CITY OF SOUTH BURLINGTON
DEPARTMENT OF PLANNING AND ZONING
THE SNYDER BRAVERMAN DEVELOPMENT CO, LLC — 112 GARDEN STREET
SITE PLAN APPLICATION #SP-24-09
FINDINGS OF FACT AND DECISION
Site plan application #SP-24-09 of The Snyder-Braverman Development Co., LLC, to amend a
previously approved plan for a mixed-use building consisting of 120 units and 6,800 sf of
commercial space on three existing lots totaling 2.63 acres. The amendment consists of fence,
entrance and building façade modifications, 112 Garden Street
Based on the plans and materials contained in the document file for this application, the
Administrative Officer finds, concludes, and decides the following:
FINDINGS OF FACT & CONCLUSIONS OF LAW
1. The applicant, The Snyder Braverman Development Co, LLC, seeks site plan approval to
amend a previously approved plan for a mixed-use building consisting of 120 units and 6,800
sf of commercial space on three existing lots totaling 2.63 acres. The amendment consists of
fence, entrance and building façade modifications, 112 Garden Street.
2. The owner of record of the subject property is Prospect Place Apartments, LLC.
3. The subject property is located in the City Center Form Based Code Transect 4 (T4) District and
the Transit Overlay District.
4. The application was received on March 7, 2024.
5. The project obtained initial approval for Garden Street Infrastructure in #SP-20-009, and for the
building at 112 Garden Street in #SP-22-050.
6. The submitted materials consists of the following plans and supplemental information.
Directly superseded materials are excluded.
• Form Based Code Application
• Form Based Code Application Cover Letter/Memo 2/23/24
• Abutter and Owner Address Sheet
• Zoning Permit Application 2/23/24
• Project Drawings
Sheet Number Sheet Name
Latest Revision
Date
A3-00 Building Elevations North and West 02/22/2024
A3-01 Building Elevations South and East 02/22/2024
A211 Building First Floor Plan 03/06/2024
A3 Garden Street Building Requirements 02/22/2024
A3-03 Garden Street Building Requirements 12/12/2023
C 1 Site Plan 02/02/2024
C 3 Grading and Utility Plan 02/02/2024
C 5 Lighting Plan 02/02/2024
C 8 Details Sitework 02/02/2024
C 11 Pavement Markings and Sign Plan 02/02/2024
SP-24-09
Findings of Fact and Decision
2
L101 Landscape Detail Layout and Materials 02/12/2024
L100 Overall Layout and Materials 02/12/2021
L200 Planting Plan 02/12/2024
1
Phased Completion Plan and Temporary Pedestrian
and Vehicular Access 04/04/2024
7. Process Elements:
a. The project is subject to administrative review. The requirements for a pre-application
meeting, abutter notice, and written Department of Public Works and Fire Department
review are not applicable because the application consists of less than 5,000 sf
expansion from the previous approval for which such requirements were addressed.
b. The Administrative Officer deemed the application complete on April 4, 2024.
8. Review Criteria:
CITY CENTER FORM BASED CODES STANDARDS
Section 8.03 Land Development and Building Placement
A. Land Development. No land development shall be permitted except in full compliance with the
applicable Building Envelope Standards (BES) and this Article.
The updated BES is provided below.
B. Building Placement. All new buildings, and all additions to buildings, except as permitted in a T3
Cottage Court or as permitted under Section 8.11, Nonconformities, shall include at least one
building façade located entirely within a Build-to-Zone.
No changes to the building placement are proposed or approved.
C. Special Requirements, Prohibitions & Exceptions. Not applicable.
Section 8.04 Blocks, Streets, and Alleys
A. General Standards
(1) Purpose…
(2) Construction of streets
(a) Where a building is proposed to be located on a lot that is adjacent to a new or extended
street, such street shall be constructed by the applicant pursuant to Article 15 and in
accordance with the requirements of Article 11, Street Typologies.
The public street was approved (SP-20-009) pursuant to the conditions of subdivision
approval SD-19-24. The conditions of that approval require certain portions of the roadway
to be complete prior to issuance of the certificate of occupancy for the first building on the
street segment. The approval for this lot, SP-22-050, specified that the conditions of SD-19-
24 be met prior to issuance of a certificate of occupancy for this building, 112 Garden Street.
Since approval of SP-22-050, construction on adjacent lots has accelerated and is now
taking place concurrently with construction on 112 Garden Street. In the interest of
improved traffic and circulation on Market Street, as well as public safety adjacent to
ongoing construction sites, the Administrative Officer hereby modifies the conditions of SP-
22-050.
SP-24-09
Findings of Fact and Decision
3
The elements identified on the plan sheet entitled “Phased Completion Plan and Temporary
Pedestrian and Vehicular Access” shall be completed as designated on that sheet, except
as follows.
a. The wearing course and striping for Garden Street shall be complete at least 1 month
prior to requesting that the road be opened. Incidental work including seeding and final
sidewalk tie-ins from the adjacent buildings may be completed prior to occupancy of
the adjacent buildings.
b. At least 5-ft clear and open sidewalk shall be provided along the South side of Market
Street along N Block no later than August 26, 2024. Temporary (partial day) closures
may be permitted by approval of the Director of Public Works or their designee.
c. Items identified as “Temporary” on that sheet must be restored to the permanent
conditions shown on the remaining approved plan sheets no later than concurrently
with the opening of Garden Street
(b) Where a building is proposed to be located on a lot that is adjacent to existing street, such
street shall be upgraded pursuant to Article 15 and in accordance with requirements of
Article 11, Street Typologies.
Not applicable
(3) Perimeter and Length of Blocks. Not applicable.
(4) Frontage Buildout. See below under Building Envelope Standards.
(5) Connectivity. All existing or proposed streets shall connect directly at each end to another
existing public street, or planned or proposed street listed as a qualifying street type in the
applicable BES.
No changes to previous approvals are proposed.
(6) Build-to-Zones. See below under Building Envelope Standards.
B. Location of blocks and streets.
(1) Applicability of block lengths and perimeters.
The subject property is located within an exempt area.
(2) Public Facilities on the Official Map. Where a planned street or any other planned public
feature, facility, or improvement is shown on a parcel or lot on the Official Map, the owner
of such parcel or lot shall provide an irrevocable offer of dedication of such planned street
or planned public feature, facility for improvement to the City at the time of an application
for land development on such parcel or lot. In the event that the applicant proposes a private
street, a plan clearly depicting the area of such street shall be recorded in the land records
prior to the issuance of any zoning permit. The following additional standards shall apply
in either instance:
(a) – (e) Not applicable.
C. Primary and Secondary Streets.
Garden Street is a primary street.
D. Primary and Secondary Building Façade determination.
In accordance with 8.04D, the principal façade is located on Garden Street.
E. Corner Radii; Clear zones.
No changes to previous approvals are proposed.
F. Alleys.
SP-24-09
Findings of Fact and Decision
4
No alleys are proposed.
Section 8.05 Parking
No changes to previous approvals are proposed.
Section 8.06 Special Standards
A. Civic Sites. Not applicable.
B. Places of Worship. Not applicable.
C. Drive Throughs. Not applicable.
D. Service Stations. Not applicable.
E. Buffer Strip. Not applicable.
F. Required Minimum Stories, Combined Stories.
No changes to previous approvals are proposed.
G. Rooftop Elements and Uses; utilities.
The applicant has proposed to modify the approved rooftop structure by removing the cross-pieces.
(1) Conceal rooftop devices.
No changes to mechanical equipment or appurtenances are proposed.
(2) Flat Roof Designs.
No changes to architectural elements at the cornice of the roof are proposed.
(3) Rooftop Use and structures.
The total area of rooftop uses and structures may not exceed 200 sq ft or 20% of the area of the
upper-most story of the building, whichever is greater, and the height of rooftop uses and
structures may not exceed 14-ft above the maximum height of the building.
No changes to the dimensions of the rooftop structure are proposed. The applicant is
considering a change to design elements within the previously-approved 500 sf roof tower and
is proposing to test-install and visualize one or more components prior to finalizing the feature
in collaboration with the Administrative Officer in order to produce a final product that complies
with this standard and presents an attractive gateway feature. The Administrative Officer
considers this approach acceptable and may consider any final design as a field change.
(4) Utility features. Utility features, such as generators, gas lines or meters, or electrical meters,
shall not be located on any façade parallel to and adjacent to a street and shall be screened
from view of any such street.
No changes to previous approvals are proposed.
H. Alternate Compliance for Entrances in T4.
The applicant has not requested alternative compliance for entrances. Entrances are addressed in
the BES table.
The Administrative Officer finds that the entrances to the non-residential spaces must be operated in a
manner consistent with the definition of public entrance unless subsequent alternative compliance is
approved by the DRB.
SP-24-09
Findings of Fact and Decision
5
Section 8.07 Prohibited Materials
The applicant is proposing to replace some of the approved building materials with different building
materials. No prohibited materials are proposed.
Section 8.08 Open Space Requirements
No changes to approved or required open space are proposed.
Section 8.09 Uses Allowed and Changes of Use.
No prohibited uses have been proposed.
Section 8.14 T-4 Building Envelope Standards
See below.
TRAFFIC OVERLAY DISTRICT
No changes to previous approvals are proposed.
SITE PLAN REVIEW STANDARDS
Section 14.06 Site Plan Review Standards
A. Relationship of Proposed Structures to the Site.
(1) The site shall be planned to accomplish a desirable transition from structure to site, from
structure to structure, and to provide for adequate planting, safe pedestrian movement,
and adequate parking areas.
(a) Street Frontage. Maintain internally-consistent building setbacks and landscaping along
the street.
No changes to previous approvals are proposed.
(b) Building Placement, Orientation. Maintain or establish a consistent orientation to the
street and, where a prevalent pattern exists, shall continue the manner in which the
site’s existing building foundations relate to the site’s topography and grade.
No changes to previous approvals are proposed.
(c) Transition Contrast in Scale. Minimize and mitigate abrupt contrasts in scale between
existing, planned or approved development, and proposed development.
No changes to previous approvals are proposed.
(d) Pedestrian Orientation. Improve and enhance pedestrian connections and walkability
within the area proposed for development.
The applicant is proposing a modification to doors at the northwest corner of the
building. The same number of doors are provided, and continue to provide access to
the same interior spaces.
(e) Solar Gain. Orient their rooflines to maximize solar gain potential, to the extent
possible within the context of the overall standards of these regulations.
No changes to previous approvals are proposed.
SP-24-09
Findings of Fact and Decision
6
The Administrative Officer finds this criterion met.
(2) Parking:
No changes to previously approved parking are proposed.
(3) The height and scale of each building shall be compatible with its site and existing or
anticipated adjoining buildings.
No changes to previous approvals are proposed.
B. Relationship of Structure and Site to Adjoining Area
The applicant is proposing modification to some of the entrances and elements of the building
façade.
(1) The Development Review Board shall encourage the use of a combination of common
materials and architectural characteristics (e.g. rhythm, color, texture, form or detailing),
landscaping, buffers, screens, and visual interruptions to create attractive transitions
between buildings of different architectural styles.
(2) Proposed structures shall be related harmoniously to themselves, the terrain and to
existing buildings and roads in the vicinity that have a visual relationship to the proposed
structures.
The Administrative Officer finds the proposed changes to be relatively minor and
unaffecting compliance with these criteria.
Section 14.07 Specific Review Standards
In all Zoning Districts and the City Center Form Based Codes District, the following standards shall
apply:
A. Environmental Protection Standards. All proposed development shall be subject to the
applicable requirements of Article 12, Environmental Protection Standards.
Section 12.02 Wetland Protection Standards
No changes to previous approvals are proposed.
B. Site Design Features. All proposed development shall comply with standards for the
placement of buildings, parking and loading areas, landscaping and screening, open space,
stormwater, lighting, and other applicable standards related to site design pursuant to these Land
Development Regulations.
These standards are contained in Article 13 and are discussed below.
C. Access and Circulation. All proposed development shall comply with site access and
circulation standards of Section 15.A.14.
15.A.14 pertains largely to road design. Changes to previously approved pedestrian circulation
include minor modifications to the accessible entrance on the south side of the building near the
parking lot. The Administrative Officer finds this criterion met.
D. Transportation Demand Management (TDM) [reserved]
E. Building Form. Development within the City Center Form Based Code District, the Urban
Design Overlay District, and other districts with supplemental building form standards shall
adhere to the standards contained therein.
See 8.13 below.
SP-24-09
Findings of Fact and Decision
7
F. Streetscape Improvements. A proposed new construction or extension/expansion of an
existing structure exceeding the thresholds listed in either (a) Section 14.09(B) or (b) Section
8.11(D) within the City Center Form Based Code, or Section 3.11(D) in all other zoning districts,
shall be required to upgrade adjacent sidewalks, greenbelts, and related street furniture (trees,
benches, etc.) to the standards contained within the applicable Street Type and Building Envelope
Standard. Nothing in this subsection shall be construed to limit requirements for additional
upgrades as necessary to meet the requirements of these Regulations.
No changes to previous approvals are proposed.
G. Access to Abutting Properties. The reservation of land may be required on any lot for
provision of access to abutting properties whenever such access is deemed necessary to reduce
curb cuts onto an arterial or collector street, to provide additional access for emergency or other
purposes, or to improve general access and circulation in the area.
No changes to previous approvals are proposed.
H. Utility Services. Electric, telephone and other wire-served utility lines and service
connections shall be underground insofar as feasible and subject to state public utilities
regulations. Any utility installations remaining above ground shall be located so as to have a
harmonious relation to neighboring properties and to the site. Standards of Section 15.A.18,
Infrastructure, Utilities, and Services, shall also be met.
No changes to previous approvals are proposed.
I. Disposal of Wastes. All dumpsters and other facilities to handle solid waste, including
compliance with any recycling, composting, or other requirements, shall be accessible, secure and
properly screened with opaque fencing to ensure that trash and debris do not escape the
enclosure(s). Small receptacles intended for use by households or the public (ie, non-dumpster,
non-large drum) shall not be required to be fenced or screened.
No changes to previous approvals are proposed.
BUILDING ENVELOPE STANDARDS
See following pages
SP-24-09
Findings of Fact and Decision
8
SP-24-09
Findings of Fact and Decision
9
SP-24-09
Findings of Fact and Decision
10
SP-24-09
Findings of Fact and Decision
11
Highlighted cells above have been updated to reflect current proposal. Unhighlighted cells are
unchanged from previous approval.
SP-24-09
Findings of Fact and Decision
12
DECISION
Based on the above Findings of Fact, the Administrative Officer hereby approves site plan
application #SP-24-09 of The Snyder Braverman Company, LLC, subject to the following conditions:
1. This project shall be completed as shown on the plan(s) on file in the South Burlington
Department of Planning and Zoning.
2. The Administrative Officer hereby concurrently issues Zoning Permit #ZP-24-045.
Prior to Issuance of a Certificate of Occupancy
3. This project must be completed as shown on the plans submitted by the applicant, and on
file in the South Burlington Department of Planning and Zoning.
4. The proposed project shall adhere to standards for erosion control as set forth in Section
16.03 of the South Burlington Land Development Regulations. In addition, the grading plan
shall meet the standards set forth in Section 16.04 of the South Burlington Land
Development Regulations.
5. Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines,
services, and service modifications must be underground.
6. All products installed in the qualifying open space must be of high quality materials intended
to be used for commercial application, pursuant to Appendix G.
7. Bicycle parking and clothes lockers must be installed in a manner meeting the minimum
standards of 13.14.
8. All exterior lighting must be installed or shielded in such a manner as to conceal light
sources and reflector surfaces from view beyond the perimeter of the area to be
illuminated.
9. All new buildings are subject to the Stretch Code pursuant to Section 3.15: Residential and
Commercial Building Energy Standards of the LDRs. The applicant must provide the
Administrative Officer with a copy of the energy certificate for each building prior to issuance
of a Certificate of Occupancy.
10. The elements identified on the plan sheet entitled “Phased Completion Plan and Temporary
Pedestrian and Vehicular Access” shall be completed as designated on that sheet, except as
follows.
a. The wearing course and striping for Garden Street shall be complete at least 1 month
prior to requesting that the road be opened. Incidental work including seeding and final
sidewalk tie-ins from the adjacent buildings may be completed prior to occupancy of
the adjacent buildings.
b. At least 5-ft clear and open sidewalk shall be provided along the South side of Market
Street along N Block no later than August 26, 2024. Temporary (partial day) closures
may be permitted by approval of the Director of Public Works or their designee.
c. Items identified as “Temporary” on that sheet must be restored to the permanent
conditions shown on the remaining approved plan sheets no later than concurrently
with the opening of Garden Street
SP-24-09
Findings of Fact and Decision
13
Operational and Ongoing Conditions
11. All previous approvals and stipulations which are not changed by this decision, will remain
in full effect.
12. The applicant must regularly maintain all stormwater treatment and conveyance
infrastructure.
13. All on-site lighting must comply with the requirements of 13.07, including the requirement
that all light sources be shielded or positioned so as to prevent glare from becoming a hazard
or a nuisance, or having a negative impact on site users, adjacent properties, or the traveling
public. Excessive spillover of light to nearby properties shall be avoided. Glare shall be
minimized to drivers on adjacent streets.
14. The applicant must obtain a Certificate of Occupancy from the Administrative Officer prior
to use or occupancy of any building.
15. Any change to the approved plan will require approval by the Administrative Officer.
Signed on this 3rd day of May, 2024 by
_______________________________________
Marty Gillies, Administrative Officer
PLEASE NOTE: Pursuant to 24 VSA §4465, an interested person may appeal this decision by filing
a Notice of Appeal with the secretary of the Development Review Board. This Notice of Appeal
must be accompanied with a $233 filing fee and be filed within 15 days of the date of this decision.
The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state
permits for this project. Call 802.477.2241 to speak with the regional Permit Specialist.