HomeMy WebLinkAboutSP-24-04 CU-24-02 - Decision - 0099 Proctor Avenue
1
CITY OF SOUTH BURLINGTON
DEPARTMENT OF PLANNING AND ZONING
ROMAN CATHOLIC DIOCESE OF BURLINGTON – 99 PROCTOR AVENUE
SITE PLAN APPLICATION #SP-24-04 & CONDITIONAL USE APPLICATION #CU-24-02
FINDINGS OF FACT AND DECISION
Site plan application #SP-24-04 and conditional use application #CU-24-02 of the Roman Catholic
Diocese of Burlington to amend a previously approved plan for a 126,875 sq. ft. educational facility
(Rice Memorial High School). The amendment consists of reconfiguring and installing turf on the
existing athletic fields, removing the existing track and bleachers, constructing new pervious
walkways, and other minor site improvements, 99 Proctor Avenue.
The Development Review Board held a public hearing on March 5, 2024. Andrew Nagy, Greg
Dixson, Christopher Hulk, Jeff Hodgson, and Ella Braco represented the applicant.
Based on testimony provided at the above-mentioned public hearing and the plans and supporting
materials contained in the document file for this application, the Development Review Board finds,
concludes, and decides the following:
FINDINGS OF FACT
1. The applicant is seeking to amend a previously approved plan for a 126,875 sq. ft. educational
facility (Rice Memorial High School). The amendment consists of reconfiguring and installing
turf on the existing athletic fields, removing the existing track and bleachers, constructing new
pervious walkways, and other minor site improvements, 99 Proctor Avenue.
2. The owner of record of the subject property is the Roman Catholic Diocese of Burlington.
3. The subject property is located in the Residential 4 Zoning District. Portions of this property not
proposed to be impacted by this project are located in the Wetland Advisory Layer.
4. The application was received on 1/19/2024.
5. The plans submitted consist of:
Sheet No. & Title Prepared by Last Revised Date
C-3.00 – Location Map Krebs & Lansing 02/02/2024
C-0.00 – Existing Conditions Plan Krebs & Lansing 02/02/2024
C-1.00 – Civil Site Plan Krebs & Lansing 02/02/2024
C-1.01 – Civil Site Plan Krebs & Lansing 02/02/2024
C-1.02 – Civil EPSC Plan Krebs & Lansing 02/02/2024
C-2.00 – Civil Details Krebs & Lansing 02/02/2024
C-2.01 – Civil Details Krebs & Lansing 02/02/2024
C-2.02 – Civil Details Krebs & Lansing 02/02/2024
SP-1 – Site Development Plan FieldTurf 1/12/2024
PR-1 – Profile View 1 FieldTurf 1/12/2024
PR-2 – Profile View 2 FieldTurf 1/12/2024
SP-24-04 & CU-24-02
2
6. The applicant is proposing to alter the existing athletic field space at Rice Memorial High School
to slightly enlarge the dimensions of the existing baseball field, slightly shift the location of the
existing grass soccer field, and replace the existing natural grass surface of both fields with
artificial turf. As part of this project, the applicant is also proposing some associated site
alterations, including the removal of the existing track and bleachers, the creation of previous
pedestrian pathways, and the installation of short-term bike parking facilities.
7. The existing educational facility is a Conditional Use in the Residential-4 Zoning District. Section
14.10.C of the Land Development Regulations specifies “any alteration, extension or other
change to an existing conditional use shall require review under the requirements of this
section” – as such, the proposed alteration of the athletic fields necessitates that the project is
subject to the review standards for both Site Plans and Conditional Uses.
ZONING DISTRICT & DIMENSIONAL REQUIREMENTS
Residential-4 Zoning District Required Existing Proposed
Min. Lot Size (non-residential) 40,000 sf 30.1 acres No change
Max. Building Coverage 30 % 5.7% No change
Max. Overall Coverage 60 % 18.7% 17.3% 1
Min. Front Setback 30 ft. Not provided No change
Min. Side Setback 10 ft. Not provided No change
Min. Rear Setback 30 ft. Not provided No change
Max Height, flat roof 25 ft. Not provided No change
1. The applicant is proposing to remove impervious site features such as the existing
track, bleachers, and impervious walkway, and replace them with synthetic turf and
pervious walkways, thereby reducing the total amount of impervious surface on
the site and avoiding the responsibility to provide stormwater treatment as part of
this project.
TABLE C-1 USES APPLICABLE IN ALL ZONING DISTRICTS
The subject property is in the Residential-4 Zoning District. This zoning district has the stated
purpose of “encouraging residential use at moderate densities.” This zoning district permits
‘educational facilities’ as a Conditional Use. The LDRs define “educational facility” as a “facility used
for or in support of education, instruction, or research in any branch of knowledge”. The Board finds
that the existing athletic fields, used for physical education instruction and interscholastic
competition, both support and are integrated into the function of the existing educational facility.
The Board finds that simply re-surfacing the existing athletic fields does not constitute a change in
use or purpose of the existing athletic fields.
The Residential-4 Zoning District prohibits “outdoor recreation facilities” as a use, which the LDRs
define as a “commercial recreational facility for activities wholly or partially outside of any building
or structure”. The definition of goes on to identify ‘ball fields’ as an example of an outdoor recreation
facility. The Board finds that one of the primary distinctions between athletic fields associated with
an educational facility (approvable as a Conditional Use) and athletic fields that would be classified
as an outdoor recreation facility (prohibited) is the relationship of the proposed field users with the
educational facility.
To ensure that the athletic fields are not used as an “outdoor recreation facility”, the Board finds
that the athletic fields at Rice Memorial High School shall only be used for school-related athletics
and activities.
SP-24-04 & CU-24-02
3
SITE PLAN REVIEW CRITERIA
Pursuant to Section 14.03.A(1)(b) & (c) of the South Burlington Land Development Regulations, the
proposed alteration to the approved site plan, which is also subject to conditional use approval, shall
require site plan approval and shall meet the following standards of Section 14.06:
14.06 General Review Standards
A. Relationship of Proposed Structures to the Site.
(1) The site shall be planned to accomplish a desirable transition from structure to site, from
structure to structure, and to provide for adequate planting, safe pedestrian movement, and
adequate parking areas. The DRB shall consider the following:
(a) Street Frontage. Maintain internally-consistent building setbacks and landscaping along the
street.
The Board finds that the proposed project does not impact compliance with this standard.
(b) Building Placement, Orientation. Maintain or establish a consistent orientation to the street
and, where a prevalent pattern exists, shall continue the manner in which the site’s existing
building foundations relate to the site’s topography and grade.
The Board finds that the proposed project does not impact compliance with this standard.
(c) Transition Contrast in Scale. Minimize and mitigate abrupt contrasts in scale between
existing, planned or approved development, and proposed development.
The Board finds that the proposed project does not impact compliance with this standard.
(d) Pedestrian Orientation. Improve and enhance pedestrian connections and walkability within
the area proposed for development.
The proposed project involves a slight increase in the amount of formal pedestrian walkway area
throughout the athletic field space, which the Board finds constitutes a slight improvement in
terms of pedestrian connectivity throughout the subject property.
(e) Solar Gain. Orient their rooflines to maximize solar gain potential, to the extent possible
within the context of the overall standards of these regulations.
The Board finds that the proposed project does not impact compliance with this standard.
(2) Parking.
No impacts to parking are proposed. Therefore, the Board finds the criteria pertaining to parking
location and layout to be irrelevant.
(a) Parking shall be located to the rear or sides of buildings. Any side of a building facing a
public street shall be considered a front side of a building for the purposes of this subsection.
(b) The Development Review Board may approve parking between a public street and one or
more buildings if the Board finds that one or more of the following criteria are met. The Board
shall approve only the minimum necessary to overcome the conditions below.
(c) Parking area width. Surface parking areas and affiliated drive aisles located to the side of
buildings shall not exceed the width of building(s), Civic Spaces, and Site Amenities along any
street frontage. This may be calculated separately or cumulatively for corner lots. Parking
approved pursuant to 14.07(B)(2)(b) shall be exempt from this subsection.
(d) For through lots, parking shall be located to the side of the building(s) or to the front of the
building adjacent to the public street with the lowest average daily volume of traffic. Where a
lot abuts an Interstate or its interchanges, parking shall be located to the side of the building(s)
or to the front adjacent to the Interstate. Parking areas adjacent to the Interstate shall be
SP-24-04 & CU-24-02
4
screened with sufficient landscaping to screen the parking from view of the Interstate.
(3) Without restricting the permissible limits of the applicable zoning district, the height and scale
of each building shall be compatible with its site and existing or anticipated adjoining buildings.
Buildings are not proposed to be impacted, therefore the Board finds that the proposed project does
not impact compliance with this standard.
B. Relationship of Structures and Site to Adjoining Area.
(1) The Development Review Board shall encourage the use of a combination of common materials
and architectural characteristics (e.g., rhythm, color, texture, form or detailing), landscaping,
buffers, screens and visual interruptions to create attractive transitions between buildings of
different architectural styles.
Buildings are not proposed to be impacted therefore the Board finds that the proposed project does
not impact compliance with this standard.
(2) Proposed structures shall be related harmoniously to themselves, the terrain and to existing
buildings and roads in the vicinity that have a visual relationship to the proposed structures.
The applicant is proposing to remove an existing structure (bleachers), but not to add any structures.
The Board finds that the proposed project does not impact compliance with this standard.
(3) To accomplish (1) and (2), the DRB shall consider:
(a) Pattern and Rhythm. Update or maintain or extend the overall pattern of development
defined by the planned or existing street grid, block configurations, position and orientation
of principal buildings, prevalence of attached or detached building types.
(b) Architectural Features. Respond to recurring or representative architectural features
that define neighborhood character, without adhering to a particular architectural style.
(c) Privacy. Limit impacts and intrusions to privacy on adjoining properties, including side
and back yard areas through context sensitive design.
C. Site Amenity Requirement.
(1) Sites are required to include a specific minimum area for appropriate Site Amenities. This
section does not apply to projects within the City Center FBC District (which are governed by
Section 8.08).
(2) Applicability. Applications for the following shall be required to provide Site Amenities:
(a) Any non-residential development over 5,000 SF.
(b) Additions or expansions exceeding 5,000 SF for existing non-residential structures.
(c) Any residential development, including conversion of non-residential structures to
residential use.
This project does not meet any of these three criteria; as such, there is no Site Amenity
requirement associated with this project.
14.07 Specific Review Standards
In all Zoning Districts and the City Center Form Based Codes District, the following standards shall
apply:
SP-24-04 & CU-24-02
5
A. Environmental Protection Standards
All proposed development shall be subject to the applicable requirements of Article 12,
Environmental Protection Standards.
No protected natural resources are located within the project area.
B. Site Design Features.
All proposed development shall comply with standards for the placement of buildings, parking and
loading areas, landscaping and screening, open space, stormwater, lighting, and other applicable
standards related to site design pursuant to these Land Development Regulations.
No changes to landscaping and screening, open space, or lighting are proposed. The comments of
the stormwater section are provided below under Section 13.05.
C. Access and Circulation.
All proposed development shall comply with site access and circulation standards of Section
15.A.14.
While pedestrian circulation is impacted, Section 15.A.14 pertains to street network, and the Board
finds this criterion unaffected by the proposed project.
D. [Reserved for Transportation Demand Management (TDM)]
E. Building Form.
Development within the City Center Form Based Code District, the Urban Design Overlay District,
and other districts with supplemental building form standards shall adhere to the standards
contained therein.
No building form standards are applicable to the proposed project.
F. Streetscape Improvements.
A proposed new construction or extension/expansion of an existing structure exceeding the
thresholds listed in either (a) Section 14.09(B) or (b) Section 8.11(D) within the City Center Form
Based Code, or Section 3.11(D) in all other zoning districts, shall be required to upgrade adjacent
sidewalks, greenbelts, and related street furniture (trees, benches, etc.) to the standards contained
within the applicable Street Type and Building Envelope Standard. Nothing in this subsection shall
be construed to limit requirements for additional upgrades as necessary to meet the requirements
of these Regulations.
The only impacted structure, as noted above, is removal of the existing bleachers, therefore the
Board finds that this criterion is not applicable.
G. Access to Abutting Properties.
The reservation of land may be required on any lot for provision of access to abutting properties
whenever such access is deemed necessary to reduce curb cuts onto an arterial or collector street,
to provide additional access for emergency or other purposes, or to improve general access and
circulation in the area.
No modifications to existing access between properties are proposed.
H. Utility Services.
Electric, telephone and other wire-served utility lines and service connections shall be underground
insofar as feasible and subject to state public utilities regulations. Any utility installations
remaining above ground shall be located so as to have a harmonious relation to neighboring
properties and to the site. Standards of Section 15.A.18, Infrastructure, Utilities, and Services, shall
also be met.
SP-24-04 & CU-24-02
6
No impacts to wire-served utilities are proposed.
I. Disposal of Wastes.
All dumpsters and other facilities to handle solid waste, including compliance with any recycling,
composting, or other requirements, shall be accessible, secure and properly screened with opaque
fencing to ensure that trash and debris do not escape the enclosure(s). Small receptacles intended
for use by households or the public (i.e., non-dumpster, non-large drum) shall not be required to be
fenced or screened.
The applicant has testified that the existing dumpsters are screened in compliance with the above
standard. The Board finds the Administrative Officer must verify this testimony as part of the
Certificate of Occupancy inspection that will be required prior to use of the new turf field space.
CONDITIONAL USE CRITERIA
Pursuant to Section 14.10.C of the South Burlington Land Development Regulations, the proposed
alteration to an existing conditional use must be reviewed under the conditional use review criteria
and shall meet the following standards of Section 14.10.E:
14.10.E General Review Standards. The Development Review Board shall review the proposed
conditional use for compliance with all applicable standards as contained in these regulations. The
proposed conditional use shall not result in an undue adverse effect on any of the following:
(1) The capacity of existing or planned community facilities.
If the proposed turf fields are used significantly more often and by a significantly larger number of
groups or organizations than the existing grass athletic fields are, that increase in usage may result
in an increase in impacts to community facilities, which may or may not be undue and adverse.
However, the Board finds that Condition of Approval #6 of this decision to be sufficient to prevent
an undue adverse impact on the capacity of existing or planned community facilities.
(2) The character of the area affected, as defined by the purpose or purposes of the zoning district
within which the project is located, and specifically stated policies and standards of the municipal
plan.
As noted above, the subject Zoning District has the purpose of “encouraging residential use at
moderate densities” and prohibits ‘outdoor recreational facility’ uses. If the proposed turf fields are
used significantly more often and by a significantly larger number of groups or organizations than
the existing grass athletic fields are, that increase in usage could have an impact the character of the
area as it relates to the purpose of the subject Zoning District. As above, the Board finds that
Condition of Approval #6 of this decision to be sufficient to prevent an undue adverse impact on the
character of the area.
(3) Traffic on roads and highways in the vicinity.
If the proposed turf fields are used significantly more often and by a significantly larger number of
groups or organizations than the existing grass athletic fields are, that increase in usage could also
result in an impact on vehicle traffic on the roads and highways in the vicinity. As above, the Board
finds that Condition of Approval #6 of this decision to be sufficient to prevent an undue adverse
impact on traffic.
(4) Bylaws and ordinances then in effect.
The Board finds the project consistent with other applicable bylaws.
(5) Utilization of renewable energy resources.
This project will not affect renewable energy resources.
SP-24-04 & CU-24-02
7
14.11 Site Plan and Conditional Use Review: Specific Uses and Standards
F. Alteration of Existing Grade
(1) Approval Required. The removal from land or the placing on land of fill, gravel, sand, loam,
topsoil, or other similar material in an amount equal to or greater than twenty (20) cubic yards,
except when incidental to or in connection with the construction of a structure on the same lot,
shall require the approval of the Development Review Board. The Development Review Board may
grant such approval where such modification is requested in connection with the approval of a site
plan, planned unit development or subdivision plat. This section does not apply to the removal of
earth products in connection with a resource extraction operation (see Section 14.11(G), Earth
Products.)
The applicant is proposing to remove from the land or place on the land over twenty cubic yards of
material as part of this project. However, the intent of this earthwork is not to alter the existing grade.
The purpose of the proposed fill and removal is primarily to excavate the space needed for the sub-
base that will support and drain the turf fields. Because the fill and removal will not alter the exiting
grade, the standards of this ‘Alteration of Existing Grade’ section do not apply. The applicant is
proposing to maintain the elevations along the perimeter of the existing field space and to maintain
the slope of the field as it runs gently downhill from northeast to southwest. However, there is a
note on Sheet C-1.01 that reads, “Final grades in this area may vary based on amount of excess fill
from project.” The applicant testified that this note is intended to indicate that excess fill material
will be spoiled/wasted by extending the level area at the west perimeter of the field prior to returning
to existing grade. To accommodate the unknown quantity of waste material, the Board finds that
final grades west of the turf may vary by no more than 3 vertical feet from existing grade and grading
beyond the turf shall be limited to east of the existing driveway. Any variation in excess of these
limits shall only be permitted via the approval of a separate Conditional Use application by the
Board.
OTHER APPLICABLE CRITERIA
13.04 Landscaping
Existing approved landscaping is required to be maintained in a vigorous growing condition. No
protections for the existing 12” tree on the west end of the existing track are proposed. The applicant
testified that this tree can be retained. The Board finds that the applicant shall submit a revised EPSC
plan identifying the Tree Protection measures proposed for the identified tree, subject to review and
approval by the City Arborist.
13.04.B(7) Snow Storage
The applicant has specified the snow storage areas on the submitted plans. The Board finds this
criterion met.
13.05 Stormwater Management
The Board finds that the applicant shall submit revised EPSC plans, subject to review and approval
by the City Stormwater Section, prior to issuance of a Zoning Permit for this project.
13.03 Bicycle Parking & Storage
Table 13-3 identifies that educational facilities need to provide 1 short-term bike parking space per
every 20 students of planned capacity. The applicant has testified that the planned capacity of Rice
Memorial High School is 500 students, which requires 25 short-term bike parking spaces. The
applicant has provided Sheet C-1.01, which identifies the proposed location of eleven ‘inverted-U’
style bike racks and the proposed new location of the existing ‘schoolyard’ style bike rack. The
SP-24-04 & CU-24-02
8
proposed new and relocated bike racks cumulatively total 26 short-term bike parking spaces, thereby
exceeding the minimum requirement. The Board finds this criterion met.
13.07 Exterior Lighting
The applicant has testified that no new or revised exterior light fixtures are proposed as part of this
application.
DECISION
Motion by John Moscatelli, seconded by Charles Johnston, to approve site plan application #SP-
24-04 and conditional use application #CU-24-02 of the Roman Catholic Diocese of Burlington,
subject to the following conditions:
1. All previous approvals and stipulations shall remain in full effect except as amended
herein.
2. This project shall be completed as shown on the plan submitted by the applicant and on
file in the South Burlington Department of Planning and Zoning as conditioned herein.
3. Prior to issuance of a Zoning Permit, the plans must be revised to show the changes below
and shall require approval of the Administrative Officer.
a. Revise EPSC plan to include tree protection measures for the 12” tree on the west
end of the existing track, pending review and approval of the City Arborist.
b. Revise EPSC plan to meet all applicable requirements of the City Stormwater
Section, pending review and approval of the City Stormwater Section.
4. A digital PDF version of the full set of approved final plans as amended must be delivered
to the Administrative Officer prior to issuance of a Zoning Permit.
5. The zoning permit must be obtained within six (6) months of this decision with the option
for requesting a one (1) year extension as allowed in LDR 17.04.
6. The athletic fields at Rice Memorial High School shall only be used for school-related
athletics and activities.
7. The applicant must regularly maintain all stormwater treatment and conveyance
infrastructure.
8. Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines,
services, and service modifications must be underground.
9. The proposed project must adhere to standards for erosion control as set forth in Section
16.03 and the grading standards set forth in Section 16.04 of the South Burlington Land
Development Regulations.
10. The final grades west of the turf may vary by no more than 3 vertical feet from existing
grade, and grading beyond the turf shall be limited to east of the existing driveway.
11. The Administrative Officer must verify that the existing dumpster enclosure(s) meet all
standards of Article 14.07.I prior to issuance of a Certificate of Occupancy.
12. The applicant shall obtain a Certificate of Occupancy from the Administrative Officer upon
completion of the modifications approved herein and prior to occupancy and/or use of the
approved modifications.
SP-24-04 & CU-24-02
9
13.Any change to the site plan shall require approval by the South Burlington Development
Review Board or the Administrative Officer as allowed by the Land Development
Regulations.
John Moscatelli Yea Nay Abstain Not Present
Mark Behr Yea Nay Abstain Not Present
Frank Kochman Yea Nay Abstain Not Present
Quin Mann Yea Nay Abstain Not Present
Dawn Philibert Yea Nay Abstain Not Present
Stephanie Wyman Yea Nay Abstain Not Present
Charles Johnston Yea Nay Abstain Not Present
Motion carried by a vote of 4 - 0 - 2.
Signed this _20th_ day of March, 2024, by
_____________________________________
Quin Mann, Vice Chair
Please note: An appeal of this decision may be taken by filing, within 30 days of the date of this
decision, a notice of appeal and the required fee by certified mail to the Superior Court,
Environmental Division. See V.R.E.C.P. 5(b). A copy of the notice of appeal must also be mailed to
the City of South Burlington Planning and Zoning Department at 180 Market Street, South
Burlington, VT 05403. See V.R.E.C.P. 5(b) (4)(A). Please contact the Environmental Division at 802-
828-1660 or http://vermontjudiciary.org/GTC/environmental/default.aspx for more information on
filing requirements, deadlines, fees and mailing address.
The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state
permits for this project. Call 802.477.2241 to speak with the regional Permit Specialist.