Loading...
HomeMy WebLinkAboutSP-24-09 - Supplemental - 0112 Garden Street (6)D R R R R RR RR UD UD SOUTH BURL I N G T O N GARDEN STREET S0 7 ° 4 6 ' 2 7 " E L 2 IPF D LOT L 526,082 S IPS 112 GARDEN STREET PROSPECT PLACE LOT N PAVED PARKING AREA EX. SIDEWALK PA V E D P A R K I N G A R E A EXISTING BOX CULVERT TO CORSET ST EXISTING STORM POND 1 EXISTING GRAVEL WETLAND 5 LOT N M A R K E T S T R E E T FUTURE BUILDING 7 303 MARKET ST 113 GARDEN STREET BUILDING 6 267 MARKET STREET BUILDING 4 EXIS T I N G C O N C R E T E S I D E W A L K EXIS T I N G P A V E D P A T H E X I S T I N G C O N C R E T E S I D E W A L K TEMPORARY 6' WIDE PAVED PATH. (10' PAVED PATH AND ADJACENT SIDEWALK TO BE COMPLETED PRIOR TO OCCUPANCY OF BUILDING 7) EXIST. STOP SIGN 50 ' R REMOVE 40 LF EXISTING CURB TEMPORARY NEW GRAVEL SUBBASE (18") AND PAVEMENT (2.5" TYPE II) POLY SAFETY BARRIERS (EMPTY) EXIST. STOP SIGN FUTURE CONCRETE SIDEWALK FUTURE PAVED PATH TYPICAL TRAFFIC FLOW DIRECTION TYPICAL RESERVED PARKING SPACE FOR DAY CARE STOP SIGN TYPICAL TEMPORARY CHAIN LINK FENCE ALONG 6' PAVED PATH WHEN THERE IS ADJACENT CONSTRUCTION BIORETENTION AREA NEW TAPERED CONCRETE CURB TEMPORARY ONE-WAY CIRCULATION NEAR DAY CARE BUILDING ENTRY UD UD GARDEN STREET 112 GARDEN STREET PROSPECT PLACE LOT N EX. SIDEWALK PA V E D P A R K I N G A R E A EXISTING BOX CULVERT TO CORSET ST EXISTING STORM POND 1 LOT N M A R K E T S T R E E T FUTURE BUILDING 7 303 MARKET ST 113 GARDEN STREET BUILDING 6 267 MARKET STREET BUILDING 4 EXIS T I N G C O N C R E T E S I D E W A L K EXIS T I N G P A V E D P A T H COUR S E WEARING COURSE PAVEMENT WEA R I N G C O U R S E P A V E M E N T WEAR I N G PAVEM E N T E X I S T I N G C O N C R E T E S I D E W A L K BIORETENTION AREA SOUTH BURLINGTON CITY CENTER GARDEN STREET (SOUTH OF MARKET STREET) GR I D 1 PHASED COMPLETION PLAN AND TEMPORARY PEDESTRIAN & VEHICULAR ACCESS (IN FEET) 40 0 40 80 160 1" = 40 ft. STAGE BUILDING COMPLETION DATE STAGE 1 PROSPECT PLACE 112 GARDEN STREET JUNE 1, 2024 STAGE 2 CATAMOUNT RUN-PH2 267 MARKET STREET STREET AUGUST 1, 2025 STAGE 3 CATAMOUNT RUN-PH2 113 GARDEN STREET AUGUST 1, 2025 STAGE 4 BUILDING 7 114 GARDEN STREET SEPTEMBER 1, 2025 WEARING COURSE PAVEMENT & OPEN GARDEN STREET TO PUBLIC TRAFFIC SEPTEMBER 1, 2025 GARDEN STREET PHASED COMPLETION GR I D GARDEN STREET PHASED COMPLETION SCALE: 1" = 40 FEET TEMPORARY PEDESTRIAN & VEHICULAR ACCESS - 112 GARDEN STREET SCALE: 1" = 40 FEET MINIMUM 5' WIDE TEMPORARY PAVED PATH ADJACENT TO EXISTING LIGHT POLE BASE. INSTALL TYPE 3 OBJECT MARKER SIGNS ON EACH SIDE. OM3L & R 12" X 36" R5-11 30" X 24" VEHICLES AUTHORIZED ONLY POLY SAFETY BARRIER MINIMUM HEIGHT = 36" 70 LB EMPTY WEIGHT (72" LONG UNIT) POLY SAFETY BARRIERS (EMPTY) OVERALL LENGTH = 30 FEET INSTALL (2) 'AUTHORIZED VEHICLES ONLY' SIGNS FACING CORSET STREET TYPICAL SAFETY BARRIERS (POLY OR CONCRETE) TO TEMPORARILY CLOSE PARKING SPACES TEMPORARY NO PARKING TEMPORARY NO PARKING TEMPORARY NO PARKING TEMPORARY NO PARKING COORDINATE WITH DPW ON TEMPORARY PARKING SPACE CLOSURE, IF REQUIRED, TO EXTEND CORNER SIGHT DISTANCE FROM EXISTING DRIVEWAY DO NOT ENTER R5-1 30" X 30" S1 S1 ONE WAY R6-1 36"X18"S2S1 S2 S2 R5-11 30" X 24" VEHICLESAUTHORIZED ONLY (2) 'AUTHORIZED VEHICLES ONLY' SIGNS FACING MARKET STREET TYPICAL TRAFFIC FLOW DIRECTION Date Sheet number Scale Checked Drawn Survey Date Revision By These plans shall only be used for the purpose shown below: Sketch/Concept Final Local Review Construction Record Drawing 04-04-24 KB ABR B&G THE SNYDER GROUP, INC. 4076 SHELBURNE ROAD, SUITE 6 SHELBURNE, VERMONT 05482 802-985-5722 WWW.SNYDERHOMESVT.COM AS SHOWN TEMPORARY RUBBER SPEED BUMP MOUNTED ON PAVEMENT (LENGTH = 18', MIN. HEIGHT = 2") 04-18-24 ADD NOTES PER STAFF REVIEW ABR TEMPORARY PEDESTRIAN AND VEHICULAR ACCESS 1.ONE-WAY CIRCULATION WITHIN A PORTION OF THE PARKING LOT SERVING THE BUILDING AT 112 GARDEN STREET SHALL BE TEMPORARY. SIGNS FOR ONE-WAY CIRCULATION SHALL BE REMOVED CONCURRENT WITH THE OPENING OF THE GARDEN STREET CURBCUT FOR RESIDENT USE. 2.THE CONCRETE CURB MODIFICATION (REMOVAL) AT THE SOUTHERLY CORNER OF THE BUILDING AT 303 MARKET STREET SHALL BE TEMPORARY. THE CONCRETE CURB SHALL BE RE-CONSTRUCTED TO MATCH THE APPROVED RECORD PLAN FOR 303 MARKET STREET WITHIN 30 DAYS OF THE OPENING OF THE GARDEN STREET CURBCUT FOR THE RESIDENTS AT 112 GARDEN STREET. 3.CONTINUOUS PEDESTRIAN ACCESS SHALL BE PROVIDED ALONG GARDEN STREET BETWEEN MARKET STREET AND THE BOX CULVERT LOCATED WEST OF THE BUILDING AT 112 GARDEN STREET, THE TEMPORARY PAVED PATH ALONG THE NORTH SIDE OF BUILDING 7 SHALL BE REMOVED PRIOR TO INSTALLATION OF THE PERMANENT 10 FEET WIDE PAVED PATH (SEE GARDEN STREET DESIGN PLANS FOR CONSTRUCTION DETAILS RELATED TO THE PAVED PATH AND CONCRETE SIDEWALK). STOP R1-1 30" X 30" PRIOR TO BEING OPENED TO PUBLIC TRAFFIC, STOP SIGNS SHALL BE INSTALLED ON EACH GARDEN STREET APPROACH TO MARKET STREET S3 S3 S3