HomeMy WebLinkAboutZP-24-089 - 0530 Community Drive 4/17/20241 Rev 2019-11
CITY OF SOUTH BURLINGTON
ZONING PERMIT APPLICATION
PROPERTY Street Address:_________________________________________ Application No:_________________
[office use only]
Property Owner:__________________________________________________Parcel Size:___________________
Property Owner Mailing Address:___________________________________________________________________
APPLICANT:__________________________________________________________________________________
Applicant Mailing Address:_______________________________________________________________________
Applicant Email: ______________________________________________Daytime phone:_________________
1.PROPOSED project including building dimensions (describe):
1a: IF NEW STRUCTURE
Building height (see Land Development Regulations Definition of Height): __________ft.
# of Bedrooms: ___________
The project will comply with the City of South Burlington “Regulation of Heating and Service Water Heating Systems
in New Buildings” ordinance: Yes No
2.RELATED Site Plan, Conditional Use, PUD, Subdivision, or Misc Approval Number (if applicable)
3.Present USE(S) of the property:
Single family home on its own parcel
Other (please state the USE per Land Development Regulations- retail, general office, multifamily residential, etc.):
_________________________________________________________________________________________________
4.List all present structure(s) on property (describe including dimensions or square footage of each):___________________
___________________________________________________________________________________________________
5.Does the project include a proposed change of USE?
No (the property will still be used for the same purpose)
Yes
a. proposed changed or added USES per Land Development Regulations- retail, general office, multifamily
residential, etc.): ___________________________________________________________
b. proposed wastewater generation (GPD):
c. proposed PM Peak hour trip generation for entire property (in and out):
i. Land Use Code(s) Used, independent variables, calculations:
6.ESTIMATED total cost of improvements (materials and labor): $_______________________________
7.BUILDING footprint – i.e. size in sq. ft. of main floor of house and all attached and detached structures including enclosed
breezeways, garages, and sheds (describe): Existing:______________________Proposed:_______________________
8.TOTAL impervious surfaces on site (i.e. Building footprint PLUS size in s.f. of driveways, patios, decks):
Existing:______________________Proposed:_______________________
Complete the following only if the project involves changes to the dimensions of your building or other site changes (ie, not interior
renovations or roof / window / deck replacement)
530 Community Drive
Technology Park Ass.,PMF Energy Ass., Axinn-VT Inc.30.13 acres
88 Technology Park Way Suite 2, South Burlington VT, 05403
University of Vermont & State Agricultural College
31 Spear Street Marsh Hall Suite 10, Burlington VT 05405
Lani.Ravin@uvm.edu (802) 656-3217
N/A
N/A
N/A
General Office
481,121
Replacement of large rooftop chiller: 1. Installation of temporary surface 2. Crane will remove old
chiller and install new 3. Remove temporary surface, restore to existing conditions, plant 3 maples
✔
Existing large office building is on site. No proposed changes to any existing structures.
✔
ZP-24-089
2 Rev 2019-11
9.ATTACH SKETCH PLAN OR SITE PLAN
10.APPLICANT/OWNER CERTIFICATION
The undersigned property owner hereby consents to submission of this application and understands that if the application is
approved, the Zoning Permit and any attached conditions will be binding on the property.
_____________________________________________________________________ _________________________
Property Owner Signature PRINT NAME Date
The undersigned applicant hereby affirms that the information presented in this application is true, accurate and complete.
_________________________________Lani_Ravin AICP, for Univ. of VT & SAC
Applicant Signature PRINT NAME
_____April 9, 2024_____
Date
OFFICE USE ONLY –ADMINISTRATIVE OFFICER ACTION – OFFICE USE ONLY
DATE Received: ___________________ FEE Received: $ _____________ Identification of zoning district: _______________
Project description: ______________________________________________________________________________________
SITE PLAN _____________________________________ ____________________________
Application #Approval Date
SUBDIVISION _____________________________________ ____________________________
Application #Approval Date
CONDITIONAL USE _____________________________________ ____________________________
Application #Approval Date
VARIANCE _____________________________________ ____________________________
Application #Approval Date
MISCELLANEOUS _____________________________________ ____________________________
Application #Approval Date
FINAL ADMINISTRATIVE OFFICER ACTION
ZONING PERMIT
Ƒ APPROVED _________________________ ____________________________________________________________
Approval Date Administrative Officer’s Signature
Permit EFFECTIVE date _________________________Permit EXPIRATION date ___________________________
CONDITIONS of Approval __________________________________________________________________________
ƑProvided applicant copy of URBEC or VCBE Standards Handbook or Ƒ Not Applicable
Ƒ DENIED _________________________ _____________________________________________________________
Denial Date Administrative Officer’s Signature
REASON for DENIAL ______________________________________________________________________________________
Notice of Appeal Rights:Any interested person may appeal this decision by filing a written Notice of Appeal with the clerk of the Development Review
Board within fifteen [15] days of the date of this decision. The notice of appeal must be accompanied by a filing fee of $223.00.
This permit does NOT authorize commencement of any development activity approved by the permit until the permit takes effect as set forth
above. Site modifications and improvements made prior to this permit becoming effective may be subject to removal and site restoration if a timely
appeal is commenced.
NOTE:The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state permits for this project. Call (802) 477-2241 to
speak with the regional Permit Specialist.
John Illick 04/09/2024
4/10/2024 IC43.00
replacement of rooftop mechanical equipment, including temporary site modifications
X
X
The applicant shall make every effort to retain the tree identified in red on Sheet C-1.0. If this tree is removed, the applicant shall
replace it with a maple tree with a caliper of no less than 4" and pay a fine of no less than $800 to the City of South Burlington.
4/17/2024
5/3/2024 4/16/2025
Project Description: University of Vermont Computer Chiller Replacement
The University of Vermont is planning to replace the large chiller at our computer facility at 530
Community Drive, in Technology Park in South Burlington. This facility provides computing capacity for
the University and is part of the University’s critical infrastructure. We know that the existing chiller
currently has the potential to fail, which would negatively impact University functions.
We plan to replace the current chiller with a new unit which will be slightly smaller, but still fit onto the
existing metal holding frame that is currently located on the roof. The process to remove the existing
chiller and replace with the new unit will involve moving a crane close to the building.
The replacement will involve a number of steps:
1. Clearing 3 existing crabapples (caliper ~10’-16”) so that the crane can get close enough to the
building to remove the old chiller and install the new. These 3 existing trees were not part of
Site Plan C2-01.
2. Putting down a temporary surface of crushed stone or matting near the building. The crane will
be able to maneuver between an existing line of mature trees to get close enough to the
building for this work. One of these trees may need to get pruned, to facilitate entry of the
crane.
3. The project will make every effort to retain this tree. If tree is accidentally damaged to the point
that the tree is not viable, the project will replant a tree in the same location and pay a
reasonable fine that the City determines is appropriate.
4. Crane operator will obtain an FAA approval as necessary.
5. Crane will be used to remove the existing equipment and lift in the new equipment.
6. After this work is complete and the crane is removed, staff will remove the temporary surface,
restore to original condition, and plant three 4” caliper acceladel maple trees near the building
(see landscape plan).
The only permanent change to the site plan will be the 3 new maple trees instead of the 3 crabapple
trees, as per the proposed landscape plan.
This is a request for administrative zoning permit review. We have designed this plan to have the least
permanent impact possible on the site, and will replace three existing trees (that were not on the site
plan) with a robust, longer life species of tree.
The cost of installation is estimated to be $481,121, which will include the landscape materials and
work, temporary surface, restoration, all site work, and the crane (excludes cost of the chiller).
D
D
D
D
D
D
D
C-1.0
164 Main Street, Suite 201 P: (802) 878-0375
Colchester, Vermont 05446 www.krebsandlansing.com
CIVIL ENGINEER
University of Vermont
284 EAST AVENUE
BURLINGTON, VERMONT 05405
Physical Plant Department
STAGING
Site Plan
Project Manager: Adam Frazier
University of
Vermont
Technology Park
Chiller Upgrade
Temporary Staging Pad
(See Details)
Place crushed stone (6" thick min),
temporary steel plates (3/4" thick),
or timber matting for temporary
access to crane staging area
After construction remove stone
and fabric. Rototill and amend soil
per Post Construction Soil Depth
and Quality Notes, and hydroseed.
Install temporary chain-link
construction fence
Post-Construction Soil Depth and Quality Notes:
■Soil quality: See Soil & Seeding Notes on this plan.
■Compost and other materials shall be used that meet the following requirements:
o The compost or other materials shall have a carbon to nitrogen ratio below 25:1.
o Compost shall meet the definition of “compost” in the Agency's Solid Waste Management Rules or shall meet the
contaminant standards in the Vermont Solid Waste Management Rules §6-1104(g)(6- 7), §6-1105(e)(8-9), and
§6-1106(e)(7-9). Compost or other organic materials may be amended to meet the foregoing requirements.
■The soil quality requirements shall be met by using one or a combination of the following methods:
o Option 1: Leave undisturbed native vegetation and soil, and protect from compaction during construction. Failure
to establish and maintain exclusionary controls around these areas during the construction phase may trigger the
requirement to restore soils per one of the following options.
o Option 2: Amend existing site topsoil or subsoil in place.
▪Scarify or till subsoils to 4 inches of depth or to depth needed to achieve a total depth of 8 inches of
uncompacted soil after calculated amount of amendment is added. Except for within the drip line of existing
trees, the entire surface shall be disturbed by scarification;
▪Amend soil to meet organic content requirements:
·PRE-APPROVED RATE: Place 1 inch of composted material with an organic matter content between
40 and 65% and rototill into 3 inches of soil, or
·CALCULATED RATE: Place calculated amount of composted material or approved organic material
and rototill into depth of soil needed to achieve 4 inches of settled soil at 4% organic content.
*Contractor to provide calculation and site sketch indicating areas used for calculations.
▪Rake beds to smooth and remove surface rocks larger than 2 inches in diameter; and
▪Water or roll to compact soil in turf areas to 85% of maximum dry density.
o Option 3: Import topsoil mix, or other materials for mixing, including compost, of sufficient organic content and
depth.
·Scarify or till subgrade to a depth of 4 inches. Except for within the drip line of existing trees, the entire
surface shall be disturbed by scarification;
·Place 4 inches of imported topsoil mix on surface. The imported topsoil mix shall contain 4% organic
matter. Soils used in the mix shall be sand or sandy loam as defined by the USDA; Shop drawing
submittal is required. Find USDA sieve for sand and sandy loam.
·Rake beds to smooth and remove surface rocks larger than 2 inches in diameter; and
·Water or roll to compact soil in turf areas to 85% of maximum dry density.
300
Remove four (3) existing
trees and stumps.
Temporarily remove and
replace existing signs as
necessary
Do not cut existing trees at entrance.
Lower tree branches may be limbed.
Coordinate with Owner.
Install and maintain
temporary straw wattles
along downslope limit of
disturbance until
vegetation is restored
Protect existing curb with cribbing, crushed
stone, or other means. Contractor shall
replace any curb damaged during the work
Temporary 4' wide gravel
access path for tenant use
After construction, excavate and plant (3)
4” caliper Acceladel Maple trees in
approximate location identified.
Coordinate exact locations with Owner.
1
The project will make every effort to retain this
tree. If tree is accidentally damaged to the point
that the tree is not viable, the project will replant a
tree in the same location and pay a reasonable
fine that the City determines is appropriate.
1
C
s THE INTENT OF THIS PLAN IS FOR THE REPAVING OF THE PARKING LOT AND I IUPGRADINGTHEEXISTINGPARKINGLOTLIGHTING, WHICH INCLUDES
CONDUIT, LIGHT BASES AND FIXTURE REPLACEMENT WITH LED FIXTURES.
1 all EXIS77NG UNDERGROUND
ELECTRIC d TELEPHONE
CABLE s I
I T
10 WIDE EASEMENT i0 VERMOM
I -I i GASSYSTEMS.INC.V.397P.56 ---- — -----
11 IT I I `` •. I
ce.—g-----p— -..-
V10F
ELEC
UNDERGROUNDCOMMUNICATION iCABLEISEMENTCTRIC'MTCTEL. PTK CABINET CA
SNOWSTORAGE I' 10'BUILDING$EBA10'BUILDING SETBAC \ -
II i l c I SMH ELECTR
i i 1 CONCRETE PAD I = MANHOLE
TELEPHONE—
I• . I i FOR 2 DUMPSTERS WITH \
R 3.79 MANHOLE u CABINET EASEMENT TO VERMOIIIi1N=335.79 (5) 8" .1 / GASSYSTEMS, INC. v.
I 411i i I FENCED EN OSURE 10' PA VED i1N 335.74 (E) B" .. / / 315 P. 84 2 1 III" CONDU03
li III i I
I
HRELANE 5. 72 (N) 8" TANK ON
O OCONC
OOOOOOOI
p CONDITIONING
I 0I
DRA. IBERM
O0EQUIPMENTI6NAM dONEWNWt=
I3N090.
59
PAVED PARKING AREA
ELEC. MH /VOU VAPORIZER p II
I
GATE c >• I "
X 1
PAVED YELLOW &RCH PAVED PARKING AREA
1 NITROGEN EN
TAN 10'GRAVEL FIRELANE TRANSFORMER PA VAULT PADS SERVICE
1 DRIVE I
1 i WOODEN
SERVICE TEL. CAB. — — Y PLATFORM W/
STEPS FOR DUMPSTE ' — —4' I Ili G
O O PAD MOUNTED GENERATOR HVAC Euow&RCH ol----
w-----w-----w--
is I DUMPSTERS
EQUIPMEN y
CONCRETE
PAD alpp2CONCRETE
ELEV.
347.5 UNDERGROUND FUEL 1 •III PROPOSEDDUMPSTER
I BOLLARDS 6'..NCHAIN =I' 1 I ENCLOSURE
CONCRETE LINK FENCE 4 - I O
1 6" PVC SDR 35 SLEEVE CONCRETE PAD FOR i I V ,
SPACETO ARBERESERVED TECHNOLOG
BURIED 5'DEEP EMERGENCY
PAVEMENT Y p I PARK
PARTNERS
AS NO PARKING GENERATORS WITH i tCHAINLINK FENCEr-
ONCRETE -- O O
Y I PAI IIEXISTING
MP
S i - O O O \\ 1
CRABAPPLES BUILDING EXISTING
CCi I I
IBOULDER /
BIKE RACE i
I I CANO
1 I1 I I CRABAPPLES
PAVED PARKIN AREA /—CONCRETE
I \ I °\ I lI
I 1 C3 /
MOTORCV LE PN"
BEN & JERRY'S II II Ilil \\ PAD
SMOKING PAVILION I \ \ (/ O O Q O
S' 1*— SPACE TO BE
RESERVED BY TECkNOLOGY1II 1 CRABAPPLES
I RK PARTNERS A$ NO PARKLNG\\ Ill JECT LOCATION I -
If
II II
II
11
I
O
I\
II
I lI
p
i
I
I4 1
I,
l
11
11
I CANOPY HANDICAP511ACE I PAVED
PARKING AREA
III'I I 44
C WATER PUMP 1
I r,
APPROXIMATE
LOCATION Of THE
EASTERLY ° r EDGE OF THE AIRPORT
APPROACH CONE0 I / l o—
PAVED
PARKING AREA
EXISTINGDEIENIWN V. POND
02 `'\ O /
I . F• 40'8WL,,NG SETBACK
COMMUNITY DRIVE GropwC Seab
feel I
0 60
120
100 240 T EXISTING DETENTION POND
MI
td V§
J010* TRUDELL
CONSULTING
ENGINEERS
Re
s ew BnaprI
YAYW.TCFVrcow
NlDcscrpban DoleBy Qi
Add C-01I—
VIa by ECl D5/I2/N DAB use hire wpwtnot 0
ed IM1esew1hg preyog codanoton-9 i a' pl
r
TB A; e ovpl
hOm Meredul dy LneM1 B s. Y nttled
ai c«shuctlon
arovnngs un ess n0tetl Only tl 'ng p«i' BY
mak.d 'Fl, C m t' e 1 tl A to b, A
I to h. g rs antl be MYa IM M1b
d' p Gulling IAA t BnTed rK Arcs . B
ppE a . m 6owps btl b0u1. COntpcl ICE r
m,<t 1 v:,e
ery I obmm b ttlo ' abk i Iron l
y 3. 1ne D,vmd spetific lO Ine
Ier Itt l hea Rq tl de
npl opesbk. .fs
of —II the d
rqs.
ontl n'by ICE de s evW petty. Ojn in gs—yonly Mm a byICE. If re a scovared IM1ey n II be
b oughtfo 1M1e p I TCE immeal0rely. BY ItBYu
Wp dsi ,Nbwofme Project.
the Owner repressors M1c tlxrn viewed opproved.
bppkbbptea lne dr d ' Iw e r
w1 oPP Kpbb purl es/ds pl"1. In
Pde properly c0dd nplea IM1 1 sped Prcject. fie
Owner oN AreMect. ore resparpbk Id an"yy
bultlmgs sldwn, na°and on prepmer,etl
o mrYmdn live Is) lest oorAla dw bwamg. s. n 1:the users
msponsilBy to
erode INs coot comom: me most Mrnr reYBxns. rESIO'11 yIII/I E
N..]WT + CIA
OniITlyimp``• 30CommunityDrive, LLC
30 CommunityDrive
South
Burlington, Vermont
Site Plan
Dm° </30/Igl.
xale. I-BV
Project NurN
er' _ 14w 3
Drown By: RW
Pr e t En*— DAB -..
Approved By: C.
2-01
H0.01
CBR
DH
FITTINGS
VALVES
ABBREVIATIONS & SYMBOLS PIPING DUCTWORKPIPING CONTINUED
0 07/26/2023
- -
- -
- -
- -
- -
- -
- -
- -
- -
10/07/2020
DATE:DESIGNED:
DATENo.ISSUED
CHECKED:PROJ. No.
SHEET NO.
ISSUED
CONSULTANTS:
DRAWING TITLE:
20264.000
SHEET SIZE: 24x36
H1.01
CBR
DH
MECHANICAL SITE PLAN
10/07/2020
DATE:DESIGNED:
DATENo.ISSUED
CHECKED:PROJ. No.
SHEET NO.
ISSUED
CONSULTANTS:
DRAWING TITLE:
20264.000
SHEET SIZE: 24x36
0 07/26/2023
- -
- -
- -
- -
- -
- -
- -
- -
- -
APPROACH LOOKING SOUTH STAGING AREA LOOKING WEST STAGING AREA LOOKING EAST STAGING AREA LOOKING NORTH
H2.01
CBR
DH
MECHANICAL ROOF PLAN
10/07/2020
DATE:DESIGNED:
DATENo.ISSUED
CHECKED:PROJ. No.
SHEET NO.
ISSUED
CONSULTANTS:
DRAWING TITLE:
20264.000
SHEET SIZE: 24x36
MECHANICAL ROOF DEMOLITION PLAN
0 07/26/2023
- -
- -
- -
- -
- -
- -
- -
- -
- -
CHILLER SECTIONMECHANICAL ROOF PLAN - ALTERNATE #1
H5.01
CBR
DH
CHILLER MOUNTING VIBRATION ISOLATOR
10/07/2020
DATE:DESIGNED:
DATENo.ISSUED
CHECKED:PROJ. No.
SHEET NO.
ISSUED
CONSULTANTS:
DRAWING TITLE:
20264.000
SHEET SIZE: 24x36
AIR COOLED CHILLER
BACNET CONTROL POINTS
INPUT/OUTPUT POINTS LIST
AIR COOLED CHILLER
0 07/26/2023
- -
- -
- -
- -
- -
- -
- -
- -
- -
OUTDOOR WEATHER STATION
BACNET CONTROL POINTS
E3.01
MWF
LRT
DEMO WORK
10/07/2020
DATE:DESIGNED:
DATENo.ISSUED
CHECKED:PROJ. No.
SHEET NO.
ISSUED
CONSULTANTS:
DRAWING TITLE:
20264.000
SHEET SIZE: 24x36
NEW WORK
RELEVANT LOCATIONS
0 11/16/2022
- -
- -
- -
- -
- -
- -
- -
- -
- -
NEW WORK - ALTERNATE #2