION (K30.3 VAULT). CONTRACTOR TO COORDINATE WITH GMP AND ELECTRICAL PLANS PROPOSED 4'X10' GENERATOR PAD PROPOSED 8'x15' TRANSFORMER PAD LOCATION (K30.6 VAULT). CONTRACTOR TO COORDINATE WITH GMP AND ELECTRICAL PLANS PROPOSED 7'x12.5' TRANSFORMER PAD LOCATION (K30.3 VAULT). CONTRACTOR TO COORDINATE WITH GMP AND ELECTRICAL PLANS PEDESTRIAN PUSH BUTTON PEDESTAL. LOCATION AND WIRING TO BE COORDINATED WITH ENGINEER AND SOUTH BURLINGTON DPW PR I M A R Y B U I L D I N G F A C A D E 12' PLAZA 8' WIDE MULTI-USE PATH LA LA LA LA LA LA LA LA TOTAL GSF = 59,815 SF FFE = 313.95' (RENOVATION OF EXISTING BUILDING) PROPOSED LOBBY ADDITION TOTAL GSF = 136,561 SF FFE = 313.9' PROPOSED POOL ADDITION LALA LA LA LA R15.0' R18.3' R229.5' R221.5' R15.0' R30.0' R49.5' R100.0' R5.0' R5.0' R5.0' R5.0' R5.0' R3.0'R5.0'R5.0' R5.0' R5.0' R10.0' R199.5' R3.0' R100.0' R94.0'R55.0' R65.6' R21.0' R7-8 TYPE B END CURB FLUSH CURB FLUSH CURB BEGIN TRANSITION CURB BEGIN TRANSITION CURB BEGIN TRANSITION CURB R12.0' R34.0' R5.0' R10.0' R5.0' FLUSH CURB BEGIN MOUNTABLE CURB END MOUNTABLE CURB 18'X25' CONCRETE DUMPSTER PAD WITH ENCLOSURE 18" GRAVEL SUBBASE 24" GRAVEL SUBBASE 24 " G R A V E L SU B B A S E "F I R E L A N E " BEGIN TRANSITION CURB END PERMANENT SIDEWALK TEMPORARY CONCRETE SIDEWALK AND CURB, EXTEND TO FULL HEIGHT CURB 10 23 23 22 12 8 3 2 16 13 12 FUTURE PHASE HOLIDAY INN MULTI-FAMILY BUILDING TOTAL GSF = 83,927 SF FFE = 314.5' HAMPTON INN END CURB TEMPORARY DRIVE AISLE 22 ' - 0 " 22'-0" 8'- 0 " 20'-0" R10.0' 20' TEMPORARY DRIVE AISLE 20' TEMPORARY DRIVE AISLE R50' R20' R30' SIX (6) U-RACKS (12 SPACES TOTAL) 10 EXISTING PROPERTY LINE LIMITS OF FUTURE ROW LIMITS OF PHASE 2A WOOD GUARDRAIL RELOCATED CHAIN LINK FENCE 1.5'x3' COMMUNICATIONS PEDESTAL (2) 2.2'X3.2' COMMUNICATIONS VAULT (2) 1' MIN. SEPARATION 2' MIN. SEPARATION A B C DABCD A B C D 6' WIDE TEMPORARY ASPHALT PATH of Project Number Sheet Drawing Number Drawing Title Issued for Checked byDesigned by Appvd.DateRevisionNo. vh b . c o m Date 40 IDX Drive, Building 100 Suite 200 South Burlington, VT 05403 Holiday Inn Redevelopment 1068 Williston Rd. South Burlington, Vermont Permitting July 29, 2021 35 57913.01 Proposed Site Plan C2.01 3 CHS PBS Feet6030015 Parking Summary Chart Description Spaces Existing Proposed NOTE: SNOW STORAGE WILL BE LOCATED ONSITE WHERE SHOWN. EXCESS SNOW WILL BE MOVED TO AN OFFSITE LOCATION IN RESPONSE TO THE FACILITY PARKING NEEDS. NOTE: CITY PARKING REQUIREMENT FOR RESIDENTIAL: 0.75 SPACES/1-BR-STUDIO-UNIT + 1.5 SPACES/2-BR-UNIT+ 0.75 SPACES/4 UNITS =(0.75*72 UNITS)+(1.5*11 UNITS)+ ((0.75)*(83 UNITS/4) = 86 RESIDENTIAL SPACES REQUIRED Zoning Summary Chart Zoning District(S):Form Based Code - Transect Zone 4 Overlay District(S):Major Intersections - Zone 1, Transit Overlay District Zoning Regulation Requirements Existing Required Provided Phase 2A Limits and Temp Drive Aisle 06/08/2023 DJH4 Revised Phase 2A Limits and Temp Drive Aisle 09/14/2023 DJH6 Revised Phase 2A Limits 10/31/2023 DJH8 Revised Phase 2A Limits / Courtyard 12/12/2023 DJH9 Open Space / Parking Revisions 04/17/2024 DJH11 Ground Floo r Second Floo r Ground Floo r Second Floo r PARKING ISLAND 398 S.F. PARKING ISLAND 408 S.F. PARKING ISLAND 144 S.F.PARKING ISLAND 130 S.F. PARKING ISLAND 97 S.F. PARKING ISLAND 250 S.F. PARKING ISLAND 76 S.F. PARKING ISLAND 76 S.F. PARKING ISLAND 575 S.F. PARKING ISLAND 493 S.F. 10 23 23 22 12 8 3 2 16 13 12 FUTURE PHASE HOLIDAY INN MULTI-FAMILY BUILDING FUTURE PHASE HAMPTON INN EXISTING PARKING AREA NEW PARKING AREA PARKING ISLANDS OPEN SPACE OPEN SPACE, "COURTYARD", 8,867 SF, SHARED 4,440 SF RESIDENTIAL, SHADE TREES FOR PARKING REQUIREMENT of Project Number Sheet Drawing Number Drawing Title Issued for Checked byDesigned by Appvd.DateRevisionNo. vh b . c o m Date 40 IDX Drive, Building 100 Suite 200 South Burlington, VT 05403 Holiday Inn Redevelopment 1068 Williston Rd. South Burlington, Vermont Ph 2A Construction July 29, 2021 35 57913.01 Paver Coordination, Silva Cell Removal 08/14/20235 Address P&Z Comments 10/31/20238 Address P&Z Comments 12/12/20239 Added Landings to NDMF I North Ent.02/07/202410 Temporary Open Space Revision11 04/17/2024 Landscape and Open Space L4.04 28 JRD MKW Feet6030015 LANDSCAPING SUMMARY PARKING SPACES IN EXISTING PAVED AREA: 115 NEW PARKING SPACES:29 TOTAL PARKING (SURFACE PARKING):144 TOTAL PARKING LOT SHADE TREES REQUIRED (1 PER 5 SPACES)**:25 TOTAL SHADE TREES PROVIDED (In parking areas):26 * Section 13.06 (B) (2) of the LDR sets a requirement of 10% of the interior parking lot to be landscaped islands planted with trees, shrubs, and other plants. ** Section 13.06 (B) (4) of the LDR sets the requirement for parking areas to provide one (1) deciduous shade tree for every five (5) parking spaces. The required shade trees were calculated based upon the total parking spaces being provided. Total count of required trees is based on 144 total parking spaces minus the 22 parking spaces on the western parcel boundary since the Project cannot plant in the VTrans and CWD existing ROW to the west side of the parcel. NEW PARKING LOT AREA: 6,020 SF PARKING LOT INTERIOR PLANTED ISLANDS REQUIRED*: 602 SF TOTAL PARKING LOT INTERIOR PLANTED ISLANDS PROVIDED: 2,647 SF OPEN SPACE SUMMARY HOLIDAY INN GROSS SQUARE FOOTAGE: 59,814 SF MIXED-USE BUILDING I - COMMERCIAL SPACE: 5,789 SF HAMPTON INN GROSS SQUARE FOOTAGE: 83,927 SF TOTAL GROSS SQUARE FOOTAGE OF NON RESIDENTIAL* 149,530 SF * Open space requirements based open Table 8-1 Open Space Requirements, 6% of building gross floor area for non-residential buildings with a parcel size greater than 20,000 S.F for parcels in T-4 transect zone. ** Open space requirement for residential units is 60sf per residential unit. QUALIFYING OPEN SPACE REQUIRED (Non Residential*): 8,972 SF QUALIFYING OPEN SPACE REQUIRED (Residential**): 4,980 SF TOTAL OPEN SPACE REQUIRED 13,952 SF RESIDENTIAL UNITS MIXED USE BUILDING (83ea)** TOTAL OPEN SPACE PROVIDED:14,629 SF OPEN SPACE, "COURTYARD", 9,130 SF - SHARED, 4,980 SF - RESIDENTIAL, 4,150 SF - NON-RESIDENTIAL OPEN SPACE, "OUTDOOR CAFE/RESTAURANT SEATING", 3,639 SF - NON-RESIDENTIAL OPEN SPACE, "SNIPPET/PARKLET", 1,860 SF - NON-RESIDENTIAL Ground Floo r Second Floo r Ground Floo r Second Floo r 10 23 23 22 12 8 3 2 16 13 12 FUTURE PHASE HOLIDAY INN MULTI-FAMILY BUILDING FUTURE PHASE HAMPTON INN OPEN SPACE of Project Number Sheet Drawing Number Drawing Title Issued for Checked byDesigned by Appvd.DateRevisionNo. vh b . c o m Date 40 IDX Drive, Building 100 Suite 200 South Burlington, VT 05403 Holiday Inn Redevelopment 1068 Williston Rd. South Burlington, Vermont Ph 2A Construction July 29, 2021 35 57913.01 Paver Coordination, Silva Cell Removal 08/14/20235 Address P&Z Comments 10/31/20238 Address P&Z Comments 12/12/20239 Added Landings to NDMF I North Ent.02/07/202410 Temporary Open Space Revision11 04/17/2024 Open Space (Phase 2A) L4.05 28A JRD MKW Feet6030015 MULTI-BUILDING OPEN SPACE SUMMARY (PHASE 2A) MIXED-USE BUILDING I - COMMERCIAL SPACE: 5,789 SF RESIDENTIAL UNITS MIXED-USE BUILDING (83ea)** * Open space requirements based open Table 8-1 Open Space Requirements, 6% of building gross floor area for non-residential buildings with a parcel size greater than 20,000 S.F for parcels in T-4 transect zone. ** Open space requirement for residential units is 60sf per residential unit. QUALIFYING OPEN SPACE REQUIRED (Non Residential*): 347 SF QUALIFYING OPEN SPACE REQUIRED (Residential**): 4,980 SF TOTAL OPEN SPACE REQUIRED 5,327 SF TOTAL OPEN SPACE PROVIDED (PHASE 2A): 5,350 SF OPEN SPACE, "COURTYARD", 5,350 SF - PUBLIC WI L L I S T O N R O A D (N O T E 9 ) (NOTE 10) DN UP UP DN UPDN Ground Floo r Second Floo r Ground Floo r Second Floo r TOTAL GSF = 59,815 SF FFE = 313.95' TOTAL GSF = 136,561 SF FFE = 313.9' 1 1 FUTURE PHASE HOLIDAY INN MULTI-FAMILY BUILDING 10 9 9 11 C6 C7 A1 A2 A3 A4A5 A6 A8 A9 A10 B3 C2 A7 F1 F2 F3F4 F5 F8 F9 G1 G2 G3 G4 G5 G6 C1 C3 C4C5 H3 H4 H7 H8 H9 H10 H5 H6 F7 H1 H2 F6B2 1 1 LIGHTING PLAN 6.01 LIGHTING PLAN 6.02 LIGHTING PLAN 6.03 TOTAL GSF = 59,815 SF FFE = 313.95' TOTAL GSF = 136,561 SF FFE = 313.9' FUTURE PHASE HOLIDAY INN MULTI-FAMILY BUILDING FUTURE PHASE 10 LIMITS OF PHASE 2A LIMITS OF PHASE 2A LIMITS OF PHASE 2A LIGHTING PLAN 6.04 LIGHTING PLAN 6.05 of Project Number Sheet Drawing Number Drawing Title Issued for Checked byDesigned by Appvd.DateRevisionNo. vh b . c o m Date 40 IDX Drive, Building 100 Suite 200 South Burlington, VT 05403 Holiday Inn Redevelopment 1068 Williston Rd. South Burlington, Vermont Ph 2A Construction July 29, 2021 35 57913.01 Paver Coordination, Silva Cell Removal 08/14/20235 Address P&Z Comments 10/31/20238 Address P&Z Comments 12/12/20239 Added Landings to NDMF I North Ent.02/07/202410 Temporary Open Space Revision11 04/17/2024 Overall Landscape Lighting Plan L6.00 30 JKH MKW Feet6030015 LIGHT FIXTURE AND POLE SPECIFICATIONS 3,000K SACL - Saturn Cutoff LED Mounting: Manufacturer: Fixture A Pole: Fixture: Light Engine: Color Temperature: Selux 1 Optics:R3 5G700 Pole Height:20' Phillips APR5S-20 SV (Silver)Finish: DS (No uplight finish)Options: 3,000K SACL - Saturn Cutoff LED Mounting: Manufacturer: Fixture B Pole: Fixture: Light Engine: Color Temperature: Selux 1 Optics:R3 5G700 Pole Height:13' Philips APR4F-13 SV (Silver)Finish: DS (No uplight finish)Options: 3,000K7 - 70CRI Ouro20 Mounting: Manufacturer: Fixture C Pole: Fixture: Light Engine: Color Temperature: KIM Lighting FM44 (Flush Mount) Optics:Type III 24L-65 7,000 Pole Height:16' LTRA16-6188 BL (Black)Finish: SF, CLROptions: 3,000K EDGE EV3D Mounting: Manufacturer: Fixture D Fixture: Light Engine: Color Temperature: Pinnacle Recessed Shielding: Satine Lens 17.1 Watt Voltage:120-277V WhiteFinish: Voltage:120-277V Voltage:120-277V Voltage:120-277V (Approx 12foot Mounting) 3,000K 1649SK-LED Manufacturer: Fixture E Fixture: Light Source: Color Temperature: Hinkley Lighting 11W LED Mounting Height:6' (To bottom of fixture) Black SatinFinish: 3,000K SACL - Saturn Cutoff LED Mounting: Manufacturer: Fixture F Fixture: Light Engine: Color Temperature: Selux Wall Mounted, 9'-4", Optics:R4 5G400 SV (Silver)Finish: DS (No uplight finish)Options: Voltage:120-277V Fixture G Height Measured to Center of Mounting Bracket 3,000K SACL - Saturn Cutoff LED Mounting: Manufacturer: Pole: Fixture: Light Engine: Color Temperature: Selux 1 Optics:R4 - House Side Shield 5G700 Pole Height:20' Phillips APR5S-20 SV (Silver)Finish: DS (No uplight finish)Options: Voltage:120-277V Mini Beacon Pathlight Stem Length: Manufacturer: Fixture H Fixture: Teka Illumination 18" Material:Aluminum Solid State (MBP) Style:8" Shade (SD8) LED Type:7W LED, 2700K (e93) Black Satin Powercoat (BLP)Finish: Cone Cap (CC1)Cap Stype: PMC mounting plateMounting: Notes: 1.Fixture "H" shall be powered by a remote transformer, contractor to coordinate power feed and connection from mechanical room of the building. Install per manufacturer's recommendations. 2.Controls for Fixture H: Provide astrological time clock. Install dimmer connected to astrological time clock that is suitable for low temperature and high humidity use. Astrological time clock and dimmer shall be installed in a surface mounted in-use gasketed and lockable enclosure. 3.Mounting for Fixture H: Light fixture will be mounted to the deck surface using the provided mounting plate by the manufacturer. Contractor to coordinate waterproofing penetrations associated with the installation. CONSTRUCTED 6" DI WATER SERVICE. Ground Flo o r Second Flo o r 1 FUTURE PHASE 9 9 11 A2 A3 A6 A8 A9 A10 B3 A7 G6 H3 H4 H7 H8 H9 H5 H6 SITE LIGHTING POWER FEED FROM BUILDING MECHANICAL ROOM 1.5" WIRED CONDUIT 1.5" WIRED CONDUIT 1.5" WIRED CONDUIT WITH AC POWER 1.5" WIRED CONDUIT WITH AC POWER LIGHT FIXTURE L7.00 A CHARGING STATION (TYP. OF 3)L3.01 ALIGHT FIXTURE L7.00 A 2" CONDUIT, PROVIDE WIRE AND CONNECT TO CHARGING STATIONS, INSTALL PER MANUFACTURER'S RECOMMENDATIONS SITE LIGHTING POWER FEED FROM BUILDING MECHANICAL ROOM H1 H2 LIGHT FIXTURE L7.00 A B2 FUTURE PHASE of Project Number Sheet Drawing Number Drawing Title Issued for Checked byDesigned by Appvd.DateRevisionNo. vh b . c o m Date 40 IDX Drive, Building 100 Suite 200 South Burlington, VT 05403 Holiday Inn Redevelopment 1068 Williston Rd. South Burlington, Vermont Ph 2A Construction July 29, 2021 35 57913.01 Paver Coordination, Silva Cell Removal 08/14/20235 Address P&Z Comments 10/31/20238 Address P&Z Comments 12/12/20239 Added Landings to NDMF I North Ent.02/07/202410 Temporary Open Space Revision11 04/17/2024 Feet201005 Landscape Lighting Plan Enlargement L6.02 32 JKH MKW DN UP UP DN Ground Flo o r Second Flo o r 1 FUTURE PHASE 911 C6 F1 F2 F3F4 F5 F8 F9 C5 H3 H4 H7 H8 H9 H10 H5 H6 SITE LIGHTING POWER FEED FROM BUILDING MECHANICAL ROOM F6 LIGHT FIXTURE A LIGHT FIXTURE L7.00 A B2 FUTURE PHASE LIMITS OF PHASE 2A LIMITS OF PHASE 2A of Project Number Sheet Drawing Number Drawing Title Issued for Checked byDesigned by Appvd.DateRevisionNo. vh b . c o m Date 40 IDX Drive, Building 100 Suite 200 South Burlington, VT 05403 Holiday Inn Redevelopment 1068 Williston Rd. South Burlington, Vermont Ph 2A Construction July 29, 2021 35 57913.01 Paver Coordination, Silva Cell Removal 08/14/20235 Address P&Z Comments 10/31/20238 Address P&Z Comments 12/12/20239 Added Landings to NDMF I North Ent.02/07/202410 Temporary Open Space Revision11 04/17/2024 Feet201005 Landscape Lighting Plan Enlargement L6.03 33 JKH MKW EXISTING 8x8 TEE 8" GATE VALVE CONSTRUCTED 6" DI WATER SERVICE. 6" GATE VALVE 8"x6" REDUCER DN UP Ground Flo o r Second Flo o r 1 FUTURE PHASE 911 C6 C7 A1 A2 A4A5 A6 F2 F3F4 F5 F8 F9 C5 H4 H7 H8 H9 H10 H5 H6 CAR CHARGING STATION POWER FEED FROM BUILDING MECHANICAL ROOM 1.5" WIRED CONDUIT 1.5" WIRED CONDUIT 1.5" WIRED CONDUIT L3.01 A LIGHT FIXTURE L7.00 A 2" CONDUIT, PROVIDE WIRE AND CONNECT TO CHARGING STATIONS, INSTALL PER MANUFACTURER'S RECOMMENDATIONS 1.5" WIRED CONDUIT CENTER LIGHT POLE BASE ON PARKING STRIPE CENTER LIGHT POLE BASE ON F6 LIGHT FIXTURE L7.00 A LIGHT FIXTURE L7.00 A B2 FUTURE PHASE FUTURE PHASE LIMITS OF PHASE 2A LIMITS OF PHASE 2A LIMITS OF PHASE 2A of Project Number Sheet Drawing Number Drawing Title Issued for Checked byDesigned by Appvd.DateRevisionNo. vh b . c o m Date 40 IDX Drive, Building 100 Suite 200 South Burlington, VT 05403 Holiday Inn Redevelopment 1068 Williston Rd. South Burlington, Vermont Ph 2A Construction July 29, 2021 35 57913.01 Paver Coordination, Silva Cell Removal 08/14/20235 Address P&Z Comments 10/31/20238 Address P&Z Comments 12/12/20239 Added Landings to NDMF I North Ent.02/07/202410 Temporary Open Space Revision11 04/17/2024 Feet201005 Landscape Lighting Plan Enlargement L6.04 34 JKH MKW DN UP UP DN UPDN Ground Floor Second Floor Ground Floo r Second Floo r FUTURE PHASE FUTURE PHASE 11 11 11 11 DECIDUOUS TREES QTY BOTANICAL NAME COMMON NAME SIZE AF 2 Acer x freemanii `Sienna`Sienna Glen Maple 2 1/2 - 3" CAL./ B&B BN 1 Betula nigra `Heritage`Multi-Stem Heritage River Birch 12 -14` HT. GBP 6 Ginkgo biloba `Princeton Sentry`Princeton Sentry Ginkgo 2 1/2 - 3" CAL. GT 17 Gleditsia triacanthos `Draves` TM Street Keeper Honey Locust 2 1/2 - 3" CAL. SHRUBS QTY BOTANICAL NAME COMMON NAME SIZE JP2 37 Juniperus horizontalis `Plumosa Compacta`Creeping Juniper 18 - 24" SPD MD 11 Microbiota decussata Siberian Carpet Cypress/Russian Arborvitae 18 - 24" SPD PN2 151 Physocarpus opulifolius Ninebark 18 - 24" SPD TC 5 Taxus cuspidata `Greenwave`Greenwave Yew 18 - 24" SPD PERENNIALS QTY BOTANICAL NAME COMMON NAME SIZE NF 8 Nepeta x faassenii Catmint 1 GAL. VINES QTY BOTANICAL NAME COMMON NAME SIZE PQV 8 Parthenocissus quinquefolia Virgina Creeper #1 POT GRASSES QTY BOTANICAL NAME COMMON NAME SIZE CA 121 Calamagrostis x acutiflora `Karl Foerster`Karl Foerster Feather Reed Grass 2 GAL. PVS 44 Panicum virgatum `Shenandoah`Shenendoah Switch Grass 2 GAL. PLANT SCHEDULE - Phase 2A Notes: 1.CONTRACTOR IS RESPONSIBLE TO VERIFY ALL PLANT QUANTITIES FOUND IN THE PLANTING PLANS. IF ANY DISCREPANCIES ARE FOUND, LANDSCAPE ARCHITECT SHOULD BE NOTIFIED IMMEDIATELY. 2.FINAL LAYOUT AND PLACEMENT OF ALL PLANT MATERIAL TO BE APPROVED BY THE LANDSCAPE ARCHITECT. 3.CONTRACTOR IS RESPONSIBLE TO SEED ALL DISTURBED AREAS ACCORDING TO THE SPECIFICATIONS 4.REFER TO PLANTING DETAILS FOR PROPER PLANT MATERIAL INSTALLATION REQUIREMENTS. 5.ALL TREE, SHRUB AND PERENNIAL PLANTING BEDS ARE TO BE CONTINUOUS, COMPLETELY DUG OUT AND BACKFILLED WITH THE PROPER PLANTING BED BACKFILL MATERIAL TO DEPTH SPECIFIED IN DETAILS AND SOIL PREPARATION SPECIFICATION. 6.IF THE LANDSCAPE CONTRACTOR PROPOSES A SUBSTITUTE PLANT SPECIES, ALL SUBSTITUTES NEED TO BE APPROVED BY THE LANDSCAPE ARCHITECT IN WRITING PRIOR TO ORDERING. 11 DECIDUOUS TREES QTY BOTANICAL NAME COMMON NAME SIZE ARA 5 Acer rubrum `Armstrong`Armstrong Red Maple 2 1/2 - 3" CAL. BN 4 Betula nigra `Heritage`Multi-Stem Heritage River Birch 12 -14` HT. TC2 1 Tilia cordata `Greenspire`Greenspire Littleleaf Linden 2 1/2 - 3" CAL. SHRUBS QTY BOTANICAL NAME COMMON NAME SIZE EF 65 Euonymus fortunei Wintercreeper #2 CONT. JP2 5 Juniperus horizontalis `Plumosa Compacta`Creeping Juniper 18 - 24" SPD MD 53 Microbiota decussata Siberian Carpet Cypress/Russian Arborvitae 18 - 24" SPD SB 61 Spiraea bumalda `Anthony Waterer`Anthony Waterer Spirea 18 - 24" SPD PERENNIALS QTY BOTANICAL NAME COMMON NAME SIZE HSO 61 Hemerocallis x `Stella de Oro`Stella de Oro Daylily 1 GAL. HG 10 Hosta x 'Guacamole'Guacamole Hosta 1 GAL. NF 11 Nepeta x faassenii Catmint 1 GAL. GRASSES QTY BOTANICAL NAME COMMON NAME SIZE CA 146 Calamagrostis x acutiflora `Karl Foerster`Karl Foerster Feather Reed Grass 2 GAL. PVS 50 Panicum virgatum `Shenandoah`Shenendoah Switch Grass 2 GAL. PLANT SCHEDULE - Phase 2B 11 11 11 11 11 of Project Number Sheet Drawing Number Drawing Title Issued for Checked byDesigned by Appvd.DateRevisionNo. vh b . c o m Date 40 IDX Drive, Building 100 Suite 200 South Burlington, VT 05403 Holiday Inn Redevelopment 1068 Williston Rd. South Burlington, Vermont Ph 2A Construction July 29, 2021 35 57913.01 Paver Coordination, Silva Cell Removal 08/14/20235 Address P&Z Comments 10/31/20238 Address P&Z Comments 12/12/20239 Added Landings to NDMF I North Ent.02/07/202410 Temporary Open Space Revision11 04/17/2024 Overall Planting Plan L4.00 24 JKH MKW Feet6030015 DN UP UP DN UPDN Ground Flo o r Second Flo o r Ground Flo o r Second Floo r INTERSTATE 89 FUTURE PHASE 9 GT 6 GT 1 GT 1 GT 13 PN2 13 PN2 13 PN2 13 PN2 13 PN2 13 PN2 13 PN2 13 PN2 13 PN2 13 PN2 8 PN2 13 PN2 16 JP2 1 AF 1 AF 21 JP2 REFER TO GREEN ROOF PLANTING PLAN - L4.03 REFER TO GREEN ROOF PLANTING PLAN - L4.03 11 CA 5 TC 11 10 CA 17 SB 2 ARA 37 EF 9 CA 1 TC2 26 SB 5 JP2 8 HSO 10 HG 11 HSO41 CA 3 CA 9 CA 11 CA 11 CA 14 CA 11 HSO 5 PVS 14 EF 19 CA 19 CA 21 HSO 4 PVS 7 EF 3 ARA 6 PVS 7 EF 11 11 11 18 SB LIMITS OF PHASE 2A LIMITS OF PHASE 2A TEMPORARY OPEN SPACE LIMITS OF PHASE 2A LIMITS OF PHASE 2A of Project Number Sheet Drawing Number Drawing Title Issued for Checked byDesigned by Appvd.DateRevisionNo. vh b . c o m Date 40 IDX Drive, Building 100 Suite 200 South Burlington, VT 05403 Holiday Inn Redevelopment 1068 Williston Rd. South Burlington, Vermont Ph 2A Construction July 29, 2021 35 57913.01 Paver Coordination, Silva Cell Removal 08/14/20235 Address P&Z Comments 10/31/20238 Address P&Z Comments 12/12/20239 Added Landings to NDMF I North Ent.02/07/202410 Temporary Open Space Revision11 04/17/2024 Planting Plan Enlargement L4.01 25 JKH MKW Feet4020010 DN UP UP DN Ground Flo o r Second Floo r INTERSTATE 89 WIL L I S T O N R O A D US R O U T E 2 DOR S E T S T R E E T FUTURE PHASE FUTURE PHASE 6 GBP REFER TO GREEN ROOF PLANTING PLAN - L4.03 REFER TO GREEN ROOF PLANTING PLAN - L4.03 5 TC 11 10 CA 5 JP2 14 CA 11 HSO 5 PVS 14 EF 19 CA 19 CA 21 HSO 4 PVS 7 EF 3 ARA 6 PVS 7 EF 11 11 18 SB LIMITS OF PHASE 2A LIMITS OF PHASE 2A TEMPORARY OPEN SPACE LIMITS OF PHASE 2A LIMITS OF PHASE 2A of Project Number Sheet Drawing Number Drawing Title Issued for Checked byDesigned by Appvd.DateRevisionNo. vh b . c o m Date 40 IDX Drive, Building 100 Suite 200 South Burlington, VT 05403 Holiday Inn Redevelopment 1068 Williston Rd. South Burlington, Vermont Ph 2A Construction July 29, 2021 35 57913.01 Paver Coordination, Silva Cell Removal 08/14/20235 Address P&Z Comments 10/31/20238 Address P&Z Comments 12/12/20239 Added Landings to NDMF I North Ent.02/07/202410 Temporary Open Space Revision11 04/17/2024 Planting Plan Enlargement L4.02 26 JKH MKW Feet4020010 UP Ground Floor Second Floor Ground Floor Second Floor 148 GREEN ROOF 1'x2' TRAYS 148 GREEN ROOF TRAYS 72 GREEN ROOF TRAYS 148 GREEN ROOF TRAYS 148 GREEN ROOF TRAYS NOTES: 1.REFER TO DETAIL D/L3.02 FOR GREEN ROOF TRAYS 6 HSO 44 SH 3 PN3 3 PN3 6 HSO 10 SH 40 HSO 10 SH 14 NF 14 NF 8 PN3 24 CB3 32 CA 6 HSO 44 SH 3 PN3 3 PN3 6 HSO 10 SH 40 HSO 10 SH 14 NF 14 NF 8 PN3 24 CB3 6 HSO 44 SH 3 PN3 3 PN3 6 HSO 10 SH 40 HSO 10 SH 14 NF 14 NF 8 PN3 24 CB3 6 HSO 44 SH 3 PN3 3 PN3 6 HSO 10 SH 40 HSO 10 SH 14 NF 14 NF 8 PN3 24 CB3 32 CA 32 CA12 HSO 12 SA 24 RF 24 PVS 12 HSO 12 SA 24 RF 32 CA ORNAMENTAL GRASSES QTY BOTANICAL NAME COMMON NAME SIZE CA 128 Calamagrostis x acutiflora `Karl Foerster`Karl Foerster Feather Reed Grass 2 GAL. PVS 24 Panicum virgatum `Shenandoah`Shenendoah Switch Grass 2 GAL. SH 256 Sporobolus heterolepis Prairie Dropseed 2 GAL. PERENNIALS QTY BOTANICAL NAME COMMON NAME SIZE CB3 96 Chrysanthemum x superbum 'Becky'Becky Shasta Daisy 1 GAL., 18" o.c. HSO 232 Hemerocallis x `Stella de Oro`Stella de Oro Daylily 1 GAL. NF 256 Nepeta x faassenii Catmint 1 GAL., 24" o.c. PN3 56 Perovskia atriplicifolia 'Blue Jean Baby'Blue Jean Baby Russian Sage 1 GAL. RF 48 Rudbeckia fulgida `Goldsturm`Goldsturm Black-eyed Susan 1 GAL. SA 24 Sedum x 'Autumn Joy'Autumn Joy Sedum 1 GAL. PLANT SCHEDULE - GREEN ROOF Notes: 1.CONTRACTOR IS RESPONSIBLE TO VERIFY ALL PLANT QUANTITIES FOUND IN THE PLANTING PLANS. IF ANY DISCREPANCIES ARE FOUND, LANDSCAPE ARCHITECT SHOULD BE NOTIFIED IMMEDIATELY. 2.FINAL LAYOUT AND PLACEMENT OF ALL PLANT MATERIAL TO BE APPROVED BY THE LANDSCAPE ARCHITECT. 3.REFER TO DETAIL D/L3.02 FOR GREEN ROOF TRAY INSTALLATION AND COORDINATION W/ PAVER SYSTEM. 4.IF THE LANDSCAPE CONTRACTOR PROPOSES A SUBSTITUTE PLANT SPECIES, ALL SUBSTITUTES NEED TO BE APPROVED BY THE LANDSCAPE ARCHITECT IN WRITING PRIOR TO ORDERING. DN UP UP DN Ground Flo o r Second Flo o r FUTURE PHASE 1 BN 4 NF 12 CA 4 NF 11 12 CA 15 PVS 2 PQV 2 PQV 2 PQV 11 MD 2 PQV 38 CA 18 PVS 11 CA 11 PVS 13 CA 8 CA 8 CA 8 CA 1 LIMITS OF PHASE 2A LIMITS OF PHASE 2A TEMPORARY OPEN SPACE of Project Number Sheet Drawing Number Drawing Title Issued for Checked byDesigned by Appvd.DateRevisionNo. vh b . c o m Date 40 IDX Drive, Building 100 Suite 200 South Burlington, VT 05403 Holiday Inn Redevelopment 1068 Williston Rd. South Burlington, Vermont Ph 2A Construction July 29, 2021 35 57913.01 Paver Coordination, Silva Cell Removal 08/14/20235 Address P&Z Comments 10/31/20238 Address P&Z Comments 12/12/20239 Added Landings to NDMF I North Ent.02/07/202410 Temporary Open Space Revision11 04/17/2024 Planting Plan Enlargement L4.03 27 JKH MKW Feet201005